Van_Ave._-_Bid_Tab.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Van Avenue Seawall Project
- Solicitation number
- 25-B-104IF
- Issued by
- Volusia County, Florida
About this file
This document is a bid tabulation (bid tab) spreadsheet for Hurricane Nicole Dune Walkover Repairs at Van Avenue, appearing to be a FEMA-funded coastal infrastructure restoration project. The bid tab details 15 line items for repair and reconstruction work, including mobilization, environmental compliance, demolition, excavation, concrete sidewalk installation, site restoration, sheet pile installation, concrete capping, helical anchors, and aluminum fencing. Quantities range from 1 lump sum items to specific linear feet and square yard measurements, with notable elements including 100 cubic yards of imported beach quality fill, 32 square yards of concrete sidewalk, 38 linear feet of composite sheet pile, and 29 linear feet of aluminum fencing.
Despite the comprehensive line-item breakdown, the current bid tab shows zero dollar amounts for all items, suggesting this may be a preliminary document or template awaiting contractor pricing. The project appears to be FEMA-funded, indicating it is part of disaster recovery efforts related to Hurricane Nicole's damage. The scope suggests coastal infrastructure repair and resilience, with multiple technical components addressing erosion, structural integrity, and site restoration. The inclusion of environmental compliance and survey work indicates a holistic approach to infrastructure rehabilitation that considers ecological and documentation requirements.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Hurricane Nicole Dune Walkover Repairs - Van Ave. | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| FEMA Funded | |||||
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Excavation, Grading, and Compaction | 1 | LS | $ - 0 | $ - 0 |
| 7 | Imported Beach Quality Fill | 100 | CY | $ - 0 | $ - 0 |
| 8 | 6" Concrete Sidewalk | 32 | SY | $ - 0 | $ - 0 |
| 9 | Site Restoration Bahia Sod | 1 | LS | $ - 0 | $ - 0 |
| 10 | CMI UC-95 Composite Sheet Pile | 38 | LF | $ - 0 | $ - 0 |
| 11 | Concrete Cap | 44 | LF | $ - 0 | $ - 0 |
| 12 | Concrete Plug | 2 | EA | $ - 0 | $ - 0 |
| 13 | Helical Anchors | 4 | EA | $ - 0 | $ - 0 |
| 14 | Aluminum Fence | 29 | LF | $ - 0 | $ - 0 |
| 15 | Aluminum Railing | 25 | LF | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton |
image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .