About this file
This is an Uninterruptible Power Supply (UPS) Requirements specification attachment for a federal facility project.
The requirement specifies procurement of three separate UPS systems with distinct configurations and purposes. One Online Double-Conversion UPS system for the Main Server must provide 15 to 30 minutes of runtime to enable safe, automated shutdown and prevent database corruption and hard drive damage during power loss events. Two Standard Workstation UPS systems are required for VMS workstations at the Primary and Alternate BDOC (Building Domestic Operations Center), each with 15 minutes of runtime to maintain operator workstations during the 15-second startup gap for the building generator. One Industrial Power-over-Ethernet (PoE) UPS for the Main Gate Cameras must deliver 4 hours of continuous runtime to ensure Entry Control Point cameras remain fully operational during prolonged localized grid failures and maintain force protection capabilities. All requirements are governed by UFC 4-021-02 (Unified Facilities Criteria for Electrical and Lighting Systems), with the camera UPS system additionally referenced to UFGS 28 10 05 (Unified Facilities Guide Specifications for Electrical and Communications).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
UPS Requirements
Equipment/Location Required UPS Runtime Purpose Governing References One (1) UPS system for Main Server
15 to 30 Minutes (Online Double-Conversion)
Data Protection. Allows a safe, automated shutdown if power is lost, preventing database corruption and hard drive damage.
UFC 4-021-02 (Sec 10- 6.2.2)
Two (2) UPS System for VMS work stations at Primary and Alternate
BDOC
15 Minutes (Standard Workstation UPS)
Operator Ride- Through. Prevents the computers from shutting off and rebooting during the 15-second gap while the building generator starts up.
UFC 4-021-02
One (1) UPS for Main Gate Cameras
4 Hours (Industrial PoE
UPS)
Force Protection. Ensures the Entry Control Point (ECP) cameras remain 100% operational during a prolonged localized grid failure.
UFGS 28 10 05 (Sec
2.2.7) & UFC 4-021-02