2. SOW - Hangar B1201 Air Handler rev1.docx

DOCX document 539 KB Posted

Attached to
B1201 Air Handler Replacement Federal contract opportunity
Solicitation number
W50S6N25QA011
Issued by
Department of the Army Alabama Army National Guard

About this file

This Statement of Work (SOW) details the replacement of a rooftop air handler for the Alabama Air National Guard's 187th Fighter Wing at Dannelly Field Air National Guard Base in Montgomery, AL. The project requires a contractor to remove the existing 15,000-cfm air handler on the south side of Hangar B1201 and install a new unit with compatible Johnson Controls that communicates with the Metasys computer system. The work includes modifying ductwork, installing roof flashing and sealants, performing startup and operational checks, and properly disposing of all demolished materials. The period of performance is 60 days after contract award, with work to be conducted between 0700-1700 hours Tuesday through Friday, excluding federal holidays. Contractors must comply with base security procedures, undergo background checks, and will be escorted within the controlled area during the project.

View the file

Other files for this federal contract opportunity

Other files attached to B1201 Air Handler Replacement, newest first.
File Type Posted
W50S6N25QA011.pdf PDF
ductwork.jpg JPG image
Thermostat.jpg JPG image
W50S6N25QA011 RFI Responses.docx DOCX document
Controls.jpg JPG image
Electrical Panel.jpg JPG image
Pages from Conformance Documents - drawings 2011 project.pdf PDF
M0.1-M7.3 Drawings - 2022 renovation project.pdf PDF
McQuay.jpg JPG image
Site Visit Roster B1201 Air Handler.pdf PDF
18. J and A for Brand Name-Sole Source - Air Handler 1 Signed.pdf PDF
2. SOW - Hangar B1201 Air Handler (1).docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hangar B1201 Air Handler

Alabama Air National Guard

187th FW 5187 Selma Hwy Montgomery, AL 36108

General Information The Air National Guard has a requirement to replace a rooftop air handler on Main Hangar Building 1201 at the 187th Fighter Wing. The work covered by this Statement of Work consists of furnishing all material, labor, equipment, and travel to make the needed repairs.

General Scope of Work:

The project is being managed from the 187th Civil Engineer Squadron (187th CES) and 187th Contracting offices located at Montgomery Air National Guard Base in Montgomery, Alabama. A contracting officer’s representative (COR) will be designated at the 187th CES.

Description of Work:

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items needed to remove and replace the existing rooftop air handler on the south side of the hangar as defined below:

Remove existing rooftop air hander. See site plan below.

Procure and install new rooftop air hander, in kind. Existing unit is a 15,000-cfm air hander.

Air hander shall include new Johnson Controls that communicates to the Metasys computer in the Civil Engineer Building 1801. Existing controls on existing air handler may be reused if compatible with the new air handler.

Modify ductwork as necessary to connect to new rooftop air handler.

Procure and install roof flashing and sealants as required to prevent water infiltration.

Startup and check of proper operation once the work is completed.

Dispose of all demolished material and equipment off site.

Period of performance:

The period of performance shall be 60 days after notice to proceed following contract award.

Place and hours of Performance The contractor is responsible for conducting business between the hours of 0700-1700 hours Tuesday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

The project location is in a controlled area. The 187th CES will provide an escort for all contractor personnel within the controlled area.

If contractor desires to work on Monday’s prior coordination with the 187th CES will be required to obtain an escort to the work area.

The Contractor must at all times maintain an adequate workforce for the uninterrupted execution of all tasks defined within this SOW when the Government facility is not closed for the above reasons.

Recognized Holidays:

New Year’s Day
Labor Day
Martin Luther King Jr.’s Birthday
Columbus Day
Washington’s Birthday
Veterans Day
Memorial Day
Thanksgiving Day
Juneteenth National Independence Day
Christmas Day

Independence Day

Prior to the award of the contract the Contractor will attend a Pre-Bid Conference at a time and date determined by the 187th Contracting Office. During this conference the Contractor will visit the site and conduct a preliminary walk-through with 187th CES personnel. During the site visit, the Contractor will identify any issues that may conflict with or affect the outcome of the work. The Contractor is expected to include any cost required for the accommodation of such items within the original cost proposal.

Disposal Requirements:

The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the execution of work under this contract. All such materials shall be disposed of at an off-base landfill by the CONTRACTOR. The CONTRACTOR is not permitted to deposit any such materials in base trash collection containers or at any on base location without prior approval of the Contracting Officer.

Existing Conditions:

The Contractor is responsible for returning all conditions of the site to the condition it was in prior to work beginning, to include but not limited to soils, grass, pavements, and utilities.

Security Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Site Map

Air Handler Location image1.png image2.png