Van_Ave._-_Bid_Tab.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
Van Avenue Seawall Project
Solicitation number
25-B-104IF
Issued by
Volusia County, Florida

About this file

This document is a bid tabulation (bid tab) spreadsheet for Hurricane Nicole Dune Walkover Repairs at Van Avenue, appearing to be a FEMA-funded coastal infrastructure restoration project. The bid tab details 15 line items for repair and reconstruction work, including mobilization, environmental compliance, demolition, excavation, concrete sidewalk installation, site restoration, sheet pile installation, concrete capping, helical anchors, and aluminum fencing. Quantities range from 1 lump sum items to specific linear feet and square yard measurements, with notable elements including 100 cubic yards of imported beach quality fill, 32 square yards of concrete sidewalk, 38 linear feet of composite sheet pile, and 29 linear feet of aluminum fencing.

Despite the comprehensive line-item breakdown, the current bid tab shows zero dollar amounts for all items, suggesting this may be a preliminary document or template awaiting contractor pricing. The project appears to be FEMA-funded, indicating it is part of disaster recovery efforts related to Hurricane Nicole's damage. The scope suggests coastal infrastructure repair and resilience, with multiple technical components addressing erosion, structural integrity, and site restoration. The inclusion of environmental compliance and survey work indicates a holistic approach to infrastructure rehabilitation that considers ecological and documentation requirements.

View the file

Other files

File Type Posted
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave_Park_Seawall_R2.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Hurricane Nicole Dune Walkover Repairs - Van Ave.
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
FEMA Funded
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Excavation, Grading, and Compaction1LS$ - 0$ - 0
7Imported Beach Quality Fill100CY$ - 0$ - 0
86" Concrete Sidewalk32SY$ - 0$ - 0
9Site Restoration Bahia Sod1LS$ - 0$ - 0
10CMI UC-95 Composite Sheet Pile38LF$ - 0$ - 0
11Concrete Cap44LF$ - 0$ - 0
12Concrete Plug2EA$ - 0$ - 0
13Helical Anchors4EA$ - 0$ - 0
14Aluminum Fence29LF$ - 0$ - 0
15Aluminum Railing25LF$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton

image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .