This is a Request for Proposals (RFP) from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for a Next Generation Load Device Medium (NGLD-M) replacement program. The solicitation seeks proposals for a ten-year Indefinite Delivery Indefinite Quantity multiple award contract to support the Project Manager Tactical Radios and Product Lead Communications Security requirements. The contract will have firm-fixed-price, cost-plus-fixed-fee, cost reimbursable, and IDIQ contract line items. The minimum guaranteed amount is $5,000 and the maximum amount is $265,000 for up to 265,000 units over ten years. Proposals are due by December 23, 2020 at 5:00pm Eastern Time. The RFP includes a performance work statement, statement of work, and contract data requirements list as attachments.

View the file

Other files

File Type Posted
B08_W15P7T-21-R-0001 NGLD-M Demonstration Questions.pdf PDF
B08_NGLD-M_DD254 FOR Solicitation_ W15P7T-21-R-0001_16 Dec 2020.pdf PDF
B08_W15P7T-21-R-0001_ Amendment 0002_Signed_06 Jan 2021.pdf PDF
B08_NGLD-M Bidders Library Instructions_04 Dec 2020.pdf PDF
B08_W15P7T-21-R-0001_Bidder Library_v3_4 Dec 2020.pdf PDF
A02 NGLD-M IDIQ PWS_FINAL_02 Dec 2020.docx DOCX document
B08_W15P7T-21-R-0001_Amendment 0001_03 DEC 2020.pdf PDF
A02_NGLD-M_Program Management SOW_FINAL_02 Dec 2020.docx DOCX document
B08_NGLD-M Final Solicitation Responses.pdf PDF
B08_ RFP_NGLD M_ Pricing Template Spreadsheet_v2_Dec 2020.xlsx XLSX spreadsheet
B08_RESCUE NDA Tracker Template.xlsx XLSX spreadsheet
B08_RESCUE NDA NGLD-M_2020.pdf PDF
B08_W15P7T-21-R-0001_Bidder Libarary_v2_25 Nov 2020.docx DOCX document
B08_NGLD-M Bidders Library Instructions_v2_25 Nov 2020.pdf PDF
W15P7T-21-R-0001_v12_16 Nov 2020.pdf PDF
B08_Appendix I Small Business Participation Commitiment Document.docx.docx DOCX document
B08_W15P7T-21-R-0001_NGLDM_SOLICITATION_NDA_v3_20 Oct 2020.docx DOCX document
B08_ RFP_NGLD M_ Pricing Template Spreadsheet_OED_04 Nov 2020.xlsx XLSX spreadsheet
B08_ Past Performance Questionnaire.docx DOCX document
A03_NGLD-M DD 254 Item 13 Continuation FOR solicitation W15P7T-221-R-0001signed.pdf PDF
B08_ RFP_NGLD M_ Pricing Template Spreadsheet_4 Nov 2020.xlsx XLSX spreadsheet
A03_NGLDM ACC Security Appendix to the PWS W15P7T21 R0001_signed.pdf PDF
NGLD M CDRLS_Revised_25 Sept 2020.zip ZIP file
B08_NGLD-M ACC DD254 FOR Solicitation W15P7T-21-R-0001.pdf PDF
A02_NGLD-M_Program Management SOW_FINAL.docx DOCX document
B08_W15P7T-21-R-0001_Bidder Libarary_v2_16 Nov 2020.docx DOCX document
A02 NGLD-M Engineering Development PWS_FINAL.docx DOCX document
B08-NGLD-M QASP.DOCX DOCX document
A02_GFPW15P7T21R0001_GFP Listing.pdf PDF
A02 NGLD-M IDIQ PWS_FINAL.docx DOCX document
A03 R001 DI-MGMT-82041B SB Utilization Report signed.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W15P7T-21-R-0001 X

2020NOV16

2020DEC2305:00pm

DOA7

2020NOV16 SEE SCHEDULE

W15P7T

ARMY CONTRACTING CMD-APG

6565 SURVEILLANCE LOOP

APG, MD 21005-1846

DIONNA P. BRITTEN

(443)861-4942

CCAP-CCB

DIONNA.P.BRITTEN.CIV@MAIL.MIL

1 171

X 1

X 3

X 70 X 71 X 72

X 78

X 80

X 84

X 127

X 128

X 143

X 161

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DIONNA P. BRITTEN

Buyer Office Symbol/Telephone Number: CCAP-CCB/(443)861-4942

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Other

*** End of Narrative A0000 ***

1. Pursuant to FAR 15.203, Request for Proposals (RFP), this RFP is issued to support Next Generation Load Device Medium (NGLD-M)

Project Manager Tactical Radios (PM TR) and Product Lead Communications Security (PdL COMSEC)s requirement for a NGLD family of replacement for the aging fleet of Simple Key Loader (SKL) devices. This RFP is for a ten year Firm-Fixed Price (FFP), Cost-Plus-Fixed

Fee (CPFF), Cost Reimbursable (CR), Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC). The contractually guaranteed minimum requirement under the resulting contract shall be $5,000. The maximum requirement under the resultant contract shall not exceed be 265,000 units.

2. All work performed under this contract and any subsequent TO shall be performed in accordance with (IAW) the Performance Work

Statement (PWS) and Statement of Work (SOW) found in Section J, attachments 0001, 0002, and 0003 and the associated Contract Data

Requirements List ( CDRLS) located in Sections B and Section J, Exhibits A-R.

3. The Period of Performance (PoP) for this IDIQ shall be 10 years (120 months) consisting of three (3) year base period with one (1) five year option and two (2) one (1) year options.

4. If any mention of W15P7T-20-R-0011, the previous solicitation number, is found within this announcement, please disregard as the new

Fiscal Year 2021 number for this action is W15P7T-21-R-0001.

5. Attachment 0005, Pricing Template, is provided as a means of consolidating total cost/price for the proposal, but the CPFF/cost proposal shall be submitted IAW Federal Acquisition Regulation (FAR) 15.408, Table 15-2 format. Offerors are NOT required to propose against each category outlined within the LCATs tab. The purpose of this tab is to outline the experience level, education level, degree preferred, minimum years of experience, acceptable substitutions, and description of work the proposed personnel shall meet.

6. The CLIN structure illustrated in Section B of this RFP shows the structure to be used throughout the life of this IDIQ.

7. Proposals in response to this RFP, W15P7T-21-R-0001, are due by 23 December 2020 no later than 5:00pm (Eastern Time). Offerors are encouraged to submit their proposals earlier than the aforementioned time, if at all possible, to avoid any potential IT problems that could render their submission late. Should they submit any part of their proposal after 23 Dec 2020, 5:00pm (Eastern Time), they shall be considered non-responsive.

*** END OF NARRATIVE A0001 ***

2 171

W15P7T-21-R-0001 REPRINT

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 BASE PERIOD- PROGRAM MANAGEMENT $ _______________________________ __________________

SERVICE REQUESTED: BASE PD- PROGRAM MGMT

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 BASE PERIOD- ENGINEERING DEVELOPMENT $ ____________________________________ __________________

SERVICE REQUESTED: BASE PD- ENGR DEVLP

CLIN CONTRACT TYPE:

Cost Plus Fixed Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0003 BASE PERIOD-MATERIALS $ _____________________ __________________

SERVICE REQUESTED: BASE PD- MATERIALS

CLIN CONTRACT TYPE:

Cost No Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0004 BASE PERIOD- TRAVEL $ ___________________ __________________

3 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: BASE PD-TRAVEL

CLIN CONTRACT TYPE:

Cost No Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0005 BASE PERIOD- OTHER DIRECT COST $ ______________________________ __________________

SERVICE REQUESTED: BASE PD- ODC

CLIN CONTRACT TYPE:

Cost No Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0006 CONTRACTOR MANPOWER REPORTING 1 LO $ ** NSP ** _____________________________ __________________

SERVICE REQUESTED: CONTRACTOR MANPOWER REPORTING

Reporting shall be performed IAW SOW paragraph 6.1.8.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

1000 Basic CLIN for ELIN ___________________

4 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

THe below ELIN's are associated with the Data Item

Numbers on the Contract Data Requirements List (CDRL)

(DD Form 1423), in Section J.

(End of narrative A001)

A001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CONFERENCE AGENDA

Submit Conference Agenda in accordance with DI-ADMN-

81249B. The Government requires 15 days to provide comments/approval. The contractor shall take no more than 5 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted 3 weeks prior to each event for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

A002 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CONFERENCE MINUTES

Submit Conference Minutes in accordance with DI-ADMN-

81250B. The Government requires 15 days to provide comments/approval. The contractor shall take no more than 5 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013

5 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted 2 weeks after each event for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

A003 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: PRO PROTECT IMPLMNTATION PLAN

Submit Program Protection Implementation Plan in accordance with

DI-ADMN-81306. The Government requires 15 days to provide comments/approval. The contractor shall take no more than 5 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

60 days after ADAD for the duration of the period of performance. Also required at each Milestone Review and if CPI is identified.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.Submit Program

Protection Implementation Plan in accordance with

DI-ADMN-81306. The Government requires 15 days to provide comments/approval. The contractor shall take no more than 5 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

6 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

60 days after ADAD for the duration of the period of performance. Also required at each Milestone Review and if CPI is identified.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

B001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: TEMPEST CONTROL PLAN (TCP)

Submit TEMPEST Control Plan (TCP) in accordance with

DI-EMCS-81687. The Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per

Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

45 days after CDR for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

B002 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

7 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: TEMPEST TEST (TT) PLAN

Submit TEMPEST Test Plan in accordance with DI-EMCS-

81683. The

Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

60 days prior to TT for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

B003 TEMPEST TEST AND EVALUATION REPORT 1 LO $ ** NSP ** __________________________________ __________________

SERVICE REQUESTED: SERVICE DATA ITEM- NOT PRICED

Submit TEMPEST Test Plan in accordance with DI-EMCS-

81684. The

Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

60 days prior to TT for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

8 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

C001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: TRAINING MATERIALS

Block 8: Government approval will be required in order to successfully complete the New Equipment

Training (NET), Instructor Operator Training (IOT), and Maintenance Training.

The contractor shall meet safety standards IAW local, state, and federal regulations.

Block 9: Distribution authorized to the department of

Defense and US. Department of Defense Contractor only due to critical technology, effective ( date). Other requests for this document shall be referred to COR or Contracting Officer, Or when requested by the

Government

Block 12: Draft training materials including NET, IOT, and MT submission shall be due 30 days prior to

Production Readiness Review (PRR).

Block 13: Revisions as needed throughout contract period of performance

The contractor shall deliver the final incorporating all Government comments and recommendations 30 days prior to the start of training and fielding.

Block 14: Contractor shall provide up to 15

(HARDCOPY) copies to facilitate the conduct of the

NET and IOT training.

Block 14: Reproducible shall be delivered on electronic format via electronic mail software, CD or

DVD media and shall be compatible with Microsoft

Office 2013.

The Government shall have 15 (fifteen) calendar days to incorporate Government Comments.

Contractor Format is acceptable.

(End of narrative B001)

9 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

D001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: ENG DOCUMENTATION INFORMATION

Submit Engineering Documentation Information in accordance with DI-EDRS-80410. The Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

30 days after H/W PCA and updated as required for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: MANAGEMENT PLAN

Submit in accordance with DI-MGMT-81797. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to include Government comments and changes. MS Office 2013 products and PDF) is

10 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted on the 15th of each month and on revisions to plan basis for the entire Period of Performance of the

Task Order.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E002 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CTR PROGRESS STATUS REPORT

Submit in accordance with DI-MGMT-81797. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to include Government comments and changes. MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted on the 15th of each month and on revisions to plan basis for the entire Period of Performance of the

Task Order.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

11 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

E003 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: STATUS REPORT

Submit in accordance with DI-MGMT-80368A. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per

Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted on the 20th of each month and on a monthly basis for the entire Period of Performance of the Task Order.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E004 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: INT PRGM MNGMT DTA ANLY RPT

Submit in accordance with DI-MGMT-81650B. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per

Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

15 days ADAD initially,then due on the 15th of each monthly for the duration of the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification

12 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

shall be provided to the Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E005 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CONTRACTOR RISK MNGMNT PLAN

Submit in accordance with DI-MGMT-81808. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

15 days ADAD initially,then due on the 15th of each month for the duration of the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E006 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: RISK MANAGEMENT STATUS REPORT

Submit in accordance with DI-MGMT-81809. The

Government requires 30 days

13 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

15 days ADAD initially,then due on the 15th of each month for the duration for the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E007 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CNTRCT WRK BRKDWN STRC (CWBS)

Submit in accordance with DI-MGMT-81809. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is Government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

15 days ADAD initially,then due on the 15th of each month for the duration for the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

14 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

E008 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: BRIEFING MATERIAL

Submit in accordance with DI-MGMT-81605. The

Government requires 30 days to provide comments/approval.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is government readable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted 2 weeks prior to each meeting or conference for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E009 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: STAT OF GOV FRNHD EQUIP (GFE)

Submit in accordance with DI-MGMT-80269. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

Monthly IAW basic contract

GFE requirements. 10% on a monthly basis and 100% yearly for the duration of the period of performance

Block 14: Distribution shall consist of submission of

15 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E010 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: GOV PRPRTY INVNTRY RPRT (GFP)

Submit in accordance with DI-MGMT-80441D. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

Monthly IAW basic contract

GFE requirements. 10% monthly and 100% yearly inventory for the duration of the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E011 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CNTRCT GOV FRNSHD MAT (GFM)

16 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Submit in accordance with DI-MGMT-82128. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

Monthly IAW basic contract

GFE requirements. 10% monthly and 100% yearly inventory for the duration of the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E012 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: DMNHD MAN SRC MAT STG (DMSMS)

Block 4: Format shall be in accordance with this Data

Item Description and PWS (##).

Block 7: The Letter of Transmittal shall be annotated to reflect of additional submittal are to be furnished or if this is the final submittal of data . The Letter of Transmittal shall be use only for this data item; do not combine other data item submittal with this requirement.

Block 8: Within 60 (sixty) calendar days of known obsolescence issue, contractor will submit a draft Diminishing Sources and Material

Shortages (DMSMS) management Plan.

Withing 60 (sixty) calendar days of receipt and through the Government Contracting officer, Government engineer will respond with notice of review and/or comments. If comments, contractor shall respond withing 30

(thirty) calendar days after receipt of

Government comments. The Government will have 30

(thirty) calendar days notice of review and/or, accept, and/or comment of the final submission.

17 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Block 9: Distribution Statement B. Distribution authorized to U.S. Government agencies

(Administrative/Operational Use)(Data of Contract

Award). Other requests for this document shall be referred to the Contracting

Officer.

Block 14: Reports shall be submitted via electronic mail through the COR. Documents shall be compatible with Microsoft Office 2013.

Contractor format is acceptable.

WARNING: This document contains technical data whose export is restricted by the Arms

Export Control Act (Title 22, U.S.C., Sect 2751, et seq.), or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 at seq.), as amended. Violation of these export laws are subject to sever criminal penalties. Disseminate in accordance with provisions of DoD

Directive 5230.25.

Destruction Notice: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

DD Form 250 will be required via the Wide Area Work-flow website in order for the contractor to receive payment for the data deliverable. E-mail notification is require with any electronic submitting.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E013 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: OPSEC PLAN

Submit in accordance with DI-MGMT-80934C. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

(90) calendar days from contract award and updated yearly for the duration of the period of performance

Block 14: Distribution shall consist of submission of

18 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E014 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: PHASE-OUT TRANSITION PLAN

Submit in accordance with DI-MGMT-81945. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Blocks 11, 12 and 13: Item shall be submitted (90) calendar days prior to contract end or PoP

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E015 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: STATUS REPORT

Submit in accordance with DI-MGMT-80368A. The

19 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted two weeks after trip is completed for the duration of the period of performance

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E016 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: TEST AND INSPECTION PLN (TIP)

Submit Test and Inspection Plan in accordance with DI-

MGMT-82062. The

Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

30 days prior to TRR for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

20 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

E017 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: INFO SYS SEC (INFOSEC) AN PLN

Submit in accordance with DI-MISC-81717D. The

Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

30 days prior to SRR for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E018 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: RISK MNGMNT FRMWRK (RMF) PCKG

Submit Risk Management Framework in accordance with

DI-MGMT-82001A.

The Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format.

21 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Block(s) 10, 11, 12 and 13: Initial item shall be submitted 30 days prior to SRR and final item 30 days prior to CDR for the duration of the period of performance.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E019 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: ITM UNQ ID MRKG ACTVY VLD VRF

Block 4: IUID Report is required to identify mandated

IUID requirements in accordance with MIL-STD-130 N (or the latest) and MIL-STD-129 R

(or the latest).

At a minimum, the following IUID date elements are required:

-IUD Type items description

-Unique item identifier

-Unit of Measure

- Issued Agency

-Enterprise Identification number

-Contract Number

-Original part, LOT or Batch Number

-Current Part Number

-Serial Number

-Shipment Acceptance date

-Ship to DODAAC Code

Block 9: Distribution Authorized to the department of

Defense and US. Department of

Defense Contractors only due to critical technology.

Other requests for this document shall be referred to COR or Contract Officer.

Block12: Shall be due 30 (THIRTY ) calendar days after Production Readiness Review

(PRR) and provide delivery at time of Government acceptance. For the first time delivery the contractor shall provide a report of all the data reported to the IUID registry for all items that require IUID markings

Block 13: Revisions as needed throughout period of performance for the contract.

Block 14: Each submission shall be delivered in a electronic format via electronic mail software compatible with Microsoft Office 2013, CD or

22 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DVD Media.

The Government shall have 30 (thirty) calendar days for review and acceptance or rejection of each submission. The Contractor shall have 15

(fifteen) calendar days to incorporate government comments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E020 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: TECH MAN (VLDTN CMPLTN RPT)

Block 4 : Contractor format is acceptable.

Block 8: Government Approval will be required.

Block 9: Distribution Authorized to the Department of

Defense and US. Department for

Defense Contractors only due to critical technology.

Other requests for this document shall be referred to COR or Contracting Officer.

Block 12: The draft shall be due 30 calendar days after TRR

Block 13; Final shall be due 30 (thirty) days prior the Government Verification commencement. Revisions as needed throughout period of performance of the contract.

Block 14: Reproducible shall be delivered in electronic format via electronic mail software, CD or DVD Media and shall be compatible with

Microsoft Office 2013.

The Government will have 30 (thirty) calendar days for review and acceptance of rejection of each submission.

The contractor shall have 15 (fifteen) calendar days to incorporate Government comments.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

23 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

E021 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: DATA ACCESSION LIST (DAL)

Submit in accordance with DI-MGMT-81453B. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file in a search-able and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

Upon Award

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E022 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: TRANSITION PLAN

Submit Engineering Data for Provisioning (EDFP) in accordance with

DI-MGMT-80790. The Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Due at LRIP start, final is due 30 days after completion of LRIP

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

24 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

E023 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: SUP CHN RSK MNGMNT PLN (SCRM)

Submit in accordance with DI-MGMT-82256. The

Government requires 30 days to provide comments/approval. the contractor shall take no more than 10 days to make any corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is searchable and in a non-imaged format.

Block(s) 10, 11, 12 and 13: Item shall be submitted

30 days ADAD initially,then due 5 days after update or changes as required

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

F001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CORRSN PREVENT AND CNTRL PLN

Submit Corrosion Prevention and Control Plan in accordance with

DI-MFFP-81403A. The Government requires 30 days to provide comments/approval. The contractor shall take no more than 10 days to make any

25 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

corrections as per Government comments.

Contractor's Format (compatibility MS Office 2013 products and PDF) is acceptable as long as the file is search-able and in a non-imaged format. Additional formating and requirements are found in the DID.

Block(s) 10, 11, 12 and 13: Item shall be submitted

30 days prior to CDR for the duration of the period of performance including any changes, comments or recommendations.

Block 14: Distribution shall consist of submission of electronic copies via secure means; notification shall be provided to the

Government points of contact.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

F002 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: PAGE-BASED TECHNICAL MANUALS

Block 4: Contractor Format is not acceptable. Manual

Content will be in accordance with tailored MIL-STD-40051-2C. This CDRL is related to

CDRL DI-SESS-81359B TM

development.

Block 8: Government approval will be required in order to successfully complete the

Technical Manuals.

Block 9: Distribution Authorized to the Department of

Defense and US. Department of

Defense contractors only due to critical technology, effective (NEED date). Other requests for this document shall be referred to the US Army

PEO C3T, SFAE-CCC-NE.

Block 10: The requirements matrix for Technical manuals is based on 30%, 70%, 100% validation deliverable, the verification deliverable and the FRC deliverable.

When approximately each (%) of the technical manual is completed prior to Validation, the contractor shall deliver Extensible Markup Language

(XML) - tagged data files that are compliant with the Document Type Definition (DTD) and style sheet in accordance with the applicable MIL-STD-40051. The Government will have 30 (thirty) calendar days to review the XML source code and provide comments back

26 171

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

to the contractor for incorporation. The contractor will have 15 (fifteen) days to incorporate the changes.

Block 12: Draft Shall be due 30 days after Test

Readiness Review.

Block 13: Final shall be due 30 (thirty) calendar days after Government verification.

Block 14: Reproducible copy (generated from the XML source File) shall be delivered via electronic mail to the PEO C3T, Pl NET E Contractor

Specialist ( POC) . The reproducible format shall be in adobe PDF in accordance with the

MIL-STD-40051-2C. In addition, a final approved copy in Adobe PDF (CD Format) will be fielded to each site. Reproducible delivery shall consist of the document type definition (DTD), style sheets (I.E. FOSI, XSL-T), Extensible Markup language (XML) , and

Supporting Graphics in accordance with

MIL-STD-2361C.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

G001 Service Data Item - Not Priced $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: COUNTERFEIT PREVENTION PLAN

Submit Counterfeit Prevention Plan in accordance with

DI-MISC-81832. The

Government requires 30 days to provide comments/approval.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .