PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Van Avenue Seawall Project
- Solicitation number
- 25-B-104IF
- Issued by
- Volusia County, Florida
About this file
This document is a Prime/Subcontractor Form for a county-level contract (Contract No. C-2014, ITB No. 25-B-##XX) related to a construction or infrastructure project. The form requires bidders to list all proposed subcontractors and their specific work disciplines, which include demolition, disposal, surveying, sand/fill hauling, grading, concrete work, seawall panel installation, helical anchor installation, testing, aluminum fence and guardrail installation, and site restoration. The form emphasizes that prime contractors are responsible for ensuring subcontractors hold appropriate licenses and that any subcontractor changes require prior approval from the County Project Manager.
The form serves multiple purposes, including documenting subcontractor participation, calculating percentage of work performed by each entity, and determining local bid preference in accordance with Section 2.8, D of the solicitation. Notably, the document requires bidders to complete green-shaded areas with dollar values for each contractor, with a requirement that total percentages must equal 100%. The form also highlights that failure to complete and return this document may result in a non-responsive bid, and the County reserves the right to seek clarification about subcontractors without allowing changes to the total submitted base bid pricing.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition | $ - 0 | 0.00% | |
| Disposal | $ - 0 | 0.00% | |
| Surveyors | $ - 0 | 0.00% | |
| Sand/Fill Hauling | $ - 0 | 0.00% | |
| Grading and Compaction | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Seawall Panel Installation | $ - 0 | 0.00% | |
| Helical Anchor Installation | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| Aluminum Fence Installation | $ - 0 | 0.00% | |
| Alumin Guardrail Installation | $ - 0 | 0.00% | |
| Site Restoration & Sod Placement | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .