W50S7525QA021_Attachment 1_Drawings.pdf

PDF 4 MB Posted

Attached to
Install Backup Chiller B700 Federal contract opportunity
Solicitation number
W50S7525QA021
Issued by
Department of the Army National Guard

About this file

These are detailed architectural and engineering design drawings for a C-130J Flight Simulator Facility for the California Air National Guard (146th Airwing) located at Channel Islands ANG Station in Port Hueneme, California. The comprehensive set of drawings, dated February 10, 2022, includes mechanical, electrical, structural, and architectural plans covering a range of technical specifications for the facility, such as HVAC systems, electrical power distribution, mechanical piping, equipment layouts, and building construction details. The drawings provide technical specifications for key systems including air handling units, chillers, boilers, electrical panels, and specialized equipment like computer room air conditioning units, with detailed diagrams showing installation methods, routing, and interconnections across multiple building zones.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Type B3 (Final) Submission February 10, 2022

California ANG - 146th AW Channel Islands ANG Station, C-130J Flight Simulator Facility

Port Hueneme, California

FY 2021 - PN: DJCF1490001

C ha nn el Is la nd s

AN

G S ta tio n -F lig ht

S im

OPTIONAL LINE ITEMS:

OLI #1: PROVIDE EPOXY PAINT FLOORING IN

MECH/ELEC/COMM RMS & SIM BAY- I.L.O.

COATED CONCRETE.

OLI #2: PROVIDE BRIDGE CRANE (MACHINE & RAILS

ONLY) WITH SMALLER SIZED OVERHEAD

COILING EXTERIOR DOOR – I.L.O. NO CRANE

WITH LARGER SIZED OVERHEAD COILING

EXTERIOR DOOR.

OLI #3: PROVIDE (BREATHING) AIR COMPRESSOR IN

SIM MOTION BAY.

OLI #4 : PROVIDE 2" CLAD (TO MATCH BUILDING

EXTERIOR) 8" CMU WALL (2 SEGMENTS) @

MECHANICAL EQUIPMENT YARD - I.L.O. CHAIN-

LINK FENCING (2 SEGMENTS) W VISUAL SLATS.

OLI #5: PROVIDE 2" CLAD (TO MATCH BUILDING

EXTERIOR) 8" CMU WALL (3 SEGMENTS) TRASH

DUMPSTER ENCLOSURE W ORNAMENTAL

GATE - I.L.O. NONE.

OLI #6: PROVIDE ILLUMINATED UNIT INSIGNIA SIGN

(WITH CONTROLS) ON BUILDING EXTERIOR.

OLI #7: PROVIDE BACK-UP CHILLER (CH-2) WITH

PROTECTIVE BOLLARDS .

OLI #8: PROVIDE LANDSCAPING AROUND BUILDING-

I.L.O. SPECIFIED NATIVE GRASS.

OLI #9: PROVIDE TRANSLUCENT FIBERGLASS WALL

PANELS (VERTICAL 2-STRIPES INSTALL)- I.L.O.

SCHEDULED MATERIALS/WALL SYSTEM.

OLI #10:PROVIDE TRANSLUCENT FIBERGLASS WALL

PANELS (HORIZONTAL CLERESTORY INSTALL)-

I.L.O. SCHEDULED MATERIALS/WALL SYSTEM.

OLI #11:PROVIDE ADDITIONAL CONCRETE SIDEWALK

PAVEMENTS AS INDICATED IN DRAWINGS.

OLI #12:PROVIDE 2" FABRICATED WALL PANELS ON

BUILDING EXTERIOR - I.L.O. 2" EIFS.

OLI #13:PROVIDE SCHEDULED INTERIOR FLOOR

FINISHES- I.L.O. COATED CONCRETE (NOT

INCLUDING EPOXY FLOORING, ANTI-STATIC

FLOORING IN COMM ROOM OR PORCELAIN

FLOORING TILE IN RESTROOMS & JANITOR

ROOM).

RICHARD S.

JOHNSON

JASON

MARK

ELLIOTT

30719

J.T.

LITTLE JR.

2055520555

OKLAHOMA CERTIFICATE

OF AUTHORIZATION

P.E: # 1072

EXP. 06/30/2

OKLAHOMA CERTIFICATE

OF AUTHORIZATION

ARCHITECTURE: # 00199

EXP. 06/30/

1384573777N Rectangle

3/4" CHAMFER

TYPICAL

#4 AT 12" OC EACH WAY

R E

FE

R

M

EC

H

AN

IC

AL

NOTES:

1. DRILL AND GROUT #4 DOWELS AT 2'-0" OC

TYPICAL AT PERIMETER, (4) EACH PAD MINIMUM.

2. REFER TO MECHANICAL DRAWINGS FOR PAD LOCATIONS.

R

EF

ER

P

LA

N

VA

R

IE

S

(4 " M

IN

IM

U M

8"

CONTROL JOINT

HSS COLUMN

REFER PLAN

NON-SHRINK CONC

AROUND COLUMN

INTERIOR

CONTROL

JOINT

CONTROL

JOINT

HSS COLUMN

REFER PLAN

CORNER EXTERIOR

NON-SHRINK CONCRETE

AROUND COLUMN

HSS COLUMN

REFER PLAN

NON-SHRINK

CONC

AROUND COLUMN

SAWED

JOINT

90.00°

90.00°

90.00°

TRANSVERSE SLAB STEEL

VAPOR RETARDER

REFER SPECIFICATIONS

CUT 3" OUT OF

EVERY OTHER BAR

AT SAW JOINT

LONGITUDINAL

SLAB STEEL

REFER SLAB

PLAN

SEALANTNOTE:

SAW JOINT WITHIN 8 HOURS

AFTER CONCRETE IS PLACED

1/8"

1/

4" A

T 5"

S

LA

B 2"

A T

8" S

LA

B

MAXIMUM

1 1/2" CLEAR

3"

AT

8"

SL

AB

2"

A T

5" S

LA

B

R

EF

ER

P

LA

N

NOTE:

CONSTRUCTION JOINTS

REQUIRED AT SLAB COLD

JOINTS.

SEALANT

FORMED JOINT

VAPOR RETARDER

REFER SPECS

DIAMOND

PLATE

DOWELS

3/8" THICK BY

4 1/2" SQUARE

AT 12" OC

1/4" SAW CUT

1/

4" A

T 5"

S

LA

B

2" A

T 8"

S

LA

B

REFER SLAB PLAN

3" A

T 8"

S

LA

B 2"

A T

5" S

LA

B

R

EF

ER

P

LA

N

MAXIMUM

3" CLEAR

AT SLABS WITH FLOOR

DRAINS USE ASTM D1

190 SEALANT

REFER FOUNDATION

SECTIONS FOR

REINFORCING

INFORMATION

LAPPED TOP BAR

FROM ADJACENT

SPAN

LOCATE POUR JOINTS BETWEEN

QUARTER AND THIRD POINTS OF

CONTINUOUS FOOTING SPAN

D /3

D /3

D /3

1"

2" 2"

1/

4"

(R

EF

ER

PL

AN

"D

ANCHOR BOLT

DIAMETER

BASE PL OVS

HOLE DIAMETER

PL WASHER

DIMENSIONS

PL WASHER STD

HOLE DIAMETER

3/4"

BASE PLATE HOLE AND PLATE WASHER

GEOMETRY

1" 1 1/4" 1 1/2" 1 3/4"

2"

1 5/16" 1 13/16" 2 1/16" 2 5/16" 2 3/4" 3 1/4"

1/2"X3"X3" 1/2"X3"X3" 1/2"X3"X3"

1/2"X3 1/2"X3 1/2" 5/8"X4"X4" 3/4"X5"X5"

13/16" 1 1/16" 1 5/16" 1 9/16"

1 13/16" 2 1/16"

2X D

IA

VA

R

IE

S 1'

-2 " T

YP

* P

R O

J

T

H R

D

(REFER BASE PL TYPE)

VARIES

COLUMN, REFER PLAN

1. ANCHOR RODS SHALL MEET THE REQUIREMENTS OF

ASTM F1554 UNLESS NOTED OTHERWISE.

2. ALL ANCHOR RODS SHALL BE FURNISHED WITH HEAVY

HEX NUTS AND PLATE WASHERS OF SPECIFICATIONS

COMPATIBLE WITH THOSE OF THE THREADED SHANKS,

UNLESS NOTED OTHERWISE.

3. FOR CONVENTIONAL COLUMNS (W & HSS SHAPES), A

NUT AND WASHER SHALL BE PLACED UNDER THE BASE

PLATE AND USED FOR LEVELING.

ANCHOR ROD NOTES:

*PROJ = BASE PLATE THICKNESS + NSG + WASHER + DIA + 1 1/2"

**THRD = PROJ + 1"

2" NON-SHRINK

GROUT PAD TYP

TO CONC

PLATE WASHERS

PLATE WASHER

(REFER BASE PLATE AND

WASHER GEOMETRY

SCHEDULE)

GRID

G R

ID

2"

1/ 2"

1/

2" 2"

1/

2"

1/ 2"

2" 4 1/2" 4 1/2" 2"

6 1/2" 6 1/2"

3/4" THICK BASE PL W/

(4) 3/4" DIA ANCHOR RODS

HSS 5x5 COLUMN

PLATE WASHER

TYP TOP & BOT

(8 TOTAL)

3/16

3 SIDES

TYP 1/4

COL TO

BASE PL

BASE PLATE - 1

GRID

G R

ID

2" 4"

4" 2"

6" 6"

3" 5" 5" 4" 4" 2"

1'-5" 6"

1" THICK BASE PL W/

(8) 1" DIA ANCHOR RODS

HSS 5x5 COLUMN

PLATE WASHER

TYP TOP & BOT

(16 TOTAL)

3/16

3 SIDES

TYP 5/16

COL TO

BASE PL

BASE PLATE - 3

GRID

G R

ID

1/

2" 4"

4"

1/ 2"

1/

2"

1/ 2"

2 1/2"

4 1/2" 4 1/2"

2 1/2"

7" 7"

1" THICK BASE PL W/

(4) 1" DIA ANCHOR RODS

W14 COLUMN

PLATE WASHER

TYP TOP & BOT

(8 TOTAL)

3/16

3 SIDES

TYP

3/16

COL TO

BASE PL

BASE PLATE - 2

GRID

G R

ID

1/

2" 4"

4"

1/ 2"

1/

2"

1/ 2"

2 1/2" 4" 4" 4 1/2" 4 1/2" 2 1/2" 1'-3" 7"

1 1/4" THICK BASE PL W/

(6) 1 1/4" DIA ANCHOR RODS

W14 COLUMN

PLATE WASHER

TYP TOP & BOT

(12 TOTAL)

3/16

3 SIDES

TYP 3/16

COL TO

BASE PL

BASE PLATE - 4

GRID

G R

ID

2" 4"

4" 2"

6" 6"

2" 6" 6" 4" 4" 2"

1'-6" 6"

1" THICK BASE PL W/

(12) 1" DIA ANCHOR RODS

HSS 5x5 COLUMN

PLATE WASHER

TYP TOP & BOT

(24 TOTAL)

3/16

3 SIDES

TYP 5/16

COL TO

BASE PL

BASE PLATE - 5

2" 2" 8" 2"

4" 10"

2"

1/ 2"

1/

2" 2"

1/

2"

1/

2" 3/4" THICK BASE PL W/

(4) 3/4" DIA ANCHOR

RODS

PLATE WASHER

TYP TOP & BOT

(8 TOTAL)

1/4

COL TO

BASE PL

HSS 7x7 POST

BASE PLATE - 6

CMU PARTITION WALL

REFER PLAN

#6x48" BAR DOWEL

AT 8" OC W/ 8"

EMBED USING HILTI

HY-200 EPOXY

GROUT

(2) #4 BARS CONT

CONC SLAB

(REFER PLAN )

ENGINEERED FILL 2 IN. SAND LAYER

15 MIL MIN VAPOR

RETARDER, TYP

UNDER SLAB

TY

P

3" C

LR

#4 BAR MATCHING

SLAB SPACING

7" 5"

1' -0

1'-4"

CONCRETE REINFORCEMENT LAP LENGTH SCHEDULE

BAR

SIZE

TOP

#4

#5

#6

#7

#8

#9

#10

#11

1. VALUES ARE BASED ON 4,000 PSI CONCRETE, MINIMUM 60,000 PSI

REINFORCEMENT STEEL AND NORMAL WEIGHT CONCRETE. LENGTHS

ARE IN INCHES.

2. CENTER TO CENTER SPACING WAS ASSUMED TO BE GREATER THAN

1.0 db PLUS TWICE THE CONCRETE COVER

3. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF

CONCRETE CAST BELOW THE BARS.

4. FOR GRADE 75 REINFORCING BARS, MULTIPLY THE TABULATED VALUES

BY 1.25. FOR GRADE 80 REINFORCING BARS, MULTIPLY THE TABULATED

VALUES BY 1.33.

5. FOR LIGHTWEIGHT CONCRETE, DIVIDE THE TABULATED VALUES BY

0.75.

#3

LAP

CLASS

A B A B A B A B A B A B A B

A B

A B

OTHER

UNCOATED

COVER=0.75"

TOP OTHER

UNCOATED

COVER=1.50"

TOP OTHER

UNCOATED

COVER=2.00"

TOP OTHER

UNCOATED

COVER=3.00"

8" Ø STD WEIGHT PIPE

(CONCRETE FILLED) 4'-0"

PROJECTION ABOVE SLAB

CONCRETE SLIGHTLY

ROUNDED

NOTES:

1. POST TO BE PRIMED PRIOR TO SETTING IN

CONCRETE.

2. TOP OF BLOCKOUT SURFACE SHALL MATCH

SURROUNDING SURFACE IN COLOR, TEXTURE, AND

TREATMENT.

3. COORDINATE LOCATIONS WITH ARCHITECTURAL.

FINISH BLOCKOUT TO MATCH SLAB

4" C

LR

2'-0"

BOLLARD

BLOCKOUT 2'-0"

TOP OF SLAB

(2) #4 HOOPED

TIES

CENTER POST

IN CONCRETE

CONCRETE

ENCASEMENT

TOP OF SLAB

REFER PLAN

4' -0

AW

AY

FR

O

M

BL

D G

4' -0

" A

BO

VE

G

R

AD

E

ELEV 104'-0"

NEAR BLDG

100'-0"

TOP OF SLAB

PAVEMENT

REFER CIVIL

1' -2

8" 6"

8"

3" C

LR

1/2" EXPANSION MAT'L

AROUND PAD

#4 "Z" BAR

AT 12" OC 18"

#4 BARS AT 12"

OC EA WAY

CONT #4 BAR

2" C

LR

D /3

D /3

D /3

D

R

EF

ER

P

LA

N

4" 4"

2" TYP

4" 4"

#4X4'-0" BAR EA SIDE OF CONT

FOOTING AND TOP AND BOT OF PIPE.

FOR 12" DIA PIPES USE #5X6'-0" BARS

TIES PER FOUNDATION DETAILS

NOTE:

1. PIPE PENETRATION SHALL OCCUR BETWEEN

1/3 AND 1/2 OF THE SPAN OF CONT FOOTING

2. PIPE PENETRATION THROUGH SPREAD

FOOTINGS SHALL HAVE A MINIMUM OF 6

INCHES CLEAR FROM EDGE OF FOOTING.

3. UNDER-SLAB UTILITIES SHALL NOT RUN

UNDER SPREAD FOOTINGS

PROVIDE ADDITIONAL TIES

EA SIDE OF PIPE SLEEVE

TOP OF SLAB

ELEV = REF PLAN

CONC SLAB

(REFER PLAN) CONC SLAB (REINF

NOT SHOWN)

PIPE BY PLUMB

PROVIDE SLEEVE WITH

COMPRESSIBLE MATERIAL

SURROUNDING UTILITY AND

WITHIN ANNULAR SPACE FOR

PIPE (VERIFY LOCATION AND

COORD SIZE OF PIPE

W/PLUMBING)

CONT FOOTING

(REF PLAN)

REINF (REF PLAN)

SECTION ELEVATION

DEPTH ALLOWED

PIPE PENETRATION

SEE NOTE

POUR CONCRETE AROUND

PIPE UNDER FOUNDATION

WHEN PLACING CONCRETE

FOR THE FOUNDATION.

M

IN6"

M

IN

1' -0

MIN

1'-0"

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity C

:\U sers\gm r\D ocum ents\71350_Stru_G R eddout .rvt 2/4/2022

11:40: 47

AM

FEBRUARY 10, 2022

TYPICAL DETAILS

S-002

TJD

CGH

CGH

SCALE: NTS

TYPICAL HOUSE KEEPING PAD DETAILD3

SCALE: NTS

SLAB BLOCKOUT - CIRCULARC1

SCALE: NTS

SAWED CONTROL JOINT (SJ)D2SCALE: NTS

CONSTRUCTION JOINT (CJ)D1

SCALE: NTS

BULKHEADB1

SCALE: NTS

THICKENED SLABA1

SCALE: NTS

TYPICAL BOLLARD DETAILA4

SCALE: NTS

TYPICAL EXTERIOR HOUSE

KEEPING PAD DETAILB2

SCALE: NTS

PIPE PENETRATION THRU FOUNDATIONC3

J J

GFI

48"

48"

48"

T

H

J

L

F

126A

125A

FIRE PROT

ELEC

2' - 0" 28' - 4" 11" 1' - 1"

63' - 6"

12' - 4"

13' - 8"

2" 12' - 2"

0"

2" 13' - 4"

2"

5/8"

3/8" 4"

10' - 8" 4"

3/8"

5/8"

2' - 0" 28' - 4" 11" 1' - 1"

1'

1"

/1

OLI #4

OLI #4

OLI #5

TRANSFORMER

MECH EQUIP

8" CONC FILLED

STEEL PIPE

BOLLARD

8" CONC FILLED

STEEL PIPE

BOLLARD OLI #7

8" CONC FILLED

STEEL PIPE

BOLLARD

6'

1/

2" 6'

1/ 2"

8" CONC FILLED

STEEL PIPE

BOLLARD OLI #7

8" CONC FILLED

STEEL PIPE

BOLLARD OLI #7

2" 28' - 0" 2"

2" 28' - 2" 2"

A4

AE102

A3

AE102

16.62°

CMU / EIFS VENEER

SCREEN WALL (OLI #4)

SCREEN WALL CONCRETE

FOUNDATION (OLI #4)

B3

AE102

B3

AE102

SIM

B3

AE102

SIM

C1

AE102

CONCRETE GATE POST FOUNDATIONS:

COORDINATE WITH WALL FOUNDATION

NETWORK

ROOM

GROUND FLOOR

100' - 0"

3'

0" 3'

0"

3'

0"

1'

4"

1'

6"

1' - 1"11"28' - 4"2' - 0"

EIFS1

(FWP1-OLI#12)

EIFS2

(FWP2-OLI#12)

B3

AE102

SIM

NETWORK

ROOM

GROUND FLOOR

100' - 0"

EIFS1

(FWP1-OLI#12)

EIFS2

(FWP2-OLI#12)

1' - 1" 11" 28' - 4" 2' - 0"

6X6 PREFIN

DOWNSPOUT

B3

AE102

FACE OF

EXPOSED SLAB

EDGE

8" CONC FILLED STEEL

PIPE BOLLARD OLI #7

1'

6" 1'

4"

3'

0" 3'

0"

3'

0"

PREFIN METAL COPING

GROUND FLOOR

100' - 0"

CONCRETE

FOUNDATION

PREFIN METAL

COPING

PAINT EXPOSED FACE

OF CMU TO MATCH

EIFS COLOR BANDS

ON OUTSIDE FACE

MECH YARD PAVING

(REFER TO CIVIL)

GROUT FILLED 8"

CMU & BOND

BEAMS

GROUT FILLED 4"

CMU SPACER

BLOCK

9'

0" 1'

4"

3'

0" 3'

0"

3'

0"

EIFS1

(FWP1-OLI#12)

EIFS2

(FWP2-OLI#12)

EIFS2

(FWP2-OLI#12)

3/4" CHAMFER ON ALL EDGES

B1

AE102

7 5/8"

2"

FLUID-APPLIED

MEMBRANE AIR BARRIER

CONT PREFIN SHEET

METAL J FLASHING FOR

EIFS OR FWP OPTION (SET

IN CONT BEAD OF BUTYL

SEALANT)

GROUND FLOOR

100' - 0"

CONCRETE

FOUNDATION

CONCRETE PAVING

(REFER TO CIVIL)

CONCRETE GATE POST FOUNDATIONS:

COORDINATE WITH WALL FOUNDATION

MFRS STANDARD

CANE BOLTS

2'

0" 1'

6"

1'

4" 9'

0"

1' - 6"

3'

0" 3'

0"

3'

0" N

O M

9"

PREFIN METAL

COPING

EIFS1

(FWP1-OLI#12)

EIFS2

(FWP2-OLI#12)

3/4" CHAMFER ON

ALL EDGES

PAINT EXPOSED FACES OF CMU

INSIDE ENCLOSURE TO MATCH EIFS

COLOR BANDS ON OUTSIDE FACE

G

AT

E H

EI

G

H T

9'

1" N

O M

4"

PREFIN METAL

COPING

1/2" DIA EPOXY

ANCHORS AT 24" OC

(MIN 4" EMBED)

CONT 3/4" TREATED

PLYWOOD BLOCKING

PAINT EXPOSED FACE

OF CMU TO MATCH

EIFS COLOR BANDS ON

OUTSIDE FACE

7 5/8" 2"

FLUID-APPLIED

MEMBRANE AIR BARRIER

2" EIFS INSUL BOARD

(FWP - OLI#12)

INSUL BOARD

DRAINAGE CHANNELS

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

N

4' 12'8'0

3/16" = 1'-0"

C :\U sers\jcl\D oc um ents\M y

R evit\71350_Arch_jlu ckow ski.rvt 2/4/2022

7:54:4 7 A

M

FEBRUARY 10, 2022

MECHANICAL YARD /

DUMPSTER SCREEN WALL

PLANS AND DETAILS

AE102

JMI

JCL

JCL

SCALE: 3/16" = 1'-0"

MECH YARD & DUMPSTER SCREEN WALL PLANB4

SCALE: 3/16" = 1'-0"

MECH SCREEN WALL - NORTH ELEVATION (OLI #4)A4SCALE: 3/16" = 1'-0"

MECH SCREEN WALL - SOUTH ELEVATION (OLI #4)A3

SCALE: 3/4" = 1'-0"

MECH SCREEN WALL SECTION (OLI #4)B3

SCALE: 1/2" = 1'-0"

DUMPSTER ENCLOSURE GATE ELEVATION (OLI #5)C1

EXT DUMPSTER SCREEN WALLS - SIMILAR (OLI #5) EXT DUMPSTER SCREEN WALLS - SIMILAR (OLI #5)

DUMPSTER SCREEN WALLS - SIMILAR (OLI #5)

0 1' 2' 4'

1/2" = 1'-0"

1' 3'2'0

3/4" = 1'-0"

SCALE: 3" = 1'-0"

SECTION DETAIL (OLI#4 & 5)B1

3" 9"6"0

3" = 1'-0"

RICHARD S.

JOHNSON

T

TT

T

T

T

T

T

T

T T

T

T

T

T

H

T H

T

T

T H

M-301

A11 1/4" HWS

1" HWS

1" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

VAV-1-02

VAV-1-03

VAV-1-01

123 111

109125 117

120122

A A

B B

C C

D D

E E

F

G

H

J

K

L

D.5 D.5

A3 M-401

SIMULATOR COCKPIT A/C UNIT

(BY OTHERS), COORD. PIPING

INSTALLATION & PROVIDE FINAL

CONNECTION TO UNIT.

VAV-1-06

VAV-1-05

VAV-1-04

VAV-1-07

VAV-1-08

VAV-1-09VAV-1-11

VAV-1-10

VAV-1-12

M-301 B4

M-301 B1

CH-2

AHU-2

AHU-2

LVR-2

12 13

CH-1

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR 3/4" HWS

ACCU-1

FCU-1

ROUTE CHW PIPES

BELOW GRADE BEAM

COORD. W/

UNDERGROUND

CONDUIT &

FIRE PROT.

E.7 E.7

FCU-2

1 1/2" CHR

1 1/2" CHS

2" CHS

2" CHR

3/4" CD

3/4" CHR

3/4" CHS

1" CHS

3/4" CD

3/4" CD

CRAC-1

CRAC-2

FCU-4

3/4" HWS

3/4" HWR

1" CHR

3/4" HWS

3/4" HWR

3/4" CD

3/4" CD

3/4" CD

EHS2

DASHED LINE OUTLINES

"SECURED AREA" EXTENTS

IN PLAN VIEW

DASHED LINE OUTLINES

"SECURED AREA" EXTENTS

IN PLAN VIEW

DASHED LINE OUTLINES

"SECURED AREA" EXTENTS

IN PLAN VIEW

COORDINATE WITH

FIRE PROTECTION

PIPE IN SECURE

AREA SPACE

3/4" CD

1 1/4" CHS

& CHRLVR-4

LVR-3

EF-1

LVR-1

3/4" CD

1 1/2" CHS

1 1/2" CHR

3M G

4 4

DPT

D

PT

14 13

21 TYP.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

N

4' 12'8'0

3/16" = 1'-0"

C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022

1:52:1 1 P

M

FEBRUARY 10, 2022

PIPING PLAN - GROUND FLOOR

MP101

RRS

CAD

JLW

GENERAL NOTES

SHEET KEYNOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

B. MINIMUM CHILLED & HEATING WATER PIPE SIZE

SHALL BE 3/4". ALL CHILLED & HEATING WATER

BRANCH PIPING RUNOUTS SHALL BE 3/4" U.N.O.

AND SHALL TEE OUT OF THE TOP OF THE MAINS.

C. ALL WALL SENSORS (I.E. THERMOSTATS & HUMI-

DISTATS) SHALL BE MOUNTED 48" A.F.F. U.N.O.

D. MINIMUM CONDENSATE PIPE SIZE SHALL BE 3/4".

ALL HORIZONTAL CONDENSATE DRAINAGE

PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.

E. ALL NATURAL GAS APPLIANCES SHALL INCLUDE

SHUTOFF COCK, DIRT LEG, & UNION.

1. PROVIDE PENETRATION SIMILAR TO DETAIL

A1/M-501.

2. EMERGENCY HVAC SHUT-DOWN SWITCH.

3. GAS SERVICE LINE UP FROM BELOW GRADE TO

METER/REGULATOR.

4. HEATING WATER MAINS ROUTED ABOVE THE

SECURE AREA "LID", SERVING ALL THE NON-

SECURE AREAS.

5. SECURE AREA HEATING WATER PIPING, ALL

BELOW THE SECURE AREA "LID."

6. MOUNT TEMPERATURE & HUMIDITY SENSORS UP

HIGH, 30'-0" A.F.F. PER SIMULATOR GUIDELINES.

7. SUPPORT & SECURE RUNOUT PIPING (FOR

FLOOR-MOUNTED UNIT) FROM FLOOR.

8. SIZE REFRIGERANT SUCTION & LIQUID LINES IN

ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS.

9. COORDINATE PIPING INSTALLATION WITH

ARCHITECTURAL CEILING SOFFIT TO MAINTAIN

REQUIRED SEPARATION TO ELECTRICAL/FIRE

PROTECTION ROOM.

10. CHILLER CH-2 BRANCH PIPING, VALVES, AND

ACCESSORIES PAST THIS POINT ARE PART OF

O.L.I. #7. IF O.L.I. #7 IS NOT SELECTED, PROVIDE

ISOLATION VALVE AND CAP.

11. EXPANSION JOINT WHERE PIPING CROSSES 5"

ARCHITECTURAL EXPANSION JOINT.

12. 6" THICK CONCRETE HOUSEKEEPING PAD UNDER

EQUIPMENT. REF DETAIL C2/M-501.

13. CHILLER CH-2 AND PAD PART OF OLI #7.

14. INSTALL EQUIPMENT WITH MFR'S REQUIRED

CLEARANCES.

15. ALIGN OUTERMOST EDGE OF CHILLER CH-2 (IF

PROVIDED) OR EQUIP. PAD WITH OUTER EDGE OF

SCREEN WALL / FENCE. REFER TO STRUCT. &

CIVIL SHEETS SB102 & C-401 FOR SCREEN WALL

LENGTH & POSITION RELATIVE TO DRIVEWAY.

16. ELEC. TRANSFORMER & PAD. SHOWN FOR REF.

ONLY, REF. TO ELEC. PLAN C2/EP401. COORD.

REQUIRED CLEARANCES TO MECH. EQUIP.

17. CHILLED WATER SUPPLY & RETURN PIPING DOWN

TO BELOW GRADE & INTO MECH. ROOM. SLEEVE

PIPES THRU CONCRETE PAD 6" LARGER IN EA.

DIMENSION THAN SLEEVES. SLEEVE COLLAR

SHALL BE MIN. OF 6" ABOVE FINISHED GRADE.

FILL INTERSTITIAL COLLAR SPACE WITH SUITABLE

MATERIAL.

18. FOR REFERENCE: WALL SPACE RESERVED FOR

FIRE PROT. EQUIP, TEST HEADERS, &

MAINTENANCE ACCESS.

19. ROUTE CONDENSATE DOWN TO FLOOR DRAIN

WITH 1" AIR GAP.

20. ROUTE REFRIGERANT PIPING DOWN EXPOSED,

THEN OUT THRU WALL SLEEVE TO EXTERIOR.

21. SUPPORT PIPING 12" A.F.G. WITH PIPE STANDS.

SCALE: 3/16" = 1'-0"

GROUND FLOOR MECHANICAL PIPING PLANB2

ROOM LIST

NUMBER NAME

101 LOBBY

102 CORR

103 CORR

104 SITE MGR

105 COR

106 INSTRUCTOR'S OPEN OFFICE

107 WORK/COPY

108 CBT/MP

109 BREAK

110 JAN

111 RECYCLING

112 MEN

113 WOM

114 VEST

115 LMPTT

116 COMM

117 CORR

118 DEBRIEFING

119 DEBRIEFING

120 CORR

121 STOR

122 DEBRIEFING (VTRAT)

123 DEBRIEFING

124 MECH

125 ELEC

126 FIRE PROT

127 MOTION BAY

128 MAINT. SUPPORT

129 IT SUPPORT

130 MAINT OFFICE

131 NETWORK ROOM

GAS SERVICE LINE (BELOW

GRADE), REF. CIVIL UTILITY

SHEET C-601 FOR CONTIN.

1384573777N Rectangle

GROUND FLOOR

100' - 0"

LOW ROOF FRAMING

113' - 0"12"x18"

18"x18" 10"x10" RA

10"ø SA3/4" HWS

MECH

DEBRIEFING

(VTRAT)

CORR

CORR

4 5 6 7 8 9 10 11 12 13 14 15 16

DASHED LINE OUTLINES

"SECURED AREA" EXTENTS

IN THIS SECTION VIEW

12"x12"

12"x10" SA

CONCRETE LID OVER

SECURED AREAS

SECURE SIDE

12"x16"

16"x18" RA

12"x22" SA

10"x12"18"x18"

18"x20" RA

12"x22" SA

18"x20" RA

DS-2

12"x16"

"x

GROUND FLOOR

100' - 0"

LOW ROOF FRAMING

113' - 0"

H J K L

2" CW

6" FIRE PROTECTION PIPE

22"x12" SA

3/4" HWR

3/4" HWS 10"x10" RA

CONCRETE LID

CABLE TRAY

NON-SECURE ATTIC TUNNEL

DASHED LINE OUTLINES

"SECURED AREA"

EXTENTS IN THIS

SECTION VIEW

10"x12" SA

14"x18" RA

CORR

STOR

LIGHTS & SENSORS

IN LAY-IN CEILING

F.P. PIPING

1" HWR

1" HWS

STRUCTURAL STEEL

SECURE SIDE

20"x18" RA

GROUND FLOOR

100' - 0"

LOW ROOF FRAMING

113' - 0"

HIGH ROOF FRAMING

142' - 0"

2 3 4 5 6 7 8 9 10

30"ø SA

2" CHS

2" CHR

3/4" HWS &

3/4" HWR

6"ø SA

8"x8" RA

TEMPERATURE SENSOR &

HUMIDITY SENSOR, HIGH

WALL MOUNT. INSTALL

TEMPERATURE SENSOR

AT GYPBOARD FACE,

BETWEEN WALL STUDS, &

COORD. FOR INSULATION

TO BE INSTALLED BEHIND

GYPBOARD AT THIS

LOCATION.

S-5

S-5

S-6

22"ø SA

MOTION BAY

' A

.F .F

32"x32" SA

S-5

S-6

S-5

30"ø SA 22"ø SA

32"x32" RA

S-5

THERMOSTAT &

HUMIDISTAT

R-4

SIMULATOR COCKPIT A/C UNIT

(BY OTHERS), COORD. PIPING

INSTALLATION & PROVIDE FINAL

CONNECTION TO UNIT.

VENT THRU ROOF, REF.

PLBG. SHEET P-102

CEILING, REF. ARCH.

SHEET AE103

BRIDGE CRANE BEAM,

REF. STRUCT. SHEET SF102

CABLE TRAY, REF.

ELEC. SHEET ET101

COORD. TO AVOID STRUCTURAL

ELEMENTS AT WALL PENETRATION

INCLUDING STRUCTURAL CROSS-

BRACING ON THE OTHER SIDE OF THIS

WALL IN MECH. ROOM STRUCT. I-BEAM AT

TOP OF CMU WALL

STRUCT.

X-BRACE

BEYOND

R-2

R-4

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

0 2' 4' 8'

1/4" = 1'-0"

C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022

2:33:3 4 P

M

FEBRUARY 10, 2022

MECHANICAL SECTIONS

M-301

RRS

CAD

JLW

SCALE: 1/4" = 1'-0"

STACKED DUCTWORK SIZING & ROUTING SECTIONA1

SCALE: 1/4" = 1'-0"

NON-SECURE UTILITY ATTIC "TUNNEL" SECTIONB4

SCALE: 1/4" = 1'-0"

SIM. MOTION BAY MECHANICAL SECTIONB1

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

B. SEAL ALL DUCTWORK IN ACCORDANCE WITH

SMACNA SEAL CLASS "A".

C. NON-MECHANICAL ITEMS SHOWN FOR REF. ONLY

(I.E. ELECTRICAL, STRUCTURAL, ARCHITECTURAL,

FIRE PROTECTION). REF. OTHER RESPECTIVE

DISCIPLINE DRAWINGS FOR FINAL COORD.

100' - 0"

LOW ROOF FRAMING

113' - 0"

GH

J K

L

LVR-1

MECH

GAS

METER

AHU-1

HWBT-1

RF-1

BLR-2BLR-1

HUM-1

FCU-3

HWP-4

HWP-3

XT-2

CF-2

HWP-1

HWP-2

12"x22"

"x

"x

"x

"x

20"x22"

30"x60"

CD-1

GROUND FLOOR

100' - 0"

LOW ROOF FRAMING

113' - 0"

G H

J K

L

CWBT-1

LVR-1

MECH

AHU-2

CWP-1

CWP-2

CD-1

RF-2

CD-2

"x

" 32"x32"

20"x22"12 "x

" 30"x60"

CP-1

CP-2

CP-3 CP-4

CP-5

CF-1

XT-1

AS-1

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

0 1' 2' 4'

1/2" = 1'-0"

C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022

2:28:0 1 P

M

FEBRUARY 10, 2022

MECHANICAL SECTIONS

M-302

RRS

JLW

JLW

SCALE: 1/2" = 1'-0"

MECHANICAL ROOM SECTION LOOKING PLAN-EASTA3

SCALE: 1/2" = 1'-0"

MECHANICAL ROOM SECTION LOOKING PLAN-WESTB1

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

B. SEAL ALL DUCTWORK IN ACCORDANCE WITH

SMACNA SEAL CLASS "A".

C. NON-MECHANICAL ITEMS SHOWN FOR REF. ONLY

(I.E. ELECTRICAL, STRUCTURAL, ARCHITECTURAL,

FIRE PROTECTION). REF. OTHER RESPECTIVE

DISCIPLINE DRAWINGS FOR FINAL COORD.

M-302 B1

M-302 A3

G

H

J

K

L

CWBT-1

LVR-1

ACCESS PANEL

AS-1

XT-1

CF-1

CP-1

CP-2

CP-3

CP-4

CP-5

VFD-6

VFD-5VFD-4

VFD-3

VF

D

-2

VF

D -1

MECH

DEBRIEFING

DEBRIEFING

(VTRAT)

MOTION BAY

CD-2

RF-2

RF-1

FCU-3

BLR-1

BLR-2

HWP-3

HWP-4

HWP-1

HWP-2

CWP-2

CWP-1

AHU-2

AHU-1

CF-2XT-2

HWBT-1

HUM-160"x30"

36"x28" SA

"x

SA

"x

R A

"x

SA

CD-1

32"x32" RA

34"x50"

12"x32"

22"x20"

22"x12"

32"x32"

AC

C

ES

S

PA

N

EL

19 19

34"x30"

"x

22"x20"

22"x20"

"x

16"x12"

"x

"x

M-302 B1

M-302 A3

G

H

J

K

L

GAS METER/ REGULATOR

0.5 PSI OUTLET

TOTAL CONNECTED LOAD = 1,598 CFH

CWBT-1

VFD-1

VFD-2

VFD-3

VF

D

-4

VF

D

-5

VFD-6

CP-1

CP-2

CP-3

CP-4

CP-5

TO

R

F-

TO

R

F-

TO

C

W P-

TO

C

W P-

TO

H

W P-

TO

H

W P-

XT-1

CF-1

AS-1

1 1/2" STEAM

TO AHU-2

HUMIDIFIER

MECH

DEBRIEFING

(VTRAT)

DEBRIEFING

MOTION BAY

3/4" HWR

3/4" HWS

1" HWR

1" HWS

3/4" CHR

3/4" CHS

3/4" CD

3/4" HWR

3/4" HWS

3/4" HWR

HWBT-1

XT-2 CF-2

HWP-3

HWP-4

CWP-1

CWP-2

HWP-1

HWP-23

FCU-3

BLR-1

BLR-2

AHU-2

AHU-1

3" C

H R

1" CHR

2" C

H R

1/

4" H

W S

1/

4" H

W R

3/4" HWS

3/4" HWR

2 1/2" CHR

3" CHS

1 1/4" HWR

1 1/4" HWS

1" CHS

1" CHR

3/4" CD

3/4" HWS

2" CHS

2" CHR

2" CHS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWS

1 1/4" HWR

3" C

H R

1" C

H S

3/ 4"

H W

R 3/

4" H

W S

3/4" CD

3" C

H R

2" HWS

3 TYP.

3/4" CD

1 1/2" STM

1 1/4" HWR

1 1/4" HWS

HUM-1

3/4" CD

3/4" CD

1" CD 9

G

2"

1 1/2" G

1 1/2" G

C H

S

C H

S

3"

3"

3"

3"

16 17

1/

4" C

H R

2" C

H S

STACKED 2" CHS & CHR

1 1/4" CHS

3"

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

N

0 1' 2' 4'

1/2" = 1'-0"

C :\U sers\jlw \D o cum ents\M y R evit\71350_M ech_J W oodEngr44.rvt 2/8/2022

1:52:2 6 P

M

FEBRUARY 10, 2022

ENLARGED PLANS

M-401

RRS

CAD

JLW

GENERAL NOTESSHEET KEYNOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

B. SEAL ALL DUCTWORK IN ACCORDANCE WITH

SMACNA SEAL CLASS "A".

C. DUCTWORK DIMENSIONS SHOWN REPRESENT

INSIDE CLEAR DIMENSIONS. OUTSIDE DUCT

DIMENSIONS FOR DUAL-WALL DUCTS (WHERE

NOTED) SHALL BE LARGER TO ACCOMMODATE

INTERSTITIAL DUCT INSULATION.

D. REFER TO GEN. NOTE "G" ON SHEET MH102 FOR

SPECIAL T.A.B. CONTRACTOR INSTRUCTIONS

FOR AHU-2 SYSTEM.

E. MINIMUM CHILLED & HEATING WATER PIPE SIZE

SHALL BE 3/4". ALL CHILLED & HEATING WATER

BRANCH PIPING RUNOUTS SHALL BE 3/4" U.N.O.

AND SHALL TEE OUT OF THE TOP OF THE MAINS.

F. ALL WALL SENSORS (I.E. THERMOSTATS & HUMI-

DISTATS) SHALL BE MOUNTED 48" A.F.F. U.N.O.

G. MINIMUM CONDENSATE PIPE SIZE SHALL BE 3/4".

ALL HORIZONTAL CONDENSATE DRAINAGE

PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.

H. ALL NATURAL GAS APPLIANCES SHALL INCLUDE

SHUTOFF COCK, DIRT LEG, & UNION.

I. REFER TO MECHANICAL PIPING DIAGRAMS ON

SHEETS M-601 & M-602 FOR PIPE SIZES NOT

INDICATED ON THE PLANS.

J. REFER TO DIAGRAMS C1/M-604 & C4/M-604 FOR

AHU-1 DUCTWORK SIZES.

K. REFER TO DIAGRAMS A1/M-604 & A4/M-604 FOR

AHU-2 DUCTWORK SIZES.

SCALE: 1/2" = 1'-0"

MECHANICAL ROOM DUCTWORK PLANA1 SCALE: 1/2" = 1'-0"

MECHANICAL ROOM PIPING PLANA3

13. MOUNT F.C.U. 9'-6" A.F.F. TO BOTTOM OF UNIT.

COORD. INSTALLATION WITH LIGHTS & EQUIP.

14. MOUNT HUMIDIFIER ON HOUSEKEEPING PAD WITH

SUPPORT LEGS.

15. 2-1/2" CHILLED WATER BYPASS CONTROL VALVE.

16. PIPE PENETRATION THRU SECURE AREA

PERIMETER, REF. NOTES ON SHEET MP101.

17. PIPE CROSSES BUILDING EXPANSION JOINT, REF.

NOTES ON SHEET MP101.

18. PIPING UP ABOVE SECURE AREA "LID" TO SERVE

NON-SECURE AREAS BEYOND.

19. DUCT CROSSES BUILDING EXPANSION JOINT, REF.

NOTES ON SHEET MH102.

20. STACKED DUCTS ABOVE THE "LID" IN THE NON-

SECURE "ATTIC".

SHEET KEYNOTES

1. COORD. INSTALLATION OF DUCT SMOKE

DETECTOR IN SUPPLY DUCT OF A.H.U. WITH FIRE

PROT. & ALARM SYSTEMS. INSTALL ACCESS DOOR

IN DUCT FOR SMOKE DET. SERVICING.

2. 6" THICK CONCRETE HOUSEKEEPING PAD UNDER

EQUIPMENT. REF DETAIL C2/M-501.

3. EQUIP. CLEARANCE LINES, INCLUDING REQUIRED

COIL PULL SPACES, SHALL BE PAINTED ON THE

FLOOR, COORDINATE WITH G.C. & OTHER

TRADES. PAINTING SHALL COMPLY WITH SPEC

SECTION 09 90 00 "PAINTS & COATINGS".

4. SUPPORT UPPER PUMP FROM THE WALL.

5. CONCENTRIC FLUE & INTAKE VENT THRU

SIDEWALL.

6. DASHED LINE OUTLINES "SECURED AREA"

EXTENTS IN PLAN VIEW.

7. DUCT PENETRATION THRU SECURE AREA

PERIMETER, REF. NOTES ON SHEET MH102.

8. CHILLED WATER SUPPLY & RETURN DOWN TO

BELOW SLAB & OUT TO CHILLER YARD. SLEEVE

FLOOR PENETRATION WITH TOP OF COLLAR MIN.

2" ABOVE FINISHED FLOOR.

9. ROUTE CONDENSATE DOWN TO FLOOR DRAIN.

PROVIDE 1" AIR GAP TO FLOOR DRAIN.

10. G.C. TO CONSTRUCT STRUT CHANNEL FRAME TO

SUPPORT CONTROL PANELS 36" A.F.F.

11. TRANSITION DUCT TO FULL LOUVER SIZE (114"W X

36"H) FOR 12" MINIMUM.

12. DO NOT ROUTE PIPING ABOVE ELEC. PANELS.

MANUAL DAMPER

LAY-INSURFACE MOUNT

FLEXIBLE DUCT RUNOUT TO BE SAME

SIZE AS DEVICE NECK.

EXHAUST REGISTER

OR GRILLE

45° BRANCH ENTRY

CONNECTION

RAS/A

MIXING BOX

FILTER

SECTION

HEATING

COIL

SECTION

COOLING

COIL SECTIONFAN SECTION

ACCESS

SECTION

ACCESS

SECTION

BASE RAIL

ACCESS DOOR (TYP.)

(REFER TO PLANS

FOR SIDE TO BE

INSTALLED)

6" CONCRETE

PAD, PER DETAIL

C2/M-501

OA

PARALLEL

BLADE

DAMPERS

EQUIP.

CONTROL

PANEL

CONDENSATE DRAIN OUTLET.

TRAP & PIPE TO FLOOR

DRAIN PER DETAIL A4/M-501

MERV 8 PREFILTER

MERV 13 FINAL FILTER

AIR

FLOW

STUD WALL

MASONRY OR

CONCRETE WALL

ADD ADDITIONAL BRACING AS REQUIRED

SECURE RETAINING ANGLE TO FIRE

DAMPER

FRAME/SLEEVE WITH SHEETMETAL

SCREWS

OR 1/4" DIA BOLTS AT 8" MAXIMUM

SPACINGS, MINIMUM 2 PER SIDE

COVER HANDLE

STAINLESS STEEL NEGATOR

CLOSURE SPRING

ACCESS DOOR LOCATED AS CLOSE

AS POSSIBLE TO THE DOWNSTREAM

SIDE OF FIRE DAMPER

FIRE DAMPER FRAME/SLEEVE

DUCT CONNECTION COLLAR.

SECURE DUCT TO DAMPER

FRAME/SLEEVE WITH S-SLIPS

OR STANDING S-SLIPS WITH

SHEETMETAL SCREWS SECURED

BACK THRU SLIPS AND DUCT,

2 PER SIDE

FIRE DAMPER BLADES

(OUT OF AIRSTREAM)

FUSIBLE LINK, REFER

SPECIFICATIONS FOR

TEMPERATURE RATING

RETAINING ANGLE, INSTALLED TIGHT

AGAINST WALL W/MIN. 1" COVER

OF WALL SURFACE, BEYOND OPENING

A

B

A - TOTAL NEGATIVE STATIC PRESSURE + 1"

B - 1/2 OF A

CONDENSATE

FROM DRAIN

PAN

SEAL PENETRATION

AIR TIGHT

DRAIN LINE SHALL BE AT LEAST

THE SAME SIZE AS THE NIPPLE

ON THE UNIT

OPEN FOR VENTING

ROUTE TO NEAREST

FLOOR DRAIN WITH

INDIRECT CONNECTION

FINISHED FLOOR

AIR HANDLER

CASING

S/A

MIXING BOX

FILTER

SECTION

COOLING

COIL

SECTION

RE-HEAT

COIL SECTION

FAN SECTION

ACCESS

SECTION

ACCESS

SECTION

BASE RAIL

ACCESS DOOR (TYP.)

(REFER TO PLANS

FOR SIDE TO BE

INSTALLED)

CONDENSATE DRAIN OUTLET.

TRAP & PIPE TO FLOOR

DRAIN PER DETAIL A4/M-501

PARALLEL

BLADE

DAMPERS

MERV 8 PREFILTER

MERV 13 FINAL FILTER

RA OAHUMUDIFIER

SECTION

EQUIP.

CONTROL

PANEL

6" CONCRETE

PAD, PER DETAIL

C2/M-501

DIFFERENTIAL

PRESSURE

TRANSMITTER

REMOVABLE CAP

(TYP. OF TWO)

BYPASS (NC)

HIGH PRESSURE

LOW PRESSURE

SPIN-IN FITTING WITH

VOLUME DAMPER

RUN-OUT DUCT TO BE SAME

SIZE AS DIFFUSER NECK U.N.O.

RIGID DUCTWORK, WITH

EXTERNAL INSULATION

INSULATED FLEXIBLE

DUCT. MAX. LENGTH

TO BE FIVE FEET, SIZE

TO BE SAME AS

DIFFUSER NECK

DIFFUSER SUSPENDED CEILING SYSTEMSURFACE MOUNT

BRANCH SUPPLY

DUCT WRAP

AIRFLOW

SURFACE MOUNT

RETURN GRILLE

LAY-IN CEILING

SIDE DUCT TAP SIZE

PER HVAC PLANS

SECURE DUCT TO

GRILLE WITH SHEET

METAL SCREWS

DUCT RISER TO BE

SAME SIZE AS

GRILLE CONNECTION

GRADE OR

FINISHED FLOOR

EQUIPMENT BASE REINFORCEMENT &

CHAMFERS TYP.

REF: STRUCTURAL

DETAIL D3/S-002

6" U

.N .O

6" MIN 6" MIN

SECURE EQUIPMENT

TO PAD PER SEISMIC

SPECIFICATIONS

OUTSIDE

CONTROLLED AREA

WALL

ELEVATION

INSIDE

CONTROLLED AREA

PIPE &

INSULATION

FIRESTOPPING

OR OTHER

SUITABLE

SEALANT

NEOPRENE

CONNECTOR,

TYPICAL

GROUND PIPE WITHIN 6 INCH

OF THE SECURE AREA

PERIMETER PENETRATION

USING NO. 4 COPPER WIRE

TO THE BUILDING GROUND

WIRE CONTINUED

TO METALLIC

STRUCTURE ABOVE

FINISHED

ESCUTCHEON

FINISHED ESCUTCHEON

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity C

:\U sers\jlw

\D o cum ents\M y

R evit\71350_M ech_J W oodEngr44.rvt

2/8/2022 1:52:2 7

P M

FEBRUARY 10, 2022

DETAILS

M-501

RRS

CAD

JLW

SCALE: NTS

TYPICAL EXHAUST GRILLE INSTALLATION DETAILB4

SCALE: NTS

AHU-1 COMPONENT DETAILD1

SCALE: NTS

TYPICAL FIRE DAMPER DETAILA2 SCALE NTS

TYPICAL DRAW-THRU

CONDENSATE DRAIN

INSTALLATION DETAILA4

SCALE: NTS

AHU-2 COMPONENT DETAILC3

SCALE:NTS

B3

DIFFERENTIAL PRESSURE

TRANSMITTER 5 VALVE

BLOCK & BLEED DETAIL

SCALE: NTS

TYPICAL DIFFUSER INSTALLATIONB1

SCALE: NTS

TYP. RETURN GRILLE INSTALLATIONC1

SCALE: NTS

TYPICAL EQUIPMENT PAD DETAILC2

SCALE:NTS

A1

TYP. SECURE AREA PIPE

PENETRATION DETAIL

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

AHU-1

COCKPIT AC

AHU-2

57.1 GPM

2"

1 1/4"

2"

3"

1 1/2"

20.0 GPM

2 1/2"

1 1/2"

20.6 GPM

P1 T1

P1 T1

FS

DPS

P1 T1

P1 T1

FS

DPS

CWP-1

FD

CWP-2

P1

FD

AV

CWBT-1

AV

XT-1

FD

P1

AV

M

AV

M

AV

AV

AV

CWR

CWS

CWS

CWR

CH-2

CH-1

3"

1 1/4"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3" DPT

CF-1

C F

C F

FD

3/4"3/4"

CF

3/4", REFER TO

P-102 FOR

CONTINUATION

NPW

3"

2 1/2"

2"

AIR SEPARATOR AS-1

"OPEN SECURE STORAGE"

AREAS BOUNDARY

P1

FCU-2

1"1"

4.9 GPM

FCU-4

3/4"3/4"

2.6 GPM

1 1/4"

CWR

CWS

3"3"

3"

CRAC-1

10.8 GPM

CRAC-2

10.8 GPM

1 1/2"

1 1/2"

1 1/4" 1 1/4"

2" 2"

FCU-3

1"1"

5.5 GPM

CH-2 & ACCESSORIES, PART OF OLI #7

1 1/4" 1 1/4"

MAV

MAV

DPT

2" 3"

REF. CHEMICAL

FEEDER DETAIL

SYSTEM BYPASS LINE

2 1/2" BYPASS

CONTROL VALVE

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity C

:\U sers\jlw

\D o cum ents\M y

R evit\71350_M ech_J W oodEngr44.rvt

2/8/2022 1:52:2 8

P M

FEBRUARY 10, 2022

CHILLED WATER FLOW

DIAGRAMS

M-601

RRS

CAD

JLW

SCALE: NTS

CHILLED WATER FLOW DIAGRAMA1

SHEET KEYNOTES

1. PROVIDE 3-WAY VALVE PIPING IN ACCORDANCE

WITH DETAIL B4/M-502.

2. REFER TO DETAIL B3/M-501 FOR DIFFERENTIAL

PRESSURE TRANSMITTER INSTALLATION.

3. CHILLER CH-2 AND ALL BRANCH PIPING, VALVES,

AND ACCESSORIES PAST THIS POINT ARE PART OF

OLI #7. IF OLI #7 IS NOT SELECTED, PROVIDE

ISOLATION VALVE AND CAP.

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

B. ALL HEATING WATER PIPING BRANCH RUNOUTS

ARE 3/4" UNLESS OTHERWISE NOTED. REFER TO

MECHANICAL PIPING DIAGRAMS FOR PIPE SIZES

NOT INDICATED IN THE PLANS.

C. PROVIDE 2-WAY VALVE PIPING FOR COILS IN

ACCORDANCE WITH DETAILS A4/M-502, D1/M-502,

OR C4/M-503 UNLESS NOTED OTHERWISE.

D. AUTOMATIC AIR VENTS AND MANUAL AIR VENTS

INDICATED DO NOT SHOW ALL REQUIRED AIR

VENTS. PROVIDE AIR VENTS WHERE AIR COULD

BECOME TRAPPED IN PIPING AND WHERE

MANUFACTURER'S RECOMMEND COIL VENTING.

1384573777N Rectangle

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity C

:\U sers\jlw

\D o cum ents\M y

R evit\71350_M ech_J W oodEngr44.rvt

2/8/2022 1:52:5 4

P M

FEBRUARY 10, 2022

SCHEDULES

M-701

RRS

CAD

JLW

AIR HANDLING UNIT SCHEDULE

MARK SERVES

SUPPLY FAN DATA COOLING COIL DATA (CHILLED WATER) REHEAT COIL DATA (HEATING WATER) ELECTRICAL

WEIGHT

(LBS) NOTES

MAX.

(CFM)

MIN.

(CFM)

MIN. O/A

(CFM)

E.S.P.

(IN.

W.C.)

T.S.P.

(IN.

W.C.)

FAN

SPEED

(RPM)

FAN

QTY.

MOTOR HP

FAN TYPE

COIL

CFM

ENTERING

D.B. / W.B.

(°F)

LEAVING

D.B. / W.B.

(°F)

SENSIBLE

CAP. MIN.

(MBH)

TOTAL

CAP. MIN.

(MBH)

COIL

GPM

MIN.

ROWS

MAX. AIR

P.D. (IN.

W.C.)

MAX.

WATER P.D.

(FT. HEAD)

COIL

CFM

ENTERING

D.B. (°F)

LEAVING

D.B. (°F)

TOTAL

CAP. MIN.

(MBH)

COIL

GPM

MIN.

ROWS

MAX. AIR

P.D. (IN.

W.C.)

MAX.

WATER P.D.

(FT. HEAD) MCA MOCP V / Ø / HZ

BHP

EA.

NOM.

HP EA.

TOT.

NOM. HP

AHU-1 OFFICE AREAS 4,010 1,255 795 2.0 5.0 2,804 2 2.6 5 10 PLENUM 4,010 74.0 / 59.8 46.3 / 46.3 121.5 142.8 20.3 8 1.00 11.1 2,105 59.5 81.2 50.0 3.3 1 0.08 2.3 11.8 15 460 / 3 / 60 1,800 ALL AHU-2 SIMULATION BAY 12,380 3,650 780 1.5 4.6 2,700 4 3.5 5 20 PLENUM 12,380 70.1 / 57.0 48.2 / 47.7 296.3 296.3 42.2 6 0.96 10.7 4,950 65.4 93.6 152.0 10.2 1 0.18 9.1 19.9 20 460 / 3 / 60 3,550 ALL

NOTES:

1. CHILLED WATER COILS SELECTED FOR 42°F ENTERING WATER TEMPERATURE AND 56°F LEAVING WATER TEMPERATURE.

2. HEATING WATER COILS SELECTED FOR 150°F ENTERING WATER TEMPERATURE AND 120°F LEAVING WATER TEMPERATURE.

3. VARIABLE FREQUENCY DRIVE FOR SUPPLY FAN(S).

4. PROVIDE 2" MERV-8 PRE-FILTERS AND 4" MERV-13 MAIN FILTERS.

5. PROVIDE HEATING AND COOLING COILS WITH A FACTORY-APPLIED CORROSION RESISTANT EPOXY COATING.

6. PROVIDE INTERFACE CARDS FOR COMMUNICATION WITH EMCS SYSTEM AS REQUIRED.

7. PROVIDE SINGLE POINT POWER WITH A NON-FUSED DISCONNECT SWITCH.

FAN SCHEDULE

MARK LOCATION SERVICE FAN TYPE

AIRFLOW

MAX / OPER.

(CFM)

MAXIMUM

TSP (IN.

WC)

FAN

SPEED

(RPM)

SOUND

LIMITATION

(DBA)

MOTOR DATA ELECTRICAL

WEIGHT

(LBS) NOTES

MOTOR

(BHP)

DRIVE

TYPE HP FLA V/Ø/HZ VFD

EF-1 BREAK ROOM RESTROOMS & JANITOR CENTRIFUGAL INLINE FAN 535 0.2 874 44 0.03 DIRECT 1/4 3.8 115/60/1 - 50 1, 3 RF-1 MECHANICAL ROOM AHU-1 CENTRIFUGAL INLINE FAN 3475 / 3330 0.4 1317 68 0.8 DIRECT 2 - 460/60/3 VFD-1 170 1, 2 RF-2 MECHANICAL ROOM AHU-2 CENTRIFUGAL INLINE FAN 12380 / 11880 0.4 837 70 2.1 DIRECT 5 - 460/60/3 VFD-2 440 1, 2

NOTES:

1. PROVIDE SPRING ISOLATORS FOR SUPPORT

2. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING

3. EC MOTOR WITH A SPEED CONTROLLER

PUMP SCHEDULE

MARK LOCATION TYPE SERVICE FLUID

DESIGN FLOW

(GPM) HEAD (FT)

ELECTRICAL WEIGHT

(LBS) NOTESHP RPM V/Ø/HZ VFD

CWP-1 MECHANICAL VERTICAL INLINE CLOSE COUPLED CHILLED WATER WATER 132.3 124.7 7.5 HP 3500 460 / 3 / 60 VFD-3 340 1-5 CWP-2 MECHANICAL VERTICAL INLINE CLOSE COUPLED CHILLED WATER WATER 132.3 124.7 7.5 HP 3500 460 / 3 / 60 VFD-4 340 1-5 HWP-1 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER PRIMARY, BLR-1 WATER 15.3 22 1.5 HP - 460 / 3 / 60 - 240 2,6 HWP-2 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER PRIMARY, BLR-2 WATER 15.3 22 1.5 HP - 460 / 3 / 60 - 240 2,6 HWP-3 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER SECONDARY WATER 28.8 47.5 2 HP 1760 460 / 3 / 60 VFD-5 270 1-5 HWP-4 MECHANICAL VERTICAL INLINE CLOSE COUPLED HEATING WATER SECONDARY WATER 28.8 47.5 2 HP 1760 460 / 3 / 60 VFD-6 270 1-5

NOTES:

1. PROVIDE WITH VFD & SHAFT GROUNDING RING.

2. SELECTED PUMP SHALL BE NON-OVERLOADING.

3. SELF SENSING, VERTICAL CLOSE COUPLED TYPE.

4. PROVIDE WITH SHAFT SEAL.

5. ONE PUMP IN EACH SERVICE IS 100% REDUNDANT.

6. PROVIDE MANUAL MOTOR STARTER.

AIR-COOLED CHILLER SCHEDULE

MARK TYPE

EVAPORATOR DATA ELECTRICAL DATA EFFICIENCY REQUIREMENTS

WEIGHT

(LBS) NOTES

CAPACITY

(TONS)

FLOW

(GPM) FLUID TYPE

EWT

(F)

LWT

(F)

MAX PD

(FT WC) MCA MOCP V/Ø/HZ

AMBIENT

TEMPERATURE

(°F) KW/TON EER

CH-1 AIR COOLED MAGLEV 62 104.9 WATER 56.1 42 3.2 106 150 460 / 3 / 60 82..5 0.8392 14.3 6,950 1-7 CH-2 AIR COOLED SCROLL 68.6 116.6 WATER 56.1 42 6.0 124 150 460 / 3 / 60 82.5 0.695 17.27 7,200 3-9

NOTES:

1. VARIABLE SPEED DRIVE WITH SOFT START.

2. R-134A REFRIGERANT.

3. SINGLE POINT ELECTRICAL CONNECTION.

4. PROVIDE MANUFACTURER'S HEAVY SALT-SPRAY RESISTANT COATING, INCLUDING FOR STRUCTURAL COMPONENTS OF CHILLER.

5. ECONOMIZER.

6. PROVIDE HAIL GUARDS.

7. PROVIDE INTERFACE CARD AS REQUIRED FOR COMMUNICATION WITH DDC.

8. CHILLER IS PROVIDED AS OPTIONAL LINE ITEM #7.

9. R-410A REFRIGERANT.

HOT WATER BOILER SCHEDULE (FULL MODULATION, CONDENSING)

MARK LOCATION

DESIGN

FLOW

RATE

(GPM)

ENTERING

WATER

TEMP. (°F)

LEAVING

WATER

TEMP. (°F)

MIN.

REQ'D.

OUTPUT

(MBH)

MAXIMUM

PRESSURE

DROP (FT

WC) FUEL

ELECTRICAL DATA

WEIGHT

(LBS) NOTESFLA V/Ø/HZ

BLR-1 MECHANICAL 15.3 123.1 150 202.3 5.6 NATURAL GAS 1.8 120 / 1 / 60 630 ALL

BLR-2 MECHANICAL 15.3 123.1 150 202.3 5.6 NATURAL GAS 1.8 120 / 1 / 60 630 ALL

NOTES:

1. PROVIDE CONDENSATE TRAP AND NEUTRALIZER BEFORE INDIRECT CONNECTION OF CONDENSATE TO DRAIN.

2. BOILER SHALL BE CAPABLE OF 5:1 TURNDOWN MINIMUM.

3. PROVIDE INTERFACE CARD AS REQUIRED FOR COMMUNICATION WITH DDC.

VAV BOX SCHEDULE (PRESSURE INDEPENDENT, SINGLE DUCT, NON FAN POWERED, HW REHEAT)

MARK

(NOTE #1) SERVICE

AIRFLOW HOT WATER HEATING COIL

INLET

SIZE

(IN)

OUTLET

SIZE

(INxIN) NOTES

MAX

(CFM)

MIN

(CFM)

MIN. S.P.

DROP

(IN.W.C.)

MAX NC

(RAD OR

DISCH.)

MIN.

HTG.

(CFM)

TOTAL

LOAD

(MBH) ROWS

LAT

(ºF)

FLOW

RATE

(GPM)

WPD

(FT.)

LWT

(°F)

VAV-1-01 106 585 175 0.34 25 235 11.7 2 97.4 1.2 0.28 130 7 12x10 ALL VAV-1-02 103, 107, 108, 110, 114 575 175 0.34 25 305 11.3 2 83.1 0.8 0.16 120.1 7 12x10 ALL VAV-1-03 109, 111 380 115 0.3 24 155 4.6 2 91.6 0.8 0.12 130.4 6 12x8 ALL VAV-1-04 112, 113 245 75 0.12 31 150 5.8 2 96.9 0.8 0.12 130.8 5 12x8 ALL VAV-1-05 104, 129 185 60 0.05 28 85 3.3 1 88.2 0.5 0.15 135.2 5 12x8 ALL VAV-1-06 101, 102, 105, 130 320 95 0.29 22 130 9.8 3 118.3 0.8 0.18 124.1 6 12x8 ALL VAV-1-07 115, 117 290 90 0.13 25 95 3.5 1 85.0 0.5 0.18 136.5 6 12x8 ALL VAV-1-08 118 315 95 0.21 22 125 6.6 2 97.7 0.8 0.12 132.5 6 12x8 ALL VAV-1-09 119 255 80 0.19 24 105 6.0 2 101.6 0.8 0.12 134.1 6 12x8 ALL VAV-1-10 122 180 55 0.07 27 125 6.6 2 97.7 0.8 0.12 132.5 5 12x8 ALL VAV-1-11 123 255 80 0.19 24 105 6.0 2 101.6 0.8 0.12 134.1 6 12x8 ALL VAV-1-12 128 425 130 0.13 24 170 5.4 1 88.5 0.5 0.24 129.4 7 12x10 ALL

NOTES:

1. REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHEET M-001.

2. CONTRACTOR SHALL FURNISH AND INSTALL EACH INDIVIDUAL TERMINAL UNIT WITH THE SAME CONFIGURATION, I.E. LOCATION OF COIL

CONNECTIONS, CONTROL ENCLOSURE, ETC. AS SHOWN ON THE FLOOR PLANS.

3. E.W.T. IS 150°F. FINS PER INCH MIN. IS 10. HEATING MEDIUM IS WATER. E.A.T. IS 49°F. INLET STATIC PRESSURE IS 1.0" W.C. DOWNSTREAM STATIC

PRESSURE DROP IS 0.25" W.C.

4. WRAP THE HEATING WATER COIL WITH INSULATION.

5. PROVIDE WITH 24V CONTROL TRANSFORMER, POWERED BY 120V ELECTRICAL SUPPLY, DISCONNECT BY E.C.

COMPUTER ROOM AIR-CONDITIONING UNIT SCHEDULE

MARK LOCATION TYPE

SUPPLY FAN DATA

MIN.

O.A.

(CFM)

COOLING COIL (CHILLED WATER)

ELECTRIC

REHEAT

CAPACITY

(MBH)

HUMIDIFIER

CAPACITY

REQ'D

(LBS/HR)

ELECTRICAL

WEIGHT

(LBS) NOTES

SUPPLY

AIRFLOW

(CFM)

EXTERNAL

STATIC

PRESS.

(IN. H2O)

COOLING CAPACITY

(MBH) AIR CONDITIONS (°F) WATER CONDITIONS

FLA V/Ø/HZSENS. TOT.

E.A.T.

D.B. / W.B.

L.A.T.

D.B. / W.B.

FLOWRATE

(GPM)

COIL P.D.

(FT.)

L.W.T.

(°F) CRAC-1 NETWORK ROOM 131 FLOOR MTD. - DOWNFLOW 4,250 0.2 18 57.1 60.8 70.1 / 56.8 54.5 / 50.6 14.0 7.4 52.5 40.9 4.4 31.8 460 / 3 / 60 650 ALL CRAC-2 NETWORK ROOM 131 FLOOR MTD. - DOWNFLOW 4,250 0.2 18 57.1 60.8 70.1 / 56.8 54.5 / 50.6 14.0 7.4 52.5 40.9 4.4 31.8 460 / 3 / 60 650 ALL

NOTES:

1. PROVIDE UNIT WITH RETURN AIR FILTER (2" MERV 8).

2. PROVIDE CONDENSATE PUMP.

3. PROVIDE UNIT WITH FILTER CLOG SENSOR AND MOISTURE DETECTOR SWITCH FOR CONDENSATE PUMP FAILURE.

4. 42°F ENTERING WATER TEMPERATURE.

5. PROVIDE UNIT WITH INTEGRAL MICROPROCESSOR CONTROLLER, SUPPLY & RETURN TEMPERATURE SENSOR AND HUMIDITY SENSOR, EC FAN MOTOR, & INTEGRAL 2-WAY CONTROL VALVE FOR CHILLED WATER.

6. UNIT SHALL INTERFACE WITH THE BUILDING DDC SYSTEM TO MONITOR UNIT STATUS AND ALARMS. PROVIDE INTERFACE CARDS AS REQUIRED.

7. SYSTEM SHALL MAINTAIN THE SPACE AT 70°F AND 50% RELATIVE HUMIDITY.

8. BOTH UNITS OPERATE SIMULTANEOUSLY TO MAINTAIN TEMPERATURE AND HUMIDITY.

9. PROVIDE WITH 2-SIDED AIR DISCHARGE AT BASE OF CABINET & PROVIDE SUPPLY GRILLE TO COVER FACE OF OPENING - DOUBLE-DEFLECTION, ADJUSTABLE BLADE, FRONT BLADES PARALLEL TO SHORT DIMENSION, 3/4" BLADE

SPACING, & MATCH COLOR OF UNIT CABINET.

10. PROVIDE CABINET EXTENSION RETURN AIR PLENUM TALL ENOUGH TO EXTEND TO ROUGHLY 6" ABOVE THE FINISHED CEILING IN THE SPACE. COORDINATE UNIT PLACEMENT WITH OTHER TRADES TO ALLOW INSTALLATION OF

ARCHITECTURAL CEILING IN THE SPACE AROUND THE PLENUM CABINET.

DIRECT DIGITAL CONTROL PANEL

T

CONTROL SEQUENCE FOR CHILLED WATER SYSTEM

VFDCS

VFDCS

C W

R

C W

R

AS-1

CWCS-2

CWP-2

CWP-1

CWCS-1

CWT-4

CWT-3

CWS

CWDPT-1

CWR

CWS

N.O.

DPT DPTCWDPT-2

CHILLER MICROPROCCESSOR

CONTROL PANEL W/ DDC

INTERFACE

CH-1

T

CWT-1-1

T

CWT-1-2

FS

DPS

CHILLED WATER SYSTEM CONTROL

THE CHILLED WATER SYSTEM SHALL BE ENABLED / DISABLED BY AN OPERATORS COMMAND THROUGH THE EMCS. THE LEAD CHILLED WATER PUMP VFD SHALL BE ENABLED AND THE LEAD CHILLER ISOLATION VALVE SHALL BE OPEN. ONCE THE CHILLER ISOLATION VALVE IS OPEN, THE LEAD CHILLER SHALL BE ENABLED AND OPERATE VIA THE CHILLER PACKAGED MICROPROCCESSOR CONTROLLER AND PER THE CHILLER MANUFACTURER'S PROGRAMMED CONTROL SEQUENCE TO MAINTAIN 45°F LEAVING WATER TEMPERATURE AS SENSED BY THE OPERATING CHILLER'S ASSOCIATED LEAVING WATER TEMPERATURE SENSOR (CWT-1). THE OPERATIONAL CHILLER'S ASSOCIATED DIFFERENTIAL PRESSURE SWITCH (CWDPS-1) AND FLOW SWITCH (CWFS-1) SHALL BE USED TO PROVE FLOW. THE CHILLER PACKAGED DDC CONTROLLER SHALL FULLY INTERFACE WITH THE EMCS TO ALLOW MONITORING OF SETPOINTS, OPERATING POINTS, ALARMS AND ALL OTHER CONTROL PARAMETERS. THIS SHALL INCLUDE ALL POINTS THAT CAN BE READ FROM THE CHILLER PANEL. ALL SETPOINTS ARE TO BE

ADJUSTABLE. PROVIDE ALARM NOTICES AT THE EMCS FOR ALL CHILLER FAILURES.

THE CHILLED WATER PUMP VFD SHALL BE MODULATED TO MAINTAIN THE BUILDING DIFFERENTIAL PRESSURE SETPOINT AS SENSED BY CWDPT-1. THE BUILDING DIFFERENTIAL SETPOINT SHALL BE SLIGHTLY HIGHER THAN THE HIGHEST COIL DESIGN PRESSURE DROP PER COIL SUBMITTAL DATA. THE CWDPT-1 SETPOINT SHALL BE ADJUSTABLE THROUGH THE EMCS.

THE BYPASS VALVE (CWV-2) SHALL MODULATE AS REQUIRED TO ENSURE MINIMUM ALLOWABLE CHILLER FLOW BY MAINTAINING THE MINIMUM CHILLER DIFFERENTIAL SETPOINT AS SENSED BY CWDPT-2. THE CHILLER MINIMUM DIFFERENTIAL PRESSURE SETPOINT IS THE PRESSURE THAT CORRELATES TO SLIGHTLY MORE THAN THE MINIMUM EVAPORATOR FLOWFOR THESE CHILLERS PER MANUFACTURERS DATA. THE CWDPT-2 SETPOINT

SHALL BE ADJUSTABLE THROUGH THE EMCS.

THE CHILLER ISOLATION VALVES (CWV-1) AND THE BYPASS VALVE (CWV-2) SHALL BE SLOW ACTING TO ENSURE SMOOTH TRANSITIONS, AND PREVENT TRIPPING RUNNING CHILLER ON FLOW LOSS. THE OPENING RATE DEPENDS ON THE CHILLER'S FLOW RATE CHANGE TOLERANCE LISTED IN THE MANUFACTURERS DATA. THE OPENING AND CLOSING RATE OF THE VALVES SHALL BE ADJUSTABLE IN THE FIELD.

THE CHILLER ISOLATION VALVES (CWV-1) AND THE BYPASS VALVE (CWV-2) SHALL HAVE A LINEAR RESPONSE CHARACTERISTIC. THESE VALVES SHALL HAVE NO MORE THAN 3 PSI OF PRESSURE DROP.

THE VARIABLE PRIMARY FLOW CHILLED WATER SYSTEM SHALL BE CONTROLLED DIRECTLY BY A LOCAL DDC CONTROLLER TO ALLOW THE BYPASS CONTROL VALVE TO REACT QUICKLY TO CHANGES IN FLOW.

T

CWT-5

CWDPS-1

CWV-1

CWFS-1

N.O.

CWS

EQUIPMENT INPUT/OUTPUT SUMMARY

CHILLER CH-1

CH-1 CONTROL PANEL

CURRENT SWITCH, CWCS-2

EN

AB

LE

/D

IS

BL

E

FO

R W

AR

D

/R

EV

ER

SE

EN

ER

G

IZ

E/ D

EE

N

ER

G

IZ

E

O

PE

N /C

LO

SE

ST

AU

S

AL

AR

M

IN

P

U T

SE

TU

PS

FL

O W

TE

M

PE

R

AT

U

R E

D

IF

F.

P

R

ES

SU

R

E

EL

EC

TR

IC

PN

U

EM

A

TI

C

R

ES

ET

H

IG

H L

IM

IT

A

LA

R M

LO

W

L

IM

IT

A

LA

R

M

AB

N O

R M

AL

O

FF

R

U N

TI

M

E

TO

TA

L

TO

TA

L

FL

O W

BT

U

C

AL

C U

LA

TI

O N

AV

E

R

AG

E

G R

AP

H

IC

POINT TYPES

DO

PROGRAMS

DI AI AO

H

ER

TZ

AM

PS

CWP-2 VFD FAULT

CWP-2 VFD BYPASS

CWP-1 VFD

CWFS-1

CWT-1-1

CWT-1-2

CWT-3

CWT-4

CWV-1

CWV-2

CWDPS-1

CWDPT-1

CWDPT-2

CWV-2

CWT-5

CHILLER MICROPROCCESSOR

CONTROL PANEL W/ DDC

INTERFACE

CH-2

T

CWT-2-1

T

CWT-2-2

FS

DPS

CWDPS-2

CWV-2

CWFS-2

N.O.

CHILLER CH-2

CH-2 CONTROL PANEL

CWDPS-2

CWFS-2

CWT-2-1

CWT-2-2

CWP-2 VFD

CURRENT SWITCH, CWCS-1

CWP-1 VFD FAULT

CWP-1 VFD BYPASS

FCU-n (INDOOR UNIT)

ACCU-n

(OUTDOOR UNIT)

CONDENSATE PUMP

CONTROL SEQUENCE OF OPERATION

FOR MINISPLIT SYSTEM #1 (FCU-1 / ACCU-1)

MINISPLIT SYSTEM

PACKAGED CONTROLLER

GENERAL

THE BAS SHALL MONITOR THE FCU ZONE TEMPERATURE BY A

THERMOSTAT INDEPENDENT OF THE FCU. FCU INTERNAL PACKAGED

CONTROLS SHALL MAINTAIN 70°F (ADJ.) COOLING SETPOINT AND 68°F

(ADJ.) HEATING SETPOINT. IF ZONE TEMPERATURE RISES ABOVE 80°F

(ADJ.) OR FALLS BELOW 60°F (ADJ.), BAS SHALL GENERATE AN ALARM.

AI - SPACE TEMPERATURET

WALL-MOUNTED SYSTEM CONTROLLER &

TEMP. SENSOR, FURNISHED BY MINISPLIT MFR.

(DEG. F.)EHS NOTES:

1. ENGRAVED PLASTIC SIGN, YELLOW WITH BLACK LETTERING,

INSTALLED 1" ABOVE SHUTDOWN BUTTON. 1-1/2" TALL x 5"

WIDE. "EMERGENCY HVAC SHUTDOWN" LETTERING 1/2" TALL,

OTHER LETTERING 1/8" TALL.

2. SIGN STATES PURPOSE OF SHUTDOWN BUTTON.

3. SIGN STATES BUILDING NUMBER (TO BE DETERMINED BY

BASE CIVIL ENGINEER) & AREA AFFECTED (ENTIRE

BUILDING).

4. SIGN TO LIST EQUIP. TAGS OF ALL HVAC SYSTEMS &

EQUIPMENT AFFECTED BY SHUTDOWN SYSTEM

(AHU-1/RF-1/EF-1, AHU-2/RF-2, CRAC-1, & CRAC-2).

5. BUTTON ACTIVATION SHALL INITIATE EQUIPMENT

SHUTDOWN (OF AHU-1/RF-1/EF-1) & CLOSE ALL OUTSIDE AIR

(O.A.) DAMPERS (FOR ALL EQUIPMENT LISTED) WITHIN 30

SECONDS. CRITICAL ELECTRICAL COOLING SYSTEMS

(AHU-2/RF-2, CRAC-1, & CRAC-2) SHALL CONTINUE

OPERATING WITHOUT ANY O.A. (FULL RECIRC. MODE) UNTIL

SHUTDOWN BUTTON IS DEACTIVATED.

6. SHUTDOWN BUTTON TO BE MOUNTED IN SINGLE GANG BOX.

7. SHUTDOWN BUTTON STATUS SHALL BE SENT TO B.A.S. AS

ALARM.

8. FOR INTERLOCK WITH MULTIPLE HVAC UNITS & SYSTEMS.

INTERFACE WITH D.D.C. PANELS PER CONTROL SEQUENCES

OF AFFECTED EQUIPMENT ON SHEETS M-801, M-802, & M-803.

9. EMERGENCY SHUTDOWN AS INITIATED BY THIS BUTTON

SHALL BE REMOTELY ENABLED BY FIRE ALARM INPUT FOR

EQUIPMENT SHUTDOWN THRU B.A.S.

10. BUTTON LOCATION IN LOBBY 101, SHOWN ON SHEET MP101

AS:

LIFT HERE

POLYCARBONATE

HOUSING

PUSH

EMERGENCY

HVAC SHUTDOWN

EMERGENCY HVAC SHUTDOWN

PUSH TO SHUTDOWN NON-CRITICAL SYSTEMS & CLOSE O.A.

EQUIPMENT: ALL HVAC SYSTEMS WITH OUTSIDE AIR INTAKES,

INCL. AHU-1/RF-1/EF-2, AHU-2/RF-2, CRAC-1, & CRAC-2.

5"

1"

1/ 2"

EHS

PUSH BUTTON. RED

IN COLOR, KEYED

RESET (2 KEYS

PROVIDED)

BUILDING: # ___ AREA: ENTIRE BUILDING

CLEAR FLIP-UP

COVER REQUIRED

CUSTOM LABEL,

YELLOW W/ BLACK

LETTERING

USE BLDG. NO. AS

DETERMINED BY

BASE CIVIL ENG.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity C

:\U sers\jlw

\D o cum ents\71350_M ech_JW oodEn gr44.rvt 2/6/2022

5:29:4 7 A

M

FEBRUARY 10, 2022

CONTROLS

M-804

RRS

CAD

JLW

SCALE: NTS

CHILLED WATER CONTROL DIAGRAMA1

SCALE: NTS

D.X. MINISPLIT CONTROL DIAGRAMD4

SCALE: NTS

EMERGENCY HVAC SHUTDOWN (EHS) BUTTONC2

SHEET KEYNOTES

1. ALL ITEMS RELATED TO SUPPLY AND INSTALL OF

CHILLER CH-2 SHALL BE PROVIDED AS PART OF

OLI #7. REFER TO BOUNDARY OF DASHED LINES.

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND,

ABBREVIATIONS, & GENERAL NOTES.

1384573777N Rectangle

1384573777N Rectangle

1384573777N Rectangle

J

J

J

G

FI

GFI

C

GFI

C

IG

IGIG

IG

IG

IGIG

IGIG

IG

IG

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

J

J

J

J

J J

J

J

J

J

IG

48"

48"

48"

48" 48"

48"

48"

J J

J J

IG

J

J

JJ

J J

J

J

J

J

M

M M

M

M M

M

M

M

M

M

M

48"

66"

J

J

J

M

J

TV

TV

TV

TV

TV

TV

TV

J

INSTRUCTOR'S

OPEN

OFFICE

SITE

MGR

COR

CBT/MP

MAINT

OFFICE

IT

SUPPORT

JAN

WOM

LMPTT

COMM

DEBRIEFING

DEBRIEFING121

STOR

DEBRIEFING

BREAK

MEN

ELEC

CORR

CORR

VEST

CORR

DEBRIEFING

(VTRAT)

MECH

MAINT.

SUPPORT

MOTION

BAY

LOBBY

CORR

WORK/COPY

NETWORK

ROOM

T1

EMM

SBMTS

MSWBD

MT-3A

B2

EP401

HEO1

LEO1

LR1

LEO2

HS1

LR2

TLR2

LL

JJ

HH

FF

D.5

D.5 D

D

C

C

E

E

B B

A

A

2 4 6 9 10

12 13

LCP

MSUPS

MSEMM

UPS

CH-2

VAV-1-09

VAV-1-11

VAV-1-10

VAV-1-08 VAV-1-07

VAV-1-04

VAV-1-05

VAV-1-12

VAV-1-06

VAV-1-01

VAV-1-02

VAV-1-032

PLF

LR3

B4

EP401

C4

EP401

OPEN STORAGE AREA

MSA

LEO3

LR1

17 17

BAS-1

BAC-1

20 20

TLR1

TLEO1

UPS-PDU

LR2 - 7,9,11

4-#6, 1-#10E.G., 1"C

22 22

LR2

LR3 - 2

LR3 - 3

LR3 - 4 LR3 - 5

LR3 - 6

12 12

HS1 - 8,10,12

LR3 - 9,11

LR3 - 10

17,19

HS1 - 13,15,17

RECYCLING

LEO1 - 9

P.C.

LEO1 - 7

LEO1 - 16

LEO1 - 4

LEO1 - 5

LEO1 - 11

20 20

LEO3 - 4

HS1 - 14,16,18

HM1

LR1 - 16

LR1 - 16

LR1 - 16

LR1 - 16

LR1 - 25

LEO3 - 7

3 3

4 4

12 12

EPO

EP

O

LR3 - 12

EPO

HM2

LEO2 - 2,4

2-#8, 1-#10E.G., 1"C

ACCU-1

FCU-1

P.C.

LEO3 - 2

P.C.

EF-1

FIRE

PROT

EGB3

A4

EP401

LR1 - 16

TGB1

TGB2

EGB1

EGB2

LR1 - 1

FCU-3

+66"

+66"

+66"

+66"

+66"

+66"

T2

SIMBAY

AC

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20171350

FDN

Ch an ne l Is lan ds

A

NG

St ati on Po rt Hu en em e, CA

Ca lifo rn ia

Ai r N ati on al Gu ard

- 1 th

AW

C-

0J

Fl igh t S im ula tor

Fa cil ity

N

4' 12'8'0

3/16" = 1'-0"

C :\U sers\atj\D oc um ents\71350_Elec_ajohnsen45 M M

D .rvt

2/4/2022 4:24:3 7

P M

FEBRUARY 10, 2022

ELECTRICAL POWER PLAN

EP101

WCM

ATJ

ATJ

SCALE: 3/16" = 1'-0"

ELECTRICAL POWER PLANA1

GENERAL NOTES

A. PROVIDE ALL THE NECESSARY COMPONENTS FOR A

FULLY FUNCTIONAL SWITCHED RECEPTACLE

SYSTEM. RE: DETAIL B3 ON SHEET EP402 FOR

TYPICAL CONTROLLED RECEPTACLE DETAIL.

B. FOR ELECTRICAL EQUIPMENT NOT LOCATED ON

WALLS, CONTRACTOR TO PROVIDE STEEL STRUT

SUPPORT SYSTEM SIZED FOR THE ELECTRICAL

EQUIPMENT.

C. EPO'S SHOWN ARE ROUGH IN ONLY. PROVIDE 1"

CONDUIT WITH PULL STRING TO THE NEAREST FIRE

ALARM OUTPUT MODULE IN MOTION SIM BAY.

COORDINATE WITH SIMULATOR PROVIDER ON MAKE

AND MODEL OF CONTRACTOR PROVIDED EPO'S.

D. ALL TV BOXES SHALL BE DOUBLE GANG BACK

BOXES MOUNTED AT 66" AFF AND CONTAIN (1)

DUPLEX RECEPTACLE. COORDINATE WITH

SIMULATOR MANUFACTURER FOR DROPS IN

SECOND GANG.

SHEET KEYNOTES

14. POWER FOR FIRE ALARM EQUIPMENT. PROVIDE RED

LOCK-ON BREAKER. COORDINATE FINAL

TERMINATIONS WITH FIRE ALARM CONTRACTOR.

15. POWER FOR FIRE PROTECTION AIR SAMPLING

DETECTOR. COORDINATE FINAL TERMINATION WITH

FIRE PROTECTION INSTALLER.

16. ROUTE (1) 1" EMT CONDUIT WITH PULL STRING

FROM RIOS STATION TO P1 CABINET IN NETWORK

ROOM 131. CONDUIT FOR RIOS POWER.

COORDINATE FINAL TERMINATIONS WITH

SIMULATOR PROVIDER.

17. POWER FOR ACCESS CONTROL.

18. POWER FOR ADA AUTOMATIC DOOR OPERATOR.

19. OPTIONAL LINE ITEM #3 (OLI #3): BID OPTION, 3P30A,

600V, SINGLE THROW, HEAVY DUTY, NEMA 1,

DISCONNECT SWITCH FOR BREATHING AIR

COMPRESSOR. COORDINATE FINAL TERMINATIONS

WITH AIR COMPRESSOR INSTALLER.

20. 1P20A, 120V, NEMA 1, TOGGLE OPERATOR, MANUAL

MOTOR SWITCH. COORDINATE FINAL TERMINATIONS

WITH MECHANICAL CONTRACTOR.

21. 2P60A, 240V, SINGLE THROW, HEAVY DUTY, NEMA

3R, DISCONNECT SWITCH FOR MINI SPLIT.

COORDINATE FINAL TERMINATIONS WITH THE

MECHANICAL CONTRACTOR.

1. POWER ALL ELECTRICAL DEVICES TO THE PANEL

INDICATED NEXT TO KEYNOTE UNO. NUMBER NEXT

TO ELECTRICAL DEVICE INDICATES CIRCUIT

NUMBER IN PANEL.

2. POWER FOR AUTOMATIC FLUSH VALVES.

COORDINATE FINAL TERMINATIONS WITH PLUMBING

CONTRACTOR.

3. POWER FOR SCC/ACS PANELS. COORDINATE WITH

OWNER FOR FINAL LOCATION.

4. POWER FOR FIRE PROTECTION EXIT TEXT SIGN.

COORDINATE FINAL TERMINATION WITH FIRE

PROTECTION INSTALLER.

5. POWER FOR SMART WHITEBOARD. COORDINATE

FINAL TERMINATIONS WITH WHITEBOARD

INSTALLER.

6. POWER FOR PROJECTOR. COORDINATE FINAL

TERMINATIONS WITH PROJECTOR INSTALLER.

7. OPTIONAL LINE ITEM #2 (OLI #2): BID OPTION,

PROVIDE 3P30A…

This is the start of the file's text. The full file is on GovTribe.