AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
W15QKN
ARMY CONTRACTING COMMAND - NJ
5418 SOUTH SCOTT PLAZA
JOINT BASE MDL, NJ 08640
JULIE CAMERON
EMAIL: JULIE.A.CAMERON.CIV@MAIL.MIL
W15QKN-16-R-0027
2015DEC10
X
X
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 14
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JULIE CAMERON
Buyer Office Symbol/Telephone Number: ACC-NJ-WS/(609)562-7026
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Cost No Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
EXECUTIVE SUMMARY
The U.S. Army Contracting Command - New Jersey, located at Fort Dix, NJ on behalf of the Naval Air Systems Command (NAVAIR) Corporate
Business Office (CBO), is soliciting proposals for the Program and Systems Support - Small Business (PASS-SB) services.
This solicitation will utilize 100% small business set-aside to award approximately ten (10), five (5) year Indefinite
Delivery/Indefinite Quantity (IDIQ) Multiple Award Contract (MACs). The total maximum dollar value (Program Ceiling) for all Task Orders placed under these contracts is $499,267,406.45. The guaranteed minimum dollar value for the entire contract period of performance for each awardee is $2,000.00. Because this is an IDIQ contract, every awardee must be capable of performing all aspects of the PWS. It is the Government's intent to award Task Order 0001 to each awardee at the execution of the basic contract award. All individual performance periods/delivery schedules for the services to be procured will be specified in each Task Order. For proposal preparation purposes, the expected or approximate date for initiation of contract performance is 23 September 2016.
The Government will make the awards utilizing the Best Value Trade-off approach. This approach allows award to the offerors whose proposal is the most advantageous to the Government when considering evaluation factors in addition to price. These evaluation factors will include Technical, Past Performance, and Price. For more information regarding proposal submission or the source selection evaluation factors, see the INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS (Section L) and the EVALUATION FACTORS FOR AWARD sections of this solicitations (Section M).
PASS-SB support services will be required throughout the Continental United States (CONUS) and outside the Continental United States
(OCONUS). Foreign Military Sales (FMS) services are also required.
It is anticipated that there may be requirements for access to classified information by Contractors under the PASS-SB MACs. The highest security levels that may be required by the Contractor to perform on individual TOs under this contract are up to a TOP SECRET
Facility/Personnel Clearance with a SECRET safeguarding capability. These security requirements will not be a condition for basic contract award. However, any offerors that do not have the required security clearances in place by 6 months after the award of the basic contract, risk being "off-ramped" from the PASS-SB IDIQ MAC.
Disclaimer: This Executive Summary has been prepared as an aid to the potential offerors. We have made every attempt to accurately reflect the requirements/information contained in the solicitation. However, if you find any discrepancies between the Executive
Summary and the clauses/provisions contained in the solicitation/contract, the clauses/provisions contained in the solicitation/contract shall prevail. Please notify the Contracting Office Point of Contact (POC) identified in Block 10 of the SF 33 if any discrepancies are found.
*** END OF NARRATIVE A0001 ***
The purpose of Amendment 0004 to W15QKN-16-R-0027 is to:
1.page 1, Block 12 states 60 days for acceptance of proposals this is computer generated and cannot be changed; for this requirement this block is changed to read: In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (196 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
2. Revise Executive Summary paragraph 2 last sentence contract performance date from 16 August to 23 September.
3. Revise Section L-17, 2 . Proposal Submission Files, c., Content Requirement, Sentence beginning with "Paper Tabs and/or" delete the word and in the sentence where it is repeated.
4. Revise Section L-17, Proposal Submission Files 2, c., Content Requirement, last sentence to correct the spelling from inforamtion to information
2 14
W15QKN-16-R-0027 0004
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5. Revise Section L-17, Proposal Submission Files 2, (iv) IV Cost /Price Factor, (4) first sentence delete One OCONUS fully loaded FFP labor Rate for each category of labor
6. Revise Section L-17, Proposal Submission Files 2, (iv) IV Cost /Price Factor, (9) sentence beginning with "The estimate award date change the date from 11 August 2016 to 23 September 2016.
7. Revise Section L-17, Proposal Submission Files 2, (iv) IV Cost /Price Factor, ordering periods
FROM:
Ordering Period 1: 11 August 2016 to 10 August 2017
Ordering Period 2: 11 August 2017 to 10 August 2018
Ordering Period 3: 11 August 2018 to 10 August 2019
Ordering Period 4: 11 August 2019 to 10 August 2020
Ordering Period 5: 11 August 2020 to 10 August 2021
TO:
Ordering Period 1: 23 September 2016 to 22 September 2017
Ordering Period 2: 23 September 2017 to 22 September 2018
Ordering Period 3: 23 September 2018 to 22 September 2019
Ordering Period 4: 23 September 2019 to 22 September 2020
Ordering Period 5: 23 September 2020 to 22 September 2021
8. Revise Section M-1 Basis For Award (Section M) C. 3. Past Performance Factor paragraph c. first sentence correct the spelling from
Stae to State
Posted with Amendment 0004 is an amended response from questions and responses posted with Amendment 0002. The amended response is for questions 189.
*** END OF NARRATIVE A0005 ***
3 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L-17 PROPOSAL SUBMISSION (Section L)
1. Introduction. The offerors proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP _____________ shall provide the Government address and receipt date for proposal submittal. All proposal submissions must be received by the closing date and time identified in the RFP, to the following address:
Julie Cameron
Contract Specialist
Army Contracting Command New Jersey
5418 South Scott Plaza
2nd Floor
Joint Base MDL, NJ 08640
Proposals shall be mailed through a commercial/Government carrier. The Procuring Contracting Officer (PCO) and the Contract Specialist are the sole points of contact for this acquisition. Address all questions or concerns you may have to the PCO and Contract Specialist.
All questions regarding the RFP shall be submitted in writing via electronic mail to both:
a. Torrence Trappier, Contracting Officer, at mailto:torrence.trappier.civ@mail.mil; and
b. Julie Cameron, Contract Specialist, at mailto:julie.a.cameron.civ@mail.mil
The offerors proposal shall consist of six (6) volumes. The Volumes are I Technical Factor - Sample Task Subfactor, II Management
Subfactor, III Past Performance, IV Cost/Price, V-Solicitation, Offer and Award Documents, and Certifications/Representations and VI
Limitations on Subcontracting. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
Offerors are cautioned that parroting of the Technical requirements or the PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
Each Hard Copy volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 4).
Printing sha11 be single spaced. Each paragraph shall be separated by at least one blank line.
The following volumes of material shall be submitted:
Volume Title Page Limitation Printed Copies Digital Copies File Name
Prime contractor shall incorporate a sheet to include the names of sub-contractors but this page will not count towards the page count on any volume when included. The sheet shall include a list of all subcontractors to include Subcontractor Name, POC, Address, Email, Phone, Fax, DUNNs and Cage Code shall be incorporated and the sheet shall be included in Volume II Management Sub factor & Volume III
Past Performance.
Volume I Technical Factor - Sample Task Sub factor
The offeror shall complete Attachment 0007 in accordance with the instructions included in the attachment. The hours by labor category, ordering period and total hours proposed in Attachment 0007 SHALL match the hours proposed in Attachment 0003.
FFP Sample Task
Approach* 30 pages 4 3 Sample Task.docx
Integrated Master Schedule No Limit 4 3 IMS.mpp
Key Resumes 2 pages Each 4 3 Name of individual and labor category.docx
Volume II Management Subfactor
Management Plan* 30 pages 4 3 ManagementPlan.docx
Key Resumes 2 pages Each 4 3 Name of individual and labor category.docx
4 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Volume III PAST PERFORMANCE
6 pages for the 1 3 PR_Contracts.docx prime; 12 pages for the top 3 Major Subcontractors.
10 pages for the narrative portion. 28 PAGES TOTAL
Attachment 0004 Accounting System Checklist only needs to be completed if the contractor does NOT have an approved accounting system.
Volume IV - COST/PRICE
Cost/Price Submission No limit Shall 0 1 Cost-Price.docx include the Attachments
Attachments 0001 through 0001 - 0004
0004 and all proposal requirements listed in
Section L
Volume V SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS
Solicitation N/A 1 1 Soliciation.pdf
Amendments
(if applicable) N/A 1 1 Amendment00x.pdf
Certifications/
Representations N/A 1 1 CertsReps.pdf
Volume VI LIMITATIONS ON SUBCONTRACTING REQUIREMENT
Limitations On No Limit 4 3 Limitations On Subcontracting.docx
Subcontracting
*NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
2. PROPOSAL SUBMISSION FILES _________________________
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at _______ the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. All price breakdown information to aide in the cost/price evaluation shall be submitted with formulae intact in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. MS Word (.docx) files shall use the following page setup parameters:
Margins Top, Bottom, Left, Right 1 Gutter 0
From Edge Header, Footer 0.5 Page Size, Width 8.5
Page Size, Height 11
Font Times New Roman 12 font shall be used for all documents and key resumes. There are no specific font sizes required for graphs, tables, schedules, etc. but they must be legible. Landscape print is acceptable.
NOTE: 11X17 folded pages are acceptable for tables/graphic representations; however, each 11X17 page counts as two pages.
The following additional restrictions apply:
b. File Packaging. All of the digital proposal files shall be submitted on CDs or DVDs using the file formats and file names in the _______________
Proposal Submission table above. Zip disks are not permitted. All price breakdown information to aide in the cost/price evaluation shall be submitted with formulae intact in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. Each disc shall be externally labeled with the volume number, date, and the offerors name. **Please note Self extracting exe files are not ___
5 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
acceptable. ** If the hard-copy proposal differs from the electronic version, the electronic copy will govern.
c. Content Requirement. All information shall be confined to the appropriate volume. The offeror shall confine submissions to essential ____________________ matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. The table of contents and summary section will not count towards the page limitations, however nothing in the table of contents or the summary section will be evaluated. Paper tabs and/or cover pages may be used to separate sections of the proposal and the tabs and/or cover pages will not count towards the page limitation. However, do not include any proposal information on the tabs and/or cover pages as it will not be evaluated. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:
(i) Volume I SAMPLE TASK SUBFACTOR____________________________________
This volume shall be specific, detailed, and complete. Simply stating that the offeror understands and will perform the listed functions is inadequate. Paraphrasing the Performance Work Statement (PWS) or Sample Task (or parts thereof) is similarly inadequate. The Sample
Task Subfactor Volume will consist of the following:
Sample Task Subfactor (30 page limit for submission) The Offeror shall address the Sample Task provided as Attachment 0006 to Section J of the RFP. In accordance with the instructions provided with the Sample Task, the offeror shall provide a narrative response describing their detailed and thorough technical approach to meet desired outcomes ofthe following key areas and how they specifically relate to the Sample Task: Overall Logistics Approach; Business Analytics Process; Information Technologies Methodologies; Program
Management Concepts including the IMS, Scheduling Constraints, and Risk Management Principles. The offeror shall submit its staffing approach, Key Resumes, along with supporting documents as described in the Sample Task. The resumes for Key Personnel will not count towards the 30 page limit and shall be limited to two (2) pages per resume.
For proposal purposes, Offerors shall assume they will be performing multiple tasks, worldwide, concurrently.
(ii) Volume II MANAGEMENT SUBFACTOR (30 page limit for the Management Plan)
Offerors shall provide their PASS-SB Management Plan for their organization and each major subcontractor. Major subcontractors are defined as the three (3) subcontractors who will be providing the highest percentage of the total proposed price. The plan shall detail the management approach, techniques, and controls to include, as a minimum:
- Team construct to include management roles and responsibilities; communication processes and work distribution between all team members. The teams ability to rapidly respond to government requirements and quickly expand staff to meet increased workloads considering the impact of an environment of fluctuating workloads, demanding schedules, and complex project issues.
- Coordination and execution of multiple concurrent tasks performed at various locations around the world.
- The staffing and training processes; the ability to hire and maintain a skilled workforce. Methods for attracting, hiring, developing, training, and retaining a workforce with all the skills and knowledge necessary to support the
PASS-SB program requirements. Approaches to provide the training and mentoring necessary to keep the work force up to date on current technologies, trends, and best business practices. Potential personnel and team member retention risks and risk mitigation measures.
- The identification and resumes of Senior Level Key Personnel that will ensure success on the PASS-SB contract. At least two (2) resumes will be required for the following Senior Level/Key Labor Categories: Program Manager, Project Lead, Logistician Senior, Operations Research Senior, Information Technology Specialist Senior, Acquisition Analyst Senior, and
Facilitator/Trainer Senior. The resumes for Key Personnel will not count towards the 30 page limit and shall be limited to two
(2) pages per resume. Key Personnel shall be available upon contract award. Resumes of proposed key/senior personnel shall be provided for the specified key/senior personnel positions to further support proposals in regard to personnel work experience and qualifications as they pertain to the level of the Offerors overall technical/management and capability to perform the stated requirements of this effort. In conjunction with the resumes, letters of commitment for contingent hires identified shall be provided documenting availability to begin performing this effort at time of contract award. The letters of commitment shall include a statement certifying that the Employees total compensation package (including salary) has been agreed upon between the Offeror and prospective employee. Resumes shall include: Employee name; Years of employment experience in chronological order, including narrative description of duties and responsibilities; Current position, title, and employer; Educational history; Institution name, degree or certification earned, and year for all degrees or certifications earned; Current level of security clearance and status (final, interim, or pending).
(iii) Volume III PAST PERFORMANCE ____________________________
This volume shall contain past performance information regarding similar contracts. This volume shall not exceed three (3) past performance references for the prime contractor and two (2) past performance references for each of the three (3) major subcontractors
6 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
excluding Past Performance Questionnaire Forms. Each past performance reference shall be limited to two pages. Offerors shall submit no more than three (3) Prime Federal or State Government contracts, CONUS and OCONUS, for the prime offeror and no more than two (2) contracts for each major subcontractor in performance or awarded during the past three (3) years, from the issue date of the RFP, which are relevant to the efforts required by the RFP. Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractors past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors for their past performance to be considered. The information provided for the prime offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government PWS subparagraph number. This volume shall be organized into the following sections:
(1) Section 1 Contract Descriptions. This section shall include the following information in the following format. _________________________________
(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers). Limit the contract references to those performed by the segment (e.g., division, group, and unit) of the firm that is submitting the proposal.
(b) Government contracting activity, and current address, Procuring Contracting Officers name, e-mail address, telephone and fax numbers.
(c) Governments technical representative/COR and current email address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officers name, and current e-mail address, telephone and fax number.
(e) Government contract administration activitys Pre-Award Monitors name, and current e-mail address, telephone and fax numbers.
(f) Contract Number to include date of award and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase
Agreements, include Delivery Order Numbers. If an Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements is identified the specific Delivery/Task Order Number is to be provided or it will not be evaluated.
(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of
Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(h) Total contract value, total obligated amount, and total percent of contract obligated amount actually performed by the offerors employees.
(i) Final or projected final price/cost.
(j) Original delivery schedule, including dates of start and completion or work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work or whether performance is ongoing.
(2) Section 2 Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1, Contract ________________________ _________
Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of the RFP.___________
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery/performance schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and
Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure
Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(3) Section 3 Subcontracts. This section will include written consent of major subcontractors to allow the disclosure of their __________________________ subcontractors past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors.
(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. ___________________________________
However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.
7 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(5) Past Performance Questionnaire. For all contracts identified in Section 1, Contract Descriptions, a Past Performance Questionnaire _______________________________ _____________________ must be completed and submitted. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Julie.a.cameron.civ@mail.mil. The offeror shall e-mail to the Contracting Office a list of all the
POCs who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number;
Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mailed to POC (month/day).
(6) Submissions. Offerors are discouraged from providing points of contact with another contractors facility, i.e., in case an offeror ____________
(or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement.
Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.
(iv) Volume IV COST/PRICE FACTOR ____________________________
(1) This instruction is used to assist the offeror in developing and documenting adequate support for the costs and overall price included in the proposals. The instruction is not intended to be all-inclusive. The responsibility for providing cost and price documentation rests with the offeror. The offerors proposal shall contain sufficient cost documentation for analysis and evaluation of the offerors proposal in accordance with FAR 15.403-5(b)(2) and 15.404.
(2) The offeror shall not propose pricing on the CLINs in Section B. These contract line items are established to enable the placement of future orders. Fully loaded labor rates and indirect rates applicable to material, other direct costs and travel in the Excel spreadsheets (Attachments 0001 & 0002) will be incorporated in the resultant contracts for future orders.
(3) The charts referenced in the Excel spreadsheet Attachments 0001 must be completed for all categories of labor for all five (5) ordering periods. The total proposed hours per labor category shall be equal to the total government estimated hours listed for each labor category.
(4) Firm Fixed Price (FFP) Labor (Attachment 0001): For the FFP rates, each offeror shall submit one CONUS
Government-site fully loaded FFP labor rate, one CONUS Contractor-site fully loaded FFP labor rate for each category of labor, for each of the five (5) ordering periods. These fully loaded labor rates shall be inclusive of wages, applicable indirect expenses and profit.
The FFP rates under the basic contract are on a Not-To-Exceed basis. Offerors will have the opportunity to propose lower fully loaded
FFP labor rates for competitive orders but shall not exceed what is incorporated via attachment to the basic contract. It is anticipated that the offerors proposed Government-site fully loaded labor rates will be lower than the Contractor-site rates since the government is providing office space, equipment, utility services, etc. Offerors may not deviate from categories listed in the Excel spreadsheet
(Attachment 0001).
(5) Material, Other Direct Costs and Travel (Cost Reimbursable/no fee): Material, Other Direct Costs and Travel will be reimbursed on a cost, no fee basis. Offerors shall propose CR/no fee indirect rates applicable to material, other direct costs and travel in Attachment 0002. Offerors shall fill in their company name in the appropriate cell highlighted in yellow on each worksheet.
Offerors shall complete applicable cells highlighted in yellow on each Ordering Period worksheet with the appropriate element of cost, indirect rate base descriptions, percentages and amounts or formulas in the "Total" column. Do not change the government-provided material, ODC or travel costs. If needed, offerors can insert additional rows for applicable indirect expenses. Material, ODCs and
Travel are reimbursed at cost. Indirect rates applicable to Material, ODCs and Travel are also reimbursed at cost and shall be incorporated into any resultant contract. No profit/fee shall be proposed. Only the offeror shall propose Cost Reimbursable/no fee indirect rates/indirect expenses for Material, ODCs and Travel. Material, ODCs and Travel shall not be allocated to subcontractors and/or affiliates.
(5.1) The offeror shall identify the basis for the proposed indirect rates applicable to Material, Other Direct Costs and travel (i.e. Forward Pricing Rate Agreement (FPRA), Forward Pricing Rate Proposal submission, Approved Provisional Billing Rates, budgetary rates, etc.) and provide documentation supporting their proposed indirect rates. The offerors shall provide their current
(within the last twelve months) Forward Pricing Rate Agreement or Forward Pricing Rate Proposal submission for indirect rates, and/or
Provisional Billing Rates approval letter for current-year indirect rates. For out-year rates and/or rates based on budgetary data or if none of the listed DCAA/DCMA documents are available, in order to perform a cost realism analysis, the offeror shall provide details on formulation of indirect rates (including pool of expenses and allocation bases and forecasted data) as well as actual indirect rates for the last two completed financial years. If the offerors rates are weighted or blended from year to year, the offeror shall provide a detailed breakout which demonstrates how the weighted or blended indirect rates are calculated.
(6) Sample Task (FFP): As part of the overall proposal submission, all offerors are required to submit a sample task proposal utilizing Attachment 0003. The period of performance for the Sample Task is 30 months. The sample task will represent the offerors mix of labor categories and hours, and will be used in the total evaluated price evaluation. The Sample Task is listed in
Section J as an attachment to the solicitation. NOTE: The labor categories and hours proposed must be limited ONLY to those which are necessary to complete the sample task. THIS IS A SEPARATE, STAND-ALONE SUBMISSION FROM THE LABOR CATEGORIES AND RATES PROPOSED WITHIN
8 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ATTACHMENT 0001.
(6.1) Proposed Labor Categories/Hours. The sample task proposal MUST utilize labor categories and fully _______________________________ loaded FFP labor rates (Contractor Site) that are included with the offerors base labor rate proposal in Attachment 0001. It is up to each offeror to determine which labor categories proposed in Attachment 0001 will be needed to fulfill the sample task requirement.
Each Offeror must independently determine the most efficient mix of labor categories and labor hours necessary to successfully complete the sample task. The sample task proposal must utilize the same LOADED labor rates that are included with the offerors proposal in
Attachment 0001. The hours proposed in Attachment 0003 and Attachment 0007 shall be the same. If a discrepancy is noted when comparing
Attachment 0003 and 0007, the Government will utilize the higher of the two when computing the total evaluated price.
(7) Accounting System.
(7.1) Since this acquisition includes cost-reimbursable effort, pursuant to FAR 16.301-3(a)(3), the contractors accounting system must be deemed adequate for determining costs applicable to the contract/orders. Provide documentation from DCAA supporting the determination that the offerors accounting system has been deemed adequate. If DCAA has not deemed the offerors accounting system adequate, the offeror shall complete Attachment 0004 IN FULL. If the offeror does not complete Attachment
0004 in full including providing appropriate narrative describing how the accounting system supports the response to the questions in
Attachment 0004, a determination cannot be made regarding the adequacy of the offerors accounting system and award of a cost-reimbursable contract cannot be made rendering the offeror ineligible for award.
(8) Price Inconsistencies: A proposal is presumed to represent an offerors best effort to respond to the solicitation. Any inconsistency, whether real or apparent, between promised performance and price, shall be explained in the proposal.
Any significant inconsistencies, if unexplained, raise a fundamental issue of the offerors understanding of the nature and scope of work required and his/her financial ability to perform the contract, and may be grounds for rejection of the proposal.
(9) Each Ordering Period of the contract shall be from the date of award until one (1) year later. The estimated award date for this IDIQ contract is 23 August 2016, therefore the ordering periods shall be as follows:
Ordering Period 1: 23 September 2016 to 22 September 2017
Ordering Period 2: 23 September 2017 to 22 September 2018
Ordering Period 3: 23 September 2018 to 22 September 2019
Ordering Period 4: 23 September 2019 to 22 September 2020
Ordering Period 5: 23 September 2020 to 22 September 2021
(10) For a more detailed description of Labor Categories, see Attachment 0005 entitled PASS-SB Labor Category
Descriptions.
(v) Volume V SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS __________________________________________________ __________________________________
Certifications and Representations Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 33 and all certifications requiring original signature. An Acrobat PDF fileshall be created to capture the signatures for submission.
Section A Standard Form 33 (SF 33), Solicitation, Offer and Award
Section G Contract Administration Data
Section K Representations, Certification and Other Statements of Offerors
Solicitations, Offer and Award Documents and Certifications/Representations shall not be addressed separately from that submitted in
VOLUME V SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS /REPRESENTATIONS________________________ _____________________________________________________________
(vi) VOLUME VI -- LIMITATIONS ON SUBCONTRACTING_______________________________________________
This volume shall be specific and detailed. The offeror shall provide a narrative response describing their capability and capacity to satisfy the requirements of 52.219-14, Limitations on Subcontracting (LOS) requirement.
*** END OF NARRATIVE L0002 ***
9 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
M-1
A. BASIS FOR AWARD (Section M)
The award will be made on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the three (3) evaluation factors: (1) Technical; (2) Past Performance and (3) Cost/Price. The factors are listed in descending order of importance. The Technical Factor is slightly more important than the Past Performance Factor.
The Past Performance Factor is significantly more important than the Cost/Price Factor. All non-Price Factors, when combined, are significantly more important than the Cost/Price Factor. Offerors will be cautioned that the award may not necessarily be made to the lowest price/cost offered. The Government may award a contract without discussions, but the Government may hold discussions (except for clarification as described in FAR 15.306(a)), as permitted by FAR 15.306(a)(3) and FAR 52.215-1. However, the Government reserves the right to conduct discussions to permit Offerors to revise their proposals.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and subfactors will be used to evaluate each proposal: Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.
Factor 1: Technical Factor: The Technical Factor is further divided in to the following subfactors: The Sample Task Subfactor is more important than the Management Subfactor.
a) Subfactor 1: Sample Task Subfactor.
b) Subfactor 2: Management Subfactor.
Factor 2: Past Performance.
Factor 3: Cost/Price.
C. EVALUATION APPROACH
All responsive proposals shall be subject to evaluation by the Source Selection Team (SST).
1. The overarching evaluation approach for all technical factors and subfactors is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine whether the offerors methods and approach_____________________ have adequately and completely considered, defined and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.
b. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed________________________ approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven tools and techniques. The proposal will be evaluated to determine the extent to which the offeror is expected to be able to successfully perform and complete the proposed tasks and technical requirements within the required schedule.
2. The Technical Factor is divided into the following subfactors:
Subfactor 1: This subfactor evaluates the offerors proposed Sample Task response. The evaluation will focus on the offerors detailed and thorough approach to meet desired outcomes including these key areas and how they specifically relate to the Sample Task:
-Overall Logistics Approach
-Business Analytics Process
-Information Technologies Methodologies
-Program Management Concepts including the Integrated Master Schedule (IMS), Scheduling Constraints, and Risk Management Principles
-The staffing resources proposed to support the Sample Task.
Subfactor 2: This subfactor evaluates the Prime Offerors and its 3 Major Subcontractors Management Plan. Major subcontractors are defined as the three (3) subcontractors who will be providing the highest percentage of the total proposed price. The evaluation will
10 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
focus on the following areas of management capability to meet the requirements of the solicitation:
Team construct to include management roles and responsibilities; communication processes and work distribution between all team members. The teams ability to rapidly respond to government requirements and quickly expand staff to meet increased workloads considering the impact of an environment of fluctuating workloads, demanding schedules, and complex project issues.
Coordination and execution of multiple concurrent tasks performed at various locations around the world.
The staffing and training processes; the ability to hire and maintain a skilled workforce. Methods for attracting, hiring, developing, training, and retaining a workforce with all the skills and knowledge necessary to support the PASS-SB program requirements. Approaches to provide the training and mentoring necessary to keep the work force up to date on current technologies, trends, and best business practices. Potential personnel and team member retention risks and risk mitigation measures.
Identification and Resumes of Senior Level/Key Personnel and Letters of Commitment for the following labor categories on the
PASS-SB contract:
Program Manager
Project Lead
Logistician Senior
Operations Research Senior
Information Technology Specialist Senior
Acquisition Analyst Senior
Facilitator/Trainer Senior
The Technical Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror's proposal. The color rating depicts how well the offerors proposal meets the Technical subfactor requirements. The compilation of these Subfactor adjectival ratings will form the basis of the factor rating.
TABLE 1 COMBINED TECHNICAL/RISK RATINGS
Color Rating Description
Blue Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses.
Risk of unsuccessful performance is very low.
Purple Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses.
Risk of unsuccessful performance is low.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements and contains one or more deficiencies.
Proposal is unawardable.
The following definitions will also be used in the evaluation process:
a. Deficiency - A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
b. Significant Weakness - A flaw that appreciably increases the risk of unsuccessful contract performance.
c. Weakness - A flaw in the proposal that increases the risk of unsuccessful contract performance.
d. Strength - An aspect of an Offerors proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
e. Significant Strength - An aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
11 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
f. Adverse Past Performance Information - Any unfavorable past performance information to which the offeror has not previously had an opportunity to respond.
3. Past Performance Factor. The Government will evaluate the offerors record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS CONUS and OCONUS.
a. Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Section J, Attachment 0011.
b. The Government will focus its inquiries on the offerors (and major subcontractors) record of performance as it relates to all solicitation requirements, including cost, schedule, performance and management of subcontractors. Major subcontractors are defined as the top three (3) subcontractors who will be providing the highest percentage of the total proposed price. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, offerors will be reminded to include the most recent and relevant efforts (within the past three years) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an unknown confidence rating and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal or State government contracts, CONUS and OCONUS for same or similar services as compared to services/efforts that are the same as or similar to the effort required by the RFP. Data used in conducting performance risk assessments shall not extend past three years prior to the issue date of the RFP, but may include performance data generated during the past three years without regard to the contract award date. The Government will not consider experience of subordinate or affiliated offices of the Offeror, unless the Offeror clearly details the proposed involvement of the Offeror's subordinate or affiliated offices in this requirement.
c. Offerors shall submit no more than three (3) Prime Federal or State Government contracts, CONUS and OCONUS, for the prime offeror and no more than two (2) contracts for each major subcontractor in performance or awarded during the past three (3) years, from the issue date of the RFP, which are relevant to the efforts required by the RFP. The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.
d. The past performance factor considers each offerors demonstrated recent and relevant record of performance in supplying services and/or products that meet the contract requirements CONUS and OCONUS. There are two aspects to the past performance evaluation:
relevancy and performance confidence assessment.
(i) RELEVANCY: The first aspect of the past performance evaluation is to assess the offerors past performance to____________ determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection.
Relevancy is not separately rated; however, the following criteria will be used to establish what is relevant which shall include similarity of Federal or State government contracts, CONUS and OCONUS service/support, complexity, total contract value, total obligated amount, total percent of contract obligated amount actually performed by the offerors employees, contract…