Amendment 3 - Questions and Answers Round 2.pdf
PDF 536 KB Posted
- Attached to
- Construct 176WG Munitions Inspection/Assembly Facility Federal contract opportunity
- Solicitation number
- W50S6L-20-B-0010
About this file
This document contains an amendment to a solicitation for the construction of a munitions inspection and assembly facility. The amendment provides responses to questions from bidders regarding project details. Acceptable alternatives to aspects of the proposed building design are outlined, such as utilizing insulated metal panels in place of metal decking and other wall/roof materials. The magnitude of the project is estimated between $1 million to $5 million. Interested contractors are directed to attend an organized site visit on June 25, 2020. The solicitation and plans are available through the System for Award Management website. Bids are due on an unstated future date.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO ALL BIDDERS Amendment No. 3 - Q&A Round 2
Date: 07/20/20
Project: Construct Munitions Inspection Assembly Facility
Project No.: FXSB162207
The following changes, additions, and/or clarifications shall be made to the drawings/specifications for the work of the above project.
This addendum forms a part of the contract documents and in case of a conflict between drawings, specifications, and this addendum, the addendum shall govern.
Bid Questions, received 7/20/20 via emails from Capt. Conner Van Fossen
Question 1:
In the note regarding the 200A meter base states. “See ELM S‐1 for meter socket details”, we do not find the detail labeled “ELM S‐1” in the solicitation documents. Please provide ELM S‐1 detail
Jacobs’ Response: Refer to attached Service Standard ELM S‐1.
Question 2:
Jacobs’ Response: : The design intent is to provide an addressable fire alarm system only. A mass notification system is not required.
Question 3:
In the Project Drawings‐ Sht# E‐503 “DETAILS”, specifically detail 3.
In the note regarding the 200A meter base states. “See ELM S‐1 for meter socket details”.
We do not find the detail labeled “ELM S‐1” in the solicitation documents. Please provide ELM S‐1 detail
Jacobs’ Response: Refer to attached Service Standard ELM S‐1.
Question 4:
Please confirm a Contractor Quality Control personnel is not required to be on site full time?
Jacobs’ Response: A dedicated Quality Control person is not required to be on site full time.
Question 5:
Please Confirm a SSHO is not required on site full time? If he/she is required to be on site full time, can they be allowed the position of both superintendent and SSHO?
Jacobs’ Response: A dedicated SSHO person is not required to be on site full time.
Question 6:
Detail 5/A600 indicates standing seam metal roof over 5” of rigid insulation over metal deck. We believe the insulation need to be separated from the metal deck by a thermal barrier (Dens‐
Deck) to be a UL compliant roof assembly. There would also need to be an ice/water membrane installed over the thermal barrier. Additionally, to have a fastening substrate for the standing seam roof panels, the insulation would need to be a SIPS panel with at least ½” plywood/OSB or possibly thicker based on the required fastener pull out strength. This is an engineering issue.
We believe it would be far more cost effective to install 5” thick insulated metal panels with a standing seam profile that would be directly applied to the PEMB purlins. Would this be acceptable? This should also make the metal deck unnecessary. An issue for the engineer.
Jacobs’ Response: Concur, a 5” thick insulated metal panel, attached to the PEMB purlins is acceptable. It is up to the PEMB manufacturer if they want the metal deck. They can probably use rod bracing to act as a diaphragm. So as long as the PEMB’s Engineer is ok with it our Engineering is okay with removing the metal deck.
Question 7:
Detail 9/A400 indicates .358” metal stud framing at the bldg. perimeter walls with 5/8” GWB on the interior, batt insulation, and exterior grade plywood sheathing. Will the plywood need to be pressure treated and what is the required thickness? Also, will vapor barrier be required beneath the GWB? We believe it would be far more cost effective to install 5” thick insulated metal panels directly to the PEMB purlins in lieu of the aforementioned wall assembly. Would this be acceptable?
Jacobs’ Response: Concur, a 5” thick insulated metal panel, attached to the PEMB girts is acceptable.