These are detailed architectural and engineering design drawings for a C-130J Flight Simulator Facility for the California Air National Guard (146th Airwing) located at Channel Islands ANG Station in Port Hueneme, California. The comprehensive set of drawings, dated February 10, 2022, includes mechanical, electrical, structural, and architectural plans covering a range of technical specifications for the facility, such as HVAC systems, electrical power distribution, mechanical piping, equipment layouts, and building construction details. The drawings provide technical specifications for key systems including air handling units, chillers, boilers, electrical panels, and specialized equipment like computer room air conditioning units, with detailed diagrams showing installation methods, routing, and interconnections across multiple building zones.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Type B3 (Final) Submission February 10, 2022
California ANG - 146th AW Channel Islands ANG Station, C-130J Flight Simulator Facility
Port Hueneme, California
FY 2021 - PN: DJCF1490001
C ha nn el Is la nd s
AN
G S ta tio n -F lig ht
S im
OPTIONAL LINE ITEMS:
OLI #1: PROVIDE EPOXY PAINT FLOORING IN
MECH/ELEC/COMM RMS & SIM BAY- I.L.O.
COATED CONCRETE.
OLI #2: PROVIDE BRIDGE CRANE (MACHINE & RAILS
ONLY) WITH SMALLER SIZED OVERHEAD
COILING EXTERIOR DOOR – I.L.O. NO CRANE
WITH LARGER SIZED OVERHEAD COILING
EXTERIOR DOOR.
OLI #3: PROVIDE (BREATHING) AIR COMPRESSOR IN
SIM MOTION BAY.
OLI #4 : PROVIDE 2" CLAD (TO MATCH BUILDING
EXTERIOR) 8" CMU WALL (2 SEGMENTS) @
MECHANICAL EQUIPMENT YARD - I.L.O. CHAIN-
LINK FENCING (2 SEGMENTS) W VISUAL SLATS.
OLI #5: PROVIDE 2" CLAD (TO MATCH BUILDING
EXTERIOR) 8" CMU WALL (3 SEGMENTS) TRASH
DUMPSTER ENCLOSURE W ORNAMENTAL
GATE - I.L.O. NONE.
OLI #6: PROVIDE ILLUMINATED UNIT INSIGNIA SIGN
(WITH CONTROLS) ON BUILDING EXTERIOR.
OLI #7: PROVIDE BACK-UP CHILLER (CH-2) WITH
PROTECTIVE BOLLARDS .
OLI #8: PROVIDE LANDSCAPING AROUND BUILDING-
I.L.O. SPECIFIED NATIVE GRASS.
OLI #9: PROVIDE TRANSLUCENT FIBERGLASS WALL
PANELS (VERTICAL 2-STRIPES INSTALL)- I.L.O.
SCHEDULED MATERIALS/WALL SYSTEM.
OLI #10:PROVIDE TRANSLUCENT FIBERGLASS WALL
PANELS (HORIZONTAL CLERESTORY INSTALL)-
I.L.O. SCHEDULED MATERIALS/WALL SYSTEM.
OLI #11:PROVIDE ADDITIONAL CONCRETE SIDEWALK
PAVEMENTS AS INDICATED IN DRAWINGS.
OLI #12:PROVIDE 2" FABRICATED WALL PANELS ON
BUILDING EXTERIOR - I.L.O. 2" EIFS.
OLI #13:PROVIDE SCHEDULED INTERIOR FLOOR
FINISHES- I.L.O. COATED CONCRETE (NOT
INCLUDING EPOXY FLOORING, ANTI-STATIC
FLOORING IN COMM ROOM OR PORCELAIN
FLOORING TILE IN RESTROOMS & JANITOR
ROOM).
RICHARD S.
JOHNSON
JASON
MARK
ELLIOTT
30719
J.T.
LITTLE JR.
2055520555
OKLAHOMA CERTIFICATE
OF AUTHORIZATION
P.E: # 1072
EXP. 06/30/2
OKLAHOMA CERTIFICATE
OF AUTHORIZATION
ARCHITECTURE: # 00199
EXP. 06/30/
1384573777N Rectangle
3/4" CHAMFER
TYPICAL
#4 AT 12" OC EACH WAY
R E
FE
R
M
EC
H
AN
IC
AL
NOTES:
1. DRILL AND GROUT #4 DOWELS AT 2'-0" OC
TYPICAL AT PERIMETER, (4) EACH PAD MINIMUM.
2. REFER TO MECHANICAL DRAWINGS FOR PAD LOCATIONS.
R
EF
ER
P
LA
N
VA
R
IE
S
(4 " M
IN
IM
U M
8"
CONTROL JOINT
HSS COLUMN
REFER PLAN
NON-SHRINK CONC
AROUND COLUMN
INTERIOR
CONTROL
JOINT
CONTROL
JOINT
HSS COLUMN
REFER PLAN
CORNER EXTERIOR
NON-SHRINK CONCRETE
AROUND COLUMN
HSS COLUMN
REFER PLAN
NON-SHRINK
CONC
AROUND COLUMN
SAWED
JOINT
90.00°
90.00°
90.00°
TRANSVERSE SLAB STEEL
VAPOR RETARDER
REFER SPECIFICATIONS
CUT 3" OUT OF
EVERY OTHER BAR
AT SAW JOINT
LONGITUDINAL
SLAB STEEL
REFER SLAB
PLAN
SEALANTNOTE:
SAW JOINT WITHIN 8 HOURS
AFTER CONCRETE IS PLACED
1/8"
1/
4" A
T 5"
S
LA
B 2"
A T
8" S
LA
B
MAXIMUM
1 1/2" CLEAR
3"
AT
8"
SL
AB
2"
A T
5" S
LA
B
R
EF
ER
P
LA
N
NOTE:
CONSTRUCTION JOINTS
REQUIRED AT SLAB COLD
JOINTS.
SEALANT
FORMED JOINT
VAPOR RETARDER
REFER SPECS
DIAMOND
PLATE
DOWELS
3/8" THICK BY
4 1/2" SQUARE
AT 12" OC
1/4" SAW CUT
1/
4" A
T 5"
S
LA
B
2" A
T 8"
S
LA
B
REFER SLAB PLAN
3" A
T 8"
S
LA
B 2"
A T
5" S
LA
B
R
EF
ER
P
LA
N
MAXIMUM
3" CLEAR
AT SLABS WITH FLOOR
DRAINS USE ASTM D1
190 SEALANT
REFER FOUNDATION
SECTIONS FOR
REINFORCING
INFORMATION
LAPPED TOP BAR
FROM ADJACENT
SPAN
LOCATE POUR JOINTS BETWEEN
QUARTER AND THIRD POINTS OF
CONTINUOUS FOOTING SPAN
D /3
D /3
D /3
1"
2" 2"
1/
4"
(R
EF
ER
PL
AN
"D
ANCHOR BOLT
DIAMETER
BASE PL OVS
HOLE DIAMETER
PL WASHER
DIMENSIONS
PL WASHER STD
HOLE DIAMETER
3/4"
BASE PLATE HOLE AND PLATE WASHER
GEOMETRY
1" 1 1/4" 1 1/2" 1 3/4"
2"
1 5/16" 1 13/16" 2 1/16" 2 5/16" 2 3/4" 3 1/4"
1/2"X3"X3" 1/2"X3"X3" 1/2"X3"X3"
1/2"X3 1/2"X3 1/2" 5/8"X4"X4" 3/4"X5"X5"
13/16" 1 1/16" 1 5/16" 1 9/16"
1 13/16" 2 1/16"
2X D
IA
VA
R
IE
S 1'
-2 " T
YP
* P
R O
J
T
H R
D
(REFER BASE PL TYPE)
VARIES
COLUMN, REFER PLAN
1. ANCHOR RODS SHALL MEET THE REQUIREMENTS OF
ASTM F1554 UNLESS NOTED OTHERWISE.
2. ALL ANCHOR RODS SHALL BE FURNISHED WITH HEAVY
HEX NUTS AND PLATE WASHERS OF SPECIFICATIONS
COMPATIBLE WITH THOSE OF THE THREADED SHANKS,
UNLESS NOTED OTHERWISE.
3. FOR CONVENTIONAL COLUMNS (W & HSS SHAPES), A
NUT AND WASHER SHALL BE PLACED UNDER THE BASE
PLATE AND USED FOR LEVELING.
ANCHOR ROD NOTES:
*PROJ = BASE PLATE THICKNESS + NSG + WASHER + DIA + 1 1/2"
**THRD = PROJ + 1"
2" NON-SHRINK
GROUT PAD TYP
TO CONC
PLATE WASHERS
PLATE WASHER
(REFER BASE PLATE AND
WASHER GEOMETRY
SCHEDULE)
GRID
G R
ID
2"
1/ 2"
1/
2" 2"
1/
2"
1/ 2"
2" 4 1/2" 4 1/2" 2"
6 1/2" 6 1/2"
3/4" THICK BASE PL W/
(4) 3/4" DIA ANCHOR RODS
HSS 5x5 COLUMN
PLATE WASHER
TYP TOP & BOT
(8 TOTAL)
3/16
3 SIDES
TYP 1/4
COL TO
BASE PL
BASE PLATE - 1
GRID
G R
ID
2" 4"
4" 2"
6" 6"
3" 5" 5" 4" 4" 2"
1'-5" 6"
1" THICK BASE PL W/
(8) 1" DIA ANCHOR RODS
HSS 5x5 COLUMN
PLATE WASHER
TYP TOP & BOT
(16 TOTAL)
3/16
3 SIDES
TYP 5/16
COL TO
BASE PL
BASE PLATE - 3
GRID
G R
ID
1/
2" 4"
4"
1/ 2"
1/
2"
1/ 2"
2 1/2"
4 1/2" 4 1/2"
2 1/2"
7" 7"
1" THICK BASE PL W/
(4) 1" DIA ANCHOR RODS
W14 COLUMN
PLATE WASHER
TYP TOP & BOT
(8 TOTAL)
3/16
3 SIDES
TYP
3/16
COL TO
BASE PL
BASE PLATE - 2
GRID
G R
ID
1/
2" 4"
4"
1/ 2"
1/
2"
1/ 2"
2 1/2" 4" 4" 4 1/2" 4 1/2" 2 1/2" 1'-3" 7"
1 1/4" THICK BASE PL W/
(6) 1 1/4" DIA ANCHOR RODS
W14 COLUMN
PLATE WASHER
TYP TOP & BOT
(12 TOTAL)
3/16
3 SIDES
TYP 3/16
COL TO
BASE PL
BASE PLATE - 4
GRID
G R
ID
2" 4"
4" 2"
6" 6"
2" 6" 6" 4" 4" 2"
1'-6" 6"
1" THICK BASE PL W/
(12) 1" DIA ANCHOR RODS
HSS 5x5 COLUMN
PLATE WASHER
TYP TOP & BOT
(24 TOTAL)
3/16
3 SIDES
TYP 5/16
COL TO
BASE PL
BASE PLATE - 5
2" 2" 8" 2"
4" 10"
2"
1/ 2"
1/
2" 2"
1/
2"
1/
2" 3/4" THICK BASE PL W/
(4) 3/4" DIA ANCHOR
RODS
PLATE WASHER
TYP TOP & BOT
(8 TOTAL)
1/4
COL TO
BASE PL
HSS 7x7 POST
BASE PLATE - 6
CMU PARTITION WALL
REFER PLAN
#6x48" BAR DOWEL
AT 8" OC W/ 8"
EMBED USING HILTI
HY-200 EPOXY
GROUT
(2) #4 BARS CONT
CONC SLAB
(REFER PLAN )
ENGINEERED FILL 2 IN. SAND LAYER
15 MIL MIN VAPOR
RETARDER, TYP
UNDER SLAB
TY
P
3" C
LR
#4 BAR MATCHING
SLAB SPACING
7" 5"
1' -0
1'-4"
CONCRETE REINFORCEMENT LAP LENGTH SCHEDULE
BAR
SIZE
TOP
#4
#5
#6
#7
#8
#9
#10
#11
1. VALUES ARE BASED ON 4,000 PSI CONCRETE, MINIMUM 60,000 PSI
REINFORCEMENT STEEL AND NORMAL WEIGHT CONCRETE. LENGTHS
ARE IN INCHES.
2. CENTER TO CENTER SPACING WAS ASSUMED TO BE GREATER THAN
1.0 db PLUS TWICE THE CONCRETE COVER
3. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF
CONCRETE CAST BELOW THE BARS.
4. FOR GRADE 75 REINFORCING BARS, MULTIPLY THE TABULATED VALUES
BY 1.25. FOR GRADE 80 REINFORCING BARS, MULTIPLY THE TABULATED
VALUES BY 1.33.
5. FOR LIGHTWEIGHT CONCRETE, DIVIDE THE TABULATED VALUES BY
0.75.
#3
LAP
CLASS
A B A B A B A B A B A B A B
A B
A B
OTHER
UNCOATED
COVER=0.75"
TOP OTHER
UNCOATED
COVER=1.50"
TOP OTHER
UNCOATED
COVER=2.00"
TOP OTHER
UNCOATED
COVER=3.00"
8" Ø STD WEIGHT PIPE
(CONCRETE FILLED) 4'-0"
PROJECTION ABOVE SLAB
CONCRETE SLIGHTLY
ROUNDED
NOTES:
1. POST TO BE PRIMED PRIOR TO SETTING IN
CONCRETE.
2. TOP OF BLOCKOUT SURFACE SHALL MATCH
SURROUNDING SURFACE IN COLOR, TEXTURE, AND
TREATMENT.
3. COORDINATE LOCATIONS WITH ARCHITECTURAL.
FINISH BLOCKOUT TO MATCH SLAB
4" C
LR
2'-0"
BOLLARD
BLOCKOUT 2'-0"
TOP OF SLAB
(2) #4 HOOPED
TIES
CENTER POST
IN CONCRETE
CONCRETE
ENCASEMENT
TOP OF SLAB
REFER PLAN
4' -0
AW
AY
FR
O
M
BL
D G
4' -0
" A
BO
VE
G
R
AD
E
ELEV 104'-0"
NEAR BLDG
100'-0"
TOP OF SLAB
PAVEMENT
REFER CIVIL
1' -2
8" 6"
8"
3" C
LR
1/2" EXPANSION MAT'L
AROUND PAD
#4 "Z" BAR
AT 12" OC 18"
#4 BARS AT 12"
OC EA WAY
CONT #4 BAR
2" C
LR
D /3
D /3
D /3
D
R
EF
ER
P
LA
N
4" 4"
2" TYP
4" 4"
#4X4'-0" BAR EA SIDE OF CONT
FOOTING AND TOP AND BOT OF PIPE.
FOR 12" DIA PIPES USE #5X6'-0" BARS
TIES PER FOUNDATION DETAILS
NOTE:
1. PIPE PENETRATION SHALL OCCUR BETWEEN
1/3 AND 1/2 OF THE SPAN OF CONT FOOTING
2. PIPE PENETRATION THROUGH SPREAD
FOOTINGS SHALL HAVE A MINIMUM OF 6
INCHES CLEAR FROM EDGE OF FOOTING.
3. UNDER-SLAB UTILITIES SHALL NOT RUN
UNDER SPREAD FOOTINGS
PROVIDE ADDITIONAL TIES
EA SIDE OF PIPE SLEEVE
TOP OF SLAB
ELEV = REF PLAN
CONC SLAB
(REFER PLAN) CONC SLAB (REINF
NOT SHOWN)
PIPE BY PLUMB
PROVIDE SLEEVE WITH
COMPRESSIBLE MATERIAL
SURROUNDING UTILITY AND
WITHIN ANNULAR SPACE FOR
PIPE (VERIFY LOCATION AND
COORD SIZE OF PIPE
W/PLUMBING)
CONT FOOTING
(REF PLAN)
REINF (REF PLAN)
SECTION ELEVATION
DEPTH ALLOWED
PIPE PENETRATION
SEE NOTE
POUR CONCRETE AROUND
PIPE UNDER FOUNDATION
WHEN PLACING CONCRETE
FOR THE FOUNDATION.
M
IN6"
M
IN
1' -0
MIN
1'-0"
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity C
:\U sers\gm r\D ocum ents\71350_Stru_G R eddout .rvt 2/4/2022
11:40: 47
AM
FEBRUARY 10, 2022
TYPICAL DETAILS
S-002
TJD
CGH
CGH
SCALE: NTS
TYPICAL HOUSE KEEPING PAD DETAILD3
SCALE: NTS
SLAB BLOCKOUT - CIRCULARC1
SCALE: NTS
SAWED CONTROL JOINT (SJ)D2SCALE: NTS
CONSTRUCTION JOINT (CJ)D1
SCALE: NTS
BULKHEADB1
SCALE: NTS
THICKENED SLABA1
SCALE: NTS
TYPICAL BOLLARD DETAILA4
SCALE: NTS
TYPICAL EXTERIOR HOUSE
KEEPING PAD DETAILB2
SCALE: NTS
PIPE PENETRATION THRU FOUNDATIONC3
J J
GFI
48"
48"
48"
T
H
J
L
F
126A
125A
FIRE PROT
ELEC
2' - 0" 28' - 4" 11" 1' - 1"
63' - 6"
12' - 4"
13' - 8"
2" 12' - 2"
0"
2" 13' - 4"
2"
5/8"
3/8" 4"
10' - 8" 4"
3/8"
5/8"
2' - 0" 28' - 4" 11" 1' - 1"
1'
1"
/1
OLI #4
OLI #4
OLI #5
TRANSFORMER
MECH EQUIP
8" CONC FILLED
STEEL PIPE
BOLLARD
8" CONC FILLED
STEEL PIPE
BOLLARD OLI #7
8" CONC FILLED
STEEL PIPE
BOLLARD
6'
1/
2" 6'
1/ 2"
8" CONC FILLED
STEEL PIPE
BOLLARD OLI #7
8" CONC FILLED
STEEL PIPE
BOLLARD OLI #7
2" 28' - 0" 2"
2" 28' - 2" 2"
A4
AE102
A3
AE102
16.62°
CMU / EIFS VENEER
SCREEN WALL (OLI #4)
SCREEN WALL CONCRETE
FOUNDATION (OLI #4)
B3
AE102
B3
AE102
SIM
B3
AE102
SIM
C1
AE102
CONCRETE GATE POST FOUNDATIONS:
COORDINATE WITH WALL FOUNDATION
NETWORK
ROOM
GROUND FLOOR
100' - 0"
3'
0" 3'
0"
3'
0"
1'
4"
1'
6"
1' - 1"11"28' - 4"2' - 0"
EIFS1
(FWP1-OLI#12)
EIFS2
(FWP2-OLI#12)
B3
AE102
SIM
NETWORK
ROOM
GROUND FLOOR
100' - 0"
EIFS1
(FWP1-OLI#12)
EIFS2
(FWP2-OLI#12)
1' - 1" 11" 28' - 4" 2' - 0"
6X6 PREFIN
DOWNSPOUT
B3
AE102
FACE OF
EXPOSED SLAB
EDGE
8" CONC FILLED STEEL
PIPE BOLLARD OLI #7
1'
6" 1'
4"
3'
0" 3'
0"
3'
0"
PREFIN METAL COPING
GROUND FLOOR
100' - 0"
CONCRETE
FOUNDATION
PREFIN METAL
COPING
PAINT EXPOSED FACE
OF CMU TO MATCH
EIFS COLOR BANDS
ON OUTSIDE FACE
MECH YARD PAVING
(REFER TO CIVIL)
GROUT FILLED 8"
CMU & BOND
BEAMS
GROUT FILLED 4"
CMU SPACER
BLOCK
9'
0" 1'
4"
3'
0" 3'
0"
3'
0"
EIFS1
(FWP1-OLI#12)
EIFS2
(FWP2-OLI#12)
EIFS2
(FWP2-OLI#12)
3/4" CHAMFER ON ALL EDGES
B1
AE102
7 5/8"
2"
FLUID-APPLIED
MEMBRANE AIR BARRIER
CONT PREFIN SHEET
METAL J FLASHING FOR
EIFS OR FWP OPTION (SET
IN CONT BEAD OF BUTYL
SEALANT)
GROUND FLOOR
100' - 0"
CONCRETE
FOUNDATION
CONCRETE PAVING
(REFER TO CIVIL)
CONCRETE GATE POST FOUNDATIONS:
COORDINATE WITH WALL FOUNDATION
MFRS STANDARD
CANE BOLTS
2'
0" 1'
6"
1'
4" 9'
0"
1' - 6"
3'
0" 3'
0"
3'
0" N
O M
9"
PREFIN METAL
COPING
EIFS1
(FWP1-OLI#12)
EIFS2
(FWP2-OLI#12)
3/4" CHAMFER ON
ALL EDGES
PAINT EXPOSED FACES OF CMU
INSIDE ENCLOSURE TO MATCH EIFS
COLOR BANDS ON OUTSIDE FACE
G
AT
E H
EI
G
H T
9'
1" N
O M
4"
PREFIN METAL
COPING
1/2" DIA EPOXY
ANCHORS AT 24" OC
(MIN 4" EMBED)
CONT 3/4" TREATED
PLYWOOD BLOCKING
PAINT EXPOSED FACE
OF CMU TO MATCH
EIFS COLOR BANDS ON
OUTSIDE FACE
7 5/8" 2"
FLUID-APPLIED
MEMBRANE AIR BARRIER
2" EIFS INSUL BOARD
(FWP - OLI#12)
INSUL BOARD
DRAINAGE CHANNELS
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
N
4' 12'8'0
3/16" = 1'-0"
C :\U sers\jcl\D oc um ents\M y
R evit\71350_Arch_jlu ckow ski.rvt 2/4/2022
7:54:4 7 A
M
FEBRUARY 10, 2022
MECHANICAL YARD /
DUMPSTER SCREEN WALL
PLANS AND DETAILS
AE102
JMI
JCL
JCL
SCALE: 3/16" = 1'-0"
MECH YARD & DUMPSTER SCREEN WALL PLANB4
SCALE: 3/16" = 1'-0"
MECH SCREEN WALL - NORTH ELEVATION (OLI #4)A4SCALE: 3/16" = 1'-0"
MECH SCREEN WALL - SOUTH ELEVATION (OLI #4)A3
SCALE: 3/4" = 1'-0"
MECH SCREEN WALL SECTION (OLI #4)B3
SCALE: 1/2" = 1'-0"
DUMPSTER ENCLOSURE GATE ELEVATION (OLI #5)C1
EXT DUMPSTER SCREEN WALLS - SIMILAR (OLI #5) EXT DUMPSTER SCREEN WALLS - SIMILAR (OLI #5)
DUMPSTER SCREEN WALLS - SIMILAR (OLI #5)
0 1' 2' 4'
1/2" = 1'-0"
1' 3'2'0
3/4" = 1'-0"
SCALE: 3" = 1'-0"
SECTION DETAIL (OLI#4 & 5)B1
3" 9"6"0
3" = 1'-0"
RICHARD S.
JOHNSON
T
TT
T
T
T
T
T
T
T T
T
T
T
T
H
T H
T
T
T H
M-301
A11 1/4" HWS
1" HWS
1" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
VAV-1-02
VAV-1-03
VAV-1-01
123 111
109125 117
120122
A A
B B
C C
D D
E E
F
G
H
J
K
L
D.5 D.5
A3 M-401
SIMULATOR COCKPIT A/C UNIT
(BY OTHERS), COORD. PIPING
INSTALLATION & PROVIDE FINAL
CONNECTION TO UNIT.
VAV-1-06
VAV-1-05
VAV-1-04
VAV-1-07
VAV-1-08
VAV-1-09VAV-1-11
VAV-1-10
VAV-1-12
M-301 B4
M-301 B1
CH-2
AHU-2
AHU-2
LVR-2
12 13
CH-1
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR 3/4" HWS
ACCU-1
FCU-1
ROUTE CHW PIPES
BELOW GRADE BEAM
COORD. W/
UNDERGROUND
CONDUIT &
FIRE PROT.
E.7 E.7
FCU-2
1 1/2" CHR
1 1/2" CHS
2" CHS
2" CHR
3/4" CD
3/4" CHR
3/4" CHS
1" CHS
3/4" CD
3/4" CD
CRAC-1
CRAC-2
FCU-4
3/4" HWS
3/4" HWR
1" CHR
3/4" HWS
3/4" HWR
3/4" CD
3/4" CD
3/4" CD
EHS2
DASHED LINE OUTLINES
"SECURED AREA" EXTENTS
IN PLAN VIEW
DASHED LINE OUTLINES
"SECURED AREA" EXTENTS
IN PLAN VIEW
DASHED LINE OUTLINES
"SECURED AREA" EXTENTS
IN PLAN VIEW
COORDINATE WITH
FIRE PROTECTION
PIPE IN SECURE
AREA SPACE
3/4" CD
1 1/4" CHS
& CHRLVR-4
LVR-3
EF-1
LVR-1
3/4" CD
1 1/2" CHS
1 1/2" CHR
3M G
4 4
DPT
D
PT
14 13
21 TYP.
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
N
4' 12'8'0
3/16" = 1'-0"
C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022
1:52:1 1 P
M
FEBRUARY 10, 2022
PIPING PLAN - GROUND FLOOR
MP101
RRS
CAD
JLW
GENERAL NOTES
SHEET KEYNOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
B. MINIMUM CHILLED & HEATING WATER PIPE SIZE
SHALL BE 3/4". ALL CHILLED & HEATING WATER
BRANCH PIPING RUNOUTS SHALL BE 3/4" U.N.O.
AND SHALL TEE OUT OF THE TOP OF THE MAINS.
C. ALL WALL SENSORS (I.E. THERMOSTATS & HUMI-
DISTATS) SHALL BE MOUNTED 48" A.F.F. U.N.O.
D. MINIMUM CONDENSATE PIPE SIZE SHALL BE 3/4".
ALL HORIZONTAL CONDENSATE DRAINAGE
PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.
E. ALL NATURAL GAS APPLIANCES SHALL INCLUDE
SHUTOFF COCK, DIRT LEG, & UNION.
1. PROVIDE PENETRATION SIMILAR TO DETAIL
A1/M-501.
2. EMERGENCY HVAC SHUT-DOWN SWITCH.
3. GAS SERVICE LINE UP FROM BELOW GRADE TO
METER/REGULATOR.
4. HEATING WATER MAINS ROUTED ABOVE THE
SECURE AREA "LID", SERVING ALL THE NON-
SECURE AREAS.
5. SECURE AREA HEATING WATER PIPING, ALL
BELOW THE SECURE AREA "LID."
6. MOUNT TEMPERATURE & HUMIDITY SENSORS UP
HIGH, 30'-0" A.F.F. PER SIMULATOR GUIDELINES.
7. SUPPORT & SECURE RUNOUT PIPING (FOR
FLOOR-MOUNTED UNIT) FROM FLOOR.
8. SIZE REFRIGERANT SUCTION & LIQUID LINES IN
ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
9. COORDINATE PIPING INSTALLATION WITH
ARCHITECTURAL CEILING SOFFIT TO MAINTAIN
REQUIRED SEPARATION TO ELECTRICAL/FIRE
PROTECTION ROOM.
10. CHILLER CH-2 BRANCH PIPING, VALVES, AND
ACCESSORIES PAST THIS POINT ARE PART OF
O.L.I. #7. IF O.L.I. #7 IS NOT SELECTED, PROVIDE
ISOLATION VALVE AND CAP.
11. EXPANSION JOINT WHERE PIPING CROSSES 5"
ARCHITECTURAL EXPANSION JOINT.
12. 6" THICK CONCRETE HOUSEKEEPING PAD UNDER
EQUIPMENT. REF DETAIL C2/M-501.
13. CHILLER CH-2 AND PAD PART OF OLI #7.
14. INSTALL EQUIPMENT WITH MFR'S REQUIRED
CLEARANCES.
15. ALIGN OUTERMOST EDGE OF CHILLER CH-2 (IF
PROVIDED) OR EQUIP. PAD WITH OUTER EDGE OF
SCREEN WALL / FENCE. REFER TO STRUCT. &
CIVIL SHEETS SB102 & C-401 FOR SCREEN WALL
LENGTH & POSITION RELATIVE TO DRIVEWAY.
16. ELEC. TRANSFORMER & PAD. SHOWN FOR REF.
ONLY, REF. TO ELEC. PLAN C2/EP401. COORD.
REQUIRED CLEARANCES TO MECH. EQUIP.
17. CHILLED WATER SUPPLY & RETURN PIPING DOWN
TO BELOW GRADE & INTO MECH. ROOM. SLEEVE
PIPES THRU CONCRETE PAD 6" LARGER IN EA.
DIMENSION THAN SLEEVES. SLEEVE COLLAR
SHALL BE MIN. OF 6" ABOVE FINISHED GRADE.
FILL INTERSTITIAL COLLAR SPACE WITH SUITABLE
MATERIAL.
18. FOR REFERENCE: WALL SPACE RESERVED FOR
FIRE PROT. EQUIP, TEST HEADERS, &
MAINTENANCE ACCESS.
19. ROUTE CONDENSATE DOWN TO FLOOR DRAIN
WITH 1" AIR GAP.
20. ROUTE REFRIGERANT PIPING DOWN EXPOSED,
THEN OUT THRU WALL SLEEVE TO EXTERIOR.
21. SUPPORT PIPING 12" A.F.G. WITH PIPE STANDS.
SCALE: 3/16" = 1'-0"
GROUND FLOOR MECHANICAL PIPING PLANB2
ROOM LIST
NUMBER NAME
101 LOBBY
102 CORR
103 CORR
104 SITE MGR
105 COR
106 INSTRUCTOR'S OPEN OFFICE
107 WORK/COPY
108 CBT/MP
109 BREAK
110 JAN
111 RECYCLING
112 MEN
113 WOM
114 VEST
115 LMPTT
116 COMM
117 CORR
118 DEBRIEFING
119 DEBRIEFING
120 CORR
121 STOR
122 DEBRIEFING (VTRAT)
123 DEBRIEFING
124 MECH
125 ELEC
126 FIRE PROT
127 MOTION BAY
128 MAINT. SUPPORT
129 IT SUPPORT
130 MAINT OFFICE
131 NETWORK ROOM
GAS SERVICE LINE (BELOW
GRADE), REF. CIVIL UTILITY
SHEET C-601 FOR CONTIN.
1384573777N Rectangle
GROUND FLOOR
100' - 0"
LOW ROOF FRAMING
113' - 0"12"x18"
18"x18" 10"x10" RA
10"ø SA3/4" HWS
MECH
DEBRIEFING
(VTRAT)
CORR
CORR
4 5 6 7 8 9 10 11 12 13 14 15 16
DASHED LINE OUTLINES
"SECURED AREA" EXTENTS
IN THIS SECTION VIEW
12"x12"
12"x10" SA
CONCRETE LID OVER
SECURED AREAS
SECURE SIDE
12"x16"
16"x18" RA
12"x22" SA
10"x12"18"x18"
18"x20" RA
12"x22" SA
18"x20" RA
DS-2
12"x16"
"x
GROUND FLOOR
100' - 0"
LOW ROOF FRAMING
113' - 0"
H J K L
2" CW
6" FIRE PROTECTION PIPE
22"x12" SA
3/4" HWR
3/4" HWS 10"x10" RA
CONCRETE LID
CABLE TRAY
NON-SECURE ATTIC TUNNEL
DASHED LINE OUTLINES
"SECURED AREA"
EXTENTS IN THIS
SECTION VIEW
10"x12" SA
14"x18" RA
CORR
STOR
LIGHTS & SENSORS
IN LAY-IN CEILING
F.P. PIPING
1" HWR
1" HWS
STRUCTURAL STEEL
SECURE SIDE
20"x18" RA
GROUND FLOOR
100' - 0"
LOW ROOF FRAMING
113' - 0"
HIGH ROOF FRAMING
142' - 0"
2 3 4 5 6 7 8 9 10
30"ø SA
2" CHS
2" CHR
3/4" HWS &
3/4" HWR
6"ø SA
8"x8" RA
TEMPERATURE SENSOR &
HUMIDITY SENSOR, HIGH
WALL MOUNT. INSTALL
TEMPERATURE SENSOR
AT GYPBOARD FACE,
BETWEEN WALL STUDS, &
COORD. FOR INSULATION
TO BE INSTALLED BEHIND
GYPBOARD AT THIS
LOCATION.
S-5
S-5
S-6
22"ø SA
MOTION BAY
' A
.F .F
32"x32" SA
S-5
S-6
S-5
30"ø SA 22"ø SA
32"x32" RA
S-5
THERMOSTAT &
HUMIDISTAT
R-4
SIMULATOR COCKPIT A/C UNIT
(BY OTHERS), COORD. PIPING
INSTALLATION & PROVIDE FINAL
CONNECTION TO UNIT.
VENT THRU ROOF, REF.
PLBG. SHEET P-102
CEILING, REF. ARCH.
SHEET AE103
BRIDGE CRANE BEAM,
REF. STRUCT. SHEET SF102
CABLE TRAY, REF.
ELEC. SHEET ET101
COORD. TO AVOID STRUCTURAL
ELEMENTS AT WALL PENETRATION
INCLUDING STRUCTURAL CROSS-
BRACING ON THE OTHER SIDE OF THIS
WALL IN MECH. ROOM STRUCT. I-BEAM AT
TOP OF CMU WALL
STRUCT.
X-BRACE
BEYOND
R-2
R-4
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
0 2' 4' 8'
1/4" = 1'-0"
C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022
2:33:3 4 P
M
FEBRUARY 10, 2022
MECHANICAL SECTIONS
M-301
RRS
CAD
JLW
SCALE: 1/4" = 1'-0"
STACKED DUCTWORK SIZING & ROUTING SECTIONA1
SCALE: 1/4" = 1'-0"
NON-SECURE UTILITY ATTIC "TUNNEL" SECTIONB4
SCALE: 1/4" = 1'-0"
SIM. MOTION BAY MECHANICAL SECTIONB1
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
B. SEAL ALL DUCTWORK IN ACCORDANCE WITH
SMACNA SEAL CLASS "A".
C. NON-MECHANICAL ITEMS SHOWN FOR REF. ONLY
(I.E. ELECTRICAL, STRUCTURAL, ARCHITECTURAL,
FIRE PROTECTION). REF. OTHER RESPECTIVE
DISCIPLINE DRAWINGS FOR FINAL COORD.
100' - 0"
LOW ROOF FRAMING
113' - 0"
GH
J K
L
LVR-1
MECH
GAS
METER
AHU-1
HWBT-1
RF-1
BLR-2BLR-1
HUM-1
FCU-3
HWP-4
HWP-3
XT-2
CF-2
HWP-1
HWP-2
12"x22"
"x
"x
"x
"x
20"x22"
30"x60"
CD-1
GROUND FLOOR
100' - 0"
LOW ROOF FRAMING
113' - 0"
G H
J K
L
CWBT-1
LVR-1
MECH
AHU-2
CWP-1
CWP-2
CD-1
RF-2
CD-2
"x
" 32"x32"
20"x22"12 "x
" 30"x60"
CP-1
CP-2
CP-3 CP-4
CP-5
CF-1
XT-1
AS-1
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
0 1' 2' 4'
1/2" = 1'-0"
C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022
2:28:0 1 P
M
FEBRUARY 10, 2022
MECHANICAL SECTIONS
M-302
RRS
JLW
JLW
SCALE: 1/2" = 1'-0"
MECHANICAL ROOM SECTION LOOKING PLAN-EASTA3
SCALE: 1/2" = 1'-0"
MECHANICAL ROOM SECTION LOOKING PLAN-WESTB1
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
B. SEAL ALL DUCTWORK IN ACCORDANCE WITH
SMACNA SEAL CLASS "A".
C. NON-MECHANICAL ITEMS SHOWN FOR REF. ONLY
(I.E. ELECTRICAL, STRUCTURAL, ARCHITECTURAL,
FIRE PROTECTION). REF. OTHER RESPECTIVE
DISCIPLINE DRAWINGS FOR FINAL COORD.
M-302 B1
M-302 A3
G
H
J
K
L
CWBT-1
LVR-1
ACCESS PANEL
AS-1
XT-1
CF-1
CP-1
CP-2
CP-3
CP-4
CP-5
VFD-6
VFD-5VFD-4
VFD-3
VF
D
-2
VF
D -1
MECH
DEBRIEFING
DEBRIEFING
(VTRAT)
MOTION BAY
CD-2
RF-2
RF-1
FCU-3
BLR-1
BLR-2
HWP-3
HWP-4
HWP-1
HWP-2
CWP-2
CWP-1
AHU-2
AHU-1
CF-2XT-2
HWBT-1
HUM-160"x30"
36"x28" SA
"x
SA
"x
R A
"x
SA
CD-1
32"x32" RA
34"x50"
12"x32"
22"x20"
22"x12"
32"x32"
AC
C
ES
S
PA
N
EL
19 19
34"x30"
"x
22"x20"
22"x20"
"x
16"x12"
"x
"x
M-302 B1
M-302 A3
G
H
J
K
L
GAS METER/ REGULATOR
0.5 PSI OUTLET
TOTAL CONNECTED LOAD = 1,598 CFH
CWBT-1
VFD-1
VFD-2
VFD-3
VF
D
-4
VF
D
-5
VFD-6
CP-1
CP-2
CP-3
CP-4
CP-5
TO
R
F-
TO
R
F-
TO
C
W P-
TO
C
W P-
TO
H
W P-
TO
H
W P-
XT-1
CF-1
AS-1
1 1/2" STEAM
TO AHU-2
HUMIDIFIER
MECH
DEBRIEFING
(VTRAT)
DEBRIEFING
MOTION BAY
3/4" HWR
3/4" HWS
1" HWR
1" HWS
3/4" CHR
3/4" CHS
3/4" CD
3/4" HWR
3/4" HWS
3/4" HWR
HWBT-1
XT-2 CF-2
HWP-3
HWP-4
CWP-1
CWP-2
HWP-1
HWP-23
FCU-3
BLR-1
BLR-2
AHU-2
AHU-1
3" C
H R
1" CHR
2" C
H R
1/
4" H
W S
1/
4" H
W R
3/4" HWS
3/4" HWR
2 1/2" CHR
3" CHS
1 1/4" HWR
1 1/4" HWS
1" CHS
1" CHR
3/4" CD
3/4" HWS
2" CHS
2" CHR
2" CHS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWS
1 1/4" HWR
3" C
H R
1" C
H S
3/ 4"
H W
R 3/
4" H
W S
3/4" CD
3" C
H R
2" HWS
3 TYP.
3/4" CD
1 1/2" STM
1 1/4" HWR
1 1/4" HWS
HUM-1
3/4" CD
3/4" CD
1" CD 9
G
2"
1 1/2" G
1 1/2" G
C H
S
C H
S
3"
3"
3"
3"
16 17
1/
4" C
H R
2" C
H S
STACKED 2" CHS & CHR
1 1/4" CHS
3"
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
N
0 1' 2' 4'
1/2" = 1'-0"
C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022
1:52:2 6 P
M
FEBRUARY 10, 2022
ENLARGED PLANS
M-401
RRS
CAD
JLW
GENERAL NOTESSHEET KEYNOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
B. SEAL ALL DUCTWORK IN ACCORDANCE WITH
SMACNA SEAL CLASS "A".
C. DUCTWORK DIMENSIONS SHOWN REPRESENT
INSIDE CLEAR DIMENSIONS. OUTSIDE DUCT
DIMENSIONS FOR DUAL-WALL DUCTS (WHERE
NOTED) SHALL BE LARGER TO ACCOMMODATE
INTERSTITIAL DUCT INSULATION.
D. REFER TO GEN. NOTE "G" ON SHEET MH102 FOR
SPECIAL T.A.B. CONTRACTOR INSTRUCTIONS
FOR AHU-2 SYSTEM.
E. MINIMUM CHILLED & HEATING WATER PIPE SIZE
SHALL BE 3/4". ALL CHILLED & HEATING WATER
BRANCH PIPING RUNOUTS SHALL BE 3/4" U.N.O.
AND SHALL TEE OUT OF THE TOP OF THE MAINS.
F. ALL WALL SENSORS (I.E. THERMOSTATS & HUMI-
DISTATS) SHALL BE MOUNTED 48" A.F.F. U.N.O.
G. MINIMUM CONDENSATE PIPE SIZE SHALL BE 3/4".
ALL HORIZONTAL CONDENSATE DRAINAGE
PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.
H. ALL NATURAL GAS APPLIANCES SHALL INCLUDE
SHUTOFF COCK, DIRT LEG, & UNION.
I. REFER TO MECHANICAL PIPING DIAGRAMS ON
SHEETS M-601 & M-602 FOR PIPE SIZES NOT
INDICATED ON THE PLANS.
J. REFER TO DIAGRAMS C1/M-604 & C4/M-604 FOR
AHU-1 DUCTWORK SIZES.
K. REFER TO DIAGRAMS A1/M-604 & A4/M-604 FOR
AHU-2 DUCTWORK SIZES.
SCALE: 1/2" = 1'-0"
MECHANICAL ROOM DUCTWORK PLANA1 SCALE: 1/2" = 1'-0"
MECHANICAL ROOM PIPING PLANA3
13. MOUNT F.C.U. 9'-6" A.F.F. TO BOTTOM OF UNIT.
COORD. INSTALLATION WITH LIGHTS & EQUIP.
14. MOUNT HUMIDIFIER ON HOUSEKEEPING PAD WITH
SUPPORT LEGS.
15. 2-1/2" CHILLED WATER BYPASS CONTROL VALVE.
16. PIPE PENETRATION THRU SECURE AREA
PERIMETER, REF. NOTES ON SHEET MP101.
17. PIPE CROSSES BUILDING EXPANSION JOINT, REF.
NOTES ON SHEET MP101.
18. PIPING UP ABOVE SECURE AREA "LID" TO SERVE
NON-SECURE AREAS BEYOND.
19. DUCT CROSSES BUILDING EXPANSION JOINT, REF.
NOTES ON SHEET MH102.
20. STACKED DUCTS ABOVE THE "LID" IN THE NON-
SECURE "ATTIC".
SHEET KEYNOTES
1. COORD. INSTALLATION OF DUCT SMOKE
DETECTOR IN SUPPLY DUCT OF A.H.U. WITH FIRE
PROT. & ALARM SYSTEMS. INSTALL ACCESS DOOR
IN DUCT FOR SMOKE DET. SERVICING.
2. 6" THICK CONCRETE HOUSEKEEPING PAD UNDER
EQUIPMENT. REF DETAIL C2/M-501.
3. EQUIP. CLEARANCE LINES, INCLUDING REQUIRED
COIL PULL SPACES, SHALL BE PAINTED ON THE
FLOOR, COORDINATE WITH G.C. & OTHER
TRADES. PAINTING SHALL COMPLY WITH SPEC
SECTION 09 90 00 "PAINTS & COATINGS".
4. SUPPORT UPPER PUMP FROM THE WALL.
5. CONCENTRIC FLUE & INTAKE VENT THRU
SIDEWALL.
6. DASHED LINE OUTLINES "SECURED AREA"
EXTENTS IN PLAN VIEW.
7. DUCT PENETRATION THRU SECURE AREA
PERIMETER, REF. NOTES ON SHEET MH102.
8. CHILLED WATER SUPPLY & RETURN DOWN TO
BELOW SLAB & OUT TO CHILLER YARD. SLEEVE
FLOOR PENETRATION WITH TOP OF COLLAR MIN.
2" ABOVE FINISHED FLOOR.
9. ROUTE CONDENSATE DOWN TO FLOOR DRAIN.
PROVIDE 1" AIR GAP TO FLOOR DRAIN.
10. G.C. TO CONSTRUCT STRUT CHANNEL FRAME TO
SUPPORT CONTROL PANELS 36" A.F.F.
11. TRANSITION DUCT TO FULL LOUVER SIZE (114"W X
36"H) FOR 12" MINIMUM.
12. DO NOT ROUTE PIPING ABOVE ELEC. PANELS.
MANUAL DAMPER
LAY-INSURFACE MOUNT
FLEXIBLE DUCT RUNOUT TO BE SAME
SIZE AS DEVICE NECK.
EXHAUST REGISTER
OR GRILLE
45° BRANCH ENTRY
CONNECTION
RAS/A
MIXING BOX
FILTER
SECTION
HEATING
COIL
SECTION
COOLING
COIL SECTIONFAN SECTION
ACCESS
SECTION
ACCESS
SECTION
BASE RAIL
ACCESS DOOR (TYP.)
(REFER TO PLANS
FOR SIDE TO BE
INSTALLED)
6" CONCRETE
PAD, PER DETAIL
C2/M-501
OA
PARALLEL
BLADE
DAMPERS
EQUIP.
CONTROL
PANEL
CONDENSATE DRAIN OUTLET.
TRAP & PIPE TO FLOOR
DRAIN PER DETAIL A4/M-501
MERV 8 PREFILTER
MERV 13 FINAL FILTER
AIR
FLOW
STUD WALL
MASONRY OR
CONCRETE WALL
ADD ADDITIONAL BRACING AS REQUIRED
SECURE RETAINING ANGLE TO FIRE
DAMPER
FRAME/SLEEVE WITH SHEETMETAL
SCREWS
OR 1/4" DIA BOLTS AT 8" MAXIMUM
SPACINGS, MINIMUM 2 PER SIDE
COVER HANDLE
STAINLESS STEEL NEGATOR
CLOSURE SPRING
ACCESS DOOR LOCATED AS CLOSE
AS POSSIBLE TO THE DOWNSTREAM
SIDE OF FIRE DAMPER
FIRE DAMPER FRAME/SLEEVE
DUCT CONNECTION COLLAR.
SECURE DUCT TO DAMPER
FRAME/SLEEVE WITH S-SLIPS
OR STANDING S-SLIPS WITH
SHEETMETAL SCREWS SECURED
BACK THRU SLIPS AND DUCT,
2 PER SIDE
FIRE DAMPER BLADES
(OUT OF AIRSTREAM)
FUSIBLE LINK, REFER
SPECIFICATIONS FOR
TEMPERATURE RATING
RETAINING ANGLE, INSTALLED TIGHT
AGAINST WALL W/MIN. 1" COVER
OF WALL SURFACE, BEYOND OPENING
A
B
A - TOTAL NEGATIVE STATIC PRESSURE + 1"
B - 1/2 OF A
CONDENSATE
FROM DRAIN
PAN
SEAL PENETRATION
AIR TIGHT
DRAIN LINE SHALL BE AT LEAST
THE SAME SIZE AS THE NIPPLE
ON THE UNIT
OPEN FOR VENTING
ROUTE TO NEAREST
FLOOR DRAIN WITH
INDIRECT CONNECTION
FINISHED FLOOR
AIR HANDLER
CASING
S/A
MIXING BOX
FILTER
SECTION
COOLING
COIL
SECTION
RE-HEAT
COIL SECTION
FAN SECTION
ACCESS
SECTION
ACCESS
SECTION
BASE RAIL
ACCESS DOOR (TYP.)
(REFER TO PLANS
FOR SIDE TO BE
INSTALLED)
CONDENSATE DRAIN OUTLET.
TRAP & PIPE TO FLOOR
DRAIN PER DETAIL A4/M-501
PARALLEL
BLADE
DAMPERS
MERV 8 PREFILTER
MERV 13 FINAL FILTER
RA OAHUMUDIFIER
SECTION
EQUIP.
CONTROL
PANEL
6" CONCRETE
PAD, PER DETAIL
C2/M-501
DIFFERENTIAL
PRESSURE
TRANSMITTER
REMOVABLE CAP
(TYP. OF TWO)
BYPASS (NC)
HIGH PRESSURE
LOW PRESSURE
SPIN-IN FITTING WITH
VOLUME DAMPER
RUN-OUT DUCT TO BE SAME
SIZE AS DIFFUSER NECK U.N.O.
RIGID DUCTWORK, WITH
EXTERNAL INSULATION
INSULATED FLEXIBLE
DUCT. MAX. LENGTH
TO BE FIVE FEET, SIZE
TO BE SAME AS
DIFFUSER NECK
DIFFUSER SUSPENDED CEILING SYSTEMSURFACE MOUNT
BRANCH SUPPLY
DUCT WRAP
AIRFLOW
SURFACE MOUNT
RETURN GRILLE
LAY-IN CEILING
SIDE DUCT TAP SIZE
PER HVAC PLANS
SECURE DUCT TO
GRILLE WITH SHEET
METAL SCREWS
DUCT RISER TO BE
SAME SIZE AS
GRILLE CONNECTION
GRADE OR
FINISHED FLOOR
EQUIPMENT BASE REINFORCEMENT &
CHAMFERS TYP.
REF: STRUCTURAL
DETAIL D3/S-002
6" U
.N .O
6" MIN 6" MIN
SECURE EQUIPMENT
TO PAD PER SEISMIC
SPECIFICATIONS
OUTSIDE
CONTROLLED AREA
WALL
ELEVATION
INSIDE
CONTROLLED AREA
PIPE &
INSULATION
FIRESTOPPING
OR OTHER
SUITABLE
SEALANT
NEOPRENE
CONNECTOR,
TYPICAL
GROUND PIPE WITHIN 6 INCH
OF THE SECURE AREA
PERIMETER PENETRATION
USING NO. 4 COPPER WIRE
TO THE BUILDING GROUND
WIRE CONTINUED
TO METALLIC
STRUCTURE ABOVE
FINISHED
ESCUTCHEON
FINISHED ESCUTCHEON
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity C
:\U sers\jlw
\D o cum ents\M y
R evit\71350_M ech_J W oodEngr44.rvt
2/8/2022 1:52:2 7
P M
FEBRUARY 10, 2022
DETAILS
M-501
RRS
CAD
JLW
SCALE: NTS
TYPICAL EXHAUST GRILLE INSTALLATION DETAILB4
SCALE: NTS
AHU-1 COMPONENT DETAILD1
SCALE: NTS
TYPICAL FIRE DAMPER DETAILA2 SCALE NTS
TYPICAL DRAW-THRU
CONDENSATE DRAIN
INSTALLATION DETAILA4
SCALE: NTS
AHU-2 COMPONENT DETAILC3
SCALE:NTS
B3
DIFFERENTIAL PRESSURE
TRANSMITTER 5 VALVE
BLOCK & BLEED DETAIL
SCALE: NTS
TYPICAL DIFFUSER INSTALLATIONB1
SCALE: NTS
TYP. RETURN GRILLE INSTALLATIONC1
SCALE: NTS
TYPICAL EQUIPMENT PAD DETAILC2
SCALE:NTS
A1
TYP. SECURE AREA PIPE
PENETRATION DETAIL
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
AHU-1
COCKPIT AC
AHU-2
57.1 GPM
2"
1 1/4"
2"
3"
1 1/2"
20.0 GPM
2 1/2"
1 1/2"
20.6 GPM
P1 T1
P1 T1
FS
DPS
P1 T1
P1 T1
FS
DPS
CWP-1
FD
CWP-2
P1
FD
AV
CWBT-1
AV
XT-1
FD
P1
AV
M
AV
M
AV
AV
AV
CWR
CWS
CWS
CWR
CH-2
CH-1
3"
1 1/4"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" DPT
CF-1
C F
C F
FD
3/4"3/4"
CF
3/4", REFER TO
P-102 FOR
CONTINUATION
NPW
3"
2 1/2"
2"
AIR SEPARATOR AS-1
"OPEN SECURE STORAGE"
AREAS BOUNDARY
P1
FCU-2
1"1"
4.9 GPM
FCU-4
3/4"3/4"
2.6 GPM
1 1/4"
CWR
CWS
3"3"
3"
CRAC-1
10.8 GPM
CRAC-2
10.8 GPM
1 1/2"
1 1/2"
1 1/4" 1 1/4"
2" 2"
FCU-3
1"1"
5.5 GPM
CH-2 & ACCESSORIES, PART OF OLI #7
1 1/4" 1 1/4"
MAV
MAV
DPT
2" 3"
REF. CHEMICAL
FEEDER DETAIL
SYSTEM BYPASS LINE
2 1/2" BYPASS
CONTROL VALVE
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity C
:\U sers\jlw
\D o cum ents\M y
R evit\71350_M ech_J W oodEngr44.rvt
2/8/2022 1:52:2 8
P M
FEBRUARY 10, 2022
CHILLED WATER FLOW
DIAGRAMS
M-601
RRS
CAD
JLW
SCALE: NTS
CHILLED WATER FLOW DIAGRAMA1
SHEET KEYNOTES
1. PROVIDE 3-WAY VALVE PIPING IN ACCORDANCE
WITH DETAIL B4/M-502.
2. REFER TO DETAIL B3/M-501 FOR DIFFERENTIAL
PRESSURE TRANSMITTER INSTALLATION.
3. CHILLER CH-2 AND ALL BRANCH PIPING, VALVES,
AND ACCESSORIES PAST THIS POINT ARE PART OF
OLI #7. IF OLI #7 IS NOT SELECTED, PROVIDE
ISOLATION VALVE AND CAP.
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
B. ALL HEATING WATER PIPING BRANCH RUNOUTS
ARE 3/4" UNLESS OTHERWISE NOTED. REFER TO
MECHANICAL PIPING DIAGRAMS FOR PIPE SIZES
NOT INDICATED IN THE PLANS.
C. PROVIDE 2-WAY VALVE PIPING FOR COILS IN
ACCORDANCE WITH DETAILS A4/M-502, D1/M-502,
OR C4/M-503 UNLESS NOTED OTHERWISE.
D. AUTOMATIC AIR VENTS AND MANUAL AIR VENTS
INDICATED DO NOT SHOW ALL REQUIRED AIR
VENTS. PROVIDE AIR VENTS WHERE AIR COULD
BECOME TRAPPED IN PIPING AND WHERE
MANUFACTURER'S RECOMMEND COIL VENTING.
1384573777N Rectangle
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity C
:\U sers\jlw
\D o cum ents\M y
R evit\71350_M ech_J W oodEngr44.rvt
2/8/2022 1:52:5 4
P M
FEBRUARY 10, 2022
SCHEDULES
M-701
RRS
CAD
JLW
AIR HANDLING UNIT SCHEDULE
MARK SERVES
SUPPLY FAN DATA COOLING COIL DATA (CHILLED WATER) REHEAT COIL DATA (HEATING WATER) ELECTRICAL
WEIGHT
(LBS) NOTES
MAX.
(CFM)
MIN.
(CFM)
MIN. O/A
(CFM)
E.S.P.
(IN.
W.C.)
T.S.P.
(IN.
W.C.)
FAN
SPEED
(RPM)
FAN
QTY.
MOTOR HP
FAN TYPE
COIL
CFM
ENTERING
D.B. / W.B.
(°F)
LEAVING
D.B. / W.B.
(°F)
SENSIBLE
CAP. MIN.
(MBH)
TOTAL
CAP. MIN.
(MBH)
COIL
GPM
MIN.
ROWS
MAX. AIR
P.D. (IN.
W.C.)
MAX.
WATER P.D.
(FT. HEAD)
COIL
CFM
ENTERING
D.B. (°F)
LEAVING
D.B. (°F)
TOTAL
CAP. MIN.
(MBH)
COIL
GPM
MIN.
ROWS
MAX. AIR
P.D. (IN.
W.C.)
MAX.
WATER P.D.
(FT. HEAD) MCA MOCP V / Ø / HZ
BHP
EA.
NOM.
HP EA.
TOT.
NOM. HP
AHU-1 OFFICE AREAS 4,010 1,255 795 2.0 5.0 2,804 2 2.6 5 10 PLENUM 4,010 74.0 / 59.8 46.3 / 46.3 121.5 142.8 20.3 8 1.00 11.1 2,105 59.5 81.2 50.0 3.3 1 0.08 2.3 11.8 15 460 / 3 / 60 1,800 ALL AHU-2 SIMULATION BAY 12,380 3,650 780 1.5 4.6 2,700 4 3.5 5 20 PLENUM 12,380 70.1 / 57.0 48.2 / 47.7 296.3 296.3 42.2 6 0.96 10.7 4,950 65.4 93.6 152.0 10.2 1 0.18 9.1 19.9 20 460 / 3 / 60 3,550 ALL
NOTES:
1. CHILLED WATER COILS SELECTED FOR 42°F ENTERING WATER TEMPERATURE AND 56°F LEAVING WATER TEMPERATURE.
2. HEATING WATER COILS SELECTED FOR 150°F ENTERING WATER TEMPERATURE AND 120°F LEAVING WATER TEMPERATURE.
3. VARIABLE FREQUENCY DRIVE FOR SUPPLY FAN(S).
4. PROVIDE 2" MERV-8 PRE-FILTERS AND 4" MERV-13 MAIN FILTERS.
5. PROVIDE HEATING AND COOLING COILS WITH A FACTORY-APPLIED CORROSION RESISTANT EPOXY COATING.
6. PROVIDE INTERFACE CARDS FOR COMMUNICATION WITH EMCS SYSTEM AS REQUIRED.
7. PROVIDE SINGLE POINT POWER WITH A NON-FUSED DISCONNECT SWITCH.
FAN SCHEDULE
MARK LOCATION SERVICE FAN TYPE
AIRFLOW
MAX / OPER.
(CFM)
MAXIMUM
TSP (IN.
WC)
FAN
SPEED
(RPM)
SOUND
LIMITATION
(DBA)
MOTOR DATA ELECTRICAL
WEIGHT
(LBS) NOTES
MOTOR
(BHP)
DRIVE
TYPE HP FLA V/Ø/HZ VFD
EF-1 BREAK ROOM RESTROOMS & JANITOR CENTRIFUGAL INLINE FAN 535 0.2 874 44 0.03 DIRECT 1/4 3.8 115/60/1 - 50 1, 3 RF-1 MECHANICAL ROOM AHU-1 CENTRIFUGAL INLINE FAN 3475 / 3330 0.4 1317 68 0.8 DIRECT 2 - 460/60/3 VFD-1 170 1, 2 RF-2 MECHANICAL ROOM AHU-2 CENTRIFUGAL INLINE FAN 12380 / 11880 0.4 837 70 2.1 DIRECT 5 - 460/60/3 VFD-2 440 1, 2
NOTES:
1. PROVIDE SPRING ISOLATORS FOR SUPPORT
2. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING
3. EC MOTOR WITH A SPEED CONTROLLER
PUMP SCHEDULE
MARK LOCATION TYPE SERVICE FLUID
DESIGN FLOW
(GPM) HEAD (FT)
ELECTRICAL WEIGHT
(LBS) NOTESHP RPM V/Ø/HZ VFD
CWP-1 MECHANICAL VERTICAL INLINE CLOSE COUPLED CHILLED WATER WATER 132.3 124.7 7.5 HP 3500 460 / 3 / 60 VFD-3 340 1-5 CWP-2 MECHANICAL VERTICAL INLINE CLOSE COUPLED CHILLED WATER WATER 132.3 124.7 7.5 HP 3500 460 / 3 / 60 VFD-4 340 1-5 HWP-1 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER PRIMARY, BLR-1 WATER 15.3 22 1.5 HP - 460 / 3 / 60 - 240 2,6 HWP-2 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER PRIMARY, BLR-2 WATER 15.3 22 1.5 HP - 460 / 3 / 60 - 240 2,6 HWP-3 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER SECONDARY WATER 28.8 47.5 2 HP 1760 460 / 3 / 60 VFD-5 270 1-5 HWP-4 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER SECONDARY WATER 28.8 47.5 2 HP 1760 460 / 3 / 60 VFD-6 270 1-5
NOTES:
1. PROVIDE WITH VFD & SHAFT GROUNDING RING.
2. SELECTED PUMP SHALL BE NON-OVERLOADING.
3. SELF SENSING, VERTICAL CLOSE COUPLED TYPE.
4. PROVIDE WITH SHAFT SEAL.
5. ONE PUMP IN EACH SERVICE IS 100% REDUNDANT.
6. PROVIDE MANUAL MOTOR STARTER.
AIR-COOLED CHILLER SCHEDULE
MARK TYPE
EVAPORATOR DATA ELECTRICAL DATA EFFICIENCY REQUIREMENTS
WEIGHT
(LBS) NOTES
CAPACITY
(TONS)
FLOW
(GPM) FLUID TYPE
EWT
(F)
LWT
(F)
MAX PD
(FT WC) MCA MOCP V/Ø/HZ
AMBIENT
TEMPERATURE
(°F) KW/TON EER
CH-1 AIR COOLED MAGLEV 62 104.9 WATER 56.1 42 3.2 106 150 460 / 3 / 60 82..5 0.8392 14.3 6,950 1-7 CH-2 AIR COOLED SCROLL 68.6 116.6 WATER 56.1 42 6.0 124 150 460 / 3 / 60 82.5 0.695 17.27 7,200 3-9
NOTES:
1. VARIABLE SPEED DRIVE WITH SOFT START.
2. R-134A REFRIGERANT.
3. SINGLE POINT ELECTRICAL CONNECTION.
4. PROVIDE MANUFACTURER'S HEAVY SALT-SPRAY RESISTANT COATING, INCLUDING FOR STRUCTURAL COMPONENTS OF CHILLER.
5. ECONOMIZER.
6. PROVIDE HAIL GUARDS.
7. PROVIDE INTERFACE CARD AS REQUIRED FOR COMMUNICATION WITH DDC.
8. CHILLER IS PROVIDED AS OPTIONAL LINE ITEM #7.
9. R-410A REFRIGERANT.
HOT WATER BOILER SCHEDULE (FULL MODULATION, CONDENSING)
MARK LOCATION
DESIGN
FLOW
RATE
(GPM)
ENTERING
WATER
TEMP. (°F)
LEAVING
WATER
TEMP. (°F)
MIN.
REQ'D.
OUTPUT
(MBH)
MAXIMUM
PRESSURE
DROP (FT
WC) FUEL
ELECTRICAL DATA
WEIGHT
(LBS) NOTESFLA V/Ø/HZ
BLR-1 MECHANICAL 15.3 123.1 150 202.3 5.6 NATURAL GAS 1.8 120 / 1 / 60 630 ALL
BLR-2 MECHANICAL 15.3 123.1 150 202.3 5.6 NATURAL GAS 1.8 120 / 1 / 60 630 ALL
NOTES:
1. PROVIDE CONDENSATE TRAP AND NEUTRALIZER BEFORE INDIRECT CONNECTION OF CONDENSATE TO DRAIN.
2. BOILER SHALL BE CAPABLE OF 5:1 TURNDOWN MINIMUM.
3. PROVIDE INTERFACE CARD AS REQUIRED FOR COMMUNICATION WITH DDC.
VAV BOX SCHEDULE (PRESSURE INDEPENDENT, SINGLE DUCT, NON FAN POWERED, HW REHEAT)
MARK
(NOTE #1) SERVICE
AIRFLOW HOT WATER HEATING COIL
INLET
SIZE
(IN)
OUTLET
SIZE
(INxIN) NOTES
MAX
(CFM)
MIN
(CFM)
MIN. S.P.
DROP
(IN.W.C.)
MAX NC
(RAD OR
DISCH.)
MIN.
HTG.
(CFM)
TOTAL
LOAD
(MBH) ROWS
LAT
(ºF)
FLOW
RATE
(GPM)
WPD
(FT.)
LWT
(°F)
VAV-1-01 106 585 175 0.34 25 235 11.7 2 97.4 1.2 0.28 130 7 12x10 ALL VAV-1-02 103, 107, 108, 110, 114 575 175 0.34 25 305 11.3 2 83.1 0.8 0.16 120.1 7 12x10 ALL VAV-1-03 109, 111 380 115 0.3 24 155 4.6 2 91.6 0.8 0.12 130.4 6 12x8 ALL VAV-1-04 112, 113 245 75 0.12 31 150 5.8 2 96.9 0.8 0.12 130.8 5 12x8 ALL VAV-1-05 104, 129 185 60 0.05 28 85 3.3 1 88.2 0.5 0.15 135.2 5 12x8 ALL VAV-1-06 101, 102, 105, 130 320 95 0.29 22 130 9.8 3 118.3 0.8 0.18 124.1 6 12x8 ALL VAV-1-07 115, 117 290 90 0.13 25 95 3.5 1 85.0 0.5 0.18 136.5 6 12x8 ALL VAV-1-08 118 315 95 0.21 22 125 6.6 2 97.7 0.8 0.12 132.5 6 12x8 ALL VAV-1-09 119 255 80 0.19 24 105 6.0 2 101.6 0.8 0.12 134.1 6 12x8 ALL VAV-1-10 122 180 55 0.07 27 125 6.6 2 97.7 0.8 0.12 132.5 5 12x8 ALL VAV-1-11 123 255 80 0.19 24 105 6.0 2 101.6 0.8 0.12 134.1 6 12x8 ALL VAV-1-12 128 425 130 0.13 24 170 5.4 1 88.5 0.5 0.24 129.4 7 12x10 ALL
NOTES:
1. REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHEET M-001.
2. CONTRACTOR SHALL FURNISH AND INSTALL EACH INDIVIDUAL TERMINAL UNIT WITH THE SAME CONFIGURATION, I.E. LOCATION OF COIL
CONNECTIONS, CONTROL ENCLOSURE, ETC. AS SHOWN ON THE FLOOR PLANS.
3. E.W.T. IS 150°F. FINS PER INCH MIN. IS 10. HEATING MEDIUM IS WATER. E.A.T. IS 49°F. INLET STATIC PRESSURE IS 1.0" W.C. DOWNSTREAM STATIC
PRESSURE DROP IS 0.25" W.C.
4. WRAP THE HEATING WATER COIL WITH INSULATION.
5. PROVIDE WITH 24V CONTROL TRANSFORMER, POWERED BY 120V ELECTRICAL SUPPLY, DISCONNECT BY E.C.
COMPUTER ROOM AIR-CONDITIONING UNIT SCHEDULE
MARK LOCATION TYPE
SUPPLY FAN DATA
MIN.
O.A.
(CFM)
COOLING COIL (CHILLED WATER)
ELECTRIC
REHEAT
CAPACITY
(MBH)
HUMIDIFIER
CAPACITY
REQ'D
(LBS/HR)
ELECTRICAL
WEIGHT
(LBS) NOTES
SUPPLY
AIRFLOW
(CFM)
EXTERNAL
STATIC
PRESS.
(IN. H2O)
COOLING CAPACITY
(MBH) AIR CONDITIONS (°F) WATER CONDITIONS
FLA V/Ø/HZSENS. TOT.
E.A.T.
D.B. / W.B.
L.A.T.
D.B. / W.B.
FLOWRATE
(GPM)
COIL P.D.
(FT.)
L.W.T.
(°F) CRAC-1 NETWORK ROOM 131 FLOOR MTD. - DOWNFLOW 4,250 0.2 18 57.1 60.8 70.1 / 56.8 54.5 / 50.6 14.0 7.4 52.5 40.9 4.4 31.8 460 / 3 / 60 650 ALL CRAC-2 NETWORK ROOM 131 FLOOR MTD. - DOWNFLOW 4,250 0.2 18 57.1 60.8 70.1 / 56.8 54.5 / 50.6 14.0 7.4 52.5 40.9 4.4 31.8 460 / 3 / 60 650 ALL
NOTES:
1. PROVIDE UNIT WITH RETURN AIR FILTER (2" MERV 8).
2. PROVIDE CONDENSATE PUMP.
3. PROVIDE UNIT WITH FILTER CLOG SENSOR AND MOISTURE DETECTOR SWITCH FOR CONDENSATE PUMP FAILURE.
4. 42°F ENTERING WATER TEMPERATURE.
5. PROVIDE UNIT WITH INTEGRAL MICROPROCESSOR CONTROLLER, SUPPLY & RETURN TEMPERATURE SENSOR AND HUMIDITY SENSOR, EC FAN MOTOR, & INTEGRAL 2-WAY CONTROL VALVE FOR CHILLED WATER.
6. UNIT SHALL INTERFACE WITH THE BUILDING DDC SYSTEM TO MONITOR UNIT STATUS AND ALARMS. PROVIDE INTERFACE CARDS AS REQUIRED.
7. SYSTEM SHALL MAINTAIN THE SPACE AT 70°F AND 50% RELATIVE HUMIDITY.
8. BOTH UNITS OPERATE SIMULTANEOUSLY TO MAINTAIN TEMPERATURE AND HUMIDITY.
9. PROVIDE WITH 2-SIDED AIR DISCHARGE AT BASE OF CABINET & PROVIDE SUPPLY GRILLE TO COVER FACE OF OPENING - DOUBLE-DEFLECTION, ADJUSTABLE BLADE, FRONT BLADES PARALLEL TO SHORT DIMENSION, 3/4" BLADE
SPACING, & MATCH COLOR OF UNIT CABINET.
10. PROVIDE CABINET EXTENSION RETURN AIR PLENUM TALL ENOUGH TO EXTEND TO ROUGHLY 6" ABOVE THE FINISHED CEILING IN THE SPACE. COORDINATE UNIT PLACEMENT WITH OTHER TRADES TO ALLOW INSTALLATION OF
ARCHITECTURAL CEILING IN THE SPACE AROUND THE PLENUM CABINET.
DIRECT DIGITAL CONTROL PANEL
T
CONTROL SEQUENCE FOR CHILLED WATER SYSTEM
VFDCS
VFDCS
C W
R
C W
R
AS-1
CWCS-2
CWP-2
CWP-1
CWCS-1
CWT-4
CWT-3
CWS
CWDPT-1
CWR
CWS
N.O.
DPT DPTCWDPT-2
CHILLER MICROPROCCESSOR
CONTROL PANEL W/ DDC
INTERFACE
CH-1
T
CWT-1-1
T
CWT-1-2
FS
DPS
CHILLED WATER SYSTEM CONTROL
THE CHILLED WATER SYSTEM SHALL BE ENABLED / DISABLED BY AN OPERATORS COMMAND THROUGH THE EMCS. THE LEAD CHILLED WATER PUMP VFD SHALL BE ENABLED AND THE LEAD CHILLER ISOLATION VALVE SHALL BE OPEN. ONCE THE CHILLER ISOLATION VALVE IS OPEN, THE LEAD CHILLER SHALL BE ENABLED AND OPERATE VIA THE CHILLER PACKAGED MICROPROCCESSOR CONTROLLER AND PER THE CHILLER MANUFACTURER'S PROGRAMMED CONTROL SEQUENCE TO MAINTAIN 45°F LEAVING WATER TEMPERATURE AS SENSED BY THE OPERATING CHILLER'S ASSOCIATED LEAVING WATER TEMPERATURE SENSOR (CWT-1). THE OPERATIONAL CHILLER'S ASSOCIATED DIFFERENTIAL PRESSURE SWITCH (CWDPS-1) AND FLOW SWITCH (CWFS-1) SHALL BE USED TO PROVE FLOW. THE CHILLER PACKAGED DDC CONTROLLER SHALL FULLY INTERFACE WITH THE EMCS TO ALLOW MONITORING OF SETPOINTS, OPERATING POINTS, ALARMS AND ALL OTHER CONTROL PARAMETERS. THIS SHALL INCLUDE ALL POINTS THAT CAN BE READ FROM THE CHILLER PANEL. ALL SETPOINTS ARE TO BE
ADJUSTABLE. PROVIDE ALARM NOTICES AT THE EMCS FOR ALL CHILLER FAILURES.
THE CHILLED WATER PUMP VFD SHALL BE MODULATED TO MAINTAIN THE BUILDING DIFFERENTIAL PRESSURE SETPOINT AS SENSED BY CWDPT-1. THE BUILDING DIFFERENTIAL SETPOINT SHALL BE SLIGHTLY HIGHER THAN THE HIGHEST COIL DESIGN PRESSURE DROP PER COIL SUBMITTAL DATA. THE CWDPT-1 SETPOINT SHALL BE ADJUSTABLE THROUGH THE EMCS.
THE BYPASS VALVE (CWV-2) SHALL MODULATE AS REQUIRED TO ENSURE MINIMUM ALLOWABLE CHILLER FLOW BY MAINTAINING THE MINIMUM CHILLER DIFFERENTIAL SETPOINT AS SENSED BY CWDPT-2. THE CHILLER MINIMUM DIFFERENTIAL PRESSURE SETPOINT IS THE PRESSURE THAT CORRELATES TO SLIGHTLY MORE THAN THE MINIMUM EVAPORATOR FLOWFOR THESE CHILLERS PER MANUFACTURERS DATA. THE CWDPT-2 SETPOINT
SHALL BE ADJUSTABLE THROUGH THE EMCS.
THE CHILLER ISOLATION VALVES (CWV-1) AND THE BYPASS VALVE (CWV-2) SHALL BE SLOW ACTING TO ENSURE SMOOTH TRANSITIONS, AND PREVENT TRIPPING RUNNING CHILLER ON FLOW LOSS. THE OPENING RATE DEPENDS ON THE CHILLER'S FLOW RATE CHANGE TOLERANCE LISTED IN THE MANUFACTURERS DATA. THE OPENING AND CLOSING RATE OF THE VALVES SHALL BE ADJUSTABLE IN THE FIELD.
THE CHILLER ISOLATION VALVES (CWV-1) AND THE BYPASS VALVE (CWV-2) SHALL HAVE A LINEAR RESPONSE CHARACTERISTIC. THESE VALVES SHALL HAVE NO MORE THAN 3 PSI OF PRESSURE DROP.
THE VARIABLE PRIMARY FLOW CHILLED WATER SYSTEM SHALL BE CONTROLLED DIRECTLY BY A LOCAL DDC CONTROLLER TO ALLOW THE BYPASS CONTROL VALVE TO REACT QUICKLY TO CHANGES IN FLOW.
T
CWT-5
CWDPS-1
CWV-1
CWFS-1
N.O.
CWS
EQUIPMENT INPUT/OUTPUT SUMMARY
CHILLER CH-1
CH-1 CONTROL PANEL
CURRENT SWITCH, CWCS-2
EN
AB
LE
/D
IS
BL
E
FO
R W
AR
D
/R
EV
ER
SE
EN
ER
G
IZ
E/ D
EE
N
ER
G
IZ
E
O
PE
N /C
LO
SE
ST
AU
S
AL
AR
M
IN
P
U T
SE
TU
PS
FL
O W
TE
M
PE
R
AT
U
R E
D
IF
F.
P
R
ES
SU
R
E
EL
EC
TR
IC
PN
U
EM
A
TI
C
R
ES
ET
H
IG
H L
IM
IT
A
LA
R M
LO
W
L
IM
IT
A
LA
R
M
AB
N O
R M
AL
O
FF
R
U N
TI
M
E
TO
TA
L
TO
TA
L
FL
O W
BT
U
C
AL
C U
LA
TI
O N
AV
E
R
AG
E
G R
AP
H
IC
POINT TYPES
DO
PROGRAMS
DI AI AO
H
ER
TZ
AM
PS
CWP-2 VFD FAULT
CWP-2 VFD BYPASS
CWP-1 VFD
CWFS-1
CWT-1-1
CWT-1-2
CWT-3
CWT-4
CWV-1
CWV-2
CWDPS-1
CWDPT-1
CWDPT-2
CWV-2
CWT-5
CHILLER MICROPROCCESSOR
CONTROL PANEL W/ DDC
INTERFACE
CH-2
T
CWT-2-1
T
CWT-2-2
FS
DPS
CWDPS-2
CWV-2
CWFS-2
N.O.
CHILLER CH-2
CH-2 CONTROL PANEL
CWDPS-2
CWFS-2
CWT-2-1
CWT-2-2
CWP-2 VFD
CURRENT SWITCH, CWCS-1
CWP-1 VFD FAULT
CWP-1 VFD BYPASS
FCU-n (INDOOR UNIT)
ACCU-n
(OUTDOOR UNIT)
CONDENSATE PUMP
CONTROL SEQUENCE OF OPERATION
FOR MINISPLIT SYSTEM #1 (FCU-1 / ACCU-1)
MINISPLIT SYSTEM
PACKAGED CONTROLLER
GENERAL
THE BAS SHALL MONITOR THE FCU ZONE TEMPERATURE BY A
THERMOSTAT INDEPENDENT OF THE FCU. FCU INTERNAL PACKAGED
CONTROLS SHALL MAINTAIN 70°F (ADJ.) COOLING SETPOINT AND 68°F
(ADJ.) HEATING SETPOINT. IF ZONE TEMPERATURE RISES ABOVE 80°F
(ADJ.) OR FALLS BELOW 60°F (ADJ.), BAS SHALL GENERATE AN ALARM.
AI - SPACE TEMPERATURET
WALL-MOUNTED SYSTEM CONTROLLER &
TEMP. SENSOR, FURNISHED BY MINISPLIT MFR.
(DEG. F.)EHS NOTES:
1. ENGRAVED PLASTIC SIGN, YELLOW WITH BLACK LETTERING,
INSTALLED 1" ABOVE SHUTDOWN BUTTON. 1-1/2" TALL x 5"
WIDE. "EMERGENCY HVAC SHUTDOWN" LETTERING 1/2" TALL,
OTHER LETTERING 1/8" TALL.
2. SIGN STATES PURPOSE OF SHUTDOWN BUTTON.
3. SIGN STATES BUILDING NUMBER (TO BE DETERMINED BY
BASE CIVIL ENGINEER) & AREA AFFECTED (ENTIRE
BUILDING).
4. SIGN TO LIST EQUIP. TAGS OF ALL HVAC SYSTEMS &
EQUIPMENT AFFECTED BY SHUTDOWN SYSTEM
(AHU-1/RF-1/EF-1, AHU-2/RF-2, CRAC-1, & CRAC-2).
5. BUTTON ACTIVATION SHALL INITIATE EQUIPMENT
SHUTDOWN (OF AHU-1/RF-1/EF-1) & CLOSE ALL OUTSIDE AIR
(O.A.) DAMPERS (FOR ALL EQUIPMENT LISTED) WITHIN 30
SECONDS. CRITICAL ELECTRICAL COOLING SYSTEMS
(AHU-2/RF-2, CRAC-1, & CRAC-2) SHALL CONTINUE
OPERATING WITHOUT ANY O.A. (FULL RECIRC. MODE) UNTIL
SHUTDOWN BUTTON IS DEACTIVATED.
6. SHUTDOWN BUTTON TO BE MOUNTED IN SINGLE GANG BOX.
7. SHUTDOWN BUTTON STATUS SHALL BE SENT TO B.A.S. AS
ALARM.
8. FOR INTERLOCK WITH MULTIPLE HVAC UNITS & SYSTEMS.
INTERFACE WITH D.D.C. PANELS PER CONTROL SEQUENCES
OF AFFECTED EQUIPMENT ON SHEETS M-801, M-802, & M-803.
9. EMERGENCY SHUTDOWN AS INITIATED BY THIS BUTTON
SHALL BE REMOTELY ENABLED BY FIRE ALARM INPUT FOR
EQUIPMENT SHUTDOWN THRU B.A.S.
10. BUTTON LOCATION IN LOBBY 101, SHOWN ON SHEET MP101
AS:
LIFT HERE
POLYCARBONATE
HOUSING
PUSH
EMERGENCY
HVAC SHUTDOWN
EMERGENCY HVAC SHUTDOWN
PUSH TO SHUTDOWN NON-CRITICAL SYSTEMS & CLOSE O.A.
EQUIPMENT: ALL HVAC SYSTEMS WITH OUTSIDE AIR INTAKES,
INCL. AHU-1/RF-1/EF-2, AHU-2/RF-2, CRAC-1, & CRAC-2.
5"
1"
1/ 2"
EHS
PUSH BUTTON. RED
IN COLOR, KEYED
RESET (2 KEYS
PROVIDED)
BUILDING: # ___ AREA: ENTIRE BUILDING
CLEAR FLIP-UP
COVER REQUIRED
CUSTOM LABEL,
YELLOW W/ BLACK
LETTERING
USE BLDG. NO. AS
DETERMINED BY
BASE CIVIL ENG.
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity C
:\U sers\jlw
\D o cum ents\71350_M ech_JW oodEn gr44.rvt 2/6/2022
5:29:4 7 A
M
FEBRUARY 10, 2022
CONTROLS
M-804
RRS
CAD
JLW
SCALE: NTS
CHILLED WATER CONTROL DIAGRAMA1
SCALE: NTS
D.X. MINISPLIT CONTROL DIAGRAMD4
SCALE: NTS
EMERGENCY HVAC SHUTDOWN (EHS) BUTTONC2
SHEET KEYNOTES
1. ALL ITEMS RELATED TO SUPPLY AND INSTALL OF
CHILLER CH-2 SHALL BE PROVIDED AS PART OF
OLI #7. REFER TO BOUNDARY OF DASHED LINES.
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND,
ABBREVIATIONS, & GENERAL NOTES.
1384573777N Rectangle
1384573777N Rectangle
1384573777N Rectangle
J
J
J
G
FI
GFI
C
GFI
C
IG
IGIG
IG
IG
IGIG
IGIG
IG
IG
GFI
WP
GFI
WP
GFI
WP
GFI
WP
GFI
WP
J
J
J
J
J J
J
J
J
J
IG
48"
48"
48"
48" 48"
48"
48"
J J
J J
IG
J
J
JJ
J J
J
J
J
J
M
M M
M
M M
M
M
M
M
M
M
48"
66"
J
J
J
M
J
TV
TV
TV
TV
TV
TV
TV
J
INSTRUCTOR'S
OPEN
OFFICE
SITE
MGR
COR
CBT/MP
MAINT
OFFICE
IT
SUPPORT
JAN
WOM
LMPTT
COMM
DEBRIEFING
DEBRIEFING121
STOR
DEBRIEFING
BREAK
MEN
ELEC
CORR
CORR
VEST
CORR
DEBRIEFING
(VTRAT)
MECH
MAINT.
SUPPORT
MOTION
BAY
LOBBY
CORR
WORK/COPY
NETWORK
ROOM
T1
EMM
SBMTS
MSWBD
MT-3A
B2
EP401
HEO1
LEO1
LR1
LEO2
HS1
LR2
TLR2
LL
JJ
HH
FF
D.5
D.5 D
D
C
C
E
E
B B
A
A
2 4 6 9 10
12 13
LCP
MSUPS
MSEMM
UPS
CH-2
VAV-1-09
VAV-1-11
VAV-1-10
VAV-1-08 VAV-1-07
VAV-1-04
VAV-1-05
VAV-1-12
VAV-1-06
VAV-1-01
VAV-1-02
VAV-1-032
PLF
LR3
B4
EP401
C4
EP401
OPEN STORAGE AREA
MSA
LEO3
LR1
17 17
BAS-1
BAC-1
20 20
TLR1
TLEO1
UPS-PDU
LR2 - 7,9,11
4-#6, 1-#10E.G., 1"C
22 22
LR2
LR3 - 2
LR3 - 3
LR3 - 4 LR3 - 5
LR3 - 6
12 12
HS1 - 8,10,12
LR3 - 9,11
LR3 - 10
17,19
HS1 - 13,15,17
RECYCLING
LEO1 - 9
P.C.
LEO1 - 7
LEO1 - 16
LEO1 - 4
LEO1 - 5
LEO1 - 11
20 20
LEO3 - 4
HS1 - 14,16,18
HM1
LR1 - 16
LR1 - 16
LR1 - 16
LR1 - 16
LR1 - 25
LEO3 - 7
3 3
4 4
12 12
EPO
EP
O
LR3 - 12
EPO
HM2
LEO2 - 2,4
2-#8, 1-#10E.G., 1"C
ACCU-1
FCU-1
P.C.
LEO3 - 2
P.C.
EF-1
FIRE
PROT
EGB3
A4
EP401
LR1 - 16
TGB1
TGB2
EGB1
EGB2
LR1 - 1
FCU-3
+66"
+66"
+66"
+66"
+66"
+66"
T2
SIMBAY
AC
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20171350
FDN
Ch an ne l Is lan ds
A
NG
St ati on Po rt Hu en em e, CA
Ca lifo rn ia
Ai r N ati on al Gu ard
- 1 th
AW
C-
0J
Fl igh t S im ula tor
Fa cil ity
N
4' 12'8'0
3/16" = 1'-0"
C :\U sers\atj\D oc um ents\71350_Elec_ajohnsen45 M M
D .rvt
2/4/2022 4:24:3 7
P M
FEBRUARY 10, 2022
ELECTRICAL POWER PLAN
EP101
WCM
ATJ
ATJ
SCALE: 3/16" = 1'-0"
ELECTRICAL POWER PLANA1
GENERAL NOTES
A. PROVIDE ALL THE NECESSARY COMPONENTS FOR A
FULLY FUNCTIONAL SWITCHED RECEPTACLE
SYSTEM. RE: DETAIL B3 ON SHEET EP402 FOR
TYPICAL CONTROLLED RECEPTACLE DETAIL.
B. FOR ELECTRICAL EQUIPMENT NOT LOCATED ON
WALLS, CONTRACTOR TO PROVIDE STEEL STRUT
SUPPORT SYSTEM SIZED FOR THE ELECTRICAL
EQUIPMENT.
C. EPO'S SHOWN ARE ROUGH IN ONLY. PROVIDE 1"
CONDUIT WITH PULL STRING TO THE NEAREST FIRE
ALARM OUTPUT MODULE IN MOTION SIM BAY.
COORDINATE WITH SIMULATOR PROVIDER ON MAKE
AND MODEL OF CONTRACTOR PROVIDED EPO'S.
D. ALL TV BOXES SHALL BE DOUBLE GANG BACK
BOXES MOUNTED AT 66" AFF AND CONTAIN (1)
DUPLEX RECEPTACLE. COORDINATE WITH
SIMULATOR MANUFACTURER FOR DROPS IN
SECOND GANG.
SHEET KEYNOTES
14. POWER FOR FIRE ALARM EQUIPMENT. PROVIDE RED
LOCK-ON BREAKER. COORDINATE FINAL
TERMINATIONS WITH FIRE ALARM CONTRACTOR.
15. POWER FOR FIRE PROTECTION AIR SAMPLING
DETECTOR. COORDINATE FINAL TERMINATION WITH
FIRE PROTECTION INSTALLER.
16. ROUTE (1) 1" EMT CONDUIT WITH PULL STRING
FROM RIOS STATION TO P1 CABINET IN NETWORK
ROOM 131. CONDUIT FOR RIOS POWER.
COORDINATE FINAL TERMINATIONS WITH
SIMULATOR PROVIDER.
17. POWER FOR ACCESS CONTROL.
18. POWER FOR ADA AUTOMATIC DOOR OPERATOR.
19. OPTIONAL LINE ITEM #3 (OLI #3): BID OPTION, 3P30A,
600V, SINGLE THROW, HEAVY DUTY, NEMA 1,
DISCONNECT SWITCH FOR BREATHING AIR
COMPRESSOR. COORDINATE FINAL TERMINATIONS
WITH AIR COMPRESSOR INSTALLER.
20. 1P20A, 120V, NEMA 1, TOGGLE OPERATOR, MANUAL
MOTOR SWITCH. COORDINATE FINAL TERMINATIONS
WITH MECHANICAL CONTRACTOR.
21. 2P60A, 240V, SINGLE THROW, HEAVY DUTY, NEMA
3R, DISCONNECT SWITCH FOR MINI SPLIT.
COORDINATE FINAL TERMINATIONS WITH THE
MECHANICAL CONTRACTOR.
1. POWER ALL ELECTRICAL DEVICES TO THE PANEL
INDICATED NEXT TO KEYNOTE UNO. NUMBER NEXT
TO ELECTRICAL DEVICE INDICATES CIRCUIT
NUMBER IN PANEL.
2. POWER FOR AUTOMATIC FLUSH VALVES.
COORDINATE FINAL TERMINATIONS WITH PLUMBING
CONTRACTOR.
3. POWER FOR SCC/ACS PANELS. COORDINATE WITH
OWNER FOR FINAL LOCATION.
4. POWER FOR FIRE PROTECTION EXIT TEXT SIGN.
COORDINATE FINAL TERMINATION WITH FIRE
PROTECTION INSTALLER.
5. POWER FOR SMART WHITEBOARD. COORDINATE
FINAL TERMINATIONS WITH WHITEBOARD
INSTALLER.
6. POWER FOR PROJECTOR. COORDINATE FINAL
TERMINATIONS WITH PROJECTOR INSTALLER.
7. OPTIONAL LINE ITEM #2 (OLI #2): BID OPTION,
PROVIDE 3P30A…
This is the start of the file's text. The full file is on GovTribe.