Van_Ave._-_Bid_Tab.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
Van Avenue Seawall Project
Solicitation number
25-B-104IF
Issued by
Volusia County, Florida

About this file

This is a bid tabulation document for the Van Avenue Seawall Project in Daytona Beach Shores, Florida, a hurricane recovery initiative funded by FEMA. The project involves replacement of the damaged concrete seawall at Van Avenue Beach Approach Park with UC-95 composite seawall panels to protect the upland park and facilities from future storm events. The scope of work encompasses 15 line items including mobilization and demobilization, construction and as-built survey, environmental compliance, temporary traffic control, demolition and hauling, excavation and grading, imported beach quality fill (100 cubic yards), concrete sidewalk (32 square yards), site restoration with Bahia sod, composite sheet pile installation (38 linear feet), concrete cap (44 linear feet), concrete plugs (2 each), helical anchors (4 each), and aluminum fence and railing (29 and 25 linear feet respectively).

All bid line items are listed with zero dollar amounts, indicating this document represents a bid template or pricing schedule awaiting contractor cost submissions. The project is entirely FEMA-funded, as noted in the documentation. The bid tabulation format provides unit pricing structure with lump sum, linear foot, cubic yard, square yard, and each measurement categories to facilitate contractor cost proposals. No specific bid due date, award date, or contract term information is included in this particular document.

View the file

Other files

File Type Posted
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Van_Avenue_Seawall_Project_(Addendum_#2_Revision).pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_25-B-104IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_F_-_Technical_Specifications_-_REVISION_1.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_E_-_Construction_Plans.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_I_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_J_-_Payment_and_Performance_Bond.pdf PDF
Exhibit_C_-_Insurance_Requirements_25-B-104IF.pdf PDF
Exhibit_D_-_Contract_25-B-104IF.pdf PDF
Exhibit_H_-_Federal_Contract_Provisions_25-B-104IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_25-B-104IF.xls XLS spreadsheet
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Exhibit_A_-_Bid_Documents_25-B-104IF.pdf PDF
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave_Park_Seawall_R2.pdf PDF
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_Van_Avenue.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Tech_Specs.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Van_Ave._-_Bid_Tab.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Hurricane Nicole Dune Walkover Repairs - Van Ave.
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
FEMA Funded
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Excavation, Grading, and Compaction1LS$ - 0$ - 0
7Imported Beach Quality Fill100CY$ - 0$ - 0
86" Concrete Sidewalk32SY$ - 0$ - 0
9Site Restoration Bahia Sod1LS$ - 0$ - 0
10CMI UC-95 Composite Sheet Pile38LF$ - 0$ - 0
11Concrete Cap44LF$ - 0$ - 0
12Concrete Plug2EA$ - 0$ - 0
13Helical Anchors4EA$ - 0$ - 0
14Aluminum Fence29LF$ - 0$ - 0
15Aluminum Railing25LF$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton

image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .