SEPTEMBER 2018
Release 3.2
Tobyhanna Army Depot Directorate of Installation Services Tobyhanna Pennsylvania
Design Submission Requirements Manual
CONTENTS
CHAPTER 1 General Instructions Page 5
CHAPTER 2 Architectural Page 11
CHAPTER 3 Structural Page 25
CHAPTER 4 Site Development Page 37
CHAPTER 5 Plumbing Page 51
CHAPTER 6 Heating, Ventilating, and Air Conditioning (HVAC) Page 59
CHAPTER 7 Fire Suppression System Page 71
CHAPTER 8 Other Mechanical Systems and Equipment Page 77
CHAPTER 9 Electrical and Electronic Systems Page 85
CHAPTER 10 Antiterrorism/Force Protection (AT/FP) Page 113
CHAPTER 11 Sustainable Design Page 121
CHAPTER 12 Quality Management Page 125
TYAD D/IS Engineering Design Checklist Page 131
Acronyms and Abbreviations Page 139
REVISIONS Quality Management Page 125
CHAPTER 1
GENERAL INSTRUCTIONS
INDEX
1.1 GENERAL
1.1.1 Scope
1.1.2 Quality
1.2 APPLICABLE PUBLICATIONS
1.2.1 Building Code Compliance
1.2.2 Community Criteria
1.3 DEFINITIONS
1.3.1 Design Analysis
1.3.2 Drawings
1.3.3 Specifications
1.4 SUBMITTAL REQUIREMENTS
1.4.1 General
1.4.2 Concept Design (35%)
1.4.3 Interim Design (65%)
1.4.4 Final Design (Unreviewed 95%)
1.4.5 Ready-To-Advertise (RTA) (Reviewed 100%)
CHAPTER 1
GENERAL INSTRUCTIONS
1.1 GENERAL
1.1.1 Scope
This sections states criteria, requirements, and guidance for design submittals in projects provided to Tobyhanna Army Depot. These requirements are to be used for all projects. Any deviation of these project requirements will require approval from Tobyhanna Army Depot D/IS Engineering Division.
1.1.2 Quality
The objective of the D/IS Engineering Division is to obtain attractive cost-effective buildings which are designed using sound technical knowledge and which are constructed using recognized commercial building industry practices. The design shall incorporate those characteristics which will provide buildings with present and continuing utility, durability, and desirability, provide a safe and healthy environment, meet LEED sustainability goals, and which will be economical to maintain for the life of the building.
1.2 APPLICABLE PUBLICATIONS
Building Code Compliance
The following publications shall be used to establish code compliance for all work. Additional discipline or customer specific publications will be incorporated when they affect any discipline within the drawing package.
IDG (Lateset Version) Tobyhanna Installation Design Guide, Dated September 2010
Latest version of the TYAD CADD STANDARDS MANUAL
Latest version of the TYAD Design Submission Requirements Manual
1.3 DEFININITIONS
1.3.1 Design Analysis
(a) The design analysis shall be provided with each submittal, including Ready-To-Advertise (RTA) (unless it is determined during the pre-design conference that it is not required at a specific design submittal phase).
(b) At Ready-To-Advertise (RTA), the design analysis is not a contract document, but rather a final documentation of the basis of design for the Resident Engineer, and digital archival document for D/IS Engineering Division. The design analysis should be developed from Concept Design to include a discussion of any new or unfamiliar products, critical product features, critical milestones that may require designer consultation, items of particular customer interest revealed in design meetings, shop drawings of particular interest or criticality, anticipated difficult construction features.
(c) The design analysis is a written explanation of the project design and is expanded and revised for each submission. The design analysis shall contain a summary of the criteria for and the history of the project design, including criteria designated by the customer, letters, codes, references, conference minutes, and pertinent research. The justification for each major selection and design decision shall be clearly stated.
Design calculations, computerized and manual, shall be included in the design analysis in digital format.
Narrative descriptions of design solutions shall also be included. Diagrams and sketches to convey design concepts may be provided to illustrate all written material. Design phase review comments and the specific actions (annotations) taken in response to each comment from the preceding design phase review shall be included with each submission of the design analysis. A separate section with pertinent notes to the Resident Engineer shall also be included. Specific requirements for the design analysis are provided in other chapters of this manual.
(d) All items as described in each disciplines Design Analysis shall be shown in each drawing package submittal where applicable (unless it is determined during the pre-design conference that it is not required at a specific design submittal phase).
1.3.2 Drawings
Drawings are required in each design submittal. The drawings at each submittal stage shall be complete, thoroughly checked, and coordinated before submission to Tobyhanna Army Depot - D/IS Engineering Division. Specific drawing requirements are defined below and in other chapters of this Manual. Two (2) full size physical copies of the drawings as well as a media disc(CD-R/DVD/R) including all CAD dwg. and .pdf files shall be submitted with each design submittal stage for review.
1.3.3 Specifications
The specifications shall be developed in accordance with The Tobyhanna Army Depot Installation Design Guide, September 2010. A waiver may be acquired to submit specifications in drawing format for small contract projects in lieu of a booklet. This waiver will need prior written approval from D/IS Engineering Division.
1.4 SUBMITTAL REQUIREMENTS
1.4.1 General
Requirements for each submittal are generally described below. Additional requirements are contained in other chapters of this Manual. Specific instructions for A-E design projects for number of copies, addressing, and other instructions are provided in the SOW and the Tobyhanna Army Depot – D/IS Engineering Division CADD Standards.
1.4.2 Concept Design (35%)
This submittal represents approximately 35% of the design effort and shall be of sufficient detail to show how the users' functional and technical requirements will be met, indicate the designer's approach to the solution of technical problems, show compliance with design criteria or provide justification for noncompliance, and provide a valid estimate of cost.
1.4.3 Interim Design (65%)
This submittal, if required, is intended to insure that funding limitations are not being exceeded and that the drawings, design analysis, specifications, and cost estimate are proceeding in a timely manner and that the design criteria and previous review comments are being correctly interpreted. Redlined marked up specifications will be submitted at this design phase. The Interim Design shall consist of:
(a) Design Analysis developed to approximately 65% completion.
(b) Approximately 65% complete drawings including those addressing construction phasing.
(c) Detailed cost estimate developed to approximately 65% completion including Bid Options where applicable.
(d) Redlined marked up specifications.
(e) Annotated Concept review comments.
(f) Completed permit applications (if an Interim submittal was not required, the completed permit applications are required 60 days prior to the Final submittal).
1.4.4 Final Design (95% Design Submission/Un-reviewed 95% Design)
This submittal represents a 100% complete design with the exception of the incorporation of any review comments resulting from the review of the submittal. The Final Design shall consist of:
(a) Design Analysis with all items l00% complete. It shall include all backup material previously submitted and revised, as necessary, all design calculations, all explanatory material giving the design rationale for any design decisions which would not be obvious to an engineer reviewing the Final drawings and specifications, and any information for the Resident Engineer that will assist in administering the construction contract.
(b) 100% complete drawings including those addressing project construction phasing.
(c) Specifications. Final edited specifications. The contract front-end (boiler plate) with the exception of Section 00800 and portions of 0090 will be completed by the Tobyhanna Army Depot – D/IS Engineering Division and forwarded to the AE for inclusion in the Final Design Submittal.
(d) Bidding schedule and an Explanation of Bid Items. Identify Bid Options where applicable.
(e) Detailed 100% complete cost estimate.
(f) Annotated Interim review comments.
(g) All supporting documentation required for permit application approvals.
1.4.5 Ready-To-Advertise (RTA) (Reviewed 100%)
This submittal represents a complete design (design analysis, specifications, and drawings) including annotated design submittal review comments that answer and/or incorporate review comments resulting from the review of the Final design submittal. All appropriate seals per discipline with corresponding signatures will be required for the Ready-to-Advertise (RTA) submission. Any deviation from these requirements will require prior approval from Directorate of Installation Services, Installation Maintenance and Planning Division, Diane J.
Leonard.
CHAPTER 2
ARCHITECTURE
INDEX
2.1 GENERAL
2.1.1 Scope
2.1.2 Architectural Quality
2.2 APPLICABLE PUBLICATIONS
2.2.1 Building Code Compliance
2.2.2 Functional Criteria
2.2.3 Community Criteria
2.3 PROJECT DEFINITION SUBMITTAL(10% - 15%)
2.3.1 Narrative
2.3.2 Drawings
2.4 CONCEPT DESIGN SUBMITTAL (35%)
2.4.1 General Considerations
2.4.2 Design Analysis
2.4.3 Drawings
2.4.4 Specifications
2.5 INTERIM DESIGN SUBMITTAL (65%)
2.5.1 Design Analysis
2.5.2 Drawings
2.5.3 Specifications
2.5.4 TYAD PREVIOUS SUBMISSION REDLINES
2.6 FINAL DESIGN SUBMITTAL (UNREVIEWED 95%)
2.6.1 Design Analysis
2.6.2 Drawings
2.6.3 Specifications
2.6.4 TYAD PREVIOUS SUBMISSION REDLINES
2.7 READY-TO-ADVERTISE (RTA) SUBMITTAL (REVIEWED 100%)
2.7.1 Design Analysis
2.7.2 Drawings and Specifications
2.7.3 TYAD PREVIOUS SUBMISSION REDLINES
2.8 TECHNICAL REQUIREMENTS
2.8.1 Coordination
2.8.2 Site Work
2.8.3 Masonry
2.8.4 Miscellaneous Metals
2.8.5 Thermal Protection
2.8.6 Roof Systems
2.8.7 Doors
2.8.8 Windows
2.8.9 Finishes
2.8.10 Equipment/Elevators/Lifts
2.8.11 Rooms and Spaces for Utilities
2.8.12 Floor Drains and Slopes
CHAPTER 2
ARCHITECTURE
2.1 GENERAL
2.1.1 Scope
This chapter states criteria, requirements, and guidance for architectural design. Specific requirements in this chapter supplement the requirements of Chapter 1, titled GENERAL INSTRUCTIONS. All required documents, including the drawings and the design analysis, shall be prepared in accordance with the latest D/IS Engineering Division CADD Standards and the Tobyhanna Army Depot Installation Design Guide.
2.1.2 Architectural Quality
The objective of D/IS Engineering is to obtain attractive cost-effective buildings which are designed using sound technical knowledge and which are constructed using recognized commercial building industry practices.
The design shall incorporate those characteristics which will provide buildings with present and continuing utility, durability, and desirability, provide a safe and healthy environment, meet LEED sustainability goals, and which will be economical to maintain for the life of the building.
2.2 APPLICABLE PUBLICATIONS
2.2.1 Building Code Compliance (Use most current versions)
The following publications shall be used to establish code compliance for architectural work. Additional discipline or customer specific publications will be incorporated when they affect life safety and occupational safety and health.
UFC 1-200-01 Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements
IBC International Code Council, International Building Code (IBC)
IRC International Code Council, International Residential Code (IRC)
NFPA 101 National Fire Protection Association (NFPA), Life Safety Code, NFPA 101
ADAAG Americans with Disabilities Act Accessibility Guidelines (ADAAG)
UFAS Uniform Federal Accessibility Standards (UFAS)
2.2.2 Functional Criteria
Army or other customer functional criteria, and military installation specific criteria for use in the project will be determined during the pre-design conference. The following contains guidance for various Army facility types.
TI 800-01 Technical Instructions (TI), Design Criteria 9.2.3 Community Criteria Requirements of state and local governmental agencies (zoning, buildings, health department, environmental agency, etc.) for projects conducted off military installations will be determined during the pre-design conference.
2.3 PROJECT DEFINITION SUBMITTAL (10% - 15%)
During this phase the designer must define the customer's requirements and confirm that they can be met within the project's constraints. To that end, a comprehensive interface with the customer is required generally through a charrette or other previously approved data gathering process. The primary purpose of the design process at this stage is to gather any information from the customer that would be necessary in the design of the facility.
2.3.1 Narrative
2.3.1.1 General Description of the Project
State the purpose, function, and space requirements in sufficient detail to delineate and characterize functional features and the desired imager visual appearance of the project. The narrative shall reflect the regional architecture as well as the visual characteristics of the existing facilities around the site.
2.3.1.2 Basis of Design Summary
Provide a summary of the Basis of Design including, but not limited to, the following:
(a) State the building construction type and occupancy classification appropriate to the model code(s) in use.
(b) List the functional areas and describe their relationships.
(c) List authorized space allocations.
(d) Describe the energy conservation measures used in the design.
(e) Describe the noise control criteria established for the design.
(f) Describe methods to ensure safety and accessibility compliance with the latest requirements of OSHA, ADAAG.
(g) State any requirements for exterior finish materials and color selection. Indicate that consultation has occurred with the Installation’s Engineering Office, and that the Installation's program of architectural compatibility and the finish materials and colors selected for the project are in accordance with the installation’s approved standards.
(h) Describe any special functional or technical requirements including, but not limited to, physical or classified document security, anti-terrorism and force protection, sustainable design.
2.3.1.4 Building Organization Analysis
Submit, as necessary, any graphic design aids such as affinity drawings, spatial organization and relationship matrices, and space layout sketches in a sequential order, with sufficient narrative to indicate the reasoning and justification for major design decisions. Any provisions for future expansion shall be indicated, including schedules for phasing.
2.3.1.5 General Design Statement
The designer shall state the assumptions and rationale behind all major facility design decisions including, but not limited to, discussions of the following:
(a) Orientation to the sun, wind, and water (when applicable).
(b) The relationship to any surrounding natural or manmade environment.
(c) The interface with any contiguous traffic circulation.
(d) The visual impact of the facility with regard to the overall area.
2.3.1.6 Building Systems Analysis (Applicable only where no specific base criteria exists.)
Include any substantiating material to support the selection of architectural materials or systems. Selection shall be based on a comparison of several alternate systems, which shall be presented. Indicate the economic decision process (comparative cost analysis method, life-cycle analysis method, or other techniques used) and another rationale utilized in the selection of the various systems. It must be evident that the designer has adequately conceived the projects a whole and that the systems selected represent the maximum value that can be obtained for the intended result. The following are some, but not necessarily all, of the systems that should be investigated and described:
(a) Exterior wall systems.
(b) Passive solar systems.
(c) Fenestration.
(d) Roof systems.
(e) Structural Systems.
(f) Interior partition systems.
(g) Openings in interior partitions (doors, windows, etc.).
(h) Ceiling systems.
(i) Floor systems.
(j) Integrated building systems.
(k) Noise and/or acoustics control measures.
(l) Special equipment such as trash handling systems and dock levelers.
(m) Vertical transportation systems (elevators).
2.3.1.7 Design Calculations
Submit complete calculations for the following:
(a) Gross building areas.
(b) "U" values for each exterior construction assembly (walls and roofs).
(c) Calculations for toilet fixture count.
(d) Calculations for Units Egress Requirements.
(e) Roof Drainage (Roof drain sizes and quantities, gutters and Downspout sizes)based on rainfall intensity at the project location.
(f) Gross area tabulations.
2.3.2 Drawings
This submittal consists of one or more single line schematic floor plans which effectively indicate to the using agency that the function, circulation, and life safety issues have been assessed and can be met by the proposed design. At least one major elevation (preferably the front elevation) for each submitted building is required. A site plan is required to indicate the building orientation and circulation to the building entrances while providing building location using, at minimum, four (4) control points (based upon Tobyhanna Army Depot’s existing Monument System) located at the four main corners of the structure. The site plan shall be coordinated with the requirements of Chapter 4, titled SITE DEVELOPMENT.
2.4 CONCEPT DESIGN SUBMITTAL (35%)
2.4.1 General Considerations
The minimum requirements for this submittal consist of floor plan(s)drawn to appropriate scale, a Life Safety Analysis Plan, exterior building elevations, typical wall sections to indicate material usage and structure, and a design analysis. Additional drawings may be required at this submittal due to the complexity of the project (i.e., hospitals research facilities, blast resistant structures, etc.) to adequately describe the proposed design.
2.4.2 Design Analysis
Update and continue development of the narrative submitted at Project Definition.
2.4.3 Drawings
2.4.3.1 Composite Floor Plans
When the main floor plans must be drawn in segments in order to comply with the requirements for scale and sheet size, provide a composite floor plan for each floor level. These plans shall show the following:
(a) The general building layout showing exterior walls, interior partitions, and circulation elements (stairs, elevators, corridors, etc.) drawn to scale.
(b) The identification of major areas and their functional relationship.
(c) Overall building dimensions, out to out.
(d) Planning grid or column lines where applicable.
(e) Match lines locations indicating larger scale floor plan segments.
(g) Cross-references for enlarged floor plans and building sections.
2.4.3.2 New Floor Plans
Provide a floor plan or floor plan segments at 1/4"=1’-0” when available and consistent through all disciplines. Should the project location be too large for a 30x42 sheet, the standard architectural scales will be used in descending order. 1/8”=1’-0” and 3/32”=1’-0” will be the minimum allowable scales used with TYAD and will need D/IS Engineering Division prior approval. The Government shall have the authority to delegate scales to provide simplicity and clarity.
(a) Planning grid and/or column lines.
(b) Overall and building element location dimensions.
(c) Room names and numbers.
(d) Finish floor elevations for each floor or change in floor level.
(e) Opening designations in walls (doors, windows, etc.).
(f) All major equipment.
(g) Furnishings layouts for typical rooms where required.
(h) Gross floor area tabulations if not shown in composite floor plans.
(i) Cross-references for sections and details.
(j) Provisions for the handicapped where required.
2.4.3.3 New Roof Plan
Provide a roof plan showing the following:
(a) Planning grid and/or column lines.
(b) Overall and building element location dimensions.
(c) Indication of roof slope and drainage.
(d) Roof accessories (skylights, roof scuttles, etc.).
(e) Major roof-mounted equipment.
(f) Gutters and downspouts.
(g) Roof details cross-references.
2.4.3.4 Demolition Plans
Floor plans showing demolition work in sufficient detail to indicate all existing building materials and finish conditions are required for renovation and modification projects. Drawings shall be of sufficient detail to indicate "existing to remain," "existing to be removed," and new work and materials. Contractors are not required to site verify correctness or completeness of renovation and modification contract drawings and specifications during bid preparation, therefore, the drawings shall be complete with adequate detail and descriptions of existing materials, assemblies, and systems (type, thickness, quantity spacing, length, width, height, etc.) to enable the contractor to bid on the project.
2.4.3.5 New Building Elevations
Provide building elevations showing the exterior design of all major elevations, 1/4” = 1’ scale as a minimum, and preferred to match the floor plans. Each elevation shall show the following:
(a) Planning grid and/or column lines.
(b) Building masses.
(c) Door and window opening designations, and penetrations by other disciplines.
(d) Identification of major building materials.
(e) Roof-mounted equipment and roof accessories when visible in elevations.
2.4.3.6 Building Sections
Provide building sections as necessary to demonstrate the coordination of the structural, mechanical, and electrical systems. Provide at least one (1) longitudinal and one (1) transverse section through the entire building. In addition, the following shall be shown:
(a) Planning grid and/or column lines.
(b) Structural system.
(c) Changes in floor levels.
(d) Finish ceilings.
(e) Floor-to-ceiling and floor-to-floor heights.
(f) Floor elevations.
(g) Spaces to be used by the lighting and HVAC systems.
(h) Adjacent grades.
2.4.3.7 Typical Wall Sections
Provide typical wall sections at 3/4-inch scale minimum. All sections shall be fully noted. These sections shall show the following:
(a) Structural system.
(b) Exterior wall and roof assemblies.
(c) Ceiling systems.
(d) Floor-to-ceiling and floor-to-floor heights.
(e) Floor elevations.
(f) Spaces to be used by the lighting and HVAC systems.
(g) "U" values through roof, walls and floors.
2.4.3.8 Finish Schedules
Finish schedules requirements will be included in the specifications or shown on the drawings.
2.4.3.9 Details
In addition to the above requirements, show details of any significant design features and any sections necessary to demonstrate the required coordination of the various building systems.
2.4.3.10 Life Safety Analysis Plan
Life Safety Analysis Plan sheets shall be referenced as architectural sheets and placed after the other Architectural Drawing sheets in the contract drawing submittal set. Include the following data and provide a legend for symbols used on the drawings:
(a) Type of occupancy.
(b) Type of construction.
(c) Fire/smoke compartments.
(d) Exit width calculations and number of exits.
(e) Location and rating of walls (1 hr., 2 hr., etc.).
(f) Door labels. (Door Schedules)
(g) Door hold open devices. (Door Schedules and Hardware)
(h) Fire extinguisher and/or fire hose cabinet locations.
(i) Egress, dead-end, and common path of travel distances indicating code compliance.
(j) Smoke proof doors.
(k) Exit lights.
2.4.4 Specifications
Provide outline specifications in accordance with The Tobyhanna Army Depot Installation Design Guide, September 2010.
2.5 INTERIM DESIGN SUBMITTAL (65%)
2.5.1 Design Analysis
The Design Analysis shall include all items in the Concept Design Analysis narrative and any revisions made necessary by comments about the Concept Design submittal. In addition verify site and building signage requirements.
2.5.2 Drawings Incorporate comments from the Concept Design review.
2.5.2.1 Building Plans
(a) Provide plans for each floor, roof, and ceiling showing dimensions, functional arrangement, and equipment for all areas, including corridors, exits, stairs, and utility spaces.
(b) The relationship of the building to exterior access, vehicle parking, service areas, etc., shall be indicated on site plans.
(c) Individual treatment shall be given to special design or items involving deviation from normally accepted standards.
(d) All column lines shall be designated to aid in locating project components.
(e) Identify fire walls, smoke partitions, U.L. Listings and all fire rated construction.
(f) Show indications of phased construction if required.
(g) Thoroughly cross-reference section cut symbols on plans and elevations to detail sheets.
(h) Complete door and window details to minimum of 65%.
(i) Identify all interior wall and partition types on floor plans and reference them to detail sheets showing construction, heights, fire ratings, and acoustical ratings.
2.5.2.2 Schedules
The drawings shall include door, window, and equipment schedules. Schedules need not be complete at this point, however, they shall be sufficient to indicate the door and window sizes and major equipment items.
2.5.3 Specifications
Provide redlined marked up specifications developed in accordance with The Tobyhanna Army Depot Installation Design Guide, September 2010.
2.5.4 TYAD PREVIOUS SUBMISSION REDLINES
Provide previous REDLINES/MARKUPS from CONCEPT DESIGN SUBMITTAL (35%) to TYAD.
(a.) Previous Redlines that have been fixed accordingly, per previous submission, shall be HIGHLIGHTED in yellow to show thourouness.
(b.) Previous Redlines that have been approved per previous submission and/or COR/POC prior approval, shall be HIGHLIGHTED in ORANGE to distinquish changes accordingly.
2.6 FINAL DESIGN SUBMITTAL (UNREVIEWED 95%)
2.6.1 Design Analysis
The Final Design analysis narrative shall include all items in the Interim Design analysis narrative and any revisions made necessary by comments about the Interim Design submittal.
2.6.2 Drawings
(a) Complete to the extent required for the Ready-To-Advertise Submittal. Drawings are to be complete, except for incorporation of comments about this submittal.
(b) Incorporate Interim Design review comments into the drawings.
(c) Insure that all details, sections, etc., necessary for the final documents have been added to the drawings and are complete and thoroughly cross-referenced.
(d) Complete all schedules. Insure that hardware sets have been added to the door schedule and coordinated with the specifications.
2.6.3 Specifications
Provide final edited specifications if an Interim submittal was prepared in accordance with The Tobyhanna Army Depot Installation Design Guide, September 2010.
2.6.4 TYAD PREVIOUS SUBMISSION REDLINES
Provide previous REDLINES/MARKUPS from INTERIM DESIGN SUBMITTAL (65%) to TYAD.
(a.) Previous Redlines that have been fixed accordingly, per previous submission, shall be HIGHLIGHTED in yellow to show thourouness.
(b.) Previous Redlines that have been approved per previous submission and/or COR/POC prior approval, shall be HIGHLIGHTED in ORANGE to distinquish changes accordingly.
2.7 READY TO ADVERTISE SUBMITTAL (REVIEWED 100%)
2.7.1 Design Analysis Complete analysis supporting the requirements of the project.
The Design Analysis shall include all items in the Concept Design Analysis narrative and any revisions made necessary by comments about the Concept Design submittal. In addition verify site and building signage requirements.
2.7.2 Drawings and Specifications
Complete thoroughly checked drawings and specifications, with all comments from the final review incorporated.
2.7.3 TYAD PREVIOUS SUBMISSION REDLINES
Provide previous REDLINES/MARKUPS from FINAL DESIGN SUBMITTAL (95%) to TYAD.
(a.) Previous Redlines that have been fixed accordingly, per previous submission, shall be HIGHLIGHTED in yellow to show thourouness.
(b.) Previous Redlines that have been approved per previous submission and/or COR/POC prior approval, shall be HIGHLIGHTED in ORANGE to distinquish changes accordingly.
2.8 TECHNICAL REQUIREMENTS
Materials and construction methods shall comply with the instructional notes inserted in the applicable UFGS as specified in the Installation Design Guide, dated September 2010.
2.8.1 Coordination
All architectural work shall be coordinated with work of other technical disciplines.
(a) Insure adequate above-ceiling space for ductwork, piping, lighting, structural members, etc.
(b) Coordinate reflected ceiling plans with lighting and HVAC plans.
(c) Coordinate light switches with door swings.
(d) Coordinate electrical and mechanical drawings with architectural plans to assure proper power, gas, water, etc. for drinking fountains, kitchen equipment, etc.
(e) Coordinate with other disciplines to insure no there are no conflicts in roof drain, exhaust fan, louvers, and other similar item locations.
(f) Insure that all louvers are coordinated with mechanical drawings and that no louvers are located in fire or smoke doors.
(g) Coordinate structural with architectural to insure framing at all roof openings.
(h) Coordinate electrical and instrumentation to ensure utilities are provided for power operated doors and doors requiring electrical or electronic controls.
(i) Insure all rated wall penetrations receive fire stopping or receive fire rated sealant around penetrations.
2.8.2 Site Work
2.8.2.1 Floor Relation to Grade
The finish floor of concrete floor slabs shall be a minimum of 6 inches above the finished grade. Finished floor elevation shall be indicated based upon Tobyhanna Army Depot’s existing Monument System.
2.8.2.2 Access to Entrances
All stoops, steps, or similar required access to entrances that will normally be built by a building contractor as differentiated from sidewalks, driveways, etc., which are normally constructed by a paving contractor, shall be shown and detailed on the architectural drawings. Ramps complying with the requirements of ADAAG and UFAS shall be provided where required to allow access by the physically impaired.
2.8.3 Masonry
(a) Coordinate with the project Structural Engineer for incorporation of standard CMU details.
(b) Coordinate with the project Structural Engineer for incorporation of an efflorescence-controlling admixture for mortar.
2.8.3.1 Interior Walls and Partitions
Concrete masonry units (CMU) for interior masonry walls and partitions shall be not less than 6 inches in nominal thickness.
2.8.3.2 Split Face and Fluted CMU
Where split face or fluted units are used, provide smooth face units where concrete paving or flashing occurs, and where items are attached to, or penetrate CMU wall surfaces.
2.8.3.3 Coursing
Concrete masonry unit coursing generally shall be coordinated with door heights to minimize the need for cutting block.
2.8.4 Miscellaneous Metals
All access panels required to service mechanical items normally furnished and installed by the non-mechanical trades shall be shown on the architectural drawings. Insure that access panels, when required, are specified and detailed.
2.8.5 Thermal Protection
2.8.5.1 Insulation
General standards for insulation, as indicated in the applicable UFGS, require insulation thickness as determined by the established "U" value for total roof or wall thickness, and the type insulating material utilized. "U" values shall be indicated as coordinated with the project Mechanical Engineer.
2.8.5.2 Vapor Barrier
The exterior envelope of all cooled facilities shall have a continuous, positive vapor barrier of at least 0.06 permeance as coordinated with the project Mechanical Engineer.
2.8.6 Roof Systems
(a) When roof top equipment is installed that will require maintenance, ensure that roof hatches are provided for multi-story buildings and access ladders or roof hatches are provided for single story buildings. Hatches and ladders shall be secured to prevent unauthorized access.
(b) The minimum roof slope for built-up roofs shall be 1/4-inch per foot, however, the use of a "flat" built-up roof is discouraged except for facilities of unusual building configuration or extremely large areas. In no case shall a built-up roof slope exceed 2 inches per foot. Roof slope for standing seam metal roofs shall be 1 in 12minimum. Installation policy will dictate required slope above that minimum.
(c) Confirm roof system warranty and water tightness requirements with the installation prior to the Final (Unreviewed 100%) Submittal, and incorporate these requirements in the specifications.
2.8.6.1 Standing Seam Metal Roofs
(a) Roof panels shall be a minimum thickness of 24-gauge steel or 0.040 aluminum.
(b) Follow manufacturer guidelines in design and installation to permit expansion/contraction of the roof system.
(c) Standing seam metal roofs installed over a structural metal deck and rigid insulation shall include a 40 mil, self-sealing, secondary water barrier.
(d) Concealed, mechanically formed seams are preferred. Install with fasteners permitting expansion/ contraction attached to the structural deck (when present) through rigid insulation (when present) or locking type seams (as opposed to snap lock type) for hurricane and high wind areas.
(e) An independent roofing consultant shall be hired by the roofing subcontractor for roofs over 10,000 square feet. The consultant shall review and approve roofing shop drawings prior to submittal to the government.
The consultant shall be present to monitor the entire roof installation. The consultant shall be certified by the roofing manufacturer.
(f) Roof penetration flashing, curbs, gutters, and flashing shall be the product of the roofing manufacturer.
(g) All laps shall be in the direction of water flow.
(h) Full length, job fabricated panels are recommended. Individual roof panels less than 50 feet in length with joints are not permitted.
(i) Ensure that roof penetrations occur in the center of individual roof panels rather than at edges.
(j) Roof edge gutters shall be installed with gutter hangars. The front edge of the gutter shall be below the back edge at least 1 inch below the roof edge.
(k) If fascia and/or soffit panels are to match the roof system color, ensure that different manufacturers provide matching colors. Roof panels are not acceptable as fascia.
(l) Where rigid insulation is installed, ensure that its compressive strength is compatible with the standing seam metal roof system as recommended by the manufacturer.
2.8.6.2 Other Roofs
For other roof types comply with the National Roofing Contractors Association standards.
2.8.6.3 Sheet Metal
In all cases sheet metal for various elements used throughout a building shall be of the same basic metal.
Atmospheric conditions shall be considered in the selection of exposed sheet metal. Different types of sheet metal that can cause accelerated corrosion (galvanic action) of either one shall not be placed in direct contact.
Sheet metal used on roofs with concrete roof tiles shall not react with nor corrode excessively due to the concrete.
2.8.6.4 Gutters and Downspouts
When downspouts are required they shall not drain directly onto a walk or platform. When downspouts must occur at walks or platforms they shall pass through or under into underground drains or toward open ground beyond. Downspouts draining onto open ground shall be diverted using precast concrete splash blocks to prevent erosion. Use of interior downspouts shall be avoided wherever design permits. The use of scuppers should be maximized. Avoid built-in gutters behind fascia or parapet due to expansion/contraction of metal and surrounding material unless dictated by Installation requirements. All gutters shall have leaf screens at locations susceptible to collection of leaves and other windblown debris.
2.8.7 Doors
Door schedules shall be indicated on the drawings. Each door shall be assigned a number.
2.8.7.1 Pedestrian Doors
All pedestrian doors shall be 7 feet 0 inches or 7 feet 2 inches high, except in family housing where they may be 6 feet 8 inches high. Door openings shall, in general, be 3 feet 0 inches wide, except for special purpose doors, toilet rooms (except for handicap) or closet doors in family housing, for instance.
2.8.7.2 Doors to Rooms
Doors to rooms shall be of adequate size to accommodate the installation and removal of furniture and equipment installed therein.
2.8.7.3 Exterior Doors
(a) Except in underground structures and floors above the first story of multi-story structures, doors to boiler or mechanical rooms, doors from power rooms, generator rooms, and doors from similar areas should be to the outside of the building only.
(b) Where galvanized steel doors and frames are required, ensure use A40 or A60 designation in lieu of G type coatings.
2.8.7.4 Special-Purpose Doors
Special-purpose doors such as rolling and coiling doors shall be adequately designed to safely resist the design wind pressure. Rolling and coiling steel or aluminum doors shall be designed so as to permit operation of the doors at maximum wind velocities defined in the area where used.
2.8.7.5 Finish Hardware
(a) Carefully read the "Notes to Specified" for the UFGS hardware specification. Hardware shall be selected from BHMA and ANSI standards. All cylinders shall have 7 pins. Provision of these items must conform to individual requirements of the installation on which the project is located.
(b) Floor mounted center door stops for door pairs shall not be installed above floor level.
2.8.7.6 Hardware Set Designations
Hardware set designations shall be listed in the Door Schedule in preference to locating on the floor plans.
Specification Section 08 7100, Door Hardware, shall provide the necessary hardware set designation numbers, plus description and function of each hardware item included in the Hardware Set.
2.8.7.7 Return Air
Overall size of return air louvers located in doors shall be included in the Door Schedule. Minimum bottom rail dimension shall be 10 inches and the minimum stile dimension shall be 5 inches. Door undercuts shall be shown in the Door Schedule.
2.8.7.8 Room Numbering
Every room shall be assigned a separate room number and this number will be clearly indicated on the plans.
This number will be generally
Room numbers shall be clearly as consecutive as possible, beginning with the principal, entry area and progressing counter-clockwise through the plan. Spaces added by revision should be given the number of the primary office nearest room followed by the letter “A”, or if more than one (1)additional space, “B”, and so forth. Room numbering guidelines will be provided upon request.
2.8.8 Windows
(a) Window schedules and types shall be indicated in the drawings. Each window shall be assigned a number.
(b) Ensure that window types and locations are coordinated with furniture placement to avoid blocking views.
2.8.9 Finishes
2.8.9.1 Acoustical Plaster and Acoustical Tile
The use of acoustical plaster is discouraged. In electronics and communications facilities in which avoidance of dust is a major consideration acoustical treatment shall be limited to acoustical tile or gypsum wallboard with non-dusting characteristics.
2.8.9.2 Ceramic Tile
(a) Caulk joints between ceramic tile and bathroom fixtures(showers, tubs) in lieu of filling with grout.
(b) Ensure that ceramic tile installation is coordinated with toilet accessories and light switches in restrooms.
2.8.9.3 Gypsum Wall Board
Ensure that control joints are located in drawings and installed as recommended by gypsum wall board manufacturers.
2.8.9.4 Chair Rails
In rooms with movable furniture, ensure that chair rails are installed at appropriate heights to protect wall finish.
2.8.9.5 Paint
Exterior grade paint shall be specified for interior spaces open to exterior humidity and temperature weather conditions (i.e., aircraft hangars).
2.8.10 Equipment
(a) Verify that partition thicknesses are sufficient for installation of recessed or semi-recessed equipment including toilet accessories.
(b) Ensure that partition thicknesses are sufficient for installation of concealed plumbing utilities.
(c) Ensure that ceiling recesses are provided at overhead coiling doors.
2.8.11 Rooms and Spaces for Utilities
Rooms and spaces for utilities, including mechanical and electrical equipment rooms, shafts, chases, and chimneys, shall be indicated on the Project Definition Design and subsequent submittal design drawings, even though their exact size may not be determined at that stage.
2.8.12 Floor Drains and Slopes
Floor drains and slopes, hose bibbs, and shower heads shall be shown on the architectural drawings as well as on mechanical drawings, and shall be closely coordinated. All floors in areas requiring drains shall be sloped toward the drains.
CHAPTER 3
STRUCTURAL
INDEX
3.1 GENERAL
3.1.1 Scope
3.2 APPLICABLE PUBLICATIONS
3.3 PROJECT DEFINITION (10-15%)
3.4 CONCEPT DESIGN (35%)
3.4.1 Structural System Selection Analysis
3.4.2 Design Analysis
3.4.3 Drawings
3.5 INTERIM DESIGN (65%)
3.5.1 Design Analysis
3.5.2 Specifications
3.5.3 Drawings
3.5.4 TYAD PREVIOUS SUBMISSION REDLINES
3.6 FINAL DESIGN (Unreviewed 95%)
3.6.1 Design Analysis
3.6.2 Specifications
3.6.3 Drawings
3.6.4 TYAD PREVIOUS SUBMISSION REDLINES
3.7 READY-TO-ADVERTISE (Reviewed 100)%
3.7.1 Design Analysis
3.7.2 Specifications
3.7.3 Drawings
3.7.4 TYAD PREVIOUS SUBMISSION REDLINES
3.8 TECHNICAL REQUIREMENTS
3.8.1 General
3.8.2 Design Loads
3.8.3 Foundations
3.8.4 Structural Steel
3.8.5 Steel Joists
3.8.6 Pre-engineered Metal Buildings
3.8.7 Cold-Formed Steel
3.8.8 Steel Roof and Floor Deck
3.8.9 Concrete
3.8.10 Precast Architectural Concrete
3.8.11 Masonry Construction
3.8.12 Timber
3.8.13 Antiterrorism/Force Protection (AT/FP)
3.8.14 Required Standard Details
CHAPTER 3
STRUCTURAL
3.1 GENERAL
3.1.1 Scope
This chapter provides criteria, requirements, and guidance for the structural design of buildings and other structures. Specific submittal requirements in this chapter supplement the requirements of Chapter 1 GENERAL INSTRUCTIONS. All required documents, including the drawings and the design analysis, shall be prepared in accordance with the latest D/IS Engineering Division CADD Standards.
3.2 APPLICABLE PUBLICATIONS
American Association of State Highway Traffic Officials (AASHTO)
AASHTO LRFD Bridge Design specifications 4th Edition Dated 2007 (For bridge designs after 2007)
HB-17 Standard Specifications for Highway Bridges (for bridge designs prior to 2007)
American Concrete Institute (ACI )
315 Details and Detailing of Concrete Reinforcement
315R Manual of Engineering and Placing Drawings for Reinforced Concrete Structures
318 Building Code Requirements for Structural Concrete and Commentary
530 Building Code Requirements for Masonry Structures
American Institute of Timber Construction (AITC) Construction Manual
American Forest & Paper Association (AF&PA)
NDS National Design Specification for Wood Construction with Supplement
SDPWS AF&PA Supplement Special Design Provisions for Wind and Seismic
American Institute of Steel Construction (AISC)
325-05 Steel Construction Manual, Thirteenth Edition
341 Seismic Provisions for Structural Steel Buildings, including Supplements
360 Specification for Structural Steel Buildings
American Iron and Steel Institute (AISI)
NAS North American Specification for the Design of Cold-Formed Steel Structural Members, including Supplement
General Standard for Cold-formed Steel Framing-General Provisions
Header Standard for Cold-formed Steel Framing-Header Design
Lateral Standard for Cold-formed Steel Framing-Lateral Design
Truss Standard for Cold-formed Steel Framing-Truss Design
WSD Standard for Cold-formed Steel Framing-Wall Stud Design
American Society of Civil Engineers (ASCE)
7 Minimum Design Loads for Buildings and Other Structures
24 Flood Resistant Design and Construction
37 Design Loads on Structures during Construction.
International Code Council (ICC)
IBC International Building Code
IRC International Residential Code
Metal Building Manufacturers Association (MBMA)
MBSM Metal Building Systems Manual
MBMA Metal Roofing System design Manual
Precast/Prestressed Concrete Institute (PCI)
MNL 117 Manual for Quality Control for Plants and Production of Architectural Precast Concrete Products
MNL 120 PCI Design Handbook – Precast and Prestressed Concrete
Mnl-122 Architectural Precast Concrete
Steel Deck Institute (SDI)
DDM03 Diaphragm Design Manual
No. 30 Design Manual for Composite Decks, Forms Decks and Roof Decks
Unified Facilities Criteria (UFC)
UFC 1-200-01 Design: General Building Requirements
UFC 3-310-01 Design: Structural Load Data
UFC 3-310-01 Seismic design for Buildings
Truss Plate Institute
TPI 1-2002 National Design Standards for Metal Plate Connected Wood Truss Construction
Steel Joist Institute
3.3 PROJECT DEFINITION (10-15%)
At the Project Definition phase, the designer must define the specific project requirements and confirm that they can be met within the project constraints. This is normally done through a charrette or other data gathering process. The structural engineer shall also coordinate with the architect at this phase to insure that the architectural floor plan and other architectural features of the project can be framed and constructed economically.
The Project Definition submittal will consist of a narrative describing the structural loads, general design criteria and references and any unusual design conditions. The narrative shall include a brief description of the intended structural system or if the size of the project warrants, a description of the structural systems to be used for the comparative analysis.
3.4 CONCEPT DESIGN (35%)
3.4.1 Structural System Selection Analysis
(a) An economical structural system will be selected to meet the requirements of the design. For projects with a construction value of $10,000,000 or greater, a comparative analysis of two or more competitive structural systems will be required unless indicated otherwise in the Statement of Work (SOW). A portion of each facility large enough to be representative of the entire structure shall be designed in enough detail to provide for an estimate that will be the basis of the structural system selection. The portion of the structure selected for comparing alternate system costs shall include framing for at least one typical bay of the roof, floor, and foundation systems. Additional costs of nonstructural systems attributable to a structural alternative shall be included in the comparative cost estimate for that alternative. Determination of these additional costs must be based upon a concept of the complete building configuration, including architectural, mechanical, electrical, and other systems; hence, the main structural members must be sized to check for compatibility with ceiling, duct, lighting, and all other space demands. The method of providing the required degree of fire-resistance shall be determined for each alternative and the cost must be included. The submittal shall include the following items:
1. A complete description, with sketches, of each structural system considered.
2. Design calculations supporting the member sizes used for the cost estimate.
3. A comparative cost for each system, clearly showing all costs and quantities used.
4. An analysis of the study results with justification for the system selected.
(b) For projects with a construction value of less than $10,000,000, provide a rational justification of the proposed structural system.
3.4.2 Design Analysis
The following specific structural information shall be provided in a brief consolidated format:
3.4.2.1 References
List all references used in the Concept design including UFC, industry standards, and project specific criteria provided at the Charrette or pre-design meeting.
3.4.2.2 Design Loads
Design load values to be used in the design shall be identified, including roof and floor loads, wind loads, lateral earth pressure loads, seismic loads, etc., as applicable.
3.4.2.3 Lateral Stability
Describe the method of providing lateral stability for the proposed structural system to resist seismic, wind, and other lateral loads. Include sufficient calculations to verify the adequacy of the proposed lateral load resisting system.
3.4.2.4 Fire Resistance
Describe the fire resistance requirements of the structure and the proposed materials and systems to be used.
3.4.2.5 Antiterrorism/Force Protection (AT/FP) & Progressive Collapse
AT/FP and Progressive Collapse provisions which affect the structural design of the project will be identified and briefly described. Refer to Chapter 10 ANTITERRORISM/FORCE PROTECTION (AT/FP) for specific guidance related to AT/FP and Progressive Collapse.
3.4.2.6 Structural Calculations
Calculations for typical roof, floor, and foundation members as applicable for the structural system proposed.
3.4.3 Drawings
Sufficient framing plans are required for roof, floors, and foundations, as applicable, to indicate layout of principal members. Typical sections shall be furnished through roof, floors, and foundations indicating materials and type of construction proposed. Drawings will contain a set of general notes indicating design live, wind, and seismic loading, references used in the structural design, and applicable material strengths.
3.5 INTERIM DESIGN (65%)
3.5.1 Design Analysis
The interim design analysis shall include all items presented in the concept design analysis and any revisions necessitated by review comments on the Concept Submittal. Calculations shall be included for all principal members, including the structure foundations. Structural design issues related to AT/FP and Progressive Collapse will be presented in the design analysis along with structural calculations related to these issues.
3.5.2 Specifications
Provide redlined marked up specifications in accordance with The Tobyhanna Army Depot Installation Design Guide, September 2010.
3.5.3 Drawings
Drawings for this submittal will include roof and floor framing plans, as applicable. All principal members will be shown on the plans with top of steel shown relative to the Tobyhanna Army Depot’s existing Monument System or proposed finished…
This is the start of the file's text. The full file is on GovTribe.