This is Addendum Two to an Invitation to Bid (ITB-2526-119) issued by North Clackamas School District No. 12 in Clackamas County, Oregon, for Vocera electrical infrastructure installation. The addendum, dated March 24, 2026, removes Group 5 locations (Sabin Schellenberg North Campus, Sabin Schellenberg South Campus, Agricultural Land Lab, and New Urban High School) from the original scope of work in their entirety. Additionally, the addendum provides corrected floor plan maps for three school locations—Rex Putnam High School, Beatrice Morrow Cannady, and Milwaukie High School—with yellow highlighting indicating the location of electrical panels and panel rooms. These revised maps supersede and replace the original versions contained in Exhibit D of the Vocera Electrical ITB Specifications. The addendum includes attachments consisting of electrical panel photos and the three corrected floor plan maps.
The removal of Group 5 locations represents a material reduction in the project scope from the original solicitation, which originally encompassed 23 school facilities organized across five feeder groups. Bidders must acknowledge receipt of this addendum and notify all affected subcontractors of the changes. The revised floor plans are critical deliverables for accurate bid preparation, as they clarify electrical infrastructure locations necessary for the installation of dedicated outlets and circuits to support Vocera push-to-talk communication device charging stations. No pricing adjustments, set-aside requirements, or funding modifications are addressed in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH CLACKAMAS SCHOOL DISTRICT
VOCERA ELECTRICAL INFRASTRUCTURE INSTALLATION
(ITB-2526-119)
ADDENDUM TWO (2) 24 March 2026
PAGE 1 OF 1 (Plus Listed Attachments)
THE FOLLOWING CHANGES, ADDITIONS, AND DELETIONS TO THE CONTRACT DOCUMENTS
POSTED 24 MARCH 2026 HEREBY BECOME A PART OF THE CONTRACT DOCUMENTS.
NOTIFY ALL SUBCONTRACTORS AFFECTED BY THIS ADDENDUM.
ATTACHMENTS TO THIS ADDENDUM:
1. Electrical panel photos
2. Corrected Rex Putnam High School Floor Plan
3. Corrected Beatrice Morrow Cannady Floor Plan
4. Corrected Milwaukie High School Floor Plan
ADDENDUM ITEM 1: REMOVAL OF GROUP 5 LOCATIONS
The District no longer requires electrical infrastructure installation at the Group 5 locations originally listed in Exhibit D - Vocera Electrical ITB Specifications. Consequently, Group 5 is hereby removed from the scope of ITB-2526-119 in its entirety.
The following locations are struck from the solicitation:
● Sabin Schellenberg North Campus
● Sabin Schellenberg South Campus
● Agricultural Land Lab
● New Urban High School
ADDENDUM ITEM 2: REVISED FLOOR PLAN MAPS
Floor plans for the locations listed below have been updated to reflect the correct locations of electrical panels and panel rooms. These revised maps supersede and replace the original versions found in Exhibit D - Vocera Electrical ITB Specifications.
● Rex Putnam High School: Updated map includes yellow highlighting to indicate electrical panel.
● Beatrice Morrow Cannady: Updated map includes yellow highlighting to indicate electrical panel.
● Milwaukie High School: Updated map includes yellow highlighting to indicate electrical panel room.
END OF ADDENDUM TWO (2)
OREGON TRAIL ELEMENTARY
ADRIENNE NELSON HIGH SCHOOL
VERNE DUNCAN ELEMENTARY
RIVERSIDE ELEMENTARY
VIEW ACRES ELEMENTARY
BILQUEST ELEMENTARY
ALDERCREEK MIDDLE SCHOOL
LOT WHITCOMB ELEMENTARY
LEWELLING ELEMENTARY
ARDENWALL ELEMENTARY
MILWAUKIE EL PUENTE ELEMENTARY
MOUNT SCOTT
SPRING MOUNTAIN
BEATRICE MORROW CANNADY
SUNNYSIDE
ROCKCREEK
CLACKAMAS HIGH
MILWAUKIE HIGH