Amendment 3 - Questions and Answers.pdf

PDF 140 KB Posted

Attached to
Construct 176WG ADS Pad Federal contract opportunity
Solicitation number
W50S6L-20-B-0016
Issued by
Department of the Army Alaska Army National Guard

About this file

This document provides an amendment with questions and answers related to solicitation number W50S6L-20-B-0016 to construct an 176ADS pad. The amendment clarifies that the concrete grade beam depth will be at least 48 inches, allowing the use of options D, E, or F from the site prep plan. Additionally, the contractor will not be responsible for embeds.

The related federal contract opportunity is a solicitation from the Department of the Army Alaska Army National Guard to construct a 176WG ADS Training Pad. Interested contractors are invited to submit a fixed-price bid for the base item and two option items, with a magnitude between $250,000 and $500,000. A 20% bid bond is required. The total construction duration is 270 days after notice to proceed. The solicitation is a total small business set-aside with a size standard of $39.5 million average annual revenue. At least 15% of the cost must be performed by the contractor's own employees, excluding materials. An organized site visit will take place on July 14. The solicitation closing date is July 30. Contractors must register in SAM and have a CAGE code to submit a proposal.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6L‐20‐B‐0016 Construct 176ADS Pad

Q&A Round 3

Question 1:

Please provide clarification for which concrete grade beam depth will be used that is indicated in details

A through F? Also is it safe to assume that no embeds will be included in the proposal?

The concrete grade beam depth will be at least 48”, which allows for using options D, E, or F on PDF page 32 of the RSS Site Prep Plan v3.1. Additionally, the contractor will not be responsible for embeds.

3 August 2020