VA250-17-B-0970-018.pdf
PDF 20 MB Posted
- Attached to
- Building 26 Addition
- Solicitation number
- VA25017B0970
About this file
VA250-17-B-0970 2018-02-13_B26_RE-BID_DRAWINGS_Part2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018C0186-003.docx | DOCX document | |
| VA250-17-B-0970-0004001.pdf | ||
| VA250-17-B-0970-0004000.docx | DOCX document | |
| VA250-17-B-0970-0003001.pdf | ||
| VA250-17-B-0970-0003000.docx | DOCX document | |
| VA250-17-B-0970-00002000.docx | DOCX document | |
| VA250-17-B-0970-00002001.pdf | ||
| VA250-17-B-0970-00001000.docx | DOCX document | |
| VA250-17-B-0970-00001001.pdf | ||
| VA250-17-B-0970-021.pdf | ||
| VA250-17-B-0970-019.pdf | ||
| VA250-17-B-0970-020.pdf | ||
| VA250-17-B-0970-025.pdf | ||
| VA250-17-B-0970-022.pdf | ||
| VA250-17-B-0970-016.pdf | ||
| VA250-17-B-0970-024.pdf | ||
| VA250-17-B-0970-017.pdf | ||
| VA250-17-B-0970-023.pdf | ||
| VA250-17-B-0970-015.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
S
S
S
S
S
S
S
S S
S S
S
S S
S
7.0
6.0
5.0
4.0
3.0
2.0
1.0
B.0
B.0 E.1
3.2
2.4
1.6
L.0J.0C.5
C.0
C.0
D.0
D.0
C.1 C.9
F.0 G.0 G.5E.5 F.3 F.4 G.3
G.8
H.9 L.1G.4 H.0
7.2
A.0 E.0
J.5H.7G.9G.2G.1E.7
STAFF
LOUNGE /
LOCKERS
EQUIPMENT
STORAGE
ELEC.
INTAKE
ROOM
VESTIBULE
VISITOR
ROOM
SHARED
WORKROOM
EXAM
ROOM
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1D
128A
PATIENT
ROOM
TYPE B
WAITING
HAC
LINEN
VESTIBULE
LINEN
CHUTE
130A
STORAGE
133A
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1B
125A
PATIENT
ROOM
TYPE B
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1B
127A
PATIENT
BATHROOM
TYPE 1B
124A
PATIENT
BATHROOM
TYPE 1A
122A
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1B
121A
NURSE
STATION
EXISTING
STAIR
S2-1
DIRTY
LINEN
C105A
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1B
126A
PATIENT
BATHROOM
1B 138A
VISITOR
ROOM
CORRIDOR
C105
CORRIDOR
C104
CORRIDOR
C107
MED GAS
CORRIDOR
C106
1/AS703
1/
AS
1/
AS
1/
AS
1/AS701
1/
AS
1/AS701VISITOR
TOILET
105A
STORAGE
C105
S2-1-A
S2-1-B
138-A
138-B
5A
C
CLOSET
6' - 2 1/2"
1'
7/
8"
LN
-5
LN-5
GT
-3
PT-5
LN
-5
LN
-5
LN
-5
LN
-5
LN
-5
LN
-5
LN-1
LN-2
PL-1
AL
IG
N
LN-1
2' - 10 1/2"
3'
- 0
3'
- 0 7/
8"
R 48' - 9 5/16"
105A.1
138.2 138.1137.1
5.
136.1
141.1
145.1
143.1
144.1142.1
C107.1
133.1 132.1
129.1 131.1
S2-1.1
125.1
123.1
124.1
126.1
127.1 128.1
C105.1
122.1
121.1
C106.3
C104.1
C106.1
C106.2
C106.4
C107.2
2'
0"
2'
0"
1/AS704
U N
O 2'
0"
T
YP
2'
0"
UNO
1' - 0" TYP
105A.2
141.2
130.1
C104.2
C106.7
PT
-4
PT
-4
PT
-7
PT
-4
PT-2
137.2
PT-5
120.2
LN
-5
PT
-5
LN
-5
PT
-5
LN
-5
PT
-5
LN
-5
PT
-5
LN
-5
PT
-5
LN-5
PT-5
LN-5
PT-5
PT-3
PT-4
LN
-4
UNO
1' - 0" TYP
UNO
1' - 0" TYP
U N
O 1'
0"
T
YP
UNO
1' - 0" TYP
1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL
SCHEDULE ON AS705 FOR MATERIAL TYPES.
2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM
MATERIALS.
3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE
OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.
5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR
MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.
FLOOR FINISH PLAN GENERAL NOTES
FLOOR FINISH PLAN LEGEND
FLOOR PATTERN - SEE PLAN FOR MATERIAL AND
COLOR TYPE
XXX ROOM SIGNAGE AND TAG - VV. REFER TO
SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
NOTE:
THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS
AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE
INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS
DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL
COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION
REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION
REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND
CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE
SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING
INSTALLATIONS.
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
1 Revision 1 Date 1
BID DOCUMENTS
AS701
DLLDLL
PARTIAL FLOOR FINISH PLAN -
FIRST FLOOR AREA A
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA A
S
S
S
S
S S
S S
S S
S
7.0
6.0
5.0
4.0
3.0
2.0
1.0
3.2
2.4
1.6
L.0 L.1 M.0
7.2
U.0S.5 T.0S.0 S.9S.1Q.0P.0N.0 Q.5P.2N.3M.5 N.2 V.0R.0
CONFERENCE
ROOM
TOILET
IT/DATA
ROOM
SHARED
WORKROOM
NURSE
STATION
PATIENT
BATHROOM
TYPE 1B
157A
PATIENT
ROOM
TYPE A
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1A
156A
EXISTING
STAIR
S3-1
SEMI-PRIVATE
PATIENT
ROOM
SEMI-PRIVATE
PATIENT
ROOM
EXISTING
STAIR
S5-1
PATIENT
BATHROOM
TYPE 1C
147A
PATIENT
BATHROOM
- TYPE 1C
148A
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1B
152A
PATIENT
ROOM
TYPE B
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1B
154A
PATIENT
ROOM
TYPE B
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1B
151A
PATIENT
BATHROOM
TYPE 1B
153A
DIRTY
LINEN
C109A
CORRIDOR
C108
CORRIDOR
C109
CORRIDOR
C107
HAC
1/
AS
1/
AS
1/
AS
1/AS704
1/AS702
1/
AS
1/AS701
STORAGE
S5-1 S3-1A
C106
C109
C
S3-1-B
(TYP)
2' - 11 1/4" 1'
7/ 8"
1' - 4 1/2"
PT-7
LN
-7
LN
-7
LN
-7
LN
-7
LN
-7
LN
-7
LN
-7
LN-7
LN-1
LN-1
LN-7LN-7
PT-7
146.1
147.1 148.1
140.1
139.1
S5-1.1
141.1
143.1
144.1
158.1
C108.2
S3-1.1
149.1
157.1
156.1
155.1
154.1
151.1
150.1
152.1
153.1
C109.1
C106.5
C108.3
C107.2
1/AS704
ALIGN ALIGN
141.2
C108.1
158.2 C106.6
CLOSET
PT-7
PT-4
L.3
LN-7
LN-7
LN
-7
PT-7
PT-7
PT
-7
PT
-7
LN
-7
PT
-7
LN
-7
PT
-7
LN
-7
PT
-7
LN
-7
LN-7
PT-7
LN-7
PT-7
UNO
1' - 0" TYP
UNO
1' - 0" TYP
UNO
1' - 0" TYP
U N
O 1'
0"
T
YP
U N
O 1'
0"
T
YP
1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL
SCHEDULE ON AS705 FOR MATERIAL TYPES.
2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM
MATERIALS.
3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE
OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.
5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR
MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.
FLOOR FINISH PLAN GENERAL NOTES
FLOOR FINISH PLAN LEGEND
FLOOR PATTERN - SEE PLAN FOR MATERIAL AND
COLOR TYPE
XXX ROOM SIGNAGE AND TAG - VV. REFER TO
SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
NOTE:
THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS
AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE
INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS
DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL
COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION
REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION
REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND
CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE
SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING
INSTALLATIONS.
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
BID DOCUMENTS
AS702
DLLDLL
PARTIAL FLOOR FINISH PLAN -
FIRST FLOOR AREA B
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA B
S
S
S
S
S
S
S
S
S
SSSS
S
S
S
12.0
11.0
10.0
9.0
8.0
7.0
B.0 C.5C.0 D.0C.1 F.0 G.0 G.5E.5 F.3 F.4 G.3 G.8 H.9 L.1G.4 H.0
7.2
A.0 E.0 J.5H.7G.9G.2G.1E.7
13.0
10.1
9.1
8.8
7.6
7.5
STORAGE
120A
MED ROOM
TREATMENT
TEAM
ROOM
TUB ROOM
ELEC.
TOILET
CONSULT
ROOM
CONSULT
ROOM
NURSE
STATION
ISOLATION
ROOM
110A
PATIENT
BATHROOM
TYPE 1D
114A
PATIENT
ROOM -
TYPE B
ISOLATION
ANTE ROOM
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE1A
109A
PATIENT
BATHROOM
TYPE 1A
111A
PATIENT
ROOM
TYPE A
PATIENT
ROOM
TYPE A
PATIENT
ROOM
TYPE A
DAY ROOM
PATIENT
BATHROOM
TYPE 1A
108A
PATIENT
BATHROOM
TYPE 1A
107A
TOILET
MED ROOM
100A
NURSE
STATION
CORRIDOR
C103
CORRIDOR
C102
CORRIDOR
C101
CORRIDOR
C100
CLEAN
LINEN
1/AS703
1/
AS
1/
AS
1/AS701
1/
AS
1/AS701
1/
AS
1/
AS
VISITOR
TOILET
105A
NURSE
WORK
GROUP
ROOM
CORRIDOR
C100
PATIENT
TOILET
TYPE
1D 110B
PHONE
ALCOVE
C103B
PATIENT
COMPUTER
ACCESS
C103A
ALCOVE
C102B
ALCOVE
C102A
EXISTING
STAIR
S1-1
S1-1
9 10
110A
0A
-B
174104
119-A
C
106 176
C
100-A 100-B
C
5A
9-
B
100A-A
APPLY PRIVACY FILM ON WINDOWS
2' - 11"
(TYP)
LN-4
LN-4LN-4LN-4LN-4
LN
-4
LN-6 LN-6
LN-5
LN-5
PT-4
PL-1
PL-1
0.
0.
0A
.1
4.
6.
5.
3.
102.1
101.2
101.1 110.1
111.1 109.1
108.1 107.1
C100.1
120.1
119.1
120A.1
118.1
117.1 115.1
S1-1.1 116.1
113.1 114.1
112.1
C106.2
C101.1
C103.1
C103.2
1/AS704
1/
AS
UNO
2' - 0" TYP U
N O
1'
0" T
YP
TY
P
2'
0"
CONC-S
116.2
4.
4.
105A.2
C104.2
C106.7
C103B.1
172.2
100.3
PT-6
CLOSET
102A
PT-7
RB-7
PT-1
COLUMN WRAP
PL
-1
102A.1
L.3
PT-5
120.2
CONC-S
LN-5
PT-5
LN
-4
PT
-4
LN
-4
PT
-4
LN
-4
PT
-4
LN
-4
PT
-4
LN
-4
PT
-4
LN
-3
PT
-3
PT-3LN-3
PT-3
LN
-4
PT
-4
FLOOR PATTERN
U N
O 1'
0"
T
YP
UNO
1' - 0" TYP
UNO
1' - 0" TYP
UNO
1' - 0" TYP
UNO
1' - 0" TYP
1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL
SCHEDULE ON AS705 FOR MATERIAL TYPES.
2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM
MATERIALS.
3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE
OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.
5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR
MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.
FLOOR FINISH PLAN GENERAL NOTES
FLOOR FINISH PLAN LEGEND
FLOOR PATTERN - SEE PLAN FOR MATERIAL AND
COLOR TYPE
XXX ROOM SIGNAGE AND TAG - VV. REFER TO
SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
NOTE:
THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS
AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE
INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS
DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL
COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION
REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION
REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND
CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE
SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING
INSTALLATIONS.
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
1 Revision 1 Date 1
BID DOCUMENTS
AS703
DLLDLL
PARTIAL FLOOR FINISH PLAN -
FIRST FLOOR AREA C
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA C
S
S
S
S
S
S
S
S S
SS
S
S
S
12.0
11.0
10.0
9.0
8.0
7.0
L.1 M.0
7.2
U.0S.5 T.0S.0 S.9S.1Q.0P.0N.0 Q.5P.2N.3M.5 N.2 V.0R.0
Q.2P.1N.5M.1
J.5
13.0
10.1
9.1
8.8
7.6
7.5
PATIENT
BATHROOM
TYPE 1A
170A
PATIENT
ROOM
TYPE 'A'
PATIENT
ROOM
TYPE 'A'
PATIENT
BATHROOM
TYPE 1A
167A
PATIENT
BATHROOM
TYPE 1A
168A
PATIENT
ROOM
TYPE 'A
QUIET
ROOM
TOILET
TOILET
SOILED
UTILITY
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1D
164A
ELEC.
PATIENT
LAUNDRY
TREATMENT
TEAM
ROOM
STORAGE
158A
MED ROOM
NURSE
STATION
NURSE
STATION
RECREATION
DINING
NURSE
MANAGER
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1A
169A
COURTYARD
CORRIDOR
C112
CORRIDOR
C111
CORRIDOR
C110
CLEAN
UTILITY
DAY ROOM
1/
AS
1/
AS
1/AS704
1/AS702
1/
AS
1/AS701
1/
AS
1/
AS
CORRIDOR
C100
PHONE
ALCOVE
C110B
PATIENT
COMPUTER
ACCESS
C110A
ALCOVE
C111B
ALCOVE
C111A
EXISTING
STAIR
S4-1
S4-1
C106
5B
100-B
C
9-
B
175A-A
175A-B
159-A
TY
P
2'
0"
LN-4 LN-4 LN-4 LN-4
LN
-4
LN-6 LN-6
LN-5
LN-5
PL-1
PL-1
PT-7
0.
2.
4.
6.
170.1 169.1 168.1
171.1 166.1
175.1
167.1
165.1 164.1
162.1
161.1 163.1
S4-1.1
160.1
158.1
159.1
158A.1
C112.1
C110.1
C108.4
1/AS704
1/
AS
U N
O 1'
0"
T
YP
UNO
2' - 0" TYP
ALIGN ALIGN
162.2
4.
SERVERY
175A
C108.1
175A.1
173.1
C110B.1
172.2
100.3
158.2 C106.6
PT-3
PT-1
COLUMN WRAP
PL
-1
L.3
CONC-S
CONC-S
LN
-4
LN
-4
LN
-4
LN
-4
LN
-4
PT
-4
PT
-4
PT
-4
PT
-4
LN-4
PT-4
PT
-4
PT
-3
PT
-3
LN-3
PT-3
FLOOR PATTERN
FLOOR PATTERN
UNO
1' - 0" TYP
U N
O 1'
0"
T
YP
UNO
1' - 0" TYP
U N
O 1'
0"
T
YP
1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL
SCHEDULE ON AS705 FOR MATERIAL TYPES.
2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM
MATERIALS.
3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE
OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.
5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR
MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.
FLOOR FINISH PLAN GENERAL NOTES
FLOOR FINISH PLAN LEGEND
FLOOR PATTERN - SEE PLAN FOR MATERIAL AND
COLOR TYPE
XXX ROOM SIGNAGE AND TAG - VV. REFER TO
SIGNAGE SCHEDULE ON AS705 FOR
REFERENCE ONLY.
NOTE:
THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS
AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE
INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS
DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL
COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION
REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION
REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND
CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE
SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING
INSTALLATIONS.
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
BID DOCUMENTS
AS704
DLLDLL
PARTIAL FLOOR FINISH PLAN -
FIRST FLOOR AREA D
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA D
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
BID DOCUMENTS
AS705
DLLDLL
SIGNAGE SCHEDULE AND FINISH
MATERIAL SCHEDULE
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
SIGNAGE SCHEDULE
Room Number Room Name Sign Designation Sign Type Notes
C104 Corridor C104.2 IN-01.01.01 C105 Corridor C105.1 IN-01.03 C106 Corridor C106.1 IN-01.08 C106 Corridor C106.2 IN-01.08 C106 Corridor C106.3 IN-01.02 C106 Corridor C106.4 IN-01.08 C106 Corridor C106.5 IN-01.08 C106 Corridor C106.6 IN-01.08 C106 Corridor C106.7 IN-01.01.01 C107 Corridor C107.1 IN-01.04 C107 Corridor C107.2 IN-01.08 C108 Corridor C108.1 IN-01.01.01 C108 Corridor C108.2 IN-01.02 C108 Corridor C108.3 IN-01.08 C108 Corridor C108.4 IN-01.08 C109 Corridor C109.1 IN-01.03 C110 Corridor C110.1 IN-01.08 C110B Phone Alcove C110B.1 IN-18.01 See 5/AS505 for graphics C112 Corridor C112.1 IN-01.08 S1-1 Existing Stair S1-1.1 IN-01.03, IN-09.08 S2-1 Existing Stair S2-1.1 IN-01.03, IN-09.08 S3-1 Existing Stair S3-1.1 IN-01.03, IN-09.08 S4-1 Existing Stair S4-1.1 IN-01.03, IN-09.08 S5-1 Existing Stair S5-1.1 IN-01.03, IN-09.08
SIGNAGE SCHEDULE
Room Number Room Name Sign Designation Sign Type Notes
100 Nurse Station 100.1 IN-03.01 100 Nurse Station 100.2 IN-03.01 100 Nurse Station 100.3 IN-01.03 100A Med Room 100A.1 IN-03.01 101 Day Room 101.1 IN-03.01 101 Day Room 101.2 IN-18.01 Insert text to read "NO EXIT" 102 Group Room 102.1 IN-04.03 Insert text to read "Group Room" 102A Group Room Storage 102A.1 IN-03.01 103 Group Room 103.1 IN-04.03 Insert text to read "Group Room" 104 Toilet 104.1 IN-03.01 104 Toilet 104.2 IN-09.01 105 Nurse Work 105.1 IN-04.03 Insert text to read "Nursing" 105A Visitor Toilet 105A.1 IN-03.01 105A Visitor Toilet 105A.2 IN-09.01 106 Clean Linen 106.1 IN-04.03 Insert text to read "Clean Linen" 107 Patient Room 107.1 IN-04.04 108 Patient Room 108.1 IN-04.04 109 Patient Room 109.1 IN-04.04 110 Isolation Room 110.1 IN-04.03 Insert text to read "Isolation Room" 111 Patient Room 111.1 IN-04.04 112 Consult Room 112.1 IN-04.03 Insert text to read "Consult Room" 113 Consult Room 113.1 IN-04.03 Insert text to read "Consult Room" 114 Patient Room 114.1 IN-04.04 115 Electric 115.1 IN-03.01 116 Toilet 116.1 IN-03.01 116 Toilet 116.2 IN-09.01 117 Treatment Team Room 117.1 IN-04.03 Insert text to read "Treatment Team Room" 118 Tub Room 118.1 IN-04.03 Insert text to read "Tub Room" 119 Med Room 119.1 IN-03.01 120 Nurse Station 120.1 IN-03.01 120 Nurse Station 120.2 IN-01.03 120A Storage 120A.1 IN-04.03 Insert text to read "Storage" 121 Patient Room 121.1 IN-04.04 122 Patient Room 122.1 IN-04.04 123 Closet 123.1 IN-04.03 Insert text to read "Storage" 124 Patient Room 124.1 IN-04.04 125 Patient Room 125.1 IN-04.04 126 Patient Room 126.1 IN-04.04 127 Patient Room 127.1 IN-04.04 128 Patient Room 128.1 IN-04.04 129 Med Gas 129.1 IN-04.03 Insert text to read "Storage" 130 Linen Vestibule 130.1 IN-04.03 Insert text to read "Linen Chute" 131 HAC 131.1 IN-04.03 Insert text to read "HAC" 132 Exam Room 132.1 IN-04.03 Insert text to read "Exam Room" 133 Shared Workroom 133.1 IN-04.03 Insert text to read "Staff" 135 Visitor Room 135.1 IN-04.03 Insert text to read "Visitor Room" 136 Visitor Room 136.1 IN-04.03 Insert text to read "Visitor Room" 137 Vestibule 137.1 IN-01.04 137 Vestibule 137.2 IN-03.01 138 Intake Room 138.1 IN-04.03 Insert text to read "Intake Room" 138 Intake Room 138.2 IN-04.03 Insert text to read "Intake Room" 139 IT/Data Room 139.1 IN-03.01 140 Storage 140.1 IN-04.03 Insert text to read "Storage" 141 Toilet 141.1 IN-03.01 141 Toilet 141.2 IN-09.01 142 Equipment Storage 142.1 IN-04.03 Insert text to read "Storage" 143 Conference Room 143.1 IN-04.03 Insert text to read "Conference Room" 144 Staff Lounge/Lockers 144.1 IN-04.03 Insert text to read "Break Room" 145 Electric 145.1 IN-03.01 146 Shared Workroom 146.1 IN-04.03 Insert text to read "Staff" 147 Semi-Private Patient Room 147.1 IN-04.03 148 Semi-Private Patient Room 148.1 IN-04.03 149 HAC 149.1 IN-04.03 Insert text to read "HAC" 150 Patient Room 150.1 IN-04.04 151 Patient Room 151.1 IN-04.04 152 Patient Room 152.1 IN-04.04 153 Patient Room 153.1 IN-04.04 154 Patient Room 154.1 IN-04.04 155 Closet 155.1 IN-04.03 Insert text to read "Storage" 156 Patient Room 156.1 IN-04.04 157 Patient Room 157.1 IN-04.04 158 Nurse Station 158.1 IN-03.01 158 Nurse Station 158.2 IN-01.03 158A Storage 158A.1 IN-04.03 Insert text to read "Storage" 159 Med Room 159.1 IN-03.01 160 Patient Laundry 160.1 IN-04.03 Insert text to read "Laundry" 161 Electric 161.1 IN-03.01 162 Toilet 162.1 IN-03.01 162 Toilet 162.2 IN-09.01 163 Treatment Team Room 163.1 IN-04.03 Insert text to read "Treatment Team Room" 164 Patient Room 164.1 IN-04.04 165 Quiet Room 165.1 IN-04.03 Insert text to read "Quiet Room" 166 Nurse Manager 166.1 IN-04.03 Insert text to read "Nurse Manager" 167 Patient Room 167.1 IN-04.04 168 Patient Room 168.1 IN-04.04 169 Patient Room 169.1 IN-04.04 170 Patient Room 170.1 IN-04.04 171 Day Room 171.1 IN-04.03 Insert text to read "Day Room" 172 Soiled Utility 172.1 IN-03.01 172 Soiled Utility 172.2 IN-01.22 173 Recreation 173.1 IN-04.03 Insert text to read "Recreation" 174 Toilet 174.1 IN-03.01 174 Toilet 174.2 IN-09.01 175 Dining 175.1 IN-18.01 Insert text to read "NO EXIT" 175A Servery 175A.1 IN-04.03 Insert text to read "Servery" 176 Clean Utility 176.1 IN-04.03 Insert text to read "Clean Utility" C100 Corridor C100.1 IN-01.02 C101 Corridor C101.1 IN-01.08 C103 Corridor C103.1 IN-01.08 C103 Corridor C103.2 IN-01.08 C103B Phone Alcove C103B.1 IN-18.01 See 5/AS505 for graphics C104 Corridor C104.1 IN-01.08
FINISH MATERIAL SCHEDULEFOR REFERENCE ONLY
LIFT
TOILET
ELEC.
INTAKE
ROOM
IT/DATA
ROOM
SHARED
WORKROOM
VESTIBULE
137136
EXAM
ROOM
WAITING
134HAC
LINEN
VESTIBULE
LINEN
CHUTE
130A
133A
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1A
122A
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1B
121A
STORAGE
120A
MED ROOM
TREATMENT
TEAM
ROOM
TUB ROOM
ELEC.
CONSULT
ROOM
CONSULT
ROOM
NURSE
STATION
ISOLATION
ROOM
110A
PATIENT
BATHROOM
TYPE 1D
114A
PATIENT
ROOM -
TYPE B
SHELL
SPACE
DAY ROOM
SHELL
SPACE
SHELL
SPACE
TOILET
TOILET
MED ROOM
100A
SOILED
UTILITY
PATIENT
ROOM
TYPE B
PATIENT
BATHROOM
TYPE 1D
164A
ELEC.
PATIENT
LAUNDRY
TREATMENT
TEAM
ROOM
STORAGE
158A
MED ROOM
NURSE
STATION
PATIENT
BATHROOM
TYPE 1B
157A
PATIENT
ROOM
TYPE A
PATIENT
ROOM
TYPE A
PATIENT
BATHROOM
TYPE 1A
156AEXISTING
STAIR
S3-1
SEMI-PRIVATE
PATIENT
ROOM
SEMI-PRIVATE
PATIENT
ROOM
EXISTING
STAIR
S5-1
EXISTING
STAIR
S2-1
PATIENT
BATHROOM
TYPE 1C
147A
PATIENT
BATHROOM
- TYPE 1C
148A
PATIENT
BATHROOM
TYPE 1B
152A
NURSE
STATION
DAY ROOM
RECREATION
DINING
PATIENT
BATHROOM
1B 138A
CORRIDOR
C108
CORRIDOR
C104
CORRIDOR
C103
CORRIDOR
C102
CORRIDOR
C100
CORRIDOR
C101
CORRIDOR
C112
CORRIDOR
C111
CORRIDOR
C110
COURTYARD
COURTYARD
NURSE
MANAGER
VISITOR
ROOM
PATIENT
COMPUTER
ACCESS
C110A
CLEAN
LINEN
CORRIDOR
C107
MED GAS
GROUP
ROOM
CLEAN
UTILITY
PATIENT
COMPUTER
ACCESS
C103A
HAC
CORRIDOR
C106
GROUP
ROOM
VISITOR
TOILET
105A
PATIENT
TOILET
TYPE 1D
110B
STORAGE
SERVERY
175A
NURSE
WORK
Storage
2 Bed Room
Storage
Storage
1 Bed Room
Patient Dining Room
1 Bed Room
Storage
Storage
2 Bed Room
Storage
2 Bed Room
Toilet/ Shower 139A
Toilet/ Shower 143A
Corridor 100I
Kitchenette
Toilet/ Shower 118A
Toilet/ Shower 122A
2 Bed Room
2 Bed Room
1 Bed Room
2 Bed Room
Tub/ Laundry Room
Ante Room
SHELL
SPACE
SHELL
SPACE
SHELL
SPACE
ISOLATION
ANTE ROOM
TOILET
UP
UP
UP
UP
UP UP
AS801
AS801
(DEDUCT
ALTERNATE 3-
DEMOLITION)
(DEDUCT
ALTERNATE 3)
AS801
AS801 (DEDUCT
ALTERNATE 4-
DEMOLITION)
(DEDUCT ALTERNATE 4)
DEDUCT ALTERNATE 3
DEDUCT ALTERNATE 1
DEDUCT ALTERNATE 4
DEDUCT
ALTERNATE 2
DEDUCT ALTERNATE 2
DEDUCT ALTERNATE 2
DEDUCT ALTERNATE 2
DEDUCT ALTERNATE 2
FL
O O
R F
IN
IS
H T
O R
EM
AI
N
FL
O O
R F
IN
IS
H T
O R
EM
AI
N
ALIGNALIGN
P6CP6C
P6CP6C
P6B
(TYP)
P6B
(TYP)
CONSTRUCT EXTERIOR WALL PER BASE BID DOCUMENTS.
DO NOT INSTALL INTERIOR FINISH BOARD.
CONSTRUCT EXTERIOR WALL PER BASE BID DOCUMENTS.
DO NOT INSTALL INTERIOR FINISH BOARD.
CONSTRUCT
WALLS PER BASE
BID DOCUMENTS.
P6B
P6B
P6B P6B
P6B
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
BID DOCUMENTS
AS800
AuthorChecker
OVERALL FIRST FLOOR
PLAN-ALTERNATES
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
ALTERNATES LIST
NOTE: HATCHED AREAS REPRESENT
ARCHITECTURAL SCOPE OF DEDUCT ALTERNATE.
1/8" = 1'-0"1 OVERALL FLOOR PLAN-ALTERNATES
5.0
4.0
B.0 C.0 C.1
A.0
TUB/LAUNDRY
ROOM
5.0
4.0
U.0T.0S.9
V.0
ANTE ROOM
PATIENT
BATHROOM
TYPE 1A
156A
PATIENT
ROOM TYPE A
P4B
P4B
P6B
P6B
P6BP6B
1'
6"
REUSE EXISTING
DOOR FRAME, DOOR
PANEL, AND DOOR
HARDWARE
5.0
4.0
B.0 C.0 C.1
A.0
TUB/LAUNDRY
ROOM
PATIENT
BATHOOM
TYPE 1A
122A
PATIENT ROOM
TYPE A
2 BED ROOM
P6B
P6B
P4B
P4B
P6B
5.0
4.0
U.0T.0S.9
V.0
1 BED ROOM
ANTE ROOM
5'
3/
8"
2'
3"
6 1/8"
2 BED ROOM
DEMOLITION FLOOR PLAN LEGEND
1. COORDINATE SCOPE AND SEQUENCE OF DEMOLITION WORK WITH
COR INCLUDING ALL TEMPORARY ENCLOSURES AND ROUTING OF
BUILDING'S ENTRIES AND EXITS, TO MINIMIZE DISRUPTION OF THE
NORMAL DAILY FUNCTIONS OF THE OWNER'S OCCUPIED AREAS,
INLCUDING ABOVE AND BELOW THE FIRST FLOOR.
2. CHECK AND VERIFY ALL DIMENSIONS AND JOB CONDITIONS BEFORE
COMMENCEMENT OF WORK AND BE RESPONSIBLE FOR THEIR
ACCURACY. REPORT ANY DISCREPANCIES BETWEEN FIELD
CONDITIONS AND THE DOCUMENTS OR WITHIN THE DOCUMENTS TO
THE COR IMMEDIATELY. NOTIFY COR SHOULD EXISTING FIRE
RESISTANT RATED ASSEMBLIES BE COMPROMISED.
3. ALL DESIGNATED WALLS TO BE REMOVED ARE ASSUMED TO BE
NON-LOAD BEARING. BRING TO THE ATTENTION OF THE COR
BEFORE PROCEEDING, ANY CONDITIONS FOUND TO BE OTHERWISE,
AND ANY EXISTING STRUCTURE, SHOWN OR NOT SHOWN WHICH MAY
BE IN CONFLICT WITH NEW CONSTRUCTION PLANS AND DETAILS.
CUTTING OF EXISTING STRUCTURAL ELEMENTS IS PROHIBITED.
BRACE ALL EXISTING STRUCTURAL ELEMENTS AS NECESSARY
DURING CONSTRUCTION.
4. MAINTAIN EXISTING SERVICES AND UTILITIES IN ADJACENT
DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY
THESE SERVICES AND UTILITIES. COORDINATE ALL DISRUPTION OR
DISCONTINUATION OF SERVICES AND UTILITIES WITH THE COR.
5. PROTECT EXISTING FINISHES, ITEMS, AND EQUIPMENT SCHEDULED
TO REMAIN IN PLACE (AND LEFT IN PLACE) DURING DEMOLITION
ACTIVITIES. REPAIR ALL FINISHES AND ITEMS TO MATCH EXISTING
ORIGINAL CONDITION WHENEVER WORK OF THIS CONTRACT CAUSES
DAMAGE OR EXPOSES UNFINISHED CONDITIONS (INCLUDING
REMOVALS FOR DEMOLITION OF MECHANICAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION AND TECHNOLOGY COMPONENTS
OUTSIDE OF LIMITS OF CONSTRUCTION.).
6. PROVIDE TEMPORARY PARTITIONS IN ACCORDANCE WITH OSHA,
INFECTION CONTROL REQUIREMENTS, AND EGRESS REQUIREMENTS.
MAINTAIN REQUIRED MEANS OF EGRESS AT ALL TIMES COORDINATE
WITH COR. COORDINATE ALL DEMOLTION WORK WITH OVERALL
LIFE SAFETY PLAN WHICH IS TO BE MAINTAINED AT ALL TIMES.
7. DO NOT REMOVE TEMPORARY PARTITIONS UNTIL APPROVAL IS
GRANTED BY THE COR.
8. REMOVE ALL ROOM SIGNAGE, ARTWORK, PHOTOGRAPHS, ETC.
COORDINATE THE REMOVAL OR RELOCATION OF ARTWORK,
PHOTOGRAPHS, ETC. PRIOR TO DEMOLITON WITH THE COR.
9. COORDINATE WITH COR PRIOR TO DEMOLITION, ANY ITEMS TO BE
SALVAGED AND TURNED OVER TO COR.
10. REMOVE EXISTING FLOOR FINISHES (INCLUDING ADHESIVES,
MASTICS, SETTING BEDS FASTENERS, ETC.), UNO. UPON
DEMOLITION AND REMOVAL OF EXISTING FLOORING MATERIALS,
PATCH EXISTING FLOOR SLAB AS REQUIRED (INCLUDING, BUT NOT
LIMITED TO INFILLING, LEVELING, GRINDING, SLOPING, ETC.) TO
ACHIEVE A SMOOTH SEAMLESS FLOOR FINISH SUBSTRATE SUITABLE
TO RECEIVE NEW FINISH FLOORING MATERIALS AS SCHEDULED.
11. REMOVE ALL EXISTING WALL BASE, UNO. UPON DEMOLITION AND
REMOVAL OF EXISTING WALL BASE, PATCH EXISTING WALLS AS
REQUIRED TO ACHIEVE A SMOOTH GYPSUM WALLBOARD SUSTRATE
SUITABLE TO RECEIVE NEW WALL BASE AS SCHEDULED.
12. ALL EXISTING WALLS, CELINGS AND SOFFITS ARE TO BE PAINTED.
PATCH ALL GYPSUM WALLBOARD AS REQUIRED TO ACHIEVE A
SMOOTH SUBSTRATE SUITABLE TO RECEIVE NEW FINISH PAINT
(PATCH ALL NICKS, BLEMISHES, ETC. AFTER PRIME COAT. PATCHES
SHALL BE PRIMED BEFORE 1ST TOP COAT.) REMOVE ALL EXISTING
WALL HUNG ITEMS AND/OR COVER PLATES PRIOR TO PAINTING AND
REINSTALL AFTER ACCEPTANCE OF FINISHING PAINTING.
13. THE DEMOLITION DRAWINGS PROVIDE GENERAL DEMOLITION
GUIDELINES ONLY AND ARE NOT NECESSARILY INCLUSIVE OF ALL
ITEMS, MATERIALS, SYSTEMS, ETC. REQUIRED TO BE REMOVED IN
ORDER TO COMPLETE THE PROPOSED NEW CONSTRUCTION.
COORDINATE AND COMPLETE ALL DEMOLITION REQUIRED
SPECIFICALLY SHOWN OR NOT ON THE DEMOLITION DRAWINGS.
14. REPAIR ALL FINISHES AND ITEMS TO MATCH EXISTING ORIGINAL
CONDITIONS WHENEVER WORK OF THIS CONTRACT CAUSES
DAMAGE OR EXPOSES UNFINISHED CONDITIONS (INCLUDING
REMOVALS FOR DEMOLITION OF MECHANICAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION AND TECHNOLOGY COMPONENTS).
PATCH ALL SURFACES AS REQUIRED TO ACHIEVE A SMOOTH
SUBSTRATE SUITABLE TO RECEIVE NEW FINISHES.
15. IN GENERAL, AREAS SHOWING DEMOLITION OR ALTERATION OF
EXISTING CONDITIONS SHALL REQUIRE REMOVAL OF ALL FINISHES,
AND CEILING SYSTEMS (INCLUDING ALL CONCEALED COMPONENTS),
DOWN TO EXISTING SUBSTRATE OR STRUCTURE. INCLUDE ALL
PARTITIONS, DOORS, FRAMES, HARDWARE, CASEWORK, ETC., UNO.
OR SHOWN WHETHER SPECIFICALLY SHOWN OR NOT ON THE
DEMOLITION PLAN. SEE MECHANICAL, ELECTRICAL, PLUMBING AND
TECHNOLOGY DOCUMENTS FOR EXTENT OF MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION AND TECHNOLOGY
SYSTEMS.
16. VERIFY, MAINTAIN AND BRING INTO COMPLIANCE THE INTEGRITY OF
FIRE RATED ASSEMBLIES AND THE STRUCTURAL INTEGRITY OF
FLOOR SLABS, AND FILL ALL OPENINGS IN WALL AND FLOORS
REMAINING AFTER DEMOLITION OF DUCTWORK, PIPES AND CONDUIT,
ETC. PENETRATING WALLS AND FLOORS TO CONFORM TO CURRENT
FIRE RESISTIVE REQUIREMENTS LISTED IN THE BUILDING CODE
INFORMATION ON THE LIFE SAFTEY PLANS. INFILL FLOOR
SUBSTRATE SMOOTH AND FLUSH WITH EXISTING FLOOR SUBSTRATE.
17. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF
DEMOLITION.
18. SEE PROJECT MANUAL FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
DEMOLITION FLOOR PLAN GENERAL
NOTES
1. REMOVE EXISTING CASEWORK, MILLWORK AND ALL COUNTER AND
CABINET SUPPORTS.
2. REMOVE EXISTING STOREFRONT SYSTEM.
3. REMOVE EXISTING TUB AND TURN OVER TO COR.
4. REMOVE EXISTING EXTERIOR WALL INCLUDING ALL WALL MOUNTED
AND CONCEALED ITEMS, AS REQUIRED TO COMPLETE THE
PROPOSED NEW CONSTRUCTION.
5. REMOVE EXISTING EXTERIOR WINDOW INCLUDING ALL TRIM
AROUND THE WINDOWS AND ANY WINDOW TREATMENTS.
6. REMOVE ALL EXISTING EXTERIOR WALL FINISH (WALLBOARD,
PLASTER, ETC.) INCLUDING ALL CONCEALED FRAMING AND
ELEMENTS DOWN TO EXISTING CONCRETE BLOCK, INCLUDING @
WINDOW RECESSES
7. REMOVE EXISTING PHONE AND TURN OVER TO COR.
8. REMOVE EXISTING EXTERIOR DOOR INCLUDING ALL TRIM FRAME
AND HARDWARE.
9. REPAINT EXISTING HOLLOW METAL DOOR AND FRAME (BOTH
SIDES).
10. REMOVE EXISTING WINDOW FILM.
DEMOLITION FLOOR PLAN CODED
NOTES
EXISTING TO BE
REMOVED
EXISTING DOOR TO BE
REMOVED
NOTE:
THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS
AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE
INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS
DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL
COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION
REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION
REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND
CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE
SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING
INSTALLATIONS.
FLUSH
(FL)
DOOR TYPES
FLUSH WITH
HALF GLAZED
PANEL
(FLHG)
8"
6" 10"
3'
- 7
FLUSH WITH
WIDE VISION
PANEL
(FLWVP)
10"6"
8" 3'
- 7
FLUSH WITH
FULL GLAZED
PANEL
(FLFG)
ALUMINUM
AND GLASS
(ALGL)
DOOR LEGEND
TYP.
4"
DOOR MARK
PAIR DUAL
EGRESS
PAIR
1. PLAN INDICATION
2. ALL DOORS TO BE 1 3/4" THICK, UNO
3. DOOR FRAME NOTES: ALL FRAMES TO BE DOUBLE RABITTED WITH 2" FACE AND
1/2" RETURN EACH. SEE AS4-00 FOR DETAILS.
4. LABELED, LEAD LINED DOORS WITH GLASS SHALL BE GLAZED WITH FRG AND
LEADED GLASS
NOTE: REFER TO SHEET AS400 FOR DOOR SCHEDULE
DESIGNATIONS
EXISTING TO REMAIN
NEW CONSTRUCTION
ROOM NAME
ROOM NUMBER
FLOOR PLAN CODED NOTES
VA PROVIDED, VA INSTALLED (VV) OR VA
FURNISHED, CONTRACTOR INSTALLED (VC)
EQUIPMENT/FURNISHINGS
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED (CC)
NOTE: DIMENSIONS ARE FROM FINISHED FLOOR TO BOTTOM OF VISION GLASS PANEL
8"
8" 10"
1. MOP RECEPTOR
2. BEDSIDE TABLE - VV
3. PATIENT BED - VV
4. PATIENT CHAIR - VV
5. TASK CHAIR - VV
6. SIDE CHAIR - VV
7. WASTE RECEPTACLE - VV
8. COMPUTER WORK STATION - VV
9. WALL MOUNTED SHARPS CONTAINER -VC
10. WALL MOUNTED GLOVE BOX - VC
11. MEDICAL RAIL -VC
12. SYPHGMOMANOMETER (RAIL MOUNTED) - VV
13. EXAM TABLE - VV
14. OTOSCOPE (RAIL MOUNTED) - VV
15. PHYSICIAN STOOL - VV
16. CUSTOM VIRTUAL FIREPLACE
17. WALL MOUNTED CLOCK - SHOWN FOR COORDINATION
ONLY - COR TO PROVIDE FINAL LOCATIONS
18. COFFEE MACHINE - PLUMBED -VV
19. WALL MOUNTED TELEVISION (VV) AND BRACKET (VV)
20. PHONE (W = WALL PHONE, D = DESK PHONE)
21. OVERHEAD BIN FOR CHARTS - VC
22. WALL MOUNTED BIN SYSTEM - VC. INSTALL TOP OF
PANELS @ 72" UNO
23. MEDICATION CART - VV
24. MEDICATION DISTRIBUTION SYSTEM - VV
25. TREADMILL- VV
26. ELLIPTICAL MACHINE - VV
27. ICE MACHINE - VV
28. HOSTESS CART - VV
29. CRASH CART - VV
30. SIGNAGE - VV. REFER TO SIGNAGE SCHEDULE ON
AS705 FOR REFERENCE ONLY.
31. COILING DOOR - VV
32. LINEN CART - VV
33. SMART BOARD - VV
34. COUNTERTOP - REFER TO DETAIL12/AS500, PS-2.
35. SUPPLY CART - VV
36. SHELVING - VV
37. COMMERCIAL WASHER/DRYER COMBO - VV
38. MAGAZINE RACK - VV
39. PAMPHLET RACK - VV
40. ABA FIXED LOCKER BENCH
41. FOOD DISTRIBUTION CART - VV
42. UTILITY TUB - SEE P-SERIES DRAWINGS
43. INSTALL WINDOW FILM ON EXISTING WINDOW, A =
OPAQUE, B = 70% TRANSLUCENCY, C= OPAQUE BLACK
44. INTUMESCENT COATING AT EXPOSED COLUMNS
45. ALIGN
46. CONSTRUCT MTL. STUD TIGHT TO EXISTING COLUMN
47. ALIGN NEW TYPE "X" GYPSUM WALLBOARD WITH
FINISH FACE OF WINDOW OPENING. REFER TO
16/AS602
48. WINDOW SHADES (WS-1). MOUNT TIGHT TO WINDOW
FRAME. PROVIDE 2X6 IN WALL FRTW SURROUND FOR
HEAD/TRACK SECUREMENT.
49. MOVABLE WALL PARTITION - VV
50. FURNITURE-VV
CABINET DESIGNATIONS / ABBREVIATIONS
AG
BP
C
CB
CCT
D
DD
DF
DO
DS
ED
EP
F
FE
FV
HD
KBT
KS
MC
MF
MKBD
MW
O
OSC
PL/PLAM
PS
PTR
REF/FRZ
S
SA
SB
SC
SD
SH
SS
TD
TS
TL
TKBD
UCR
ACCESS GROMMET
BLANK PANEL
CART
COUNTERTOP BRACE
CUBICLE CURTAIN TRACK
DOOR BASE CABINET
DRAWER/DOOR BASE CABINET
DRAWER/FILE BASE CABINET
DRAWER/OPEN
DOOR(S) SLIDING
EQUAL DRAWERS
EMERGENCY POWER
FILLER PIECE 3/4" MIN - 2 1/2" MAX
FINISHED END OR FIXED EQUIPMENT
FIELD VERIFY
DOOR WALL CABINET
KEYBOARD TRAY
KNEE SPACE
MICROWAVE CABINET
MOBILE DRAWER/FILE CABINET
MARKERBOARD
MICROWAVE
OPEN FACE CABINET
OPEN SINK CABINET
PLASTIC LAMINATE
PEDESTAL SUPPORT PANEL
PRINTER
REFRIGERATOR/FREEZER
SINK
HAND SANITIZER
SINK BASE
STORAGE CABINET
SOAP DISPENSER
SHELF
STAINLESS STEEL
TOWEL DISPENSER
TACK SURFACE
TASK LIGHT
TACKBOARD
UNDER COUNTER REFRIGERATOR
W- WINDOW DESIGNATION. REFER TO SHEET
AS303 FOR SIZE, STYLE, AND TYPE
SEE SHEET AS000 FOR OTHER LEGEND ABBREVIATIONS
1. ALL WALLS TO REMAIN ARE TO RECEIVE NEW GYPSUM WALLBOARD
FINISH.
2. ANY EXPOSED PIPING TO REMAIN IS SHAL BE WRAPPED WITH 5/8"
TYPE "X" GYPSUM WALLBOARD ON METAL STUDS.
3. ALL SLAB INFILL IS TO MAINTAIN THE FIRE RATING PER THE CODE
ANALYSIS ON THE ASL-SERIES DRAWINGS.
FLOOR PLAN GENERAL NOTES
NOTE: NOT ALL CODED NOTES ARE NECESSARILY USED ON THIS SHEET.
ROBERT
BARGA
07459
ST
AT
E OF OHIO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\D es ig nL ev eL
\D oc um en ts \2
0- B2
6- Ar ch -C en tra l1 _D es ig nL ev eL -T
K.
rv t
BID DOCUMENTS
AS801
DLLDLL
ENLARGED PLANS AND
DETAILS-ALTERNATES
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594
Email: dynamix@dynamix‐ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
1/4" = 1'-0"3
ENLARGED DEMOLITION FLOOR PLAN
DETAIL- FIRST FLOOR_DEDUCT
ALTERNATE 3
1/4" = 1'-0"6
ENLARGED FLOOR PLAN DETAIL- FIRST
FLOOR_DEDUCT ALTERNATE 4
1/4" = 1'-0"4
ENLARGED FLOOR PLAN DETAIL- FIRST
FLOOR_DEDUCT ALTERNATE 3
1/4" = 1'-0"5
ENLARGED DEMOLITION FLOOR PLAN
DETAIL- FIRST FLOOR_DEDUCT
ALTERNATE 4
PS
EQ EQ
12" 36"
PLAN APPROVAL PURPOSES
THIS DRAWING IS NOT BEING SUBMITTED FOR
FIRE PROTECTION SYMBOLS LEGENDFIRE PROTECTION GENERAL NOTESSPRINKLER LOCATION IN CEILING TILE /
FS
DOMESTIC WATER SERVICE (U/G)
FIRE PROTECTION WATER SERVICE (U/G)
DOMESTIC COLD WATER (CW)
BALL OR BUTTERFLY VALVE
DRY PENDANT SPRINKLER
FIRE DEPARTMENT CONNECTION (EXPOSED)
FIRE PUMP TEST HEADER (CONCEALED)
DRY SIDEWALL SPRINKLER
VALVE W/ TAMPER SWITCH
PIPE-FLOOR PENETRATION (2ND FL.)
EQUIPMENT SERVED ON FLOOR ABOVE
CONNECTION POINT, NEW TO EXISTING
ELECTRICAL CONTRACTOR
FIRE HOSE CABINET
KITCHEN EQUIPMENT CONTRACTOR
PRESSURE GAUGE
A.F.F.
EXG.
K.E.C
SR.
P.C.
FHC
G.C.
H.C.
C.P.
D.I.
E.C.
C.I.
F1
EXISTING
GENERAL CONTRACTOR
HVAC CONTRACTOR
SUPPLY RISER
PLUMBING CONTRACTOR
PRESSURE SWITCH
FLOW SWITCH
CAST IRON
CHROME PLATED
DUCTILE IRON
ABOVE FINISHED FLOOR
FDC.
FH
FTH.
PIV.
FIRE
F/L W/L
GATE VALVE
OS&Y GATE VALVE
FIRE HYDRANT
CURB BOX VALVE
POST INDICATING VALVE
UPRIGHT SPRINKLER
PENDANT SPRINKLER
CONCEALED SPRINKLER
SIDEWALL SPRINKLER
FIRE SPRINKLER MAIN
PIPE CAP (OR PLUG)
PIPE DOWN
PIPE UP
DP DRY PIPE
BF BULK FEED
DRY PIPE VALVE
ALARM VALVE
DETAIL REFERENCE SYMBOL, DETAIL "A" SHOWN ON SHEET "FP2.1"FP2.1
A
D TEST / DRAIN PIPING
FIRE PROTECTION CONTRACTORF.C.
2' x 4' CEILING TILE
SCALE: NONE
2' x 2' CEILING TILE2' x 4' CEILING TILE W/ DIVIDER
SPRINKLER SPRINKLER SPRINKLER
(EITHER LOCATION)
CL
CLLC
LC
1.- PROVIDE COMPLETE WET PIPE FIRE SPRINKLER PROTECTION PER NFPA 13
AND WET STANDPIPE PROTECTION PER NFPA 14 (COMBINED SYSTEM)
THROUGHOUT THE RENOVATION AS FOLLOWS:
(A) SPRINKLER SYSTEM DESIGN SHALL BE BASED ON LIGHT HAZARD
OCCUPANCY IN LOBBIES, OFFICES, & SIMILAR AREAS, HYDRAULICALLY
CALCULATED W/ A DENSITY OF .10 GPM/SQ. FT. FOR 1500 SQ. FT. REMOTE
AREA OF SPRINKLER OPERATION FOR EACH DESIGN AREA. SPRINKLER SPACING
SHALL NOT EXCEED 225 SQ. FT. PER SPRINKLER IN FINISHED SPACES. (180 SQ.
FT. PER SPRINKLER IN SHELLED SPACES).
(B) SPRINKLER SYSTEM DESIGN SHALL BE BASED ON ORDINARY HAZARD
OCCUPANCY IN MECH. EQUIP. ROOMS & STORAGE AREAS HYDRAULICALLY
CALCULATED WITH A DENSITY OF .15 GPM/SQ. FT. FOR 1500 SQ. FT. REMOTE
AREA OF SPRINKLER OPERATION FOR EACH DESIGN AREA. SPRINKLER SPACING
SHALL NOT EXCEED 130 SQ. FT. PER SPRINKLER.
(C) STANDPIPE SYSTEM SHALL BE CLASS I WITH FIRE VALVE CABINETS
CONTAINING 2-1/2" FIRE HOSE VALVES WITH FACTORY ADJUSTED PRESSURE
REGULATORS. MINIMUM FLOW RATE FOR THE HYDRAULICALLY MOST REMOTE
STANDPIPE SHALL BE 500 GPM AND 250 GPM FOR ADDITIONAL STANDPIPES
NOT TO EXCEED 1250 GPM. A MINIMUM RESIDUAL PRESSURE OF 100 PSI AT
THE OUTLET OF THE HYDRAULICALLY MOST REMOTE 2-1/2" HOSE
CONNECTION SHALL BE PROVIDED.
2.- SPRINKLERS SHALL BE LOCATED IN RELATIONSHIP TO LIGHTING FIXTURES &
HVAC DIFFUSERS. SPRINKLERS SHALL BE CENTERED IN CEILING TILES (OR AT
THE "QUARTER" POINTS) & MAINTAIN A SYMMETRICAL PATTERN FOR AN
AESTHETICALLY PLEASING EFFECT. NO PIPING SHALL BE EXPOSED W/ THE
EXCEPTION OF PIPING IN AREAS OF EXPOSED CONSTRUCTION. GYMNASIUMS,
LABS & ANY OTHER PUBLIC SPACES W/ EXPOSED STRUCTURE SHALL HAVE ALL
PIPING ABOVE THE BOTTOM CHORD OF TRUSSES. ADDITIONAL
COORDINATION W/ HVAC, ELECTRICAL, PLUMBING, & CEILING CONT'RS. WILL
BE NECESSARY.
3.- FIRE PROTECTION RISERS AND MAINS ARE SHOWN FOR COORDINATION
PURPOSES AND SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO LOCATIONS
INDICATED ON THIS PLAN.
4.- ALL PIPING SHALL BE CONCEALED IN AREAS OF FINISHED CONSTRUCTION.
FINISHED AREAS WITH EXPOSED STRUCTURE SHALL HAVE ALL PIPING RUN
ABOVE THE BOTTOM CHORD OF TRUSSES UNLESS NOTED OTHERWISE.
5.- ALL FIRE PROTECTION INSTALLATION SHALL BE IN STRICT ACCORDANCE
WITH THE LATEST EDITIONS OF THE OHIO BUILDING CODE & NFPA
STANDARDS.
6.- THESE PLANS WERE NOT PREPARED FOR SUBMITTAL & APPROVAL OF FIRE
PROTECTION SYSTEMS.
7.- THIS PLAN IS PROVIDED TO ASSIST CONTRACTORS IN PREPARING A
COMPLETE FIRE PROTECTION BID. THE CONTRACTOR SHALL INCLUDE ALL
WORK AND COSTS OF MATERIALS AND INSTALLATION, AND PREPARATION OF
DRAWINGS AND HYDRAULIC CALCULATIONS.
8.- SUBMIT COMPLETE SPRINKLER / PIPING DRAWINGS AND HYDRAULIC
CALCULATIONS TO AUTHORITIES HAVING JURISDICTION.
9.- PROVIDE SUPERVISORY SWITCHES FOR ALL VALVES CONTROLLING THE FIRE
SPRINKLER AND STANDPIPE SYSTEMS. SUPERVISORY SWITCHES AND FLOW
SWITCHES SHALL BE INSTALLED BY F.P. CONTRACTOR AND WIRED BY
ELECTRICAL CONTRACTOR.
10.- FIRE PROTECTION CONTRACTOR SHALL PERFORM A NEW FLOW TEST
PRIOR TO PREPARING HYDRAULIC CALCULATIONS.
11.- PRIOR TO FABRICATION OR INSTALLATION OF PIPING, THE FIRE
PROTECTION CONT'R. SHALL COORDINATE LOCATIONS & ELEVATIONS OF
OTHER EQUIPMENT, INCLUDING, BUT NOT LIMITED TO LIGHT FIXTURES,
DIFFUSERS, DUCTWORK, CONDUITS, PIPING, & CEILING GRID. OBTAIN
SIGNATURES OF OTHER TRADES ON THE COORDINATION DRAWING.
THIS PLAN IS PREPARED TO ASSIST FIRE PROTECTIONS (SUB)CONTRACTORS
IN SUBMITTING A BID. SUCCESSFULL (SUB)CONTRACTORS SHALL PREPARE
DETAILED DRAWINGS, PAY FOR PLAN APPROVAL FEES, OBTAIN PERMITS,
AND SUBMIT DRAWINGS TO AUTHORITY(IES) HAVING JURISDICTION OVER
THE PROJECT.
P
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
© Copyright 2017
2690 W. Dublin-Granville Road, Columbus, OH 43214
p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\m sp en gl er \D oc um en ts
\1
0-
B2 6-
Pl um bF P-
C en tra l_ m sp en gl er dy na m ix
-lt d.
co m
.rv t
BID DOCUMENTS
FX000
DELDEL
FIRE PROTECTION LEGENDS
AND DETAILS
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUES IN BUILDING 26
FIRE PROTECTION SHEET INDEX
FX000 FIRE PROTECTION LEGENDS AND DETAILS
FX100 BASEMENT FIRE PROTECTION PLAN
FX101 FIRST FLOOR FIRE PROTECTION PLAN
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443-1178 Fax: (614) 443-1594
Email: dynamix@dynamix-ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
GI
RS
S
R P
F E
O
E E T
L
I G
S
N A O N
RE
E
D
I
R
S
E N
E
HTA
T
S
E OF
MACE E-50556
O
OI
MONTGOMERY E-66852
GRIFFIN E-57049
UP
PIPE BASEMENT
CORRIDOR
(BASEMENT)
C32A
3 4 3 4
FI
RE
FI
RE
FI
RE
FI
RE
FIRE(E)
FI
RE
(E
FI
RE
(E
FI
RE
(E
Storage
Stair S2-0
Linen
Linen Storage
EMS Supervisor
MER
CIO
P1 Equipment
Equipment 9A
Elec Closet
4D
Toilet 4A
HAC
Recreation 2A
EMS Storage
EMS Storage
Recreation Clinic
Storage 4C
Craft 4B
Stair S1-0
Men's Toilet
Women's Toilet
HAC
Tele 27A
Social Work Service
EMS Office
EMR
Stair S5-0
Cooridor
Chapel
Canteen Storage
Storage 25A Toilet
23A
MER
Stair S3-0
Employee Health Rest Area 18A
Storage 18B
Occupational Safety & Health Manager
18C
Employee Health Exam 18D
Employee Health Phy Extender
18E
Employee's Health Program Support Clerk
18F
Industrial Hygenist 18G
GEMS Coordinator 18H
Safety Program Support Specialist
18I
Employee Health
MER
Canteen Storage
Supply Room
EMS Storage 24A
Stair S4-0
3 3
EXG. BACKFLOW PREVENTOR
EXG. FIRE ENTRANCE
EXG. FIRE DEPARTMENT
CONNECTION
FIRE(E)
EXG. SPRINKLER DRAIN
4"
3"
3"
PLAN NOTES
1.- EXISTING SPRINKLER SYSTEM TO REMAIN.
2.- EXISTING 4" SPRINKLER STANDPIPE TO REMAIN.
3.- EXTEND NEW SPRINKLER MAIN TO NEW ADDITION BASEMENT AS
REQUIRED. PROVIDE UPRIGHT SPRINKLER HEADS FOR ADEQUATE COVERAGE
OF AREA WITHOUT CEILING.
4.- ORDINARY HAZARD GROUP I AREA.
5.- MODIFY EXISTING SPRINKLER HEADS & RELATED PIPING AS NECESSARY TO
PROVIDE ADEQUATE COVERAGE OF NEW ROOMS. COORDIANTE SPRINKLER
HEAD LOCATION W/ NEW CEILING LAYOUT.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
© Copyright 2017
2690 W. Dublin-Granville Road, Columbus, OH 43214
p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C :\U se rs
\m sp en gl er \D oc um en ts
\1
0-
B2 6-
Pl um bF P-
C en tra l_ m sp en gl er dy na m ix
-lt d.
co m
.rv t
BID DOCUMENTS
FX100
DELDEL
BASEMENT FIRE
PROTECTION PLAN
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUES IN BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443-1178 Fax: (614) 443-1594
Email: dynamix@dynamix-ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
SCALE: 1/8" = 1'-0"
BASEMENT FIRE PROTECTION PLAN
GI
RS
S
R P
F E
O
E E T
L
I G
S
N A O N
RE
E
D
I
R
S
E N
E
HTA
T
S
E OF
MACE E-50556
O
OI
MONTGOMERY E-66852
GRIFFIN E-57049
NON RATED SMOKE PARTITION
1-HOUR SMOKE BARRIER
1 HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
WALL RATING LEGEND
STAFF LOUNGE /
LOCKERS
CONFERENCE
ROOM
EQUIPMENT
STORAGE
TOILET
ELEC.
INTAKE ROOM
IT/DATA ROOM
SHARED
WORKROOM
VESTIBULE
VISITOR ROOM
SHARED
WORKROOM
EXAM ROOM
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1D 128A
PATIENT ROOM
TYPE B
WAITING
HAC
LINEN VESTIBULE
LINEN CHUTE
130A
STORAGE
133A
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1B 125A
PATIENT ROOM
TYPE B
PATIENT ROOM
TYPE A
PATIENT
BATHROOM TYPE
1B 127A
PATIENT
BATHROOM TYPE
1B 124A
PATIENT
BATHROOM TYPE
1A 122A
PATIENT ROOM
TYPE A
PATIENT
BATHROOM TYPE
1B 121A
STORAGE
120A
MED ROOM
TREATMENT TEAM
ROOM
TUB ROOM
ELEC.
TOILET
CONSULT ROOM
CONSULT ROOM
NURSE STATION
ISOLATION ROOM
110A
PATIENT
BATHROOM TYPE
1D 114A
PATIENT ROOM -
TYPE B
ISOLATION ANTE
ROOM
PATIENT ROOM
TYPE A
PATIENT
BATHROOM
TYPE1A
109A
PATIENT
BATHROOM TYPE
1A 111A
PATIENT ROOM
TYPE A
PATIENT ROOM
TYPE A
PATIENT ROOM
TYPE A
DAY ROOM
PATIENT
BATHROOM TYPE
1A 108A
PATIENT
BATHROOM TYPE
1A 107A
PATIENT
BATHROOM TYPE
1A 170A
PATIENT ROOM
TYPE 'A'
PATIENT ROOM
TYPE 'A'
PATIENT
BATHROOM TYPE
1A 167A
PATIENT
BATHROOM TYPE
1A 168A
PATIENT ROOM
TYPE 'A
QUIET ROOM
TOILET
TOILET
TOILET
MED ROOM
100A
SOILED UTILITY
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1D 164A
ELEC.
PATIENT LAUNDRY
TREATMENT TEAM
ROOM
STORAGE
158A
MED ROOM
NURSE STATION
PATIENT
BATHROOM TYPE
1B 157A
PATIENT ROOM
TYPE A
PATIENT ROOM
TYPE A
PATIENT
BATHROOM TYPE
1A 156A
EXISTING STAIR
S3-1
SEMI-PRIVATE
PATIENT ROOM
SEMI-PRIVATE
PATIENT ROOM
EXISTING STAIR
S5-1
EXISTING STAIR
S2-1
PATIENT
BATHROOM TYPE
1C 147A
PATIENT
BATHROOM - TYPE
1C 148A
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1B 152A
PATIENT ROOM
TYPE B
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1B 154A
PATIENT ROOM
TYPE B
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1B 151A
PATIENT
BATHROOM TYPE
1B 153A
DIRTY LINEN
C109A
NURSE STATION
DAY ROOM
RECREATION
DINING
DIRTY LINEN
C105A
PATIENT ROOM
TYPE B
PATIENT
BATHROOM TYPE
1B 126A
PATIENT
BATHROOM 1B
138A
VISITOR ROOM
NURSE MANAGER
PATIENT ROOM
TYPE A
PATIENT
BATHROOM TYPE
1A 169A
COURTYARD
2"
FIRE(E)
FI
RE
FI
RE
FI
RE
(E
FI
RE
(E
FI
RE
(E
FIRE FIRE
FI
RE
(E
FI
RE
(E
FIRE(E)
CORRIDOR
C105
CORRIDOR
C104
CORRIDOR
C103
CORRIDOR
C102
CORRIDOR
C101
CORRIDOR
C112
CORRIDOR
C100
CORRIDOR
C111
CORRIDOR
C110
CORRIDOR
C108
CORRIDOR
C109
CORRIDOR
C107
CLEAN LINEN
PATIENT
BATHROOM TYPE
1D 150A
PATIENT
COMPUTER
ACCESS
C110A
MED GAS
GROUP ROOM
CLEAN UTILITY
PATIENT
COMPUTER
ACCESS
C103A
CORRIDOR
C106
HAC
GROUP ROOM
VISITOR TOILET
105A
NURSE WORK
PATIENT TOILET
TYPE 1D
110B
CLOSET
EXISTING STAIR
S1-1
EXISTING STAIR
S4-1
PHONE ALCOVE
C103B
PHONE ALCOVE
C110B
ALCOVE
C102B
ALCOVE
C102A
ALCOVE
C111B
ALCOVE
C111A
STORAGE
CLOSET
4 4
1 1/2"
4 4
DEDUCT ALTERNATE 3
DEDUCT ALTERNATE 1
DEDUCT ALTERNATE 4 8
DEDUCT ALTERNATE 2 9
DEDUCT ALTERNATE 2 9
DEDUCT ALTERNATE 29
DEDUCT
ALTERNATE 2
DEDUCT ALTERNATE 2 10
EXG. FLOW
SWITCH
COURTYARD
CLOSET
102A
PLAN NOTES
1.- EXG. 4" FIRE PROTECTION RISER DOWN TO BASEMENT TO REMAIN.
2.- PROVIDE NEW SPRINKLER MAIN & EXTEND TO NEW ADDITION AS REQUIRED.
3.- ORDINARY HAZARD GROUP I AREA.
4.- ORDINARY HAZARD GROUP II AREA.
5.- AREA WITHIN REGION IS NEW WORK. ALL OTHER AREA OUTSIDE IS TO BE
RENOVATED.
6.- ALTERNATE 3: IF ALTERNATE 3 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS
AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES
WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR
ALTERNATE INFORMATION.
7.- ALTERNATE 1: IF ALTERNATE 1 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS
AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES
WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR
ALTERNATE INFORMATION.
8.- ALTERNATE 4: IF ALTERNATE 4 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS
AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES
WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR
ALTERNATE INFORMATION.
9.- ALTERNATE 2: IF ALTERNATE 2 IS ACCEPTED, THIS SPACE IS TO BE SHELL
SPACE ONLY. PROVIDE UPRIGHT SPRINKLER HEADS FOR ADEQUATE SPRINKLER
COVERAGE OF SHELL SPACE WITH NO CEILING. REFER TO SPECIFICATION 01 00
00 FOR ALTERNATE INFORMATION.
10.- ALTERNATE 2: IF ALTERNATE 2 IS ACCEPTED, THIS SPACE IS TO BE UTILIZED
AS A DUAL OCCUPANCY ROOM. ADJUST SPRINKLER HEAD LOCATIONS AS
NECESSARY TO ACCOMMODATE NEW CEILING & ROOM LAYOUT. REFER TO
SPECIFICATION 01 00 00 FOR ALTERNATE INFORMATION.
Drawing Title
Approved:
Proje…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.