Attached to
Replace Air Conditioning Unit 3 at Building 23 Federal contract opportunity
Solicitation number
W50S6U24QA011
Issued by
Department of the Army National Guard

About this file

This document is a Solicitation Amendment for a Request for Quote (RFQ) to replace Air Conditioning Unit 3 (ACU-3) at Building 23, Sepulveda Air National Guard Station in California. The key details are:

The purpose of the amendment is to: a) extend the quote due date from July 26, 2024 to September 3, 2024, b) change the set-aside from 100% Service-Disabled Veteran-Owned Small Business to 100% Small Business, c) provide a new site visit date and time, and d) update the period of performance from 60 work days to 30 work days. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control to replace the existing 10-ton HVAC unit with a new compatible heat pump. The contractor must have relevant experience, provide the unit specifications, and outline their technical approach. Award will be made to the responsible quoter whose quote represents the best value to the government based on technical and price factors.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Air Conditioning Unit 3 at Building 23, newest first.
File Type Posted
Solicitation - Attachment 5 -Fire Alarm Panel Photo.pdf PDF
Solicitation - W50S6U24QA0110006.pdf PDF
Solicitation - Attachment 6 - Sheet E1.03_Fire Alarm Location.pdf PDF
Solicitation - Attachment 2 - RFIs_Replace_ACU_3_Building_23_18Sep24.pdf PDF
Solicitation - Attachment 7 - Sheet E1.05_Fire Alarm Riser Diagram.pdf PDF
Solicitation Amendment W50S6U24QA0110006 SF 30.pdf PDF
Solicitation - W50S6U24QA0110005.pdf PDF
Solicitation - Attachment 2 - RFIs_Replace_ACU_3_Building_23_11Sep24.pdf PDF
Solicitation Amendment W50S6U24QA0110005 SF 30.pdf PDF
Solicitation Amendment W50S6U24QA0110004 SF 30.pdf PDF
Solicitation - Attachment 2 - RFIs_Replace_ACU_3_Building_23_6Sep24.pdf PDF
Solicitation - W50S6U24QA0110004.pdf PDF
Solicitation - Attachment 4 - BACnet_AutomatedLogic_Control_Module-SE6104CS-SPEC_Sheet.pdf PDF
Solicitation - W50S6U24QA0110003.pdf PDF
Solicitation - Attachment 2 - RFIs_Replace_ACU_3_Building_23.pdf PDF
Solicitation - Attachment 3 - HVAC_B23_As-builts_Sheets_M0-01_and_M1-01.pdf PDF
Solicitation Amendment W50S6U24QA0110003 SF 30.pdf PDF
Solicitation - Attachment 1 - ACU3 Photos.pdf PDF
Solicitation Amendment W50S6U24QA0110002 SF 30.pdf PDF
Solicitation - W50S6U24QA0110002.pdf PDF
Solicitation - W50S6U24QA0110001.pdf PDF
W50S6U24QA011_Solicitation_Questions_and_Answers_RFI.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to:Block 14 (Description of Amendment/Modification):

a) Extend the quotes due date in block 8 of the SF 1449 from 26 Jul 2024 at 10:00 a.m. to 3 September 2024 at 10:00 a.m. PT,

b) Change the set-aside in block 10 of the SF 1449 from 100% Service-disabled Veteran-owned Small Business to 100% Small Business,

c) Provide a new site visit date and time in paragraph 3 in the "Instructions, Conditions, & Notices to Offerors or Quoters" section of the SF 1449, and

d) Update the period of performance from 60 Work Days to 30 Work Days in the "Deliveries or Performance" section of the SF 1449

Quoters must acknowledge receipt of this amendment, see block 11 of the SF 30.

All other solicitation terms and conditions remain unchanged.

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Small Business Type Service-Disabled Veteran-Owned Small Business Small Business Response Due Date 26 Jul 2024 03 Sep 2024

Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

Replace Air Conditioning Unit 3 (ACU-3) Sepulveda Air National Guard Station, California

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government-furnished, to perform services to replace the air conditioning unit 3(ACU-3) in Building 23, Sepulveda Air National Guard Station (ANGS), California 91406-6451, as defined in this PWS.

1.1.1 Objectives: The replacement unit shall be a commercial, 10 ton, all-electric heat pump that has the same capabilities as the existing unit and must be compatible with the existing BACnet communications interface. The existing ACU is a Trane Precedent with model number YHC120A4RMA1KD1C3A2B0A606 and serial number 426100285L. The contractor shall install the new ACU per the manufacturer's specifications. The replacement unit shall be installed where the existing one currently is, in the exterior mechanical yard on the southeast corner of Building 23, and use existing electrical and control wiring. After replacement, conduct a startup and operational test to ensure the heat pump is functioning properly.

1.2 Background: ACU-3 is responsible for a portion of Building 23's heating, ventilation, and air conditioning (HVAC) needs at Sepulveda ANGS, CA. The existing unit has a manufactured date of 2004 and is 20 years old. The existing unit's condenser has failed and the Government has found other components to have issues.

1.3 Period of Performance (PoP): The period of performance for installation, commissioning, and testing shall be 30 calendar days.

1.4 General Information:

1.4.1 Place and Performance of Services: All work shall be performed at Building 23 at Sepulveda ANGS,15900 Victory Blvd, Van Nuys, California, 91406-6451. The contractor shall provide services between the hours of 0600 - 1600, Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Building 23. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

W50S6U24QA0110001

1.4.1.2Unscheduled gate closures, although unexpected, by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.

Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee's installation driving privileges.

1.4.1.3 The contractor's employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on the days listed on https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2024.

1.4.3 Reserved.

1.4.4Reserved.

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer's Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall submit a request to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver's license, current vehicle registration, and valid vehicle insurance certificate.

2. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1 Reserved

1.4.5.2 For contractors that do not require a common access card (CAC) but require access to a DoD facility and/or installation. The contractor and all subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI)10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (will be provided by Government representative).

1.4.5.3 Reserved

1.4.5.4 Reserved.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that anytime contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Reserved

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Reserved

1.4.5.11Reserved

1.4.5.12 Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The contractor shall possess all required licenses, training, and permits for installation of HVAC equipment used in the performance of this contract.

1.4.8 Post award Conference/Periodic Progress Meetings: The contractor must attend any post award conference convened by the Contracting Officer (KO) in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor's performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons.

Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract;

procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government's zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Reserved

1.4.13 Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor's mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

ACU Air Conditioning Unit

AEI Army Enterprise Infostructure

AR Army Regulation

AT/OPSEC Antiterrorism/Operational Security

BI Background Investigation

CM Contract Manager

COR Contracting Officer Representative

DA Department of the Army

DD254 Department of Defense Contract Security Classification Specification

DFARS Defense Federal Acquisition Regulation Supplement

DoD Department of Defense

DSCA Defense Counterintelligence and Security Agency

FAR Federal Acquisition Regulation

GFP/M/E/S Government Furnished Property/Material/Equipment/Services

HQDA Headquarters, Department of the Army

HSPD Homeland Security Presidential Directive

HVAC Heating, Ventilation, and Air Conditioning

IA Information Assurance

IS Information System(s)

KO Contracting Officer

NGB National Guard Bureau

OCI Organizational Conflict of Interest

PII Personally Identifiable Information

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

SCR Service Contract Reporting

SSN Social Security Number

TE Technical Exhibit

USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Reserved

3.2 Reserved

3.3 Reserved

3.4 Reserved

3.5 Utilities: All utilities in the facility will be available for the contactor's use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Remove existing ACU-3 and dispose of the unit off base in accordance with local laws and regulations.

5.2 Install a new heat pump unit that has the same performance capabilities as the existing air conditioning unit.

5.2.1 The heat pump must have a cooling capability of 10 tons.

5.2.2 The heat pump must be compatible with the existing BACnet Automated Logic SE 6104.

5.3 The new heat pump shall be tested and commissioned to ensure proper functioning and efficiency.

5.4 At the conclusion of the contract, conduct training of maintenance staff on the operation and maintenance of the new system. Also provide an operation and maintenance manual.

5.5 Warranty: The contractor shall provide a one-year warranty for all work performed.

5.5.1 In addition to the above warranty, provide an extended 20-year manufacturer's warranty through the manufacturer of the heat pump. This warranty shall cover parts that fail due to manufacturer defect and cover the cost of labor to fix them. The contractor shall provide to the Government the manufacturer's warranty certificate.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication

(Chapter/Page)

Date of Publication

Mandato ry or

Advisory Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.

html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

W50S6U24QA0110001

https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/dfars

DoDM 1000.13-M-V1

DoD Identification (ID) Cards

(Enclosure 2, paragraph 3.b)

01/23/2014

(Change 1: 07 /28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2

Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46

DoD Investigative and Adjudicative Guidance for Issuing the Common Access

Card (CAC)

09/09/14

(Change 1: 05 /04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive

(HSPD)-12

Policy for a Common Identification Standard for Federal Employees and

Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11

Department of Defense Privacy and Civil Liberties Programs

01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R

Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/

Information Assurance Workforce Improvement Program 12/19/2005

(Change 4: 11 /10/2015)

DoD 5220.22-M

National Industrial Security Program Operating Manual (NISPOM)

02/28/2006

(Change 2: 05 /18/2016)

AFI 10-245

Antiterrorism

03/28/2013

(Certified current 03/30

/2017) https://www.e-publishing.af.mil/Product-Index/#/?

view=pubs&orgID=10141&catID=1&series=- 1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures 08/18/2020 https://www.e-publishing.af.mil/Product-Index/#/?

view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013

Change 1:

12/02/2015

1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product-Index/#/?

view=pubs&orgID=10141&catID=1&series=- 1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-Index/#/?

view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019

(Change 1:

06/09/2020)

1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9

Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving Report Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Deliverables Schedule

PWS Reference / Deliverable Title Frequency Number of

Copies Medium/Format

Submit To

5.4 Operation and Maintenance

manual

Prior to final payment

1 ea.

Hard Copy and Electronic

Submission

COR

5.5 Contractor's warranty

Prior to final payment

1 Electronic Submission COR

5.5.1 Manufacturer's warranty

Prior to final payment

1 Electronic Submission COR https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.esd.whs.mil/Directives/forms/dd0001_0499/

Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

Place of Performance - F9YGC0 - 261 COS

INFORMATION FROM TO

Delivery 60 Work Days, From Date of Award to completion of performance

30 Work Days, From Date of Award to completion of performance

List of Attachments

Miscellaneous text in this section has been modified to:

This section has intentionally been left blank

Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

Instructions, Conditions, and Notices to Quoters

1. The 195th Wing/Mission Support Contracting (195 WG/MSC)intends to issue a Request for Quote (RFQ) to award a Description of the project:

single, firm-fixed-price purchase order for services, non-personal, to provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in paragraph 3.0 as government-furnished, to perform services to replace the air conditioning unit 3 (ACU-3) in Building 23, Sepulveda Air National Guard Station (ANGS), CA 91406-6451, as defined in the Performance Work Statement(PWS).

2. This RFQ is set-aside 100% for Small Business qualified contractors. A complete quote must contain the following:Instructions to Quoters:

- Standard Form (SF) 1449 completed and signed

- Any Amendment(s), acknowledged

- Volume I: Supplies or Services & Prices or Costs (page 3 of SF 1449)- all item(s) must be priced

- Representations, Certification, & Other Statements (pages 31 to 45 of SF 1449) - completed and filled-in

- Volume II: Technical factor, see Evaluation Factors for Award (page 48 of SF 1449), C. Volume II, Technical Factor

Send your quote(s) to the 195th Wing/Mission Support Contracting office's org box at 195wg.fal.msc.contracting.org@us.af.mil and reference the solicitation number- W50S6U24QA011, on the email's subject line.

3. Notice of pre-quote conference and site visit:

3.1. A site visit will be conducted on August 22, 2024 at 10:00 a.m. PT for the purpose of briefing RFQ requirements and answering questions regarding this solicitation. This conference will be held at . Interested quoters 15900 Victory Blvd, Building 23, Sepulveda ANGS, CA 91406-6451 are highly encouraged to attend the conference. The site visit will be held following the conference.

3.2. Due to security conditions, all quoters must register to attend this site visit. Email the following information for all attendees to the 195th Wing /Mission Support Contracting's org box at 195wg.fal.msc.contracting.org@us.af.mil, in the subject line reference the solicitation number- W50S6U24QA011.

- Firm name and telephone number

- Visitor's first name and last name,

- Social security number,

- Driver's license number,

- Date of birth, and

- Place of birth

3.3. This information must be provided in advance, in order to ensure access to the military base. The furnishing 2 business days prior to the meeting, of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-quote conference. This information will be provided to the installation's Security Forces who will authorize your entrance to the site.

3.4. Visitor's must pick up their passes at the Installation's main entry gate prior to arrival. You will be required to present the following information upon arrival: (1) vehicle registration, (2) valid driver's license, (3) proof of insurance for vehicle, (4) safety inspection and car rental agreement, if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of solicitation amendments shall apply.

Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

BASIS OF AWARD- EVALUATION

I. Basis for Contract Award - Evaluation of Quotations-Simplified Acquisition Procedures

(a) In accordance with FAR13.106, the Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:

(i) Technical - experience, air conditioning unit specification(s), and technical approach; and

(ii) Price

(b) Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. This includes options under FAR clause 52.217-8, Option to Extend Services, if included in this solicitation. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a supplier's quotation does not establish a contract. A written notice of award or purchase order mailed or otherwise furnished to the successful quoter is an offer by the Government to the supplier to buy certain supplies or services upon specified terms and conditions. A contract is established when the supplier accepts the offer.

II. Quote Evaluation: The evaluation process will be accomplished as follows (Organized by Volume):

A. General: We will award a contract to the responsible quoter who represents the best value to the Government on the basis of its (1) quote, and (2) experience, brand name, and technical approach

B. Volume I, Quote

1. General: We will determine the merits of your quote on the basis of (a) its acceptability and (b) its quoted price.

(a) Acceptability: We will determine the acceptability of your quote on an acceptable or unacceptable basis. We will consider your quote acceptable if it (i) conforms to the material solicitation requirements; (ii)manifests your unconditional assent to the terms of this Request for Quote (RFQ), and (iii) you are a responsible prospective contractor pursuant to FAR9.104-1. (NOTE: By submission of a quote, the quoter represents that it unconditionally assents to the terms of this Request for Quote, except for any written express exceptions.)

(i) Conformance. Material solicitation requirements include those terms affecting quality, quantity, price, or delivery.

(ii) Assent. If you (1) take exception to any term of this RFQ, (2) propose any additional terms, or (3) omit material information required by this RFQ then we will consider your quote to be unacceptable and ineligible for contract award.

(b) Price: We will evaluate your price for fairness and reasonableness in accordance with FAR 13.106-3(a).

C. Volume II, Technical Factor

1. General: The technical factor assessment will assess the prime's (hereafter referred to as quoter's) ability to successfully accomplish the effort based on the quoter's demonstrated technical approach. The Government will evaluate the quoter's demonstrated technical approach in supplying products and services that meet users' needs. Technical approach simply means the method of fulfilling the government's requirement and will be assessed on an suitable/unsuitable basis.

Standard of Proof: Submit the attached pro forma, Volume II, to provide evidence of a minimum of three years relevant experience.

1. Number of years the quoter has been in business and adequate evidence,

2. Identify all relevant projects that are substantially complete or have been completed within the past three years of the solicitation issue date,

3. Identify quoted air conditioning unit and provide specifications and/or product information, and

4. Provide technical approach on performing the work required.

IDCode: J
Page: 1
Pages: 12
AmendNo: 0001
EffDate: 14 Aug 2024
ReqNo:
ProjNo:
IssCode: W50S6U
AdmCode:
IssuedBy: W7MX USPFO ACTIVITY CAANG 195

KO FOR CAANG DO NOT DELETE, 17840 13TH ST BLDG 2180

BEALE AFB, CA 95903-2180

UNITED STATES

Kristian Martin Perlas, Email: 195wg.fal.msc.contracting.org@us.af.mil Telephone: 530-634-9179 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S6U24QA011
SolDate: 12 Jul 2024
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
Descript: See Schedule
ContNameTitle:
CoNameTitle: Kristian Martin Perlas
ContDate:
CODate: 14 Aug 2024