This document is a Request for Information (RFI) for the Army's Manpack Radio Production, Engineering, and Sustainment follow-on procurement. The Army is seeking market research to identify potential sources for a new Manpack Radio contract, with current incumbents being L3Harris and Rockwell-Collins. The solicitation targets a replacement radio system capable of high-rate production, with a desired manufacturing capacity of up to 500 units monthly and the ability to surge to 1,000 units. The radio must provide multi-mode, multi-channel communications with NSA Type 1 Encryption and be certified for SECRET-level communications.

The RFI requests white paper responses addressing specific areas of interest, including incentive arrangements to reduce weight/heat, improve battery life, and meet performance requirements, as well as sustainment strategies. Responses are due in a phased approach between 04 April and 17 April 2025, with a potential contract award anticipated on 02 September 2026 for approximately 5,000 units. The procurement may be set aside for small businesses, with all small business categories being considered under NAICS code 334220. Respondents must provide detailed information about their technical capabilities, production capacity, cost estimates, and experience with NSA certification and data escrow accounts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manpack Recompete RFI W15P7T-24-R-MP01, Amendment 01:

This announcement continues market research for the follow-on competitive procurement of the Manpack Recompete Radio Production, Engineering, and Sustainment, RFI W15P7T-24-R-MP01, initiated by the Army on 13 June 2024. The Government requests the following specific areas of interest for this RFI:

1. Incentive arrangements that would: a) reduce heat, size, or weight, b) increase battery life, or c) bring objective PRD requirements to production within three (3) years from award.

2. Maintain an Escrow Account Data Package similar in nature to the one described in the Draft Attachment 1: Special Requirements for Escrow Account Data Package.

3. Achieve Depot Phase 3 Repair and Sustainment capability at Tobyhanna Army Depot in accordance with the draft Attachment 2: Special Depot Maintenance and Repair Transition Requirements and all Depot Phase language.

4. Sustainment strategies that would exploit commonalities and standardization across the portfolio of HMS Tactical Radio products to reduce the overall logistics footprint of HMS commodities.

Vendors shall submit white paper(s) along with cost estimates addressing the above topics or any other suggestions leading to program cost savings, performance improvements, and/or shorter production lead times, if applicable. White paper submissions shall be single spaced, 12-point type with at least one-inch margins on 8 1/2” X 11” page size and may not exceed five (5) pages for each submission. Please submit interest/responses in Portable Document Format (PDF) via email to the following:

Contracting Officer, Phillip S. Vitakis at phillip.s.vitakis.civ@army.mil, Contract Specialist, Shawntil M. Eure at shawntil.m.eure.civ@mail.mil, and Contract Specialist, Douglas Thier at douglas.g.thier.civ@army.mil.

The Government requests input to the above questions via a phased response approach as follows:

Question 1, Incentive arrangements: due by (04 April 2025) (21 calendar days after date of publication) Question 2, Escrow Account Data Package: (10 April 2025) (28 calendar days after date of publication) Question 3, Depot Phase 3 Repair and Sustainment Capability: (17 April 2025) (35 calendar days after date of publication) Question 4, Sustainment strategies: (17 April 2025) (35 calendar days after date of publication)

Please ensure submissions are carefully labeled to reflect the paragraph number and subject. The white papers are to be developed separately from each other and delivered under separate emails. Please reference RFI W15P7T-24-R-MP01, Amendment 01 in the subject line of e-mail transmittal and on all enclosed documents.