EXhibit_A_PASS-SB_CDRL__LIST__4Dec2015.pdf
PDF 340 KB Posted
- Attached to
- Program and Systems Support - Small Business (PASS-SB) Federal contract opportunity
- Solicitation number
- W15QKN-16-R-0027
About this file
PASS-SB CDRL List
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Status Report Planning Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80368A PWS 3.1.1 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
SEE BLOCK 16
Reg
Repro
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 2) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
FOR DELIVERY OF THE DATE.
BLOCKS 10, 11,12 & 13: SUBMIT AS REQUIRED BY THE GOVERNMENT
DELIVER ELECTRONICALLY IN MS OFFICE OR COMPATIBLE FORMAT
DELIVER ELECTRONIC COPIES TO:
COR
TPOC
ATPOC
* The Office of the COR is NOT to receive any CLASSIFIED material. **
SFAE-PS-BI (COR)
15. TOTAL 0 2 0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
B001 Technical Report-Study/Services Requirements Analysis
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.1.2 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C TDP TM OTHER FNCL
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
C001 Design to Cost/Life Cycle Cost and Variance Analysis Report
Monitoring and Cost Control Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-FNCL-80449 PWS 3.1.3 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 10) PREPARATION INSTRUCTIONS SECTION 10,
INCLUDE FIDURES 1 AND 2, ARE REMOVED. CONTRACTOR FORMAT IS
ACCEPTABLE PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Acquisition Support Documentation Acquisition Life Cycle
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81607 PWS 3.1.4 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 3) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
A003 Contractor's Risk Management Plan Risk Management Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81808 PWS 3.1.5 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION 1) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
A004 Contractor's Risk Management Plan COOP/DR Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81808 PWS 3.1.6 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION 1) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
D001 Contract Summary Report Administrative & Clerical
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A PWS 3.1.7 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION USE/RELATIONSHIP) THIS REPORT SUMMARIZES
ALL WORK PERFORMED UNDER PWS SECTION 3.1.7
(DID REQUIREMENTS SECTION 2. FORMAT) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
D002 Contract Summary Report PPBE Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A PWS 3.2.1.1 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION USE/RELATIONSHIP) THIS REPORT SUMMARIZES
ALL WORK PERFORMED UNDER PWS SECTION 3.2.1.1
(DID REQUIREMENTS SECTION 2. FORMAT) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
D003 Contract Summary Report Financial Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A PWS 3.2.1.2 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION USE/RELATIONSHIP) THIS REPORT SUMMARIZES
ALL WORK PERFORMED UNDER PWS SECTION 3.2.1.2
(DID REQUIREMENTS SECTION 2. FORMAT) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
D004 Contract Summary Report Cost Estimating Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A PWS 3.2.2 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION USE/RELATIONSHIP) THIS REPORT SUMMARIZES
ALL WORK PERFORMED UNDER PWS SECTION 3.2.2
(DID REQUIREMENTS SECTION 2. FORMAT) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
The Office of the COR is NOT to receive any CLASSIFIED material. **
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Acquisition Support Documentation Procurement Planning
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81607 PWS 3.2.3.1 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 3) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Contractor's Progress, Status and Management Report
Contract Admin/Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80227 PWS 3.2.3.2 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS SECTION 10.3 CONTENT) REMOVE (h) (i). CONTRACTOR
FORMAT IS ACCEPTABLE PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
D005 Contract Summary Report Life Cycle Logistics Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80447A PWS 3.3 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
((DID REQUIREMENTS SECTION USE/RELATIONSHIP)THIS REPORT SUMMARIZES
ALL WORK PERFORMED UNDER PWS SECTION 3.3.
(DID REQUIREMENTS SECTION 2. FORMAT) CONTRACTOR FORMAT IS ACCPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Engineering and Technical Services Accomplishment Report
Systems Engineering
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80061A PWS 3.4 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 2) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B002 Technical Report-Study/Services Business Analytics Support
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.5 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
B003 Technical Report-Study/Services IT Strategy Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.6.1.1 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B004 Technical Report-Study/Services IT Portfolio Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.6.1.2 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008 DoD Architecture Framework Documentation Enterprise Architecture
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81644B PWS 3.6.1.3 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 2) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 18 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
B005 Technical Report-Study/Services IT Retirement Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.6.1.4 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 19 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
B006 Technical Report-Study/Services Transition Planning Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.6.1.5 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 20 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B007 Technical Report-Study/Services Customer Relationship Management
(CRM)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B PWS 3.6.1.6 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 4: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 21 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009 Management Plan Change Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80004A PWS 3.6.1.7 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 2: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
(DID REQUIREMENTS 3.1 THROUGH 3.7). APPLICABLE AS REQUIRED.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 22 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
E001 Contractor's Configuration Management Plan Configuration Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80858B PWS 3.6.1.8 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 2: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 23 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A010 Status Report Requirements Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80368A PWS 3.6.1.9, 3.9 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 2: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS #2) CONTRACTOR FORMAT IS ACCEPTABLE PENDING
GOVERNMENT APPROVAL..
(DID REQUIREMENTS #3) ADDRESS AS APPLICABLE..
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
SFAE-PS-BI (COR)
TPOC
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 24 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PASS-SB
A011 Status Report Technical/Functional Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80368A PWS 3.6.1.10 INSERT IN
SECTION B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT AS REQ SEE BLOCK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
BLOCK 2: TAILORED CONTENT REQUIREMENTS
(DID REQUIREMENTS PARAGRAPH 2) CONTRACTOR FORMAT IS ACCEPTABLE
PENDING GOVERNMENT APPROVAL
(DID REQUIREMENTS PARA #3) ADDRESS AS APPLICABLE.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED
FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 25 of 48
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .