Attachment 1 - PWS.pdf
PDF 624 KB Posted
- Attached to
- 162nd Epoxy Flooring
- Solicitation number
- W50S6S25QA005
About this file
This Performance Work Statement (PWS) details epoxy flooring services for Building 41, Room 2, 6, 7, 14 Missile Maintenance Bay at the 162nd Wing, Morris Air National Guard Base in Tucson, Arizona. The project requires removing approximately 3,400 square feet of existing flooring, disposing of old materials off-base, repairing damaged cement, and applying new epoxy flooring with decorative flakes. The color of the flooring will be determined after contract award, with work to be completed within a 45-day performance period between 0600-1800 hours Monday through Friday, excluding US holidays.
The contractor will be responsible for providing all labor, supervision, materials, tools, equipment, and transportation necessary to complete the flooring installation. Quality assurance will be conducted through spot inspections by the Government Representative, with acceptable quality levels set at 100% for flooring removal and new epoxy application, and 98% for cement repairs. The solicitation is a 100% small business set-aside under NAICS code 238190 with a $19 million size standard, targeting a firm fixed-price purchase order for flooring services at the Morris Air National Guard Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
PERFORMANCE WORK STATEMENT (PWS)
FOR
Bldg. 41, Room 2,6,7,14 Missile Maintenance Bay Epoxy Flooring Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Installation of Epoxy flooring Services, as defined in this PWS.
1.1.1 Objectives Repair Bldg. 41, Missile Maintenance Bay floor and apply Epoxy Flooring Services.
1.2 Background: The project is located at building 41 consisting of approximately 3,400 Square feet of flooring at the 162nd Wing, Morris Air National Guard Base. Current flooring is not repairable and requires replacement.
1.3 The Period of Performance shall begin on date of award and the project shall be completed within a 45-day POP.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0600-1800 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be in building 41 of Morris ANG/ 162nd Wing, Tucson, Arizona. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Government Representative (GR) NLT 5 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
AFARS 5107.9101 Policy. Implementation of AT and OPSEC considerations in the requirements package is the responsibility of the requiring activity and a signed AT/OPSEC cover sheet is required to be included in all requirements packages except for supply contracts under the simplified acquisition level threshold, field ordering officer actions and Government purchase card purchases. The cover sheet, at a minimum, must include all the information and reviews listed in the Army standard cover sheet at Appendix A of the AT/OPSEC Desk Reference, available via the Internet at https://army.deps.mil/army/sites/PMG/prog/ATEP/AT%20in%20Contracting/AT%20OPS EC%20Desk%20Reference%205th%20Edition_web.pdf (Army Knowledge Online login required).
This requirement also applies to orders under indefinite delivery contracts, unless each task or delivery order under the contract is for substantially the same product or service, in which case the cover sheet at the contract level is sufficient.
Consult with your local anti-terrorism (AT), operational security (OPSEC), and information protection (IP) Subject Matter Expert (SME) for assistance in correctly completing section 1.4.5. Some installations or Government facilities have additional or different language that must be included in the PWS. Do not remove or alter the language in the subparagraphs of section 1.4.5 without consulting with an
AT/OPSEC/IP SME.
Ver. October 2022
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the GR. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials for any employee who no longer requires access to the work site.
4. Not applicable
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees before period of performance of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work.
1.4.6 Physical Security. Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating tools and equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, GR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the GR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure AT/OPSEC Antiterrorism/Operational Security CM Contract Manager DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GR Government Representative HQDA Headquarters, Department of the Army IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau POC Point of Contact POP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program
SCR Service Contract Reporting TE Technical Exhibit
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
5.0 Requirements: The Contractor shall furnish all labor, supervision, materials, tools, equipment, and transportation necessary to accomplish all the work involved as necessary to install Epoxy Flooring in building 41 Morris Air National Guard Base, Tucson AZ. Room numbers 2,6,7,14 Missile Maintenance Bay Approximately 3,400 Sq.
Ft.
5.1 Remove, dispose of old flooring off base, Vendor responsible for proper disposal of any resulting garbage or waste.
5.2 Repair cracked or damage cement.
5.3 Apply new epoxy flooring. Decorative flakes are preferred. Color will be determined after contract award upon government acceptance.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars
AFI 10-245
Antiterrorism 03/28/2013 (Certified current
03/30/2017)
Advisory https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and
Procedures
08/18/2020 Advisory https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and
Procedures
03/05/2013 Change 1:
12/02/2015
Advisory https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFI 10-701
Operations Security
7/24/2019 (Change 1:
06/09/2020)
Advisory https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance Objective
Performance Standard
Acceptable Quality Levels
(AQL)
Surveillance Method / By Whom
5.1 Remove, dispose
of old flooring.
The contractor shall remove old flooring/paint and dispose of off base.
Meets the standard 100% of the time
Spot Inspection / GR
5.2 Repair cracked or
damage cement.
The contractor shall repair cracked or damaged cement
Meets the standard 98% of the time.
5.3 Apply new epoxy
flooring.
The contractor shall apply new epoxy flooring.
Decorative flakes are preferred. Color will be determined after contract award upon government acceptance.
Meets the standard 100% of the time.
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency
Medium/Format
Submit To
5.1 Remove, dispose
of old flooring.
Within 45 days of POP
N/A
GR
5.3 Apply new epoxy
flooring.
Within 45 days of POP
N/A
GR
| AFI 10701 Operations Security: |
| Advisory: |
| Performance Objective Performance Standard Acceptable Quality Levels AQL Surveillance Method By Whom: |
| 51 Remove dispose of old flooring The contractor shall remove old flooringpaint and dispose of off base Meets the standard 100 of the time Spot Inspection GR: |
| 52 Repair cracked or damage cement The contractor shall repair cracked or damaged cement Meets the standard 98 of the time Spot Inspection GR: |
| 53 Apply new epoxy flooring: |
| Meets the standard 100 of the time: |
| Spot Inspection GR: |
| PWS Reference Deliverable Title Frequency MediumFormat Submit To: |
| 51 Remove dispose of old flooring Within 45 days of POP NA GR: |
| 53 Apply new epoxy flooring_2: |
| Within 45 days of POP: |
| NA: |
| GR: |
File details come from the government source that posted it. Updated .