71. 2019 Roof Report - B1171 Breakout.pdf
PDF 1009 KB Posted
- Attached to
- Repair Fuel Cell, B1171
- Solicitation number
- W50S6K24B0002
- Issued by
-
Department of the Army National Guard
About this file
The provided document is a Roof Report for Building 1171, Fuels Maintenance Section A & B at Eielson Air Force Base. The report identifies several issues, including surface deterioration caused by the fall arresting cable, backed-out or missing fasteners, holes in the expansion joint between sections, and unsealed lightning protection penetrations that are allowing water to enter the building. No distresses were found in Section C.
The related federal contract opportunity is a solicitation (W50S6K24B0002) for the Repair of Fuel Cell, B1171 at Eielson AFB, Alaska. This Invitation for Bid (IFB) seeks to award a single firm fixed-price contract for services to replace the existing Aqueous Film Forming Foam (AFFF) fire protection system with a water-only system, perform architectural modifications, and make heating, ventilation, and lighting upgrades. The solicitation also includes option line items for constructing a fire protection water loop and fire hydrants, as well as telecommunications cabling. A pre-bid conference is scheduled for May 6, 2024, at 1:00 PM local time.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1171, Fuels Maintenance
Section A & B
The fall arresting cable is causing surface deterioration on both sections.
Several fasteners are backed-out like this one or are missing on both sections.
The expansion joint between section B and the wall of section A has a few holes.
The lightning protection penetrations on both sections are not sealed and are allowing water to enter the building.
Section C No distresses found.