This document is an amendment to a solicitation for the repair and renovation of a fuel cell facility at Eielson Air Force Base in Alaska. The key details are:
The solicitation is for a firm fixed-price contract to replace the existing Aqueous Film Forming Foam (AFFF) fire protection system with a water-only system, make architectural modifications to expand office and tool storage space, and perform heating, ventilation, and lighting upgrades. The solicitation includes two option line items - construct a fire protection water loop and fire hydrants, and provide telecommunications cabling. The solicitation has been amended to incorporate questions and answers, extend the response date to June 13, 2024, and provide additional details on the hazardous classification, PFAS contamination, existing equipment, and other technical requirements. The pre-bid conference is scheduled for May 6, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S6K24B0002 Amendment 6.pdf | ||
| Eielson B1171 Bid RFI Comments_Responses_Revised_Haz_Areas.pdf | ||
| W50S6K24B0002 Amendment 5.pdf | ||
| EIELSON E-4.1 ESK-1.pdf | ||
| W50S6k24B0002 Amendment 4.pdf | ||
| ESK-3.pdf | ||
| ESK-2.pdf | ||
| W50S6K24B0002U0003 Amendment 3.pdf | ||
| 5. Frequency Converter Photos.pdf | ||
| 71. 2019 Roof Report - B1171 Breakout.pdf | ||
| 76. AKANG Eielson B1171_Civil Drawings 65- - clouds.pdf | ||
| 1. 23 30 00.pdf | ||
| 18. B1171 Original Construction Design Drawings.pdf | ||
| 65. 01 35 26.pdf | ||
| 3. Pages from Env Atlas - B1171.pdf | ||
| 49. revised C-1.1.pdf | ||
| 19. Air Regulator Photos.pdf | ||
| W50S6K24B0002 Amendment 1.pdf | ||
| Site Visit Slides.pdf | ||
| Sign In Sheet.pdf | ||
| W50S6K24B0002 - Solicitation.pdf | ||
| Eielson B1171 Type B-3 Submittal Drawings FP revised Addendum 1.pdf | ||
| Type B-3 Final Design Submittal_SPECS_20240412.pdf | ||
| FTQW072002 AF 813 RCS 20-111 Repair Fuel Cell Revised.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FTQW 07-2002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorperate the questions and answ ers received and the 9 attachments in SAM.gov. The solicitation has been extended to 13 June 2024 at 2pm Alaska time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6K24B0002
X 9B. DATED (SEE ITEM 11)
24-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2024
CODE
USPFO AK 168 MSC
3127 WABASH AVE SUITE 101
EIELSON AFB AK 99702-1794
W50S6K 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6K24B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 05-Jun-2024 02:00 PM to 13-Jun-2024 02:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
NOTES
NOTES
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.
2. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://sam.gov/content/entity-registration. Interested bidders are required to submit their representations and certifications at the same site.
4. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section B - Supplies or Services & Prices or Costs- all items must be priced
(c) A Bid Bond and Power of Attorney (POA) is required along with the bid on the due date. A copy of the bond and POA may be submitted with the proposal, with the original signed copy with Seal to be submitted no later the time bids are due. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.
(d) Section K - Representations, Certification, & Other Statements, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
(e) When completing the "Offeror" portion of the SF 1442 (Blocks 14 - 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged.
(g) Mark the front of the envelope with the following: "BID No. W50S6K24BA001", and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
5. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers W50S6K24B0002, Repair Fuel Cell, B1171
Eielson AFB, AK
1) There is no Spec section listed for HVAC DDC Controls and no requirement for any new controls having the ability to provide Graphics and Alarming at the existing DDC Front End! Please clarify Intent.
Answer: A new specification has been added and attached to this response, see attached Specification 23 00 00, dated 24 May 2024.
2) The DDC Controls in this facility have reached end of life. Is it the intent to replace the DDC Controls in their entirety?
Answer: The existing DDC controls for the equipment not scheduled in the design package is outside the design scope of work.
3) Section 02 61 13 section 1.3 states, “Characterization data on the nature and extent of the contaminated material is shown in Attachment A - Environmental Letter Report.
Subsurface conditions are shown in Attachment A - Environmental Letter Report.” At the end of the spec section, PDF page 359, there is a filler page but no document.
Can you please provide Attachment A - Environmental Letter Report?
Answer: See attachment “Pages from Env Atlas – B1171" for the IRP Environmental Atlas Sheets 18 and 23 that indicate B1171 is a PFAS source area. The project area is within the 200' buffer for PFAS contamination.
4) I would like to request an additional 2-week minimum extension for the RFP request date.
Answer: This solicitation amendment includes an extension.
5) What is the brand/manufacturer of the existing 400 hertz converter? Information is needed to provide installation/testing/certification requirements per 26 35 43, 3.1.4.
Answer: Manufacturer is Controlled Systems EPU-6/E. Part number 8823495, see attached photographs for reference.
6) Please clarify the hazardous classification plan shown on drawing E-4.1 detail 3. The side view details a 5 foot bubble around the aircrafts as class 1 div 2 but the aerial view shows a bubble that scales to around 12 feet making the class 1 div 2 significantly larger. If the bubble on the aerial view is correct, please provide accurate dimensions of the bubble area for bidding purposes as the cost difference is significant. If the side view is correct, please provide the two elevations not called out on detail 3.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
7) Type F2 and EXXP fixtures on drawing E1.2 are detailed to be mounted well above the 18 inch class 1 div 2 area from drawing E-4.1 detail 3, but are listed in the luminaire schedule as class 1 div 2 type fixtures. Please clarify the extent of the classified area as the costs are significantly different between non-classified and classified areas.
Answer: The lighting fixtures F2 and EXXP are listed for Class 1 Div 2 to comply with UFC requirements even though it may not be within the classified area. The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
8) The Class 1 div 2 receptacles shown on drawing E1.1 and E-4.1 detail 1 are noted to be relocated. On drawing E-0.1 these are called out to be at 48” AFF, well outside of the classified area shown on E-4.1 detail 3. Please clarify the classified areas and installations.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
9) Drawing E-4.1, detail 2, key note 6 states to relocate the explosion proof phone to an area not located in the class 1 div 2 classification. Please clarify the classified areas and installations.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
10) Spec section 26 35 43, 2.4.f. states that the remote monitoring and control panel is to be in a NEMA 7 explosion proof enclosure even though the location is outside of the classified zone as shown on detail 3 drawing E4.1. Please clarify the classified areas and installations.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
11) Drawing E-4.1 demolition key notes 1 & 2 for detail 1, and key notes 1 & 2 for detail 2.
Are these electrical items currently class 1 div 2, and if so, they don’t appear to be relocated into a classified area. Please clarify the classified areas and installations.
Answer: Provide new junction boxes in hangar bay suitable for Class 1 Div 2. The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
12) Drawing E-4.1 detail 2 key note 3 calls for three class 1 div 2 receptacles installed at 48 inches AFF which is outside of the classified area. Please clarify the classified areas and installations.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
13) Drawing E-4.0, detail 1, demolition key note 7 and detail 2, key note 4. Is the existing installation and device class 1 div 2? Will the new installation location be class 1 div 2?
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
14) If classified fixtures, devices, equipment, and or like items are to be installed outside of classified areas, provide a detail of each item and circuit installation method as NEC code does not require any classified circuit installation outside of a classified area. If the intent is to have a larger classified area than that detailed on E-4.1, provide a new classified area drawing and detail so that all systems can be priced accordingly.
Answer: The hazardous classification of Class 1 Div 2 in Fuel Cell Repair Area 100 is up to top of hangar door per latest UFC requirement.
15) Drawing E-1.1 key note 1 and spec section 26 35 43, 2.3 do not call out a length for the 400hz cable. Key note 1 states “sufficient length plus 5’0” slack”, but that is an ambiguous term that cannot be priced correctly. Please provide the exact length of the 400hz cable that attaches to the motor driven cable reel.
Answer: Exact length of cable to be determined by Contractor based on exact location and type of motorized cable reel. For an approximate reference only, the point of connection on the aircraft is approximately 22 feet aft of the nose of the aircraft, approximately 6 ft above floor level, on the same side as the overhead reel.
16) Drawing E-1.0 demolition key note 2 and E-1.1key note 4. At what elevation are the three disconnects?
Answer: The disconnects will be located same as existing, which is on the catwalk, which is approximately 40 feet
AFF.
17) Reference detail 6/sheet M-2.1 SF-5 Heating Coil Piping Diagram: The diagram shows a circulating pump; this pump is not indicated on the Circulating Pumps schedule on sheet M-
3.0. What is the basis of design for this pump? Coil flow is indicated to be 50.9 gpm.
Answer: Circ Pump P-11 specs are as follow: In-Line Centrifugal, 50.9 GPM, 18 Ft H20, 1725 RPM, 0.5 HP, 120V/1PH/60Hz, 70 LBS weight. Reconnect to existing electrical circuit.
18) Please share the as-built drawings for this facility.
Answer: Hard copy record drawings can be made available for in-person review by appointment at 168 CES, B3225, Eielson AFB. Provided drawings labeled “B1171 Original Construction Design Drawings” should be used for reference only, and the contractor is responsible to verify accuracy and existing conditions.
19) Reference Key Note 2/sheet P-1.1: What is the make, model, and size of the existing breathing air filter? What is the make, model, and size of the existing breathing air regulator?
Answer: See provided photographs for reference, contractor must verify existing equipment.
20) Reference Key Note 5/sheet P-1.1: What is the make, model, and size of the existing high pressure mixing valve?
Answer: The mixing valves serving wash hose reels are Powers Process Controls Series 430 Hydroguard, product number 4331065.
21) Reference specification Section 33 11 00-2.1.1: The ductile iron utilidor water piping should have grooved joints & fittings (AWWA C606) in conformance with all local utilidor piping standards. The specification allows push-on joints, mechanical joints, and flanged joints.
Answer: Use grooved joints and fittings (AWWA C606), in conformance with all local piping standards. Jacketed HDPE would be acceptable only for the under apron portion of the hydrant loop.
22) Reference sheet C-1.1: Please clarify the water tie-ins at the existing utilidor. What is the size and configuration of the existing piping?
Answer: The existing utilidor tie is an 8” water main, with 3” of insulation. Also reference Key notes on C-1.1.
23) The fire alarm shop drawings call for both thermistor type linear heat detection to activate the pre-action system, as well as low temperature heat detectors throughout the hangar space to warn of potential freezing conditions. As a cost savings measure, would a single restorable optical fiber based linear heat detection system be permitted for use in this area that could provide both zoned preaction activation and low temperature detection?
Answer: Product solutions which meet the specified engineering criteria are permitted.
24) Keynote 574 on FA5.1 indicates a scrolling text sign. Eielson base standard is the non-scrolling Eaton LEMD-M MNS signs. Please confirm the intent is to follow Eielson base standard with the Eaton LEMD-M signs.
Answer: The intent will be to follow the base standard for uniformity and can be assumed for pricing. Formal acceptance of product substitutions will need to be made during the submittal review process.
25) 21 13 13 Section 1.2.1.1 requires a hydrant flow test prior to shop drawing submittal. Drawing FP1.1 indicates the FS system is served by a cistern. Please confirm a hydrant flow test is required.
Answer: Conduct a fire hydrant flow test to demonstrate NFPA 1 Fire Flow Requirements can be met for external fire fighting demands.
26) 21 13 13 Section 1.2.1.3 and Drawing F-0.1 require allowances for exterior hose streams to the sprinkler demand. The system is served by a tank, per UFC 3-600-01 Section 9-6.5 states hose stream is not required to be included in the fire water demand when supplied from a tank. Please confirm exterior hose stream is not required to be included to the sprinkler demand in accordance with UFC.
Answer: The exterior hose stream is not required to be included in the sprinkler system demand.
27) 21 13 13 references a backflow preventer, please indicate where this is to be used.
Answer: Backflow prevention is not required.
28) 21 30 00 Section 1.7.1 requires the Fire Protection Specialist to be a Full Member of the Society of Fire Protection Engineers or a NICET IV. Please confirm QFPE in accordance with UFC 3-600-01 and other Division 21 and Division 28 requirements is permissible.
Answer: QFPE qualifications in accordance with UFC 3-600-01 and other Division 21 and Division 28 requirements is permissible.
29) 21 30 00 Section 2.2 and Drawing FP1.0 require a 2,500 GPM fire pump rated at 165 PSI. Drawings F-0.1 and FP5.1 indicate a 2,000 GPM fire pump rated at 100 PSI. Please confirm the required fire pump size.
Answer: The required fire pump size is 2,000 gpm at 100 psi as indicated on sheets F-0.1 and FP5.1 and in B-3 submittal specifications dated July 2023.
30) 28 31 76 Section 2.15.3 requires the MNS text signs to have two lines of information and be able to display date and time. Drawing FA5.1 calls these “Scrolling LED Text Signs”. These requirements do not match any of the existing Text Signs installed on Eielson AFB, please confirm these are desired and provide a basis of design for a text sign that meets these requirements.
Answer: Conform to the base standard of Eaton LEMD-M Text Signs.
31) Does the government plan on keeping the plane inside the building during construction?
Answer: No. Once occupants are displaced and the building is turned over to the contractor, aircraft will not be parked in the hangar.
32) Does the current fire protection system need to stay active during construction until new system is installed, tested, and in service?
Answer: No, the system can be deactivated once the building is turned over to the contractor. The contractor will need to notify the Contracting Office and base fire depart prior to any disconnections.
33) Is it the government's intent to replace all 3 fire pumps with 1? As shown on bid drawings?
Answer: Remove three fire pumps and replace with one fire pump as indicated on Note A, Sheet F-0.1.
34) Is everything inside the current fire pump room or outside of the Fire pump room to be removed and all new product installed?
Answer: Yes. Demolish existing fire protection systems and equipment and replace with new as indicated on Note A, Sheet F-0.1
35) Does all the sprinkler fire protection piping throughout the building need to be removed and disposed of?
Answer: Yes, replace with new.
36) Is the intent to reuse the wet system piping and reconfigure areas that are covered by the wet system?
Answer: No. Remove and replace with new as indicated in Note A, Sheet F-0.1.
37) What is the estimated volume of AFFF solution that will need to be collected and disposed of?
Answer: The concentrate tank may contain approximately 800 gallons.
38) Our understanding of Sections 01 11 00 Summary of Work and 01 14 00 Work Restrictions and will require us to consolidate onsite construction activities as much as possible to limit occupant displacement. Once interior facility modifications begin the facility will be unoccupied and under contractor control. Is that correct?
Answer: Yes. The intent is for the contractor to mobilize and stage materials in a manner that prolongs occupancy before displacing occupants for construction activities, transferring the building to contractor control.
39) In 01 57 19 Section 3.16.1 includes a substantial analytical list for testing soils (GRO, DRO, RRO, VOC, SVOC, PAH, PCB, pesticides, PFAS, and RCRA metals), however, in 02 61 13 Section 3.4 only PFOS & PFOA are noted as chemical parameters. Please clarify if a wider chemical list should be used for handling the 250cy noted in 02 61 13 spec.
Answer: 01 57 19 Section 3.16.1 refers to procedures for INADVERTENT DISCOVERY OF PETROLEUM- CONTAMINATED SOIL OR HAZARDOUS WASTES. At this time, the only known potential contaminants are PFAS and PFOA, however there is always the possibility that other contaminants may be encountered. Should the inadvertent discovery occur, then procedures listed in that section should be followed.
02 61 13 Section 3.4 is required for this excavation on this project.
40) Should sampling for perfluoroalkyl substances (PFAS) be done by Method 1633 or Method 537?
Answer: Method 1633
41) In 01 57 19 Section 3.16 mentions PID screening as well as 02 61 13 Section 3.4 however there is no 31 09 20 00 29 specification. Is it correct that field screening with a PID during soil excavation is not required?
Answer: Correct, no PID field screening is required during excavation
42) General Note 6 on A-0.1 – Please provide referenced roofing report. Requesting Government to quantify amount of roofing repairs that will be required or set up an additional site visit to allow contractors to assess the existing conditions prior to bidding.
Answer: See attached roof report.
43) Due to the delegated design elements for building automation, seismic restraints, fall arrest system, etc., we respectfully request more time to engage with designers for concept drawings to allow subcontractors to provide accurate pricing. A minimum of 2 weeks to a maximum of 4 weeks would benefit the proposal process.
Answer: This solicitation amendment includes an extension.
44) Are as-built drawings of B1171 available? Elevation information is particularly important related to the structure, platforms etc.
Answer: See Answer to Question #18
45) Existing B1171 floor slab elevation is shown as 543.3'. Spec section 01 01 00, paragraph 1.3.2, Bid Option 2 states the new fire main water loop is to be 10' below the apron and match installation of the new utiliducts. Are soil bores available to provide ground water depth? (Reference DWG C-1.1)
Answer: Soil borings only went to 5’ below grade and did not show any groundwater in the test borings. No other information is available.
46) Given the top of water line under the apron is 10', is a sleeve/casing require? If so, what diameter, and what type of joints are required for the water piping? (Reference DWG C-1.1)
Answer: A sleeve will be required to house the insulated water line. The water line is nominal 8", with 2" of insulation around it. Outer pipe sleeve should be 14" min diameter to allow for pipe to be inside the sleeve. A minimum of 10 ft joints are acceptable.
47) Please confirm the jack-n-bore section of fire main loop does not require heat trace. (Reference DWG C-1.1)
Answer: Provide heat tape on the jack and bore section, with 2" insulation around the pipe. Provide pull points at each end and J boxes in utilidor for replacing heat tape if needed in the future.
48) If the under-apron section of pipe is in direct contact with earth, is a corrosion protection system such as sacrificial anodes, required? (Reference DWG C-1.1)
Answer: Anodes shall be put in if ductile iron pipe is used for direct contact with soil. See question 47 for additional details on pipe.
49) What are the existing swale inverts on the north (plan left) and south (plan right) sides of B1171? (Reference
DWG C-1.1)
Answer: See attached revised drawing C-1.1 with elevations taken from the sheet C3.1 from the original design/construction drawings.
50) Given the anticipated 11' - 12' depth of excavation (below 543.3') what is the footing structure of B1171?
(required to prevent undermining) (Reference DWG C-1.1)
Answer: Refer As-Built for detail. Due to Alaska climate, footing is primarily supported below the frost line. All perimeter wall is supported on Frost wall below grade and on continuous footing. All steel column is supported on concrete pedestals and on spread footing. All steel braced frame column footing is connected with concrete grade beam and footing. The area of influence from bottom of footer is a 1:1 slope. The Utilidor edge is approximately 14 feet away from the edge of the existing structure. Bottom of footers are a minimum of 6’ below finished floor. At a 1:1 influence, the 12’ excavation depth will not impact the area of influence of the existing footers.
51) Specifications state, "B1171 will remain in operation by the occupants to the greatest extent practicable . . . " It is unlikely any contractor would choose to work over an aircraft parked in the hangar; is this prohibited? If suspected service operations require use of the floor to work on jets, would the Gov't provide a quantity of times and distinct durations the hangar bay will be unavailable to the Contractor? (Reference 01 30 00, 1.1.b)
Answer: Contractor work in the hangar is generally incompatible with aircraft maintenance work. See answer to Question 38.
52) Are five sets of color boards truly required for this project? According to the submittal register following 01 45 00, each specification section calling for finishes requires samples. This paragraph is usually reserved for Design- Build proposals. (Reference 01 30 00, 1.3)
Answer: 5 sets of color boards are not necessary. Digital samples indicating color and finish are acceptable for submittal review.
53) Please confirm as-built CAD files, as well as the solicitation's design drawings, will be made available after award for Contractor use in developing shop drawings and new Record Drawings? (Reference 01 78 00, 1.3)
Answer: Hard copy record drawings are available for review. .dwg files from the design can be made available after award. .dwg files from original construction can be made available after award, however, they may not fully reflect the as-built or current facility configuration, and the contractor must verify accuracy of any record information provided.
54) Is the Contractor able to disregard the "Design Phase" commissioning activities? (Reference 01 91 00, 3.1)
Answer: Yes.
55) The Division 02 specifications insinuate a large range of known hazardous materials/wastes are in B1171.
Since it was constructed in ~1998, it's unlikely ACM, LPB and PCBs were used in construction originally. Is the Contractor to complete a full sampling / survey of these HAZMATs under scope of this project? What criteria is to be followed? (Reference Div 02 Spec)
Answer: Per specifications, the contractor is required to provide a complete hazardous waste management plan for approval by the Government.
56) If hazardous materials/waste are found in the sampling / survey, how is the Government going to work with the contractor for abatement and disposal? (Reference Div 02 Spec)
Answer: The Government does not anticipate the contractor will encounter any hazardous materials/waste.
However, if any are discovered, the contractor shall adhere to the instructions in FAR Clause 52.236-2, Differing Site Conditions.
57) Although some sitework and minor excavation occurs under the base bid, the drawings and specifications are unclear as to what activities are required detection of possible contamination, or is the site presumed clean?
(Reference 02 61 13)
Answer: See answer to Question #3.
58) If option 2 is not awarded, will a simple ESCP with field screening be acceptable in lieu of a unified QAPP?
(Reference 02 61 13, 1.3.2)
Answer: If option 2 is not awarded, all work is still subject to environmental requirements listed elsewhere in the specs. A site specific sampling and analysis plan is required for this project for any excavation because it is in the buffer of a PFAS contaminated site.
59) Please confirm a UFP-QAPP is not required for this project. (Reference 02 61 13, 1.3.2.)
Answer: All work is still subject to environmental requirements listed elsewhere in the specs. A site-specific sampling and analysis plan is required for this project for any excavation because it is in the buffer of a PFAS contaminated site.
60) The pricing schedule following the SF 1442 does not include any line items for disposal of varying categories of hazardous waste, nor does provide anticipated quantities. Is Specification 02 81 00 included only for the purpose of negotiating disposal costs should contamination be discovered? Depending on the contaminants, disposal costs vary widely, and unknown quantities prevent contractors from assessing cost impacts at this time. (Reference 02 81 00)
Answer: See answer to Question #56.
61) The fire pump specification, para 2.2 states the fire pump shall deliver 150% of rated flow (2,500 gpm) at 65% of the rated pressure (165psi). Please confirm this means at the Preliminary and Final testing the pump is to discharge 3,750 gpm @ 107.2 psi. Is Eielson's Water Treatment Plant able to produce this level of output? What is the volume of the cistern? (Reference Spec 21 30 00)
Answer: The cistern is 124,000 as indicated on Sheet FP5.1, Keynote 507. The specifications being referenced are not accurate to B-3 Submittal, July 2023 and may not reflect appropriate sizing. These specifications reference 2,000 gpm at 100 psi, which reflects 3,000 gpm at 150% of rated flow and 65 psi at 65% of the rated pressure. This size is also indicated on Sheet FP5.1, Keynote 512.
62) Sheet A 3.0 indicate a floor joist system under the new admin Office. Is this correct?, and if so, will the Gov't provide a detail for construction? (Reference DWG A-3.0)
Answer: Per Keynote 6, floor system is 18-inch raised access flooring system.
63) On Sheet S-2.0 Keynote 6 cals out "Struct-1" plywood, but on sheet A-5.0, several details call out fire rated plywood for this same location. Please advise. (Reference DWG S-2.0)
Answer: Provide fire rated Stuctural Wood Panel with equal or better strength than Structural I level plywood.
64) The specification states a fully operational and new FA/MNS must be installed, tested and accepted prior to the existing system being decommissioned and removed. The specifications state,"In unfinished areas paint the FA/MNS conduit, junction boxes and covers red. In lieu of painting conduit, the Contractor may utilize red conduit with factory applied finish." For the fittings on factory painted red conduit, is silver finish acceptable on the fittings? (Reference 28 31 76, 3.7)
Answer: Silver finish on fittings is acceptable.
65) DoD Construction solicitations generally include specification 01 35 26, Government Safety Requirements, which identify whether or not a Site Safety and Health Officer is required or may dual-hat with either the QCM or Superintendent. Is this specification and its requirements omitted from this project?
Answer: The referenced spec section, 01 35 26, Governmental Safety Requirements, has been added.
66) Please confirm no electric heat trace is required for any of the new fire sprinkler piping in B1171. (Electrical)
Answer: Heat tape is required for the new outdoor piping (both in the utilidor and jack-n-bored piping.
67) Would an extension of the bidding period be possible?
Answer: This solicitation amendment includes an extension.
68) It’s difficult to determine what is new and what is existing. Could you please delineate in the project plans what work is existing and what work is new.
Answer: Refer to bid documents for what is new and existing. Drawings will not be updated.
69) Would it be possible to extend the deadline for Q&A for another week (5-15-24)?
Answer: No
70) Please consider extending the bid submission date until May 31st.
Answer: This solicitation amendment includes an extension.
71) With no access to the roof during the site visit, it was not possible to determine the extent of the roof repairs detailed on A0.1. Can additional information be provided to quantify the repairs.
Answer: See attached roof report for basis of bidding.
72) Please provide the test results for wallboard and joint compound referenced in 02 82 00 1.3.1.1.
Answer: This note in the specifications was made in error. The government has no wallboard and joint compound test results. The government has no indication that asbestos is present in these materials.
73) Please provide a cross section of the envisioned pipe bore assembly under the airfield side apron.
Answer: See detail 2 on revised sheet C-1.1
74) Could jacketed HDPE Arctic Pipe be substituted for the ductile iron called out for the direct bury section under the apron?
Answer: Yes, jacketed HDPE pipe can be substituted. Note, 2" of insulation and heat tape are now required.
75) Per 02 61 13 the contractor is to assume 250 CY of contaminated soils will be found. Approximate locations cannot be found on the plans. Please advise.
Answer: Yes, assume 250 CY of contaminated material. See answer to question 3 regarding potential contaminated areas.
76) We are unable to open the link Civil Drawing 65 that is provided with the Enviro Impact Info. Please provide the dwg.
Answer: Please see attached “Civil Drawing 65”, this drawing was an earlier draft used for coordination only, and does not reflect the current design.
77) Are there any actual sample locations, test results and or potential QTY’s for the ACM, Lead, Contaminated Ballasts, PCB’s and Mold described in sections 02 82 00 / 02 83 00 / 02 84 16 / 02 84 33 and 02 85 00?
Answer: No, these sections refer to procedures for the handling and control of asbestos, lead, PCBs, mold containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both. 354 Insulation shop has no records for this facility.
78) For the option to install the water loop, would horizontal directional drilling using C900 PVC or HDPE be an acceptable option? Horizontal directional drilling with materials mentioned is a much cheaper option than jack and bore with steel casing and steel pipe.
Answer: See answer to question #74.
79) Sht A-7.0, Note 2 states, “All STC specific rated door assemblies must be tested OST installation to meet the minimum field sound transmission coefficient as noted on the door schedule . . .” However, the door and window schedules do not list a STC rating.
Answer: This remark regarding the doors/windows is not applicable to this project.
80) Our understanding is that DFARS 252.204-7020 is only applicable to contracts that also contain DFARS clause 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Please confirm compliance with DFARS 252.204-7012 is not required.
Answer: These clauses are required to be included in the solicitation and resultant contract. However, the Government does not anticipate any covered defense information to be transmitted to the contractor regarding this project.
(End of Summary of Changes)