Water Distribution Specs - 33 11 00 POSTED 22 DEC 2020.pdf
PDF 71 KB Posted
- Attached to
- Water Main Line - Construction Project Federal contract opportunity
- Solicitation number
- W25G1V21R0016
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tobyhanna Army Depot (TYAD) 179152IDG Tobyhanna, PA.
SECTION 33 11 00.00 99
WATER UTILITY DISTRIBUTION PIPING
02/18
PART 1 GENERAL
1.1 UNIT PRICES
Measurement and payment will be based on completed work performed in accordance with the drawings, specifications, and the Contract payment schedules.
1.1.1 Measurement
The length of water lines will be determined by measuring along the centerlines of the various sizes of pipe provided. Pipe will be measured from center of fitting to center of fitting, and from center of water main to end of service connection. No deduction will be made for the space occupied by valves or fittings.
1.1.2 Payment
Payment will be made for water lines at the Contract unit price per linear foot for the various types and sizes of water lines, and will be full compensation for all pipes, joints, specials, fittings, and bedding complete and in place. Payment for fire hydrants, valves, and valve boxes will be made at the respective Contract unit price each for such items complete and in place. Payment will include providing all testing, plant, labor, and material and incidentals necessary to complete the work, as specified and as shown.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION
(AREMA)
AREMA Eng Man (2017) Manual for Railway Engineering
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA B300 (2010; Addenda 2011) Hypochlorites
AWWA B301 (2010) Liquid Chlorine
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C105/A21.5 (2010) Polyethylene Encasement for Ductile-Iron Pipe Systems
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
SECTION 33 11 00.00 99 Page 1
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C151/A21.51 (2017) Ductile-Iron Pipe, Centrifugally Cast
AWWA C153/A21.53 (2011) Ductile-Iron Compact Fittings for Water Service
AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service
AWWA C502 (2018) Dry-Barrel Fire Hydrants
AWWA C509 (2015) Resilient-Seated Gate Valves for Water Supply Service
AWWA C511 (2017) Reduced-Pressure Principle Backflow Prevention Assembly
AWWA C512 (2015) Air-Release, Air/Vacuum, and Combination Air Valves for Water and Wastewater Service
AWWA C515 (2015) Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service
AWWA C550 (2017) Protective Interior Coatings for Valves and Hydrants
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA C651 (2014) Standard for Disinfecting Water Mains
AWWA C655 (2009) Field Dechlorination
AWWA C800 (2014) Underground Service Line Valves and Fittings
AWWA C900 (2016) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In.
Through 60 In. (100 mm Through 1,500 mm)
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
AWWA M41 (2009; 3rd Ed) Ductile-Iron Pipe and Fittings
AWWA M55 (2006) PE Pipe - Design and Installation
SECTION 33 11 00.00 99 Page 2
ASME INTERNATIONAL (ASME)
ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)
ASME B1.20.3 (1976; R 2013) Dryseal Pipe Threads (Inch)
ASME B16.18 (2018) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.26 (2018) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B18.2.2 (2015) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASME B18.5.2.1M (2006; R 2011) Metric Round Head Short Square Neck Bolts
ASME B18.5.2.2M (1982; R 2010) Metric Round Head Square Neck Bolts
ASTM INTERNATIONAL (ASTM)
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM A276/A276M (2017) Standard Specification for Stainless Steel Bars and Shapes
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A746 (2018) Standard Specification for Ductile Iron Gravity Sewer Pipe
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B61 (2015) Standard Specification for Steam or Valve Bronze Castings
ASTM B62 (2017) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B88 (2020) Standard Specification for Seamless Copper Water Tube
SECTION 33 11 00.00 99 Page 3
ASTM C94/C94M (2020) Standard Specification for Ready-Mixed Concrete
ASTM D1784 (2020) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D2774 (2012) Underground Installation of Thermoplastic Pressure Piping
ASTM D3035 (2015) Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F714 (2013; R 2019) Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter
FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH
(FCCCHR)
FCCCHR List (continuously updated) List of Approved Backflow Prevention Assemblies
FCCCHR Manual (10th Edition) Manual of Cross-Connection Control
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NSF INTERNATIONAL (NSF)
NSF 372 (2016) Drinking Water System Components - Lead Content
NSF/ANSI 14 (2019) Plastics Piping System Components and Related Materials
NSF/ANSI 61 (2019) Drinking Water System Components - Health Effects
UNDERWRITERS LABORATORIES (UL)
UL 246 (2011; Reprint Dec 2018) UL Standard for Safety Hydrants for Fire-Protection Service
UL 262 (2004; Reprint Oct 2011) Gate Valves for
SECTION 33 11 00.00 99 Page 4
Fire-Protection Service
UNI-BELL PVC PIPE ASSOCIATION (UBPPA)
UBPPA UNI-PUB-08 (2016) Tapping Guide for PVC Pressure Pipe
1.3 DEFINITIONS
1.3.1 Water Mains
Water mains include water piping having diameters 4 through 14 inch , specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.3.2 Water Service Lines
Water service lines include water piping from a water main to a building service at a point approximately 5 feet from building or the point indicated on the drawings, specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.3.3 Additional Definitions
For additional definitions refer to the definitions in the applicable referenced standard.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 .00 99 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 .00 99
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Connections ; G
SD-03 Product Data
Pipe, Fittings, Joints and Couplings ; G
Valves ; G
Valve Boxes ; G
Fire Hydrants ; G
Pipe Restraint ; G
Corporation Stops ; G
Backflow Preventer ; G
Disinfection Procedures ; G
SD-06 Test Reports
SECTION 33 11 00.00 99 Page 5
Backflow Preventer Tests ; G
Bacteriological Samples ; G
Leakage Test
Hydrostatic Test
SD-07 Certificates
Pipe, Fittings, Joints and Couplings
Lining
Valves
Fire Hydrants
Backflow Prevention Training Certificate
Backflow Tester Certification
Backflow Certificate
SD-08 Manufacturer's Instructions
Ductile Iron Piping
PVC Piping
Polyethylene (PE) Pipe
PVC Piping For Service Lines
Copper Pipe For Service Lines
1.5 QUALITY CONTROL
1.5.1 Regulatory Requirements
Comply with NSF/ANSI 14 or NSF/ANSI 61 and NSF 372 for materials for potable water systems; comply with lead content requirements for "lead-free" plumbing as defined by the U.S. Safe Drinking Water Act effective January 2014. Provide materials bearing the seal of the National Sanitation Foundation (NSF) for potable water service.
Comply with NFPA 24 for materials, installation, and testing of fire main piping and components.
1.5.2 Qualifications
1.5.2.1 Backflow Preventers
1.5.2.1.1 Backflow Preventer Certificate
Certificate of Full Approval from FCCCHR List , University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate
SECTION 33 11 00.00 99 Page 6 of Provisional Approval will not be acceptable.
[ 1.5.2.1.1.1 Backflow Tester Certificate
Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency.[ Tester must not be affiliated with any company participating in any other phase of this Contract.]
] 1.5.2.1.1.2 Backflow Prevention Training Certificate
Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling and in accordance with manufacturer's instructions.
Store materials on site in enclosures or under protective covering. Store jointing materials and rubber gaskets under cover out of direct sunlight.
Do not store materials directly on the ground. Keep inside of pipes, fittings, valves, fire hydrants, and other accessories free of dirt and debris.
1.6.2 Handling
Handle pipe, fittings, valves, fire hydrants, and other accessories in accordance with manufacturer's instructions and in a manner to ensure delivery to the trench in sound undamaged condition. Avoid injury to coatings and linings on pipe and fittings; make repairs if coatings or linings are damaged. Do not place other material, hooks, or pipe inside a pipe or fitting after the coating has been applied. Inspect the pipe for defects before installation. Carry, do not drag pipe to the trench. Use of pinch bars and tongs for aligning or turning pipe will be permitted only on the bare ends of the pipe. Clean the interior of pipe and accessories of foreign matter before being lowered into the trench and keep them clean during laying operations by plugging. Replace defective material without additional expense to the Government. Store rubber gaskets, not immediately installed, under cover or out of direct sunlight.
Handle ductile iron pipe, fittings, and accessories in accordance with AWWA C600 and AWWA M41. Handle PE pipe, fittings, and accessories in accordance with AWWA M55.
PART 2 PRODUCTS
2.1 MATERIALS
Provide all materials in accordance with AWWA C800 and as indicated herein. Provide valves and fittings with pressure ratings equivalent to the pressure ratings of the pipe.
2.1.1 Pipe, Fittings, Joints And Couplings
Submit manufacturer's standard drawings or catalog cuts, except submit
SECTION 33 11 00.00 99 Page 7 both drawings and cuts for push-on and rubber-gasketed bell-and-spigot joints. Include information concerning gaskets with submittal for joints and couplings.
2.1.1.1 Ductile-Iron Piping
2.1.1.1.1 Pipe and Fittings
Pipe, AWWA C151/A21.51 , Pressure Class 350 or Thickness Class 52.
Fittings, AWWA C110/A21.10 or AWWA C153/A21.53 ; fittings with push-on joint ends are to meet the same requirements as fittings with mechanical-joint ends, except for the factory modified bell design.
Provide fittings with pressure ratings equivalent to that of the pipe.
Provide compatible pipe ends and fittings for the specified joints.
Provide cement-mortar lining , AWWA C104/A21.4 , standard thickness on pipe and fittings.
2.1.1.1.2 Joints and Jointing Material
Provide push-on joints or mechanical joints for pipe and fittings unless otherwise indicated. Sleeve-type mechanical couplings in lieu of push-on joints are acceptable, subject to the limitations specified in the paragraph SLEEVE-TYPE MECHANICAL COUPLINGS.
a. Push-On Joints: Shape of pipe ends and fitting ends, gaskets, and lubricant for joint assembly as recommended in AWWA C111/A21.11 .
b. Mechanical Joints: Dimensional and material requirements for pipe ends, glands, bolts and nuts, and gaskets as recommended in
AWWA C111/A21.11 .
c. Sleeve-Type Mechanical Coupled Joints: As specified in the paragraph
SLEEVE-TYPE MECHANICAL COUPLINGS.
2.1.1.2 Plastic Piping
2.1.1.2.1 PVC Piping
2.1.1.2.1.1 PVC Piping
AWWA C900 plain end or gasket bell end pipe meeting or exceeding ASTM D1784 cell class 12454, with a minimum Pressure Class [150 (DR27.5)], [165 (DR25)], [200 (DR21)], [235 (DR 18)], [250 (DR17)] [305 (DR 14)] with ductile iron outside diameter (DIOD).
2.1.1.2.1.2 Fittings for PVC Pipe
Gray iron or ductile iron fittings, AWWA C110/A21.10 with special fittings in accordance with Appendix B or AWWA C153/A21.53 , with cement-mortar lining for fittings , AWWA C104/A21.4 , standard thickness. Fittings with push-on joint ends are to conform to the same requirements as fittings with mechanical-joint ends, except for the factory modified bell design compatible for use with PVC pipe as specified.
2.1.1.2.1.3 Joints and Jointing Material for PVC
a. Push-on joints: Use jointing material in accordance with ASTM D3139 and AWWA C111/A21.11 between pipes, pipes and metal fittings, valves, and other accessories or compression-type joints/mechanical joints.
SECTION 33 11 00.00 99 Page 8
Provide each joint connection with an elastomeric gasket compatible for the bell or coupling used. Gaskets for push-on joints for pipe, ASTM F477. Gaskets for push-on joints and compression-type joints/mechanical joints for joint connections between pipe and metal fittings, valves, and other accessories, AWWA C111/A21.11 , respectively, for push-on joints and mechanical joints.
b. Mechanical Joint: Use mechanically coupled joints having a sleeve-type mechanical coupling, as specified in the paragraph SLEEVE-TYPE MECHANICAL COUPLINGS, as an optional jointing method for plain-end PVC pipe, subject to the limitations specified for mechanically coupled joints using a sleeve-type mechanical coupling as specified for compression-type joints in ASTM D3139. Provide jointing material in accordance with AWWA C111/A21.11 between pipe and sleeve-type mechanical couplings.
2.1.1.2.2 Polyethylene (PE) Pipe
ASTM D3035, PE4710, material designation code[CC2] [CC3] with a minimum Pressure Class [200 (DR11)] [250 (DR 9)] [335 (DR 7)] with ductile iron outside diameter (DIOD).
2.1.1.2.2.1 Fittings For PE Pipe
AWWA M55, ASTM D3035, molded and manufactured to comply with ASTM F714.
2.1.1.3 Copper Pipe For Service Lines
2.1.1.3.1 Copper Tubing and Associated Fittings
Provide ASTM B88, Type K copper tubing. Provide AWWA C800 fittings.
AWWA C800 includes ASME B1.20.3 , ASME B1.20.1 , ASME B16.18 solder-type joint fittings.
[ 2.1.1.4 Piping Beneath Railroad Right-of-Way
Piping passing under the right-of-way of a commercial railroad is to conform to the specifications for pipelines conveying nonflammable substances in AREMA Eng Man. Provide ductile-iron pipe in lieu of cast-iron pipe. Ductile-iron railroad crossing casing pipe is to conform to and have strength computed in accordance with ASTM A746.
] 2.1.2 Valves
[ Provide a protective interior coating in accordance with AWWA C550.
] 2.1.2.1 Gate Valves 3 Inch Size and Larger
AWWA C500, AWWA C509, AWWA C515, or UL 262 and:
a. AWWA C500: nonrising stem type with double-disc gate and mechanical-joint ends or push-on joint ends compatible for the adjoining pipe
b. AWWA C509 or AWWA C515: nonrising stem type with mechanical-joint ends or resilient-seated gate valves 3 to 12 inches in size
c. UL 262 : inside-screw type with operating nut, double-disc or split-wedge type gate, designed for a hydraulic working pressure of 175
SECTION 33 11 00.00 99 Page 9 psi , and have mechanical-joint ends or push-on joint ends as appropriate for the pipe to which it is joined.
Match materials for UL 262 gate valves to the reference standards specified in AWWA C500. Gate valves open by counterclockwise rotation of the valve stem. Stuffing boxes have 0-ring stem seals. Stuffing boxes are bolted and constructed so as to permit easy removal of parts for repair. Use gate valves with special ends for connection to sleeve-type mechanical coupling in lieu of mechanical-joint ends and push-on joint ends. Provide valve ends and gaskets for connection to sleeve-type mechanical couplings that conform to the requirements specified respectively for the joint or coupling. Provide all valves from one manufacturer.
2.1.2.2 Air Release, Air/Vacuum, and Combination Air Valves
Provide AWWA C512 air release , air vacuum and combination air valves that release air and prevent the formation of a vacuum. Provide valves with an iron body, lead-free bronze trim and stainless steel float that automatically releases air when the lines are being filled with water and admits air into the line when water is being withdrawn in excess of the inflow.
2.1.2.3 Water Service Valves
2.1.2.4 Valve Boxes
Provide a valve box for each gate valve on buried piping. Construct adjustable valve boxes manufactured from cast iron of a size compatible for the valve on which it is used. Cast the word "WATER" on the lid. The minimum diameter of the shaft of the box is as indicated.
2.1.3 Blowoff Valve Assemblies
Provide blowoff valve assemblies complete with all pipe, fittings, valve, valve box, riser box and lid, riser extension, discharge fitting and other materials required to connect to the water main. Provide blow off valve assemblies 4 inches or larger with AWWA C110/A21.10 or AWWA C153/A21.53 fittings.
2.1.4 Fire Hydrants
2.1.4.1 Fire Hydrants
Provide fire hydrants where indicated. Paint fire hydrants with at least one coat of primer and two coats of red enamel paint. Stencil fire hydrant number and main size on the fire hydrant barrel using black stencil paint.
Provide all fire hydrants with isolation gate valves. Gate valve shall be located as close as possible to the fire hydrant in accordance with NFPA 24 .
2.1.4.1.1 Dry-Barrel Type Fire Hydrants
Provide Dry-barrel type fire hydrants, AWWA C502 or UL 246 , "Base Valve" with 6 inch inlet, 5 1/4 inch valve opening, one 4 1/2 inch pumper connection, and two 2 1/2 inch hose connections.
Provide mechanical-joint or push-on joint end inlet , except where flanged
SECTION 33 11 00.00 99 Page 10 end is indicated; with end matching requirements as specified in AWWA C502 or UL 246 for size and shape of operating nut, cap nuts, and threads on hose and pumper connections. Provide fire hydrants with frangible sections as mentioned in AWWA C502. Provide fire hydrant with special couplings joining upper and lower sections of fire hydrant barrel and upper and lower sections of fire hydrant stem that break from a force imposed by a moving vehicle.
2.1.5 Backflow Preventers
Provide a [bronze] [cast iron] [ductile iron] AWWA C511 reduced pressure principle type backflow preventer meeting the following requirements:
a. Size: [_____]
[ b. Maximum Rated Flow: [_____]
][ c. Allowable Pressure Loss: [_____]
] d. Flanged [cast iron], [bronze] [brass] mounted gate valve
[ e. Strainer of the same material as the backflow preventer
][ f. Stainless steel alloys in accordance with ASTM A276/A276M , Type [304]
] [The particular make, model, and size of backflow preventers to be installed must be included in the latest edition of the List of Approved Backflow Prevention Assemblies issued by the FCCCHR List and be accompanied by a backflow certificate of full approval from FCCCHR List .
]Select materials for piping, strainers, and valves used in assembly installation that are galvanically compatible. Materials joined, connected, or otherwise in contact are to have no greater than 0.25 V difference on the Anodic Index, unless separated by a dielectric type union or fitting.
2.1.5.1 Backflow Preventer Enclosure
Provide an [insulated] enclosure[ with heat].
2.1.6 Disinfection
Chlorinating materials are to conform to: Chlorine, Liquid: AWWA B301;
Hypochlorite, Calcium and Sodium: AWWA B300.
2.2 ACCESSORIES
2.2.1 Pipe Restraint
2.2.1.1 Thrust Blocks
Use ASTM C94/C94M concrete having a minimum compressive strength of 2,500 psi at 28 days.
2.2.1.2 Joint Restraint
Provide restrained joints in accordance with NFPA 24 , Chapter 10.
Provide mechanical joint restraint or metal harness fabricated by the pipe
SECTION 33 11 00.00 99 Page 11 manufacturer.
2.2.2 Sleeve-Type Mechanical Couplings
Use couplings to join plain-end piping by compression of a ring gasket at each end of the adjoining pipe sections. The coupling consists of one middle ring flared or beveled at each end to provide a gasket seat; two follower rings; two resilient tapered rubber gaskets; and bolts and nuts to draw the follower rings toward each other to compress the gaskets.
Provide true circular middle ring and the follower rings sections free from irregularities, flat spots, and surface defects; provide for confinement and compression of the gaskets. For ductile iron and PVC pipe, the middle ring is cast-iron or steel; and the follower rings are malleable or ductile iron. Cast iron, ASTM A48/A48M not less than Class
25. Malleable and ductile iron are to meet the requirements of ASTM A47/A47M and ASTM A536, respectively. Steel is to have a strength not less than that of the pipe. Use gaskets for resistance to set after installation and to meet the requirements specified for gaskets for mechanical joint in AWWA C111/A21.11 . Provide track-head type bolts ASTM A307, Grade A, with nuts, ASTM A563, Grade A; or round-head square-neck type bolts, ASME B18.5.2.1M and ASME B18.5.2.2M with hex nuts, ASME B18.2.2 . Provide 5/8 inch diameter bolts; minimum number of bolts for each coupling is 5 for 6 inch pipe, 6 for 8 inch pipe, and 8 for 12 inch pipe. Shape bolt holes in follower rings to hold fast to the necks of the bolts used. Do not use mechanically coupled joints using a sleeve-type mechanical coupling as an optional method of jointing except where pipeline is adequately anchored to resist tension pull across the joint. Provide a tight flexible joint with mechanical couplings under reasonable conditions, such as pipe movements caused by expansion, contraction, slight settling or shifting in the ground, minor variations in trench gradients, and traffic vibrations. Match coupling strength to that of the adjoining pipeline.
2.2.3 Buried Tape and Detection Wire for Water Lines
2.2.3.1 Buried Warning and Identification Tape
Provide polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 6 inches minimum width with a minimum thickness of 0.004 inch, a minimum strength of 1500 psi lengthwise, 1250 PSI crosswise, and a maximum 350 percent elongation. Tape shall be color coded "BLUE" for water lines with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED WATER LINE BELOW" or similar wording. Provide permanent color and printing, unaffected by moisture or soil.
2.2.3.2 Detection Wire for Water Lines
Provide a single strand, 12 AWG solid copper detection wire with a minimum of 30 mil HDPE insulation thickness for all underground piping.
2.2.4 Water Service Line Appurtenances
2.2.4.1 Corporation Stops
Ground key type; lead-free bronze, ASTM B61 or ASTM B62; compatible with the working pressure of the system and solder-joint, or flared tube compression type joint. Threaded ends for inlet and outlet of corporation
SECTION 33 11 00.00 99 Page 12 stops, AWWA C800; coupling nut for connection to flared copper tubing, ASME B16.26 .
2.2.4.2 Curb or Service Stops
Ground key, round way, inverted key type; made of lead-free bronze, ASTM B61or ASTM B62; and compatible with the working pressure of the system. Provide compatible ends for connection to the service piping.
Cast an arrow into body of the curb or service stop indicating direction of flow.
2.2.4.3 Service Clamps
Provide single or double flattened strap type service clamps used for repairing damaged cast-iron, steel or PVC pipe with a pressure rating not less than that of the pipe being repaired. Provide clamps with a galvanized malleable-iron body with cadmium plated straps and nuts and a rubber gasket cemented to the body.
2.2.4.4 Goosenecks
Manufacture goosenecks from Type K copper tubing; provide joint ends for goosenecks compatible with connecting to corporation stop and service line.
2.2.4.5 Curb Boxes
Provide a curb box for each curb or service stop manufactured from cast iron, size capable of containing the stop where it is used. Provide a round head. Cast the word "WATER" on the lid. Factory coat the box with a heavy coat of bituminous paint.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Connections to Existing System
Perform all connections to the existing water system in the presence of the Government Designated Representative (GDR) .
3.1.2 Operation of Existing Valves
Do not operate valves within or directly connected to the existing water system unless expressly directed to do so by the Government Designated Representative .
3.1.3 Earthwork
Perform earthwork operations in accordance with Section 31 00 00.00 99
EARTHWORK.
3.2 INSTALLATION
Install all materials in accordance with the applicable reference standard, manufacturers instructions and as indicated herein.
SECTION 33 11 00.00 99 Page 13
3.2.1 Piping
3.2.1.1 General Requirements
Install pipe, fittings, joints and couplings in accordance with the applicable referenced standard, the manufacturer's instructions and as specified herein.
3.2.1.1.1 Termination of Water Lines
Terminate the work covered by this section at a point approximately 5 feet from the building, unless otherwise indicated.
Do not lay water lines in the same trench with gas lines, fuel lines, electric wiring, or any other utility. Do not install copper tubing in the same trench with ferrous piping materials. Where nonferrous metallic pipe (i.e., copper tubing) crosses any ferrous piping, provide a minimum vertical separation of 12 inches between pipes.
3.2.1.1.2 Pipe Laying and Jointing
Remove fins and burrs from pipe and fittings. Before placing in position, clean pipe, fittings, valves, and accessories, and maintain in a clean condition. Provide proper facilities for lowering sections of pipe into trenches. Under no circumstances is it permissible to drop or dump pipe, fittings, valves, or other water line material into trenches. Cut pipe cleanly, squarely, and accurately to the length established at the site and work into place without springing or forcing. Replace a pipe or fitting that does not allow sufficient space for installation of jointing material. Blocking or wedging between bells and spigots is not permitted. Lay bell-and-spigot pipe with the bell end pointing in the direction of laying. Grade the pipeline in straight lines; avoid the formation of dips and low points. Support pipe at the design elevation and grade. Secure firm, uniform support. Wood support blocking is not permitted. Lay pipe so that the full length of each section of pipe and each fitting rests solidly on the pipe bedding; excavate recesses to accommodate bells, joints, and couplings. Provide anchors and supports for fastening work into place. Make provision for expansion and contraction of pipelines. Keep trenches free of water until joints have been assembled. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads. Do not lay pipe when conditions of trench or weather prevent installation.
Provide a minimum cover of 52 inches from top of pipe to finished grade.
3.2.1.1.3 Connections to Existing Water Lines
Make connections to existing water lines after coordination with the facility and with a minimum interruption of service on the existing line.
Make connections to existing lines under pressure in accordance with the recommended procedures of the manufacturer of the pipe being tapped and as indicated.
3.2.1.1.4 Sewer Manholes
No water piping is to pass through or come in contact with any part of a sewer manhole.
SECTION 33 11 00.00 99 Page 14
3.2.1.1.5 Water Piping Parallel With Sewer Piping
Where the location of the water line is not clearly defined by dimensions on the drawings, do not lay water line closer than 10 feet , horizontally, from any sewer line.
3.2.1.1.6 Water Piping Crossing Sewer Piping
Provide at least 18 inches above the top (crown) of the sewer piping and the bottom (invert) of the water piping whenever possible. Measure the distance edge-to-edge. Where water lines cross under gravity sewer lines, construct sewer line of AWWA compliant ductile iron water piping with rubber-gasketed joints and no joint located within 10 feet, horizontally, of the crossing.
3.2.1.1.7 Penetrations
Provide ductile-iron or Schedule 40 steel wall sleeves for pipe passing through walls of valve pits and structures. Fill annular space between walls and sleeves with rich cement mortar. Fill annular space between pipe and sleeves with mastic.
3.2.1.2 Ductile-Iron Piping
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the requirements of AWWA C600 for pipe installation, joint assembly, valve-and-fitting installation, and thrust restraint.
a. Jointing: Make push-on joints with the gaskets and lubricant specified for this type joint; assemble in accordance with the applicable requirements of AWWA C600 and AWWA M41 for joint assembly.
Make mechanical joints with the gaskets, glands, bolts, and nuts specified for this type joint; assemble in accordance with the applicable requirements of AWWA C600 and AWWA M41 for joint assembly and the recommendations of Appendix A to AWWA C111/A21.11 . Assemble joints made with sleeve-type mechanical couplings in accordance with the recommendations of the coupling manufacturer.
b. Allowable Deflection: Follow AWWA C600 and AWWA M41 for the maximum allowable deflection. If the alignment requires deflection in excess of the above limitations, provide special bends or a sufficient number of shorter lengths of pipe to achieve angular deflections within the limit set forth.
c. Exterior Protection: Completely encase buried ductile iron pipelines using Method A or B, with polyethylene film, in accordance with
AWWA C105/A21.5 .
3.2.1.3 PVC Water Main Pipe
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the requirements of AWWA C605 for laying of pipe, joining PVC pipe to fittings and accessories, valves, and fittings; and with the recommendations for pipe joint assembly and appurtenance installation in AWWA M23, Chapter 7, "Installation."
a. Jointing: Make push-on joints with the elastomeric gaskets specified for this type joint, using either elastomeric-gasket bell-end pipe or
SECTION 33 11 00.00 99 Page 15 elastomeric-gasket couplings. For pipe-to-pipe push-on joint connections, use only pipe with push-on joint ends having factory-made bevel; for push-on joint connections to metal fittings, valves, and other accessories, cut spigot end of pipe off square and re-bevel pipe end to a bevel approximately the same as that on ductile-iron pipe used for the same type of joint. Use a lubricant recommended by the pipe manufacturer for push-on joints. Assemble push-on joints for pipe-to-pipe joint connections in accordance with the requirements of AWWA C605 for laying the pipe and the recommendations in AWWA M23, Chapter 7, "Installation," for pipe joint assembly. Assemble push-on joints for connection to fittings, valves, and other accessories in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories and with the requirements of AWWA C600 for joint assembly. Make compression-type joints/mechanical joints with the gaskets, glands, bolts, nuts, and internal stiffeners previously specified for this type joint; assemble in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories, with the requirements of AWWA C600 for joint assembly, and with the recommendations of Appendix A to AWWA C111/A21.11 . Cut off spigot end of pipe for compression-type joint/mechanical-joint connections and do not re-bevel. Assemble joints made with sleeve-type mechanical couplings in accordance with the recommendations of the coupling manufacturer using internal stiffeners as previously specified for compression-type joints.
b. Joint Offset: Construct joint offset in accordance AWWA C605. Do not exceed the minimum longitudinal bending as indicated by AWWA C605.
c. Fittings: Install in accordance with AWWA C605.
3.2.1.4 Polyethylene (PE) Piping
Install PE pipes in accordance with AWWA M55 and ASTM D2774.
3.2.1.5 Metallic Piping for Service Lines
Install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the applicable requirements of AWWA C600 for pipe installation, unless otherwise specified.
3.2.1.5.1 Joints for Copper Tubing
Cut copper tubing with square ends; remove fins and burrs. Replace dented, gouged, or otherwise damaged tubing with undamaged tubing. Make solder joints using ASTM B32, 95-5 tin-antimony or Grade Sn96 solder. Use solder and flux containing less than 0.2 percent lead. Before making joint, clean ends of tubing and inside of fitting or coupling with wire brush or abrasive. Apply a rosin flux to the tubing end and on recess inside of fitting or coupling. Insert tubing end into fitting or coupling for the full depth of the recess and solder. For compression joints on flared tubing, insert tubing through the coupling nut and flare tubing.
3.2.1.6 Fire Protection Service Lines for Sprinkler Supplies
Connect water service lines used to supply building sprinkler systems for fire protection to the water main in accordance with NFPA 24 .
SECTION 33 11 00.00 99 Page 16
3.2.1.7 Water Service Piping
3.2.1.7.1 Location
Connect water service piping to the building service where the building service has been installed. Where building service has not been installed, terminate water service lines approximately 5 feet from the building line at the points indicated; close such water service lines with plugs or caps.
3.2.1.7.2 Water Service Line Connections to Water Mains
Connect water service lines less than 3 inch to the main with a rigid connection or a corporation stop and gooseneck and install a service stop below the frostline. Connect water service lines 3 inch or larger to the main with a rigid connection and install a gate valve on service line below the frostline as indicated. Connect water service lines to ductile-iron water mains in accordance with AWWA C600 for service taps.
Connect water service lines to PVC water mains in accordance with UBPPA UNI-PUB-08 and the recommendations of AWWA M23, Chapter 9, "Service Connections."
3.2.1.8 Backflow Preventers
Install backflow preventers of type, size, and capacity indicated a minimum of 12 inch and a maximum of 36 inch above concrete base. Include valves and test cocks. Install according to the manufacturers requirements and the requirements of plumbing and health department and authorities having jurisdiction. Support NPS 2 1/2 inch and larger backflow preventers, valves, and piping near floor with 12 inch minimum air gap, and on concrete piers or steel pipe supports. Do not install backflow preventers that have a relief drain in vault or in other spaces subject to flooding. Do not install by-pass piping around backflow preventers.
3.2.1.8.1 Backflow Preventer Enclosure
Install a level concrete base with top of concrete surface approximately [ 2 inches ] [[_____] inches ] above grade. Install protective enclosure over valve and equipment. Anchor protective enclosure to concrete base.
[ 3.2.2 Railroad Right-of-Way
Install piping passing under the right-of-way of a commercial railroad in accordance with the specifications for pipelines conveying nonflammable substances in Chapter 1, Part 5, of the AREMA Eng Man.[ For PVC water main pipe, also install in accordance with the recommendations of AWWA M23 for installation of casings.]
3.2.3 Buried Tape and Detection Wire
3.2.3.1 Buried Warning and Identification Tape
Provide buried utility lines with utility identification tape. Place tape half way between finished grade and top of pipe.
3.2.3.2 Buried Detection Wire
Provide detection wire secured directly to the conduit or pipe every 5 to
SECTION 33 11 00.00 99 Page 17
8 feet with tape unaffected by moisture or soil. The detection wire shall be accessible from a coms box, service stub out, or other easily accessible location with a minimum of 3 feet of extra slack at the ends.
Detection wire access for water lines shall be placed at fire hydrants, manholes, and service connection stub-outs. Detection wire access will not be permitted from water valve boxes. Extend the wire continuously and unbroken between designated points. Furnish insulated wire over its entire length. At manholes, install detection wire between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal.
3.2.4 Bedding and Backfill
Place and compact pipe bedding and backfill in accordance with Section
31 00 00.00 99 EARTHWORK.
3.2.5 Disinfection
Disinfection of systems supplying non-potable water is not required.
Prior to disinfection, provide disinfection procedures , proposed neutralization and disposal methods of waste water from disinfection as part of the disinfection submittal. Disinfect new water piping and existing water piping affected by Contractor's operations in accordance with AWWA C651. Disinfect new water piping using the AWWA C651 continuous-feed method of chlorination. Ensure a free chlorine residual of not less than 10 parts per million after 24 hour holding period and prior to performing bacteriological tests.
3.2.6 Flushing
Perform bacteriological tests prior to flushing. Flush solution from the systems with domestic water until maximum residual chlorine content is within the range of 0.2 to 0.5 parts per million , the residual chlorine content of the distribution system, or acceptable for domestic use. Use AWWA C655 neutralizing chemicals.
3.2.7 Pipe Restraint
3.2.7.1 Concrete Thrust Blocks
Install concrete thrust blocks where indicated.
3.2.7.2 Restrained Joints
Install restrained joints in accordance with the manufacturer's instructions and NFPA 24. For metal harness use tie rods and clamps as shown in NFPA 24 .
3.2.8 Valves
3.2.8.1 Gate Valves
Install gate valves, AWWA C500 and UL 262 , in accordance with the requirements of AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to AWWA C500. Install gate valves, AWWA C509 or AWWA C515, in accordance with the requirements of AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, SECTION 33 11 00.00 99 Page 18
Operation, and Maintenance of Gate Valves") to AWWA C509 or AWWA C515.
Make and assemble joints to gate valves as specified for making and assembling the same type joints between pipe and fittings.
3.2.8.2 Air Release, Air/Vacuum, and Combination Air Valves
Install pressure vacuum assemblies of type, size, and capacity indicated.
Include valves and test cocks. Install according to the requirements of plumbing and health department and authorities having jurisdiction. Do not install pressure vacuum breaker assemblies in vault or other space subject to flooding.
3.2.9 Blowoff Valve Assemblies
Install blowoff valve assemblies as indicated on the drawings or in accordance with the manufactures recommendations. Install discharge fitting on the end of riser pipe to direct the flow of water so as to minimize damage to surrounding areas.
3.2.10 Fire Hydrants
Install fire hydrants in accordance with AWWA C600 for fire hydrant installation and as indicated. Make and assemble joints as specified for making and assembling the same type joints between pipe and fittings.
Provide metal harness as specified under pipe anchorage requirements for the respective pipeline material to which fire hydrant is attached.
Install fire hydrants with the 4 1/2 inch connections facing the adjacent paved surface. If there are two paved adjacent surfaces, install fire hydrants with the 4 1/2 inch connection facing the paved surface where the connecting main is located.
3.3 FIELD QUALITY CONTROL
3.3.1 Tests
Notify the Government Designated Representative a minimum of five days in advance of hydrostatic testing. Coordinate the proposed method for disposal of waste water from hydrostatic testing. Perform field tests, and provide labor, equipment, and incidentals required for testing, except that water needed for field tests will be furnished as set forth in paragraph AVAILABILITY AND USE OF UTILITY SERVICES in Section 01 50 00.00 99 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. Provide documentation that all items of work have been constructed in accordance with the Contract documents.
3.3.1.1 Hydrostatic Test
Test the water system in accordance with the applicable AWWA standard specified below. Where water mains provide fire service, test in accordance with the special testing requirements given in the paragraph SPECIAL TESTING REQUIREMENTS FOR FIRE SERVICE. Test ductile-iron water mains in accordance with the requirements of AWWA C600 for hydrostatic testing. The amount of leakage on ductile-iron pipelines with mechanical-joints or push-on joints is not to exceed the amounts given in AWWA C600; no leakage will be allowed at joints made by any other methods.
Test water service lines in accordance with requirements of AWWA C600 for hydrostatic testing. No leakage will be allowed at copper pipe joints, SECTION 33 11 00.00 99 Page 19 copper tubing joints (soldered, compression type, brazed). Do not backfill utility trench or begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 7 days after placing of the concrete.
3.3.1.2 Leakage Test
For leakage test , use a hydrostatic pressure not less than the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test.
3.3.1.3 Bacteriological Testing
Perform bacteriological tests in accordance with AWWA C651 Option A. For new water mains use Option A and obtain two sets of samples for coliform analysis, each sample being collected at least 16 hours apart. Take samples every 750 ft plus one set from the end of the line and at least one from each branch greater than one pipe length. Analyze samples by a certified laboratory, and submit the results of the bacteriological samples .
3.3.1.4 Backflow Preventer Tests
After installation conduct Backflow Preventer Tests and provide test reports verifying that the installation meets the FCCCHR Manual Standards.
3.3.1.5 Special Testing Requirements for Fire Service
Test water mains and water service lines providing fire service or water and fire service in accordance with NFPA 24 . The additional water added to the system must not exceed the limits given in NFPA 24
3.3.1.6 Detection Wire Continuity Test
Test detection wire for continuity after service connections have been completed and prior to final pavement or restoration. Verify that detection wire is locatable with electronic utility locating equipment.
Repair breaks or separations and re-test for continuity.
3.4 SYSTEM STARTUP
Water mains and appurtenances must be completely installed, disinfected, flushed, and satisfactory bacteriological sample results received prior to permanent connections being made to the active distribution system.
Obtain approval by the Government Designated Representative prior to the new water piping being placed into service.
3.5 CLEANUP
Upon completion of the installation of water lines and appurtenances, remove all debris and surplus materials resulting from the work.
-- End of Section --
SECTION 33 11 00.00 99 Page 20
File details come from the government source that posted it. Updated .