W50S7525QA021_Attachment 8_Site Pictures (Existing Electrical Components).pdf
PDF 2 MB Posted
- Attached to
- Install Backup Chiller B700
- Solicitation number
- W50S7525QA021
- Issued by
-
Department of the Army National Guard
About this file
These images are site pictures documenting existing electrical components for a federal contract opportunity to install a backup chiller. The first image shows an electrical junction box with exposed multicolored wires (green, yellow, red, and orange) embedded in a concrete surface, surrounded by concrete blocks. The second image depicts an electrical system installation with an ESL-branded electrical panel mounted on a wall, supported by metal conduit pipes, with a small white object (potentially a sensor or electrical component) circled in red and nestled in surrounding vegetation.
The images appear to be part of Attachment 8 for Solicitation Number W50S7525QA021, which is a Department of the Army National Guard project for installing a Backup Chiller B700. The solicitation includes significant dates such as a site visit on 23 July, RFI deadline on 28 July, and quote submission deadline of 1 August 2025 at 4:30 PM. These site pictures likely serve to provide bidders with visual documentation of existing electrical infrastructure to support accurate proposal preparation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1384573777N Oval
| 1 |
| 2 |
File details come from the government source that posted it. Updated .