Van_Ave_Park_Seawall_R2.pdf

PDF 11 MB Posted

Attached to
Van Avenue Seawall Project
Solicitation number
25-B-104IF
Issued by
Volusia County, Florida

About this file

This document comprises construction drawings and technical specifications prepared by Dredging & Marine Consultants for Volusia County's Van Avenue Park Seawall Project located at 3101 South Atlantic Avenue, Daytona Beach, Florida 32118. The project addresses hurricane damage sustained during the 2022 hurricane season by replacing the existing damaged concrete seawall with UC-95 composite sheet pile panels to protect the upland park and facilities from future storm events. The scope of work includes demolition of approximately 34 linear feet of existing concrete cap and 27 linear feet of concrete sheet pile, installation of 38 linear feet of proposed UC-95 composite sheet pile measuring 24 feet in length, installation of a new concrete cap with helical anchor systems, sidewalk replacement totaling 40 feet by 7 feet, placement of approximately 100 cubic yards of beach-quality fill, and installation of aluminum railing and fencing systems. Existing facilities including the restroom, shower, vehicle beach access ramp, and stormwater utilities shall remain operational throughout construction. The project plans are dated March 27, 2025, and are classified as 100% construction documents, prepared by licensed Professional Engineer Curtis N. Todd (Florida License No. 37136).

The contractor bears responsibility for all project stakeout, survey verification, material testing, quality assurance, and compliance with state and federal environmental regulations including permits from the U.S. Army Corps of Engineers and Florida Department of Environmental Protection. All materials must comply with the more stringent of current FDOT or Volusia County standards, with concrete mixes requiring 6,000 psi compressive strength for the seawall cap and 4,500 psi for sidewalk applications. The contractor must maintain erosion control measures throughout construction, employ a certified testing laboratory for soil and material analysis, and submit comprehensive submittals including scheduling, safety plans, traffic control plans, and shop drawings prior to commencing work. A pre-construction meeting is mandatory before work begins, and the Engineer of Record must receive 72-hour advance notice of critical construction stages including demolition, pile driving, forming, and concrete placement. All removed materials shall be stored on-site with the county evaluating reuse potential, and overnight equipment parking and material storage on the beach are strictly prohibited.

View the file

Other files

File Type Posted
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUSIA

COUNTY

CVR

C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11

INDEX & LOCATION MAP

EXISTING CONDITIONS

AERIAL

DEMOLITION PLAN

SITE PLAN

SEAWALL DETAILS

SEAWALL DETAILS

SIDEWALK DETAILS

GENERAL NOTES

GENERAL NOTES

GENERAL NOTES

ENVIRONMENTAL NOTES

SURVEY

SURVEY

PROJECT ADDRESS: 3101 SOUTH ATLANTIC AVE, DAYTONA BEACH, FL 32118

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: C O

VE

R

/2

7/

INDEX

SHEET DESCRIPTION

FLORIDA

COUNTY COUNCIL

PROJECT LOCATION MAP

VOLUSIA COUNTY

BEACH ACCESS REPAIRS

CONSTRUCTION DRAWINGS

Port Orange, FL 32129 Unit 302 4643 S. Clyde Morris BlvdDredging & Marine Consultants

ENGINEERS SCIENTISTS

Phone:(386) 304-6505 Fax:(386) 304-6506 www.dmces.com

CURTIS N. TODD, P.E.

FLORIDA LICENSE No. 37136

ENGINEER CERTIFICATION:

I HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL ENGINEER IN THE

STATE OF FLORIDA PRACTICING WITH DMC, DREDGING & MARINE

CONSULTANTS LLC, A CORPORATION, AUTHORIZED TO OPERATE AS AN

ENGINEERING BUSINESS, CERTIFICATE OF AUTHORIZATION # 9410, BY THE

STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL

REGULATION, AND THAT I, OR OTHERS UNDER MY DIRECT SUPERVISION, HAVE

PREPARED OR APPROVED THE EVALUATIONS, FINDINGS, OPINIONS,

CALCULATIONS, CONCLUSIONS OR TECHNICAL ADVICE HEREBY REPRESENTED

BY THESE DRAWINGS. I CERTIFY THAT THESE DESIGN PLANS ARE IN

COMPLIANCE WITH RULE CHAPTER 62B-33.0051.

NOTE TO CONTRACTOR:

THESE DRAWINGS AND THE PROJECT SPECIFICATIONS ARE COMPLEMENTARY,

AND ANY REQUIREMENT OF ONE SHALL BE A REQUIREMENT OF THE OTHER. IT

IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE DRAWINGS AND

SPECIFICATIONS AND TO COMPARE THE REQUIREMENTS OF EACH DIVISION

AND ENSURE THAT EACH TRADE OR SUBCONTRACTOR IS MAKING THE

ALLOWANCES NECESSARY TO PROVIDE THE OWNER A COMPLETE FACILITY,

OPERATIONAL IN ALL RESPECTS, UNLESS OTHERWISE SPECIFICALLY STATED

IN THE DRAWINGS OR PROJECT MANUAL.

IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF

ANY DEFICIENCIES OR DISCREPANCIES AMONG THE DIVISIONS OF THE

DRAWING AND SPECIFICATIONS PRIOR TO THE DEADLINE FOR BID SUBMITTAL.

NEITHER THE OWNER OR ENGINEER WILL BE RESPONSIBLE FOR ANY

DEFICIENCIES OR DISCREPANCIES RAISED AFTER THE BID OPENING.

ACCORDINGLY, IN LIGHT OF THESE OBLIGATIONS, THE ENGINEER IS

OBLIGATED TO INTERPRET THE DRAWINGS SPECIFICATIONS IN A MANNER

THAT WILL PROVIDE THE OWNER WITH A COMPLETE, FUNCTIONING FACILITY

FOR THE BID PRICE.

REPRODUCTION SCALE:

THESE PLANS SHALL BE PRINTED IN COLOR AND

ARE SCALED TO ACCURATELY BE REPRODUCED ON

11X17 SIZED SHEETS. ALL OTHER SHEET SIZES ARE

NOT TO SCALE.

JEFF BROWER COUNTY CHAIR

JAKE JOHANSSON AT-LARGE REPRESENTATIVE

DON DEMPSEY DISTRICT 1

MATT REINHART VICE CHAIR, DISTRICT 2

DANNY ROBINS DISTRICT 3

TROY KENT DISTRICT 4

DAVID SANTIAGO DISTRICT 5

GEORGE RECKTENWALD COUNTY MANAGER

VAN AVENUE PARK

SECTION 35, TOWNSHIP 15 SOUTH, RANGE 33 EAST

PROJECT AREA

TROPIC SHORES

RESORT

SO

UTH ATLANTIC AVENUE

A1A

VAN AVENUE

100% PLANS

MARCH 27, 2025

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C -0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: E

XI

ST

IN

G C

O N

D

IT

IO

N

S

/2 7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

EE

RS

SC

IE

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

EXISTING CONCRETE SEAWALL AND CAP TO BE

REMOVED AND REPLACED, FACING NORTHWEST

EXISTING CONCRETE SEAWALL AND CAP TO BE

REMOVED AND REPLACED, FACING SOUTHWEST

EXISTING CONCRETE SEAWALL, BEACH

ACCESS REMAINS, FACING SOUTHEAST

DMC, 01-16-2024EXISTING CONCRETE SIDEWALK AND CAP TO BE

REMOVED AND REPLACED, FACING NORTHEAST

DMC, 01-16-2024DMC, 01-16-2024

DMC, 01-16-2024

BEACH ACCESS

TO REMAIN

RAILING TO BE REMOVED

AND STORED ON SITE.

BEACH ACCESS

TO REMAIN

FENCE TO BE REMOVED AS

NEEDED AND STORED ON SITE

FENCE TO BE REMOVED AS

NEEDED AND STORED ON SITE

AE

R

IA

L

C -0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: A

ER

IA

L

/2

7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

AERIAL

1" = 20' LABINS 2018

42 LF PROPOSED SEAWALL

AND RAILING REPLACEMENT

MEAN HIGH WATER LINE

EL.=(+)1.21

VAN AVENUE

60'-0" RIGHT OF WAY

COASTAL

CONSTRUCTION

CONTROL LINE

132'-6"

Feet 0 20 40

PROPOSED CONCRETE

SIDEWALK

PROPOSED TEMPORARY SILT

FENCING, HAY BALES, OR

FILTER SOCKS, TO BE

EMPLOYED THROUGHOUT

CONSTRUCTION DURATION

D

EM

O

LI

TI

O

N P

LA

N C

-0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: D

EM

O

/2 7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

DEMOLITION PLAN

1" = 10'

EXISTING CONCRETE

SIDEWALK TO BE

REMOVED AND REPLACED

40'±

7'±

ALL EXISTING DEBRIS TO BE

REMOVED WITHIN PROJECT AREA.

QUANTITY OF EXISTING DEBRIS TO

BE REMOVED SHALL BE DETERMINED

IN FIELD BY CONTRACTOR.6'-0"

EXISTING 34 LF CONCRETE CAP TO

BE REMOVED AND REPLACED

EXISTING SHOWER

TO REMAIN

VAN AVENUE

60'-0" RIGHT OF WAY

EXISTING METAL FENCE TO BE

REMOVED AS NEEDED, REPAIRED

AND REPLACED TO MATCH THE

EXISTING.

EXISTING CONCRETE

SEAWALL TO REMAIN

EXISTING SIDEWALK

TO REMAIN

NOTE:

· MEAN HIGH WATER LINE EL.= (+)1.21 (NOT SHOWN FOR CLARITY)

· ANY EXISTING SIGNAGE SHALL BE REMOVED AS NEEDED AND

STORED ON SITE. SIGNAGE SHALL BE REINSTALLED IN EXISTING

LOCATIONS UPON PROJECT COMPLETION.

· EXISTING CAP MUST BE CAREFULLY REMOVED TO AVOID

DAMAGE TO EXISTING CONCRETE SHEET PILE WALL PANELS

THAT ARE TO REMAIN.

· ANY HEAVY EQUIPMENT SHALL NOT BE OPERATED WITHIN 25'

OF THE EXISTING/PROPOSED SEAWALL AREAS ON THE

LANDWARD SIDE. Feet

0 10 20

EXISTING TREES

TO REMAIN (TYP.)

EXISTING CONCRETE

VEHICLE BEACH ACCESS

RAMP TO REMAIN.

EXISTING STORMWATER

UTILITIES TO REMAIN

EXISTING RESTROOM FACILITY

TO REMAIN OPEN FOR PUBLIC

USE THROUGHOUT

CONSTRUCTION DURATION.

EXISTING CONCRETE

SEAWALL RETURN

SECTION TO REMAIN

PROPOSED TEMPORARY SILT

FENCING, HAY BALES, OR SILT SOX,

TO BE EMPLOYED THROUGHOUT

CONSTRUCTION DURATION.

16± LF X 6'H FENCE TO BE REMOVED AS NEEDED

AND STORED ON SITE. COUNTY IS TO EVALUATE TO

SEE IF IT CAN BE REUSED OR TO BE REPLACED.

CONTRACTOR SHALL FIELD

VERIFY NORTH RETURN

SECTION.

6 LF OF CONCRETE SHEET PILE TO

REMAIN, CORNER CONCRETE SHEET PILE

SHALL BE REMOVED.

27'-6"±

EXISTING 27± LF CONCRETE SHEET

PILE TO BE REMOVED AND

REPLACED

1. EXISTING SHEET PILE IS BURIED UNDER CONCRETE RAMP.

CONTRACTOR SHALL SAW CUT SHEET PILE AT EL.=0.00

NAVD88. CONTRACTOR SHALL FIELD VERIFY THE LOCATION

OF SAW CUT WITH THE ENGINEER OF RECORD PRIOR TO

CUTTING SHEET PILE.

2. CONTRACTOR TO SAW CUT CONCRETE CAP AND CAREFULLY

REMOVE EXISTING REMAINING SHEET PILE PROPOSED FOR

DEMOLITION.

3. CONTRACTOR SHALL MAINTAIN STRUCTURAL INTEGRITY OF

THE EXISTING CONCRETE SLAB/BEACH ACCESS RAMP; ANY

DAMAGE TO THE CONCRETE SLAB/BEACH ACCESS RAMP

WILL BE REPAIRED AT THE CONTRACTORS EXPENSE.

25± LF X 3'-6"H ALUMINUM RAILING TO BE

REMOVED AND STORED ON SITE. COUNTY TO

EVALUATE TO SEE IF IT CAN BE REUSED OR

TO BE REPLACED.

5'-6" LF X 6'H FENCE TO BE REMOVED AND

STORED ON SITE. COUNTY IS TO EVALUATE

TO SEE IF IT CAN BE REUSED OR REPLACED.

SI

TE

P

LA

N

C -0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: S P

/2

7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

SITE PLAN

1" = 10'

Feet 0 10 20

PROPOSED CONCRETE

SIDEWALK, TOP OF SIDEWALK

SHALL BE FLUSH WITH EXISTING

40'-0"

7'-0"

PROPOSED BEACH QUALITY FILL. TOP OF GRADE

EL.=(+)12.33± NAVD88. APPROXIMATE VOLUME = 100 CY.

REFER TO BEACH QUALITY FILL NOTE TITLED "FILL

MATERIAL AND SURFACE TREATMENT" IN GENERAL

NOTES ON SHEET C-08.

EXISTING SHOWER

EXISTING CONCRETE

SEAWALL TO REMAIN

EXISTING

SIDEWALK

NOTE:

· MEAN HIGH WATER LINE EL.= (+)1.21 (NOT SHOWN FOR CLARITY)

· ANY EXISTING SIGNAGE SHALL BE REMOVED AS NEEDED AND

STORED ON SITE

· ANY HEAVY EQUIPMENT SHALL NOT BE OPERATED WITHIN 25'

OF THE EXISTING/PROPOSED SEAWALL AREAS ON THE

LANDWARD SIDE.

35"

EXPANSION JOINT (TYP.)

VAN AVENUE

60'-0" RIGHT OF WAY EXISTING CONCRETE

VEHICLE BEACH ACCESS

RAMP TO REMAIN.

EXISTING STORMWATER

TRENCH DRAIN TO REMAIN

EXISTING CONCRETE

SEAWALL RETURN

SECTION TO REMAIN

EXISTING TREES

TO REMAIN (TYP.)

EXISTING RESTROOM FACILITY

AND PAVILION STRUCTURE TO

REMAIN OPEN FOR PUBLIC

USE THROUGHOUT

CONSTRUCTION DURATION.

PROPOSED TEMPORARY SILT

FENCING, HAY BALES, OR FILTER

SOCKS, TO BE EMPLOYED

THROUGHOUT CONSTRUCTION

DURATION.

EXISTING METAL FENCE TO BE

REMOVED AS NEEDED, REPAIRED

AND REPLACED TO MATCH THE

EXISTING.

30.0°

PROPOSED

HELICAL ANCHORS

SPACED C.C. (TYP.)

PROPOSED 44 LF

CONCRETE CAP

6 LF OF CONCRETE SHEET PILE TO REMAIN,

CORNER CONCRETE SHEET PILE SHALL BE

REMOVED. CONTRACTOR SHALL MAINTAIN

STRUCTURAL INTEGRITY OF THE EXISTING

CONCRETE SLAB/BEACH ACCESS RAMP; ANY

DAMAGE TO THE CONCRETE SLAB/BEACH

ACCESS RAMP WILL BE REPAIRED AT THE

CONTRACTORS EXPENSE.

PROPOSED 38 LF UC-95

COMPOSITE SHEET PILE

10'-0"

16'-6"± X 6'H ALUMINUM FENCE TO BE

INSTALLED. FENCE SHALL MATCH

EXISTING ALUMINUM FENCE ON SITE.

12'-6"± X 6'H ALUMINUM FENCE.

CONTRACTOR SHALL WORK WITH COUNTY

TO FIELD VERIFY QUANTITY OF ALUMINUM

FENCE TO BE REUSED AND REPLACED.

28'-0"

6'-0"

6'-0"

8'-0"

25± LF X 3'-6"H ALUMINUM RAILING TO

BE INSTALLED. CONTRACTOR SHALL

WORK WITH COUNTY TO VERIFY TO

BE REUSED OR REPLACED.

B B

A

A

SE

AW

AL

L

D

ET

AI

LS

C -0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: S

EA

W

AL

L

/2 7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

CONCRETE CAP - CROSS-SECTION

1" = 1'

CONCRETE MIX:

1. f'c ≥ 6,000 psi

2. w/c ≤ 0.40

3. 6% MICROSILICA

4. NO PEA GRAVEL

5. OTHER SPECIFICATIONS, SEE GENERAL NOTES

HELICAL ANCHOR NOTES:

1. HELICAL ANCHOR MINIMUM LOAD SHALL BE 58 KIPS.

2. CONTRACTOR SHALL PERFORM THREE (3) LOAD TESTS OR

APPROVED EQUIVALENT TESTS PER MANUFACTURERS

RECOMMENDATIONS TO CONFIRM HELICAL ANCHORS HAVE

ACHIEVED THE REQUIRED LOADING. LOAD TESTS SHALL BE

SUBMITTED TO THE ENGINEER OF RECORD FOR APPROVAL.

3. HELICAL ANCHOR SPACING SHALL BE SPACED C.C.

4. CONTRACTOR SHALL SUBMIT PROPOSED HELICAL ANCHOR

PRODUCT TO ENGINEER OF RECORD FOR APPROVAL PRIOR TO

ORDERING AND INSTALLING.

ALUMINUM RAILING NOTES:

1. 4-BOLT ANCHORAGE.

2. ALL HARDWARE SHALL BE 316 STAINLESS STEEL.

3. NYLON WASHERS SHALL BE PLACED BETWEEN ALL STAINLESS

STEEL AND ALUMINUM COMPONENTS.

4. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL

PRIOR TO ORDERING.

(4) 30" LONG, 13

4" DIA., S.S.,

SMOOTH, GREASED (BOTH

SIDES) DOWELS CENTERED

ON EXPANSION JOINT.

DOWELS PLACED LEVEL,

IN-LINE WITH LONG AXIS OF

CAP AND 11

2" FROM ANY

REINFORCEMENT OR

SHEET PILE

2"

CMI UC-95 SHEET PILE,

LENGTH = 24'-0" (TYP.)

17"

24"

12" MIN.

SHEET-PILE

EMBEDMENT

PROPOSED HELICAL

ANCHOR SYSTEM

36"

4" CHAMFER

WATERSIDE TOP

AND BOTTOM

2"

4" CLEAR

COVER,

ALL SIDES

2" OUT-TO-OUT STIRRUP

2" OUT-TO-OUT

STIRRUP

(12) No.8 REBARS

SPACED EQUALLY

AS SHOWN

No.3 STIRRUP

SPACED AT 12" O.C.

7" 7" 7" 7"7"

15°

CONCRETE CAP IN-LINE EXPANSION JOINT PLAN

1" = 1'

No.8 REBARS, SPACED

EQUALLY AS SHOWN (TYP.)

No.3 STIRRUP SPACED

AT 12" O.C. (TYP.)

6" TO FIRST

STIRRUP (TYP.)

36"

CMI UC-95 SHEET PILE,

LENGTH = 24'-0" (TYP.)

8" CLOSED-CELL,

NEOPRENE, FULL W X H

PROPOSED HELICAL

ANCHOR SYSTEM

PROPOSED 4"

SQUARE OR ROUND

S.S. DOCK WASHER

WITH S.S. BEVELED

WASHER AND NUT

(4) 30" LONG, 13

4" DIA., S.S., SMOOTH,

GREASED (BOTH SIDES) DOWELS

CENTERED ON EXPANSION JOINT.

DOWELS PLACED LEVEL, IN-LINE WITH

LONG AXIS OF CAP AND 11

2" FROM

ANY REINFORCEMENT OR SHEET-PILE

4" CLEAR COVER,

ALL SIDES

7" (TYP.)

NOTE:

1. CONTRACTOR SHALL MAINTAIN STRUCTURAL INTEGRITY OF

THE EXISTING CONCRETE SLAB/BEACH ACCESS RAMP. ANY

DAMAGE TO THE STRUCTURES SHALL BE REPAIRED AT THE

CONTRACTORS EXPENSE.

2. PROPOSED END OF CONCRETE CAP, CONTRACTOR SHALL

FIELD VERIFY LOCATION OF EXISTING SEAWALL LOCATED

NORTH OF PROPOSED SEAWALL AND SHALL COORDINATE

WITH THE ENGINEER OF RECORD FOR OFFICIAL STAKEOUT

OF LOCATION OF PROPOSED SHEET PILE. NORTH CORNER PLAN VIEW

1" = 3'

NOTE: REBARS AND DOWELS ARE

NOT SHOWN FOR CLARITY

EXISTING RAILING TO BE

PLACED AND REINSTALLED

EXISTING CONCRETE

SHEET PILES AND CAP

TO REMAIN (TYP.)

PROPOSED

CONCRETE PLUG WITH

(4) No.8 REBAR

SPACED AS SHOWN.

BOTTOM OF PLUG

SHALL BE LOCATED AT

EL.= 0.00' NAVD 88

PROPOSED

CONCRETE CAP (TYP.)

UC-95 SHEET PILE,

LENGTH = 24'-0" (TYP.)

UC-95 SHEET PILE,

LENGTH = 24'-0" (TYP.)

7" (TYP.)

No.8 REBARS, SPACED EQUALLY AS

SHOWN (TYP.)

No.3 STIRRUP

SPACED AT 12"

O.C. (TYP.)

8" CLOSED-CELL,

NEOPRENE, FULL

W X H (TYP.)

NOTE: RAILING NOT

SHOWN FOR CLARITY

EXISTING CONCRETE

SHEET PILES AND CAP

TO REMAIN (TYP.)

(4) 30" LONG, 13

4" DIA., S.S., SMOOTH,

GREASED (BOTH SIDES) DOWELS

CENTERED ON EXPANSION JOINT.

DOWELS PLACED LEVEL, IN-LINE WITH

LONG AXIS OF CAP AND 11

2" FROM

ANY REINFORCEMENT OR SHEET-PILE

36" (TYP.)

4" CLEAR COVER

AT ALL SIDES

NORTH CORNER DETAIL

1" = 3'

SE

AW

AL

L

D

ET

AI

LS

C -0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: S

EA

W

AL

L (2

3/

/2

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

ELEVATION A-A

1" = 4'

PROPOSED UC-95

SHEET PILE,

LENGTH = 24'-0"

(TYP.)

PROPOSED

CONCRETE CAP

EXISTING CORNER

SHEET PILE TO BE SAW

CUT AND REMOVED TO

EL.= 0.00' NAVD 88

DEMOLITION ELEVATION A-A

1" = 4'

TOP OF CAP

EL.=(+)12.33' NAVD 88

(MATCH EXISTING)

EXISTING RAILING TO

BE REMOVED AND

STORED ON SITE

EXISTING CONCRETE

SHEET PILES TO BE

REMOVED (TYP.)

EXISTING VEHICLE

BEACH ACCESS

RAMP TO REMAIN

SAW CUT LIMIT

EXISTING CONCRETE

SHEET PILES TO

REMAIN

EL.=0.00' NAVD 88

EXISTING CONCRETE

CAP TO BE REMOVED

AND REPLACED

EXISTING VEHICLE

BEACH ACCESS

RAMP TO REMAIN

EXISTING CONCRETE

SHEET PILES TO

REMAIN

EL.=0.00' NAVD 88

TOP OF CAP

EL.=(+)12.33' NAVD 88

(MATCH EXISTING)

EXISTING RAILING TO

BE PLACED AND

REINSTALLED

PROPOSED CONCRETE

PLUG. TOP OF PLUG

SHALL BE FLUSH WITH

BOTTOM OF CAP.

TOP OF CAP

EL.=(+)12.33' NAVD 88

(MATCH EXISTING)

EXISTING RAILING TO

BE REMOVED AND

STORED ON SITE

EXISTING

CONCRETE CAP

TO REMAIN

EXISTING CORNER

SHEET PILE TO BE SAW

CUT AND REMOVED TO

EL.= 0.00' NAVD 88

EXISTING CONCRETE

SHEET PILES TO

REMAIN (TYP.)

SAW CUT

LIMIT

EL.=0.00' NAVD 88EXISTING CONCRETE

SHEET PILES TO

REMAIN

EXISTING VEHICLE

BEACH ACCESS

RAMP TO REMAIN

DEMOLITION ELEVATION B-B

1" = 4'

EXISTING RAILING TO BE

PLACED AND REINSTALLED

6'-0"± EXISTING

CONCRETE CAP TO BE

REMOVED AND

REPLACED

TOP OF CAP

EL.=(+)12.33' NAVD 88

(MATCH EXISTING)PROPOSED

CONCRETE CAP

EXISTING

CONCRETE CAP

TO REMAIN

PROPOSED UC-95

SHEET PILE,

LENGTH = 24'-0"

PROPOSED CONCRETE

PLUG. TOP OF PLUG

SHALL BE FLUSH WITH

BOTTOM OF CAP.

EXISTING VEHICLE

BEACH ACCESS

RAMP TO REMAIN

EXISTING CONCRETE

SHEET PILES TO

REMAIN

EL.=0.00' NAVD 88

EXISTING CONCRETE

SHEET PILES TO

REMAIN (TYP.)

ELEVATION B-B

1" = 4'

WATERWARD

6'-0"±

LANDWARD

WATERWARDLANDWARD

SOUTH CORNER PLAN VIEW

1" = 3'

EXISTING VEHICLE

BEACH ACCESS

RAMP TO REMAIN

PROPOSED

CONCRETE CAP (TYP.) UC-95 SHEET PILE,

LENGTH = 24'-0" (TYP.)

PROPOSED CONCRETE

PLUG WITH (4) No.8 REBAR

SPACED AS SHOWN.

BOTTOM OF PLUG SHALL

BE LOCATED AT EL.= 0.00'

NAVD 88

(4) 30" LONG, 13

4" DIA., S.S., SMOOTH,

GREASED (BOTH SIDES) DOWELS

CENTERED ON EXPANSION JOINT.

DOWELS PLACED LEVEL, IN-LINE WITH

LONG AXIS OF CAP AND 11

2" FROM

ANY REINFORCEMENT OR SHEET-PILE

EXISTING CONCRETE SHEET

PILE AT EL.= 0.00' NAVD 88

TO REMAIN

EXISTING CONCRETE

SHEET PILES TO

REMAIN (TYP.)

EXISTING RAILING

TO BE PLACED AND

REINSTALLED

NOTE: REBARS AND DOWELS ARE

NOT SHOWN FOR CLARITY

EXISTING CONCRETE

SHEET PILES TO

REMAIN (TYP.)

UC-95 SHEET PILE,

LENGTH = 24'-0"

(TYP.)

36" (TYP.)

7" (TYP.)

4" CLEAR COVER

AT ALL SIDES (TYP.)

No.8 REBARS, SPACED

EQUALLY AS SHOWN (TYP.)

No.3 STIRRUP SPACED

AT 12" O.C. (TYP.)

6" TO FIRST

STIRRUP (TYP.)

SOUTH CORNER DETAIL

1" = 3'

8" CLOSED-CELL,

NEOPRENE, FULL W X H

NOTE: RAILING NOT

SHOWN FOR CLARITY

SI

D

EW

AL

K D

ET

AI

LS C

-0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: S

ID

EW

AL

K

/2 7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

D

MINIMUM 12" "D"

AND MAXIMUM 12'

MINIMUM 28 DAY CONCRETE

COMPRESSIVE STRENGTH f'c = 4,500 psi

STABILIZED SUBGRADECONTRACTION JOINT

8" (TYP.)

EXPANSION JOINT

6" MINIMUM

(TYP.)

EXPANSION JOINT, CLOSED CELL

NEOPRENE, FULL W X H (TYP.)

4" MAXIMUM 11

2" MINIMUM

CONTRACTION JOINT

6" MINIMUM

(TYP.)

CONCRETE SIDEWALK DETAILS

N.T.S.

SUBGRADE NOTES:

1. THE BEARING SUBGRADE SHALL HAVE ALL ORGANIC, LOOSE, AND DELETERIOUS MATTER REMOVED AND THE REMAINING CLEAN SOIL SHALL BE SMOOTH, SOUND AND SOLID.

2. STABILIZED SUBGRADE SHALL CONSIST OF NATIVE SOILS MIXED WITH A QUANTITY OF SUITABLE (BEACH COMPATIBLE) STABILIZED MATERIAL SUFFICIENT TO ACHIEVE A MINIMUM LIMEROCK BEARING

RATIO (LBR) OF 40% OR A FLORIDA BEARING VALUE (F.B.V.) OF 75 psi. SUBGRADE SHOULD BE COMPACTED TO A MINIMUM RELATIVE COMPACTION OF 98% OF THE MATERIAL'S MODIFIED PROCTOR

(ASTM D-1557, AASHTO T-180) LABORATORY DRY DENSITY.

CONCRETE NOTES:

1. MINIMUM 28 DAY CONCRETE COMPRESSIVE STRENGTH f'c = 4,500 psi.

2. WATER-CEMENT RATIO LESS THAN OR EQUAL TO 0.45.

3. LARGE (3

4" MINIMUM) AND SMALL AGGREGATES WASHED AND FREE OF CHLORIDES OR REACTIVE CHEMICALS. AGGREGATE SHALL BE CRUSHED STONE, PO PEA GRAVEL OR ROUNDED GRAVEL.

4. REINFORCED WITH 1.5 LBS PER CUBIC YARD FIBERMESH 150 VIRGIN HOMOPOLYMER POLYPROPYLENE MULTI-FILAMENT FIBERS CONTAINING NO OLEFIN MATERIALS.

5. EXPANSION JOINTS SHALL BE CLOSED-CELL NEOPRENE, FULL W X H, LOCATED WHERE PROPOSED SIDEWALK ABUTS EXISTING CONCRETE (SIDEWALK & SEAWALL).

6. 1

2" DEEP CONTRACTION JOINTS AS-SHOWN.

G

EN

ER

AL

N O

TE

S C

-0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: G N

/2

7/

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

IMPORTANT NOTES TO BIDDERS:

1. The Contractor shall keep a pile driving log as specified in the plans and may not cut off piles until the Engineer has given approval to do so. The Contractor must provide advanced notification of a request to cut off piles so that the Engineer may make field observations, if necessary. The Engineer will not make a structure certification if the Contractor does not comply with this requirement. If a vibratory hammer, auger or jetting equipment is used to install piles, the time needed to hammer and/or jet and/or auger each post shall be recorded.

2. The Contractor shall retain all material delivery tickets, material testing reports and cut-sheets/shop drawings for manufactured products for the project and provide copies to the Engineer on a weekly basis. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.

3. The Engineer must be given advanced notice of the critical stages of construction such as initial construction stakeout, demolition, pile driving, false-work, forming and rebar placement prior to placing concrete, first cast of concrete, etc. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.

4. The location of existing utilities, utility services, facilities, and structural features shown on these plans has been determined from the information available at the time of the preparation of these plans, but do not purport to be absolutely correct and are provided for only the convenience of the Contractor. Any inaccuracy or omission in such information shall not relieve the Contractor of its responsibility to protect the existing features from damage and unscheduled interruption of service or from the responsibility to relocate utilities are required. Should a discrepancy arise between these plans and actual field conditions which would appreciably affect the execution of the plans the Contractor shall stop construction and notify the County and utility or facility owner immediately. The Contractor shall verify, prior to construction, the exact location, elevation, dimensions of all existing utilities, facilities, structures, and other features (whether or not shown in the plans). The Contractor shall be solely responsible for coordination of any utilities to be adjusted by others for the construction of this project and shall coordinate with other utilities and entitles as required to ensure the successful implementation of this project.

5. A pre-construction meeting must be scheduled before start of construction and all parties are to attend including: Owner or Owner's Representative, Engineer, Prime Contractor, Subcontractor(s), Surveyor, Applicable Tradesmen, etc. The Engineer will lead the meeting and provide a list of critical items to discuss.

6. Bidders are advised that overnight parking of equipment or storage of materials on the beach is forbidden at all times. The bid price shall include all costs associated with obtaining and securing temporary material stockpile areas and equipment lay down areas.

GENERAL:

1. Owner hereinafter refers to Owner's Representative, City, County, Town, Developer or

Private Entity.

2. All elevations in the project plans are referenced to feet N.A.V.D. 88.

3. The project shall be straight, plumbed, level, and elevations are correct as shown in plans.

4. Any deviation from these plans, notes or specifications must be approved in writing by the Owner or Engineer, or else the deviation will be considered construction non-compliant with the plans and specifications.

5. Any discrepancies amongst the plans, notes, specifications and other bid documents must be resolved in writing by the Owner or Engineer prior to continuing the work in question.

6. These plans, notes and specifications, along with the other components of the project bidding documents, constitute the only instructions to bidders/contractors, unless written addenda are issued.

7. All construction, manufacturing, fabrication and testing of materials shall be performed under the guidelines set forth in applicable local, state and federal codes, and/or under recommendations provided in technical publications of respected professional or industry organizations. Material testing programs, where applicable, shall be presented to the Engineer for review and approval prior to construction.

8. All products constructed or manufactured/supplied for the project shall be accompanied by industry acceptable warranties or guarantees.

9. For the purpose of these specifications. "Project Completion" is defined as completion of an agreed upon list of punchlist items compiled in a planned project walkthrough held at a time the Contractor considers the project to be "Substantially Complete". The Contractor shall notify the Owner and Engineer at least 72 hours in advance of substantial completion and schedule a mutually agreeable walkthrough.

10. A portion of the site lies within flood zones "VE" with a base flood elevation of 10.0 as indicated on Federal Emergency Management Agency Flood Insurance Rate Map Community Panel No. 12127C0386J dated September 29, 2017.

11. Any materials interfering with construction, and all abandoned utility lines, pipes, structures and other subterranean objects to be removed, shall be disposed of as directed by the Owner. All materials not claimed by the Owner shall be disposed of at the Contractor's expense in areas provided by the Contractor.

12. All materials to be removed from the existing structures per the construction plans.

13. The Contractor shall endeavor to protect private property. Any damage caused by the Contractor in the performance of his work shall be corrected to the satisfaction of the Engineer at the Contractor's expense. Payment shall not be made for this work.

14. Any damage to state, county, or local roads caused by the Contractor's hauling or excavation equipment shall be repaired by the Contractor to the satisfaction of the Engineer. Payment shall not be made for this work.

15. The construction lengths indicated in these plans are approximate. Actual limits may be set in the fields as directed by the Engineer.

16. During land alteration and construction activities, it shall be unlawful to remove vegetation by grubbing, or to place soil deposits, debris, solvents, construction material, machinery or other equipment of any kind within the dripline of a tree to remain on site unless approved by the Engineer.

17. All trimming undertaken on a tree protected by provisions of the land development code shall be pruned in accordance with the National Arborist Association (NAA) Pruning Standards.

18. The Owner and the Engineer reserve the right to perform quality assurance testing on all materials delivered to project and to reject all materials not meeting acceptable standards.

19. The Contractor shall be responsible for the complete stake-out of the project, i.e., line, grade, slope stake, utility relocations or any other stake-out that may be required to complete the project in accordance with the plans and specifications. Any and all expenses incurred for this work shall be included in the unit price bid for other items. No additional payment shall be made for this work. Contractor shall also be required to provide a certified as-built survey of the grading, drainage and earthwork improvements and meet any minimum requirements of Owner.

20. Overall cleanup shall be accomplished by the Contractor in accordance with Owner standards or as directed by the Engineer. Any and all expenses incurred for this work shall be included in the unit price bid for other items.

21. If, during construction activities, any evidence of historic resources including, but not limited to, aboriginal or historic pottery, prehistoric stone tools, bone or shell tools, historic trash pits, or historic building foundations are discovered, work shall come to an immediate stop and the client and the Florida Division of Historical Resources shall be notified within two working days.

22. All materials and construction shall be in accordance with the more stringent of the current FDOT Standards and Specifications or Volusia County Standards and Specifications.

23. Contractor shall be responsible for independently calculating all quantities for the project including earthwork. It is the Contractors responsibility to verify the Engineers estimated quantities included on the bid schedule.

24. The Contractor shall provide pumping equipment and devices to properly remove and dispose of water during construction, if needed.

25. Refer to construction pollution prevention plan for erosion control notes.

SURVEY INFORMATION:

Topographic information shown hereon from survey performed by Arc Surveying & Mapping,, Inc. October 25, 2023. Referenced on the North American Vertical Datum of 1988 (N.A.V.D.

88).

ENVIRONMENTAL AND PERMITS:

1. The U.S. Army Corps of Engineers (USACE), Florida Department of Environmental

Protection (FDEP) and the local city or county may exert jurisdiction over construction of the project. The Contractor shall be responsible to understand and comply with all applicable permit conditions imposed by the jurisdictional agencies, if permits are necessary. If not, the Contractor must at least comply with general state water quality standards for siltation and guidelines for encounters with threatened and endangered species.

2. All building and construction-related permits from the local (city or county) or state authorities are the responsibility of the Contractor.

3. The Contractor shall be responsible for penalties and/or fines levied due to work that is not in accordance with permit conditions.

4. The project includes earthwork activities located seaward of the Coastal Construction Control Line (CCCL). The Contractor is absolutely forbidden from moving nation soils located on the seaward of the CCCL to any location on the landward side of the CCCL.

The Contractor shall abide by all state regulations and permit requirements regarding the placement of imported fill seaward of the CCCL.

SUBMITTALS:

All submittals shall be made to the Engineer of Record for review and approval, in writing, prior to ordering and before construction. Submittals also include but are not limited to, shop drawings, mark-up drawings, sketches, cut-sheets, product literature, additional specifications, photographs and letters.

Submittals list:

1. Schedule for completion of work with tasks and durations defined.

2. Shipping, Stockpile and Site Administration Plan (SSSAP).

3. Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker's parking and construction equipment.

4. Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site. See "Site Safety" heading.

5. Complete list of required shop drawing submittals shall be provided by the Engineer at the preconstruction meeting.

6. Changes, alternates or other methods different from project plans must be approved, in writing, via submittals required by the Engineer and/or Owner.

7. After completing the punchlist in the field, the Contractor must submit a itemized punchlist, as-built survey and record drawings for final changes and the Engineer of Record approving in writing.

8. The Contractor shall be responsible for keeping a log of change orders, RFI's and shop drawings. The log shall be updated and available upon request.

INSPECTION COORDINATION:

1. The Engineer will be conducting routine observations and observations at critical stages of construction. A minimum of 72 hours notice shall be given to the Engineer prior to commencing the critical stages of construction. In general, critical stages are the initial work on the major structure components. Examples of critical stages of construction include: initial construction stakeout, demolition, pile driving, false-work, forming and rebar placement prior to placing concrete, first cast of concrete, etc. The local city or county may perform their own construction observations in addition to the Engineer. No observers other than the Engineer or his/her designated representative shall have the authority to determine compliance with plans and specifications.

2. Other observers may relay information to the Engineer, but it will be the Contractor's ultimate responsibility to maintain contact and resolve disputes, questions, field changes, payment requests, etc. directly with the Owner or Engineer.

CONSTRUCTION SURVEYING:

1. Stake-out survey of the project is the responsibility of the Contractor. Beginning and end points will be provided by the Owner or Engineer in the project drawings.

2. The staked project must be approved by the Engineer prior to commencing construction.

The Engineer reserves the right to make alignment changes based on conditions portrayed by the initial stakeout.

3. Methods and frequency of continuing stake-out during construction shall be submitted to the Engineer for approval prior to beginning construction.

4. The Contractor must perform an independent construction record survey (as-built survey) as a check for compliance at the end of the project. The record survey must be signed and sealed by a State of Florida Licensed Professional Surveyor. The record survey must be referenced to feet N.A.V.D. 88.

5. The Prime Contractor is advised that certification of the project elevations and alignment is required by the Engineer for final acceptance of work.

SITE SAFETY:

The Contractor shall prepare and adhere to a Site-Specific Safety Plan. The contents of the plan are:

1. Identification of potential hazards and injuries pertaining to the specific site and project.

2. Location of nearest hospital.

3. Assure availability of at least one working cell phone and one vehicle on site at all times.

4. Emergency contacts within the Subcontractor's organization and at the Prime

Contractor's organization.

5. All field personnel shall wear appropriate safety attire and utilize appropriate personal protection equipment for a given task/operation such as safety glasses/goggles, masks, shields, gloves, harnesses, hard hats, steel-toed boots,etc.

6. Safety kit shall be available onsite at all times with appropriate materials for potential hazards and injuries.

7. The Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site.

8. The Contractor shall follow all applicable local, state, and federal codes regarding site safety.

9. The Contractor shall adjust the means and methods of this plan as appropriate for maintaining site and operational safety.

SITE MAINTENANCE:

1. The Contractor shall maintain a clean and neat site, void of loose debris, trash, remnant parts or materials.

2. Trash receptacles and removal service shall be maintained by the Contractor specifically for this project. Pre-existing trash/debris facilities shall not be used to maintain the project.

3. Temporary debris piles shall be limited in number as much as practical and contained in designated areas until removal. Debris and trash shall not be scattered in areas outside the limited designated areas at any time.

4. Removal of trash/debris shall be scheduled as appropriate to not allow piles to reach five-feet in height or greater than ten-feet in diameter. Debris individually larger than these dimensions shall be removed from the site within five working days. Receptacles shall not overflow at any time.

ER

AL

N O

TE

S C

-0

D M

C J

O B

N O

C

AD

SC

AL

E

D

AT

E

D R

AW

IN

G

AP

PR

O

VE

D

C H

EC

KE

D

D R

AW

N

PR

O

JE

C

T N

AM

E:

C

LI

EN

T:

SH

EE

T N

O

D ra w in g N am e:

C :\U se rs

\n te ja da

\D re dg in g

M ar in e

C on su lta nt s\

D M

C

D oc um en ts \D

M C

P ro je ct s\

- V ol us ia C ou nt y\

-0

-4

H ur ric an e N ic ol e D un e

W al ko ve r R ep ai rs

\D ra w in gs \V an A ve P ar k

Se aw al l.d w g

B y:

n te ja da

T ab

: G N

(2

3/

/2

-2

7-

M

P

C 3D

AS

S

H O

W N

AM M

P

-0

-4

VO

LU

SI

A

C O

U N

TY

BE

AC

H A

C C

ES

S

R

EP

AI

R

S Po rt Or an ge

, F L 3

Un it 3

S

. C lyd e M or ris B lvd

Ph on e:(

6)

4-

Fa x:(

6)

4-ww w.

dm ce s.c om

D re dg in g

M ar in e

C on su lta nt s

EN

G

IN

NT

IS

TS

FL

O

R

ID

A

LI

C

EN

SE

N o.

C U

R

TI

S N

. T O

D D

, P .E

VA

N

A

VE

N U

E

PA

R K

5. Where necessary, the Contractor shall employ a Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker parking and construction equipment. The plan must be in writing, including sketches or drawings, and must be submitted to the Owner or Engineer for review and approval before commencement of any work.

6. The Contractor shall follow all applicable local, state and federal codes regarding site maintenance.

MOBILIZATION AND DEMOBILIZATION:

1. Access to near water construction areas is required for material storing, hauling, erection and construction. All facilities, public or private, used for such purposes shall be repaired to their original condition following "Completion" of the project, including grade and topping (sod, tree/vegetation cover, established road, etc.)

2. The Contractor shall present a Shipping, Stockpile and Site Administration Plan (SSSAP) to the Owner or Engineer for approval. The plan shall be specific to the project requirements for the particular materials to be delivered to the site, describing delivery points, stockpile areas, temporary debris/trash storage areas, temporary field office (including utilities maintained there), fencing, security and a statement of commitment and details for maintaining safety on the site.

3. The Owner or Engineer shall have the right to exercise reasonable alterations or additions to the SSSAP.

4. It is the Contractor's responsibility to coordinate, and pay for, necessary utilities to occupy the site and perform the work.

5. The Contractor shall not demobilize until project completion, and all parties have agreed and signed off in writing.

TECHNICAL SPECIFICATIONS FOR SITE PLAN TESTING:

1. MATERIAL

The inspection and testing of materials and finished articles to be incorporated in the work shall be made by bureaus, laboratories, or agencies approved by the Engineer of Record.

The Contractor shall submit such samples, or such special or test pieces of materials as the Engineer of Record may require. The Contractor shall not incorporate any material or finished article into the work until the results of the inspections or tests are known and the Contractor has been notified by the Engineer of Record that the material or finished article is accepted. All materials must be of the specified quality and be equal to the approved sample if a sample has been submitted. Certified copies of all tests made shall be submitted to the Engineer of Record as well as to the Owner's designated site inspector.

The Owner's designated site inspector must receive copies of all testing reports and certificates prior to the Engineer of Record requesting a final project inspection from the Owner.

2. LABORATORY CONTROL AND CERTIFICATES SPECIFICATIONS:

Sampling, testing, and laboratory methods shall be in accordance with the standard specifications of the AASHTO or ASTM. Where AASHTO or ASTM specifications are used, the reference shall be construed to be the most recent standard specifications or tentative specifications of the AASHTO or ASTM in force on the date of the test.

TEST AND CERTIFICATES:

The Contractor shall engage an approved testing laboratory to provide the following tests and certifications signed by a registered Engineer of the State of Florida. All technicians performing the tests shall be state certified for the testing performed. Additional tests that may be required by either the Engineer of Record or the Owner shall also be provided by the Contractor, and the following shall not be taken as a complete and exhaustive list of the Contractor's testing responsibilities.

a. Soil analysis for structural fill material prior to installation.

b. Proctor densities, moisture content, compacted field densities and Atterberg limits.

FILL MATERIAL AND SURFACE TREATMENT:

1. The Contractor shall provide fill material meeting the specifications and criteria of

Subsection 62B-33.005(7) of the Florida Administrative Code; the relevant portion of this subsection is given below. Only beach compatible fill shall be placed on the beach or in any associated dune system. All fill material placed seaward of the CCCL shall be sand which is similar to that already existing in the same fixed coastal cell in coloration, grain size, and composition. Beach compatible fill is material that maintains the general character and functionality of the material occurring on the beach and in the adjacent dune and coastal system. Such material shall be predominately of carbonate, quartz or similar material with a particle size distribution ranging between 0.062mm (4.0) and 4.76mm (-2.25) (classified as sand by either the Unified Soils or the Wentworth classification), shall be similar in color and grain size distribution (sand grain frequency, mean and median grain size and sorting coefficient) to the material in the existing coastal system at the placement area and shall not contain: Greater than 5 percent, by weight, silt, clay or colloids passing the #230 sieve (4.0); Greater than 5 percent, by weight, fine gravel retained on the #4 sieve (-2.25); Coarse gravel, cobbles or material retained on the 3/4 inch sieve in a percentage or size greater than found at the placement area;

Construction debris, clay balls or foreign matter; or, Material that results in cementation of the beach.

2. Fill material shall be from an upland source and shall be clean, construction-quality sand, free from organics, oils, grease and debris. The source company shall provide a sieve analysis to the Engineer for approval prior to shipping material.

3. Fill material shall be placed in maximum 12-inch lifts and compacted to minimum 98% percent optimum proctor moisture content and density. The bottom, middle and top of fill shall be tested, at the expense of the Contractor, by a qualified independent testing company. The testing company name, qualifications and contact information shall be provided to the Owner or Engineer for approval prior to commencing soil testing.

4. The filling and compaction should be performed with the smallest practical equipment to reduce surcharge on the structure during the operation. Heavy equipment shall not be operated within 25-feet of the seawall. The Contractor shall review backfilling procedure with the Engineer prior to commencing.

5. Area to be filled shall be stripped of organic materials prior to filling.

6. If any muck material is discovered, it shall be required to be removed and replaced with a suitable material that is properly filled, compacted and tested using AASHTO T-180 modified proctor method.

EROSION AND TURBIDITY CONTROL:

The following measures represent minimum standards to be adhered to by the Contractor throughout the construction of this project. The Owner reserves the right to require additional measures to be employed when warranted by extreme conditions and/or the failure of the Contractor to employ the appropriate erosion and turbidity control best management practices.

Failure to comply with these provisions shall result in the issuance of a "stop work order".

1. It shall be the responsibility of the Contractor to have all protective vegetation barricades, erosion and turbidity control structures and measures in place prior to the commencement of any work. These measures include, but are not limited to, temporary construction fences, silt fences, and floating turbidity barriers. Further, it shall be the responsibility of the Contractor to maintain all erosion control devices throughout the duration of the entire project. Maintenance shall include periodic inspection and removal of debris abutting erosion control devices.

2. Prior to the installation of any fill materials on subject site, silt fences shall be installed (1) along subject site boundary and property lines, (2) at the edge of conservation easements and wetlands, (3) adjacent to natural landscape buffers, (4) around the perimeter of existing storm water treatment facilities, and (5) at any additional areas that the Owner deems necessary to be protected from potential erosion impacts during construction. These conditions shall apply in all instances where fill material is being installed within 25-feet of any of the aforementioned locations. While these items represent the minimum requirements, the Owner reserves the right to impose additional protective measures, as determined during actual site visits conducted throughout project construction.

3. At a minimum, the Contractor shall seed and mulch all disturbed areas. Sufficient grass coverage is to be established within thirty days.

4. Soils are to be stabilized by water or other means during construction. This is intended to reduce soil erosion and the impact to neighboring communities. Adequate watering methods should be employed to allow daily coverage of the entire limits of all areas that do not have an established vegetative cover. Methods to be employed include, but are not limited to, water trucks, permanent irrigation systems, temporary sprinkler systems operated by pumping units connected to wet retention ponds, water cannons, temporary irrigation systems mounted atop stockpile areas, and other methods as deemed necessary by the Owner.

5. Any permitted demolition or removal from submerged lands or adjacent uplands shall be fully contained within siltation devices such that permit turbidity requirements and state water quality standards are met.

DEMOLITION, CLEARING AND RESTORATION:

1. Demolition or clearing may require permits. The Contractor shall acquire all necessary building permits from the local municipality prior to commencing work.

2. Clearing and removal of vegetation, rocks and debris will be required within the project structure footprint.

3. Demolition or removal of objects, debris, or material specified or obstructing construction shall take place only to the extent necessary.

4. The site shall be restored by removing and finishing all evidence of construction including temporary haul roads, vehicle ruts, stockpile areas, shoreline slopes and vegetation, sod and areas subject to project work.

AS-BUILT SURVEY AND RECORD DRAWINGS:

1. As-built survey and record drawings shall be submitted at the time of the punchlist review and shall be reviewed by the Engineer for completeness and correctness.

2. The record drawings shall be a designated set of drawings maintained on site for the purpose of hand-making all changes and deviations from the original design, no matter how slight. Color markings are preferred.

3. The record drawings shall also contain any and all field changes with respect to location, alignment, height, width, length, depth, materials, products, etc.

STEEL/MISCELLANEOUS:

1. All reinforcing steel shall be ASTM A615, Grade 60.

2. All structural steel and miscellaneous metal items (other than aluminum) shall be in accordance with structural steel, Grade 316 Stainless Steel or ASTM A36 Steel.

PILE INSTALLATION:

1. Piles hereinafter refers to post, sheet pile, concrete pile, timber pile, or composite pile

2. Provide and install concrete piles in accordance with FDOT specification 455.

3. The piles shall be of the size and length shown in the plans.

4. All piles shall be set full length with top elevation as shown in plans. Cut-offs are not allowed except for minimal required (maximum 6") to remove tops damaged by the pile driving equipment.

5. The pile-setting equipment used must be of proper size, set-up and maintenance as to not cause excessive damage to pilings. Damaged piles must be removed, discarded and replaced at the Contractor's expense. The Contractor shall provide information regarded the model and operating specifications of the pile-driving equipment to be used on the job for approval by the engineer prior to commencing pile-driving.

6. Prior to signing of the construction contract, the Contractor being considered shall have all major equipment items available for inspection. Any deficiencies in quality and quantity or type of equipment shall be corrected prior to commencing work and such correction shall be a required condition to properly fulfill the contract. This inspection and subsequent approval shall in no way relieve the Contractor from his obligation to provide all equipment required to properly perform the work.

7. The Contractor shall make an earnest attempt to drive piles to grade, utilizing alternate methods or ideas to make the grade at no additional cost to the Owner.

a. Larger hammer.

b. Alternate hammer type.

c. Tool Punch.

d. Steel "shoe".

e. Twin jetting.

f. Multiple jetting with manifold.

g. Auger

8. Cut-off of pilings is strictly not allowed unless approved by the Engineer. When requesting permission to cut off sheet piles, the Contractor shall provide a minimum of 72 hours advance notice to the Engineer to inspect the site and make recommendations.

The pile must remain "as-is" until the Engineer completes the field inspection and makes recommendations. The Engineer may request multiple driving attempts over the course of 48 hours at no additional cost to the Owner. Any pile cut off without written approval by the Engineer shall be removed and replaced at no additional cost to the Owner.

9. Contractor shall keep a pile driving log on the site at all times which shall include the following information: date, time, weather conditions, equipment used, pile location designation, blows per foot over entire…