PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls

XLS spreadsheet 38 KB Posted

Attached to
Van Avenue Seawall Project
Solicitation number
25-B-104IF
Issued by
Volusia County, Florida

About this file

This document is a Prime/Subcontractor Form for a county-level contract (Contract No. C-2014, ITB No. 25-B-##XX) related to a construction or infrastructure project. The form requires bidders to list all proposed subcontractors and their specific work disciplines, which include demolition, disposal, surveying, sand/fill hauling, grading, concrete work, seawall panel installation, helical anchor installation, testing, aluminum fence and guardrail installation, and site restoration. The form emphasizes that prime contractors are responsible for ensuring subcontractors hold appropriate licenses and that any subcontractor changes require prior approval from the County Project Manager.

The form serves multiple purposes, including documenting subcontractor participation, calculating percentage of work performed by each entity, and determining local bid preference in accordance with Section 2.8, D of the solicitation. Notably, the document requires bidders to complete green-shaded areas with dollar values for each contractor, with a requirement that total percentages must equal 100%. The form also highlights that failure to complete and return this document may result in a non-responsive bid, and the County reserves the right to seek clarification about subcontractors without allowing changes to the total submitted base bid pricing.

View the file

Other files

File Type Posted
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Demolition$ - 00.00%
Disposal$ - 00.00%
Surveyors$ - 00.00%
Sand/Fill Hauling$ - 00.00%
Grading and Compaction$ - 00.00%
Concrete$ - 00.00%
Seawall Panel Installation$ - 00.00%
Helical Anchor Installation$ - 00.00%
Testing$ - 00.00%
Aluminum Fence Installation$ - 00.00%
Alumin Guardrail Installation$ - 00.00%
Site Restoration & Sod Placement$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .