This document is a Statement of Objectives (SOO) for a comprehensive video surveillance system installation and upgrade project at a military installation. The project encompasses 54 cameras across multiple locations, including fixed cameras, pan-tilt-zoom (PTZ) cameras, and associated control and monitoring stations.
The installation locations and camera requirements are as follows: Building 151 BDOC requires a VMS/Control Station and SERVER for all camera systems; Main Gate Installation Access Control Point requires a 360-degree dome camera in the search pit, one PTZ replacement camera, three fixed cameras for incoming vehicle observation, and one PTZ camera on the overwatch gate shack; Hangar 75/Building 160/Building 4 requires one PTZ replacement camera for the north apron and fixed cameras for the patio of Building 5, with a monitoring and control station in Building 4; Building 160 requires one PTZ replacement camera for the AC parking apron with a monitoring station in Building 60; Munitions Storage Area Buildings 51 and 52 require one fixed camera at Building 52's northwest corner, one PTZ camera, and fixed cameras at the flightline gate, with monitoring capability for Building 52 only; South Apron requires one PTZ replacement camera on a light pole adjacent to the 255th ACS Radar; Hangar 68 requires one fixed camera at the southeast corner to monitor the Alternate Installation Access Control Point; Buildings 99, 109, and 119 (dormitories) require 12 fixed cameras each for hallway observation across multiple floors; Fuel Farm requires two PTZ replacement cameras; Building 155 (Combat Arms Weapons Firing Range) requires one PTZ replacement camera; and the ADR Site requires one fixed camera adjacent to the entry gate. Special installation requirements include using a crane or cherry picker for the approximately 50-foot installation at the north apron and coordinating network and power connections with installation facilities. Several PTZ cameras are specified with the capability to scan areas and hold position on detected movements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg. 151 BDOC
Installation Location: Building 151 BDOC
Camera Type(s): SERVER & VMS CONTROL STATION
Description of Work:
Install VMS/Control Station and SERVER for all camera system
Installation Location: Main Gate Installation Access Control Point (IACP)/Commercial Vehicle Search Pit
Camera Type(s): Fixed (RED) & PTZ (GREEN)
Description of Work:
Camera 1 (360 DOME CAMERA): Mount Fixed camera inside Search Pit at a height where the top of a tractor trailer can be observed
Camera 2: (Replacement) Mount PTZ. Current PTZ is inoperable. Replace.
Cameras 3, 4, 5: Install Fixed cameras to observe incoming vehicles entering the installation. The camera needs to be positioned at a level to clearly observe the operator/driver side of the vehicle for each inbound lane.
Camera 6: Mount PTZ camera on Overwatch Gate Shack to observe the Anti Vehicle Barriers. Existing conduit present from AVB EFO Switch that runs to Main Gate Facility
3 4 5
Installation Location: Hangar 75/ Bldg 160/Building 4
Camera Type(s): Fixed (RED) & PTZ (GREEN)
Description of Work:
Camera 7: (Replacement) Install PTZ camera to observe north apron. Requesting PTZ has option that can be enabled/disabled to scan area and hold position on movements in the area. *Approximately 50 ft to install. Will need a crane or “cherry picker” for install
Cameras 8: Install Fixed cameras to observe Patio of Building 5
Monitoring and Control: Install monitoring and control station in Building 4 for all cameras.
Installation Location: Hangar 75/ Bldg 160
Camera Type(s): PTZ (GREEN)
Description of Work:
Camera 9: (Replacement) Install/Replace PTZ camera to observe AC parking apron. Requesting PTZ has option that can be enabled/disabled to scan area and hold position on movements in the area.
Monitoring and Control: Install monitoring and control station in Building 60 for Flight Line Cameras only
AC parking Apron
Bldg. 60
Flight Line Gate
Personnel Gate
Bldg. 52
Vehicle Gate
Installation Location: Munitions Storage Area (MSA) Bldg(s) 51 &
Camera Type(s): Fixed (RED) & PTZ (GREEN)
Description of Work:
Camera 10: Mount Fixed camera Northwest corner of Bldg.
52 to observe Vehicle and Personnel Gate
Camera 11: Mount PTZ
Cameras 12: Install Fixed cameras to observe Flightline Gate.
Monitoring Station: Install monitoring only capability for Bldg. 52 cameras only
Bldg. 51
Installation Location : South Apron
Camera Type(s): PTZ (GREEN)
Description of Work:
Camera 13.: (Replacement) Install PTZ camera to observe South AC parking apron. Requesting PTZ has option that can be enabled/disabled to scan area and hold position on movements in the area. Replacement should be on a light pole adjacent to 255th ACS Radar.
South Apron
Alternate Installation Access Control Point
Installation Location : Hanager 68
Camera Type(s): Fixed (Red)
Description of Work:
Camera 14: Install fixed camera on southeast corner of Hangar 68 to monitor Alternate Installation Access Control Point. NOTE: If network or permission from TASMG is not granted, Building 43 may be optional for power and network purposes.
Installation Location : Building 119 Dormitory
Camera Type(s): Fixed (RED)
Description of Work:
Cameras 15-26: Mount Fixed camera on each floor of dormitory to observe hallway runs. Camera Placement near atrium of dorm should allow shorter conduit runs to power/network supply closets. Bldg. 119 Dormitory
15, 16, 24, 25, 21, 22, 18, 19, Bldg. 109 Dormitory
Installation Location : Building 109 Dormitory
Camera Type(s): Fixed (RED)
Description of Work:
Cameras 27-38: Mount Fixed camera on each floor of dormitory to observe hallway runs. Camera Placement near atrium of dorm should allow shorter conduit runs to power/network supply closets.
30, 31, 33, 34, 36, 37, 27, 28, Bldg. 99 Dormitory
Installation Location: Building 99 Dormitory
Camera Type(s): Fixed (RED)
Description of Work:
Cameras 39-50: Mount Fixed camera on each floor of dormitory to observe hallway runs. Camera Placement near atrium of dorm should allow shorter conduit runs to power/network supply closets. 45, 46, 48, 49, 42, 43, 39, 40, Installation Location : Fuel Farm
Camera Type(s): PTZ (GREEN)
Description of Work:
Camera 51: (Replacement) Mount PTZ.
Camera 52: (Replacement) Mount PTZ. 5
Installation Location : Building 155 Combat Arms Weapons Firing Range
Camera Type(s): PTZ (GREEN)
Description of Work:
Camera 53: (Replacement) Mount PTZ.
ADR Site
Installation Location : ADR Site
Camera Type(s): Fixed (RED)
Description of Work:
Camera 54: Mount Fixed to Building adjacent to ADR site entry point to observe the ADR Site Entry Gate and other avenue of approach.
| MS ANG CRTC Base Camera System Description of Requirements |
| Attachment A- Approved Equipment |
| Attachment B- Project References |
| Attachment C- UPS Requirements |
| Camera Specifics take 2 |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
File details come from the government source that posted it. Updated .