VA250-17-B-0970-018.pdf

PDF 20 MB Posted

Attached to
Building 26 Addition
Solicitation number
VA25017B0970
Issued by

About this file

VA250-17-B-0970 2018-02-13_B26_RE-BID_DRAWINGS_Part2.pdf

View the file

Other files

File Type Posted
36C25018C0186-003.docx DOCX document
VA250-17-B-0970-0004001.pdf PDF
VA250-17-B-0970-0004000.docx DOCX document
VA250-17-B-0970-0003001.pdf PDF
VA250-17-B-0970-0003000.docx DOCX document
VA250-17-B-0970-00002000.docx DOCX document
VA250-17-B-0970-00002001.pdf PDF
VA250-17-B-0970-00001000.docx DOCX document
VA250-17-B-0970-00001001.pdf PDF
VA250-17-B-0970-021.pdf PDF
VA250-17-B-0970-019.pdf PDF
VA250-17-B-0970-020.pdf PDF
VA250-17-B-0970-025.pdf PDF
VA250-17-B-0970-022.pdf PDF
VA250-17-B-0970-016.pdf PDF
VA250-17-B-0970-024.pdf PDF
VA250-17-B-0970-017.pdf PDF
VA250-17-B-0970-023.pdf PDF
VA250-17-B-0970-015.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

S

S

S

S

S

S

S

S S

S S

S

S S

S

7.0

6.0

5.0

4.0

3.0

2.0

1.0

B.0

B.0 E.1

3.2

2.4

1.6

L.0J.0C.5

C.0

C.0

D.0

D.0

C.1 C.9

F.0 G.0 G.5E.5 F.3 F.4 G.3

G.8

H.9 L.1G.4 H.0

7.2

A.0 E.0

J.5H.7G.9G.2G.1E.7

STAFF

LOUNGE /

LOCKERS

EQUIPMENT

STORAGE

ELEC.

INTAKE

ROOM

VESTIBULE

VISITOR

ROOM

SHARED

WORKROOM

EXAM

ROOM

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1D

128A

PATIENT

ROOM

TYPE B

WAITING

HAC

LINEN

VESTIBULE

LINEN

CHUTE

130A

STORAGE

133A

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1B

125A

PATIENT

ROOM

TYPE B

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1B

127A

PATIENT

BATHROOM

TYPE 1B

124A

PATIENT

BATHROOM

TYPE 1A

122A

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1B

121A

NURSE

STATION

EXISTING

STAIR

S2-1

DIRTY

LINEN

C105A

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1B

126A

PATIENT

BATHROOM

1B 138A

VISITOR

ROOM

CORRIDOR

C105

CORRIDOR

C104

CORRIDOR

C107

MED GAS

CORRIDOR

C106

1/AS703

1/

AS

1/

AS

1/

AS

1/AS701

1/

AS

1/AS701VISITOR

TOILET

105A

STORAGE

C105

S2-1-A

S2-1-B

138-A

138-B

5A

C

CLOSET

6' - 2 1/2"

1'

7/

8"

LN

-5

LN-5

GT

-3

PT-5

LN

-5

LN

-5

LN

-5

LN

-5

LN

-5

LN

-5

LN-1

LN-2

PL-1

AL

IG

N

LN-1

2' - 10 1/2"

3'

- 0

3'

- 0 7/

8"

R 48' - 9 5/16"

105A.1

138.2 138.1137.1

5.

136.1

141.1

145.1

143.1

144.1142.1

C107.1

133.1 132.1

129.1 131.1

S2-1.1

125.1

123.1

124.1

126.1

127.1 128.1

C105.1

122.1

121.1

C106.3

C104.1

C106.1

C106.2

C106.4

C107.2

2'

0"

2'

0"

1/AS704

U N

O 2'

0"

T

YP

2'

0"

UNO

1' - 0" TYP

105A.2

141.2

130.1

C104.2

C106.7

PT

-4

PT

-4

PT

-7

PT

-4

PT-2

137.2

PT-5

120.2

LN

-5

PT

-5

LN

-5

PT

-5

LN

-5

PT

-5

LN

-5

PT

-5

LN

-5

PT

-5

LN-5

PT-5

LN-5

PT-5

PT-3

PT-4

LN

-4

UNO

1' - 0" TYP

UNO

1' - 0" TYP

U N

O 1'

0"

T

YP

UNO

1' - 0" TYP

1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL

SCHEDULE ON AS705 FOR MATERIAL TYPES.

2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM

MATERIALS.

3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE

OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.

5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR

MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.

FLOOR FINISH PLAN GENERAL NOTES

FLOOR FINISH PLAN LEGEND

FLOOR PATTERN - SEE PLAN FOR MATERIAL AND

COLOR TYPE

XXX ROOM SIGNAGE AND TAG - VV. REFER TO

SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

NOTE:

THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS

AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19

ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE

INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS

DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL

COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION

REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION

REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND

CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE

SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING

INSTALLATIONS.

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

1 Revision 1 Date 1

BID DOCUMENTS

AS701

DLLDLL

PARTIAL FLOOR FINISH PLAN -

FIRST FLOOR AREA A

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA A

S

S

S

S

S S

S S

S S

S

7.0

6.0

5.0

4.0

3.0

2.0

1.0

3.2

2.4

1.6

L.0 L.1 M.0

7.2

U.0S.5 T.0S.0 S.9S.1Q.0P.0N.0 Q.5P.2N.3M.5 N.2 V.0R.0

CONFERENCE

ROOM

TOILET

IT/DATA

ROOM

SHARED

WORKROOM

NURSE

STATION

PATIENT

BATHROOM

TYPE 1B

157A

PATIENT

ROOM

TYPE A

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1A

156A

EXISTING

STAIR

S3-1

SEMI-PRIVATE

PATIENT

ROOM

SEMI-PRIVATE

PATIENT

ROOM

EXISTING

STAIR

S5-1

PATIENT

BATHROOM

TYPE 1C

147A

PATIENT

BATHROOM

- TYPE 1C

148A

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1B

152A

PATIENT

ROOM

TYPE B

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1B

154A

PATIENT

ROOM

TYPE B

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1B

151A

PATIENT

BATHROOM

TYPE 1B

153A

DIRTY

LINEN

C109A

CORRIDOR

C108

CORRIDOR

C109

CORRIDOR

C107

HAC

1/

AS

1/

AS

1/

AS

1/AS704

1/AS702

1/

AS

1/AS701

STORAGE

S5-1 S3-1A

C106

C109

C

S3-1-B

(TYP)

2' - 11 1/4" 1'

7/ 8"

1' - 4 1/2"

PT-7

LN

-7

LN

-7

LN

-7

LN

-7

LN

-7

LN

-7

LN

-7

LN-7

LN-1

LN-1

LN-7LN-7

PT-7

146.1

147.1 148.1

140.1

139.1

S5-1.1

141.1

143.1

144.1

158.1

C108.2

S3-1.1

149.1

157.1

156.1

155.1

154.1

151.1

150.1

152.1

153.1

C109.1

C106.5

C108.3

C107.2

1/AS704

ALIGN ALIGN

141.2

C108.1

158.2 C106.6

CLOSET

PT-7

PT-4

L.3

LN-7

LN-7

LN

-7

PT-7

PT-7

PT

-7

PT

-7

LN

-7

PT

-7

LN

-7

PT

-7

LN

-7

PT

-7

LN

-7

LN-7

PT-7

LN-7

PT-7

UNO

1' - 0" TYP

UNO

1' - 0" TYP

UNO

1' - 0" TYP

U N

O 1'

0"

T

YP

U N

O 1'

0"

T

YP

1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL

SCHEDULE ON AS705 FOR MATERIAL TYPES.

2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM

MATERIALS.

3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE

OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.

5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR

MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.

FLOOR FINISH PLAN GENERAL NOTES

FLOOR FINISH PLAN LEGEND

FLOOR PATTERN - SEE PLAN FOR MATERIAL AND

COLOR TYPE

XXX ROOM SIGNAGE AND TAG - VV. REFER TO

SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

NOTE:

THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS

AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19

ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE

INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS

DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL

COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION

REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION

REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND

CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE

SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING

INSTALLATIONS.

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

BID DOCUMENTS

AS702

DLLDLL

PARTIAL FLOOR FINISH PLAN -

FIRST FLOOR AREA B

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA B

S

S

S

S

S

S

S

S

S

SSSS

S

S

S

12.0

11.0

10.0

9.0

8.0

7.0

B.0 C.5C.0 D.0C.1 F.0 G.0 G.5E.5 F.3 F.4 G.3 G.8 H.9 L.1G.4 H.0

7.2

A.0 E.0 J.5H.7G.9G.2G.1E.7

13.0

10.1

9.1

8.8

7.6

7.5

STORAGE

120A

MED ROOM

TREATMENT

TEAM

ROOM

TUB ROOM

ELEC.

TOILET

CONSULT

ROOM

CONSULT

ROOM

NURSE

STATION

ISOLATION

ROOM

110A

PATIENT

BATHROOM

TYPE 1D

114A

PATIENT

ROOM -

TYPE B

ISOLATION

ANTE ROOM

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE1A

109A

PATIENT

BATHROOM

TYPE 1A

111A

PATIENT

ROOM

TYPE A

PATIENT

ROOM

TYPE A

PATIENT

ROOM

TYPE A

DAY ROOM

PATIENT

BATHROOM

TYPE 1A

108A

PATIENT

BATHROOM

TYPE 1A

107A

TOILET

MED ROOM

100A

NURSE

STATION

CORRIDOR

C103

CORRIDOR

C102

CORRIDOR

C101

CORRIDOR

C100

CLEAN

LINEN

1/AS703

1/

AS

1/

AS

1/AS701

1/

AS

1/AS701

1/

AS

1/

AS

VISITOR

TOILET

105A

NURSE

WORK

GROUP

ROOM

CORRIDOR

C100

PATIENT

TOILET

TYPE

1D 110B

PHONE

ALCOVE

C103B

PATIENT

COMPUTER

ACCESS

C103A

ALCOVE

C102B

ALCOVE

C102A

EXISTING

STAIR

S1-1

S1-1

9 10

110A

0A

-B

174104

119-A

C

106 176

C

100-A 100-B

C

5A

9-

B

100A-A

APPLY PRIVACY FILM ON WINDOWS

2' - 11"

(TYP)

LN-4

LN-4LN-4LN-4LN-4

LN

-4

LN-6 LN-6

LN-5

LN-5

PT-4

PL-1

PL-1

0.

0.

0A

.1

4.

6.

5.

3.

102.1

101.2

101.1 110.1

111.1 109.1

108.1 107.1

C100.1

120.1

119.1

120A.1

118.1

117.1 115.1

S1-1.1 116.1

113.1 114.1

112.1

C106.2

C101.1

C103.1

C103.2

1/AS704

1/

AS

UNO

2' - 0" TYP U

N O

1'

0" T

YP

TY

P

2'

0"

CONC-S

116.2

4.

4.

105A.2

C104.2

C106.7

C103B.1

172.2

100.3

PT-6

CLOSET

102A

PT-7

RB-7

PT-1

COLUMN WRAP

PL

-1

102A.1

L.3

PT-5

120.2

CONC-S

LN-5

PT-5

LN

-4

PT

-4

LN

-4

PT

-4

LN

-4

PT

-4

LN

-4

PT

-4

LN

-4

PT

-4

LN

-3

PT

-3

PT-3LN-3

PT-3

LN

-4

PT

-4

FLOOR PATTERN

U N

O 1'

0"

T

YP

UNO

1' - 0" TYP

UNO

1' - 0" TYP

UNO

1' - 0" TYP

UNO

1' - 0" TYP

1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL

SCHEDULE ON AS705 FOR MATERIAL TYPES.

2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM

MATERIALS.

3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE

OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.

5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR

MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.

FLOOR FINISH PLAN GENERAL NOTES

FLOOR FINISH PLAN LEGEND

FLOOR PATTERN - SEE PLAN FOR MATERIAL AND

COLOR TYPE

XXX ROOM SIGNAGE AND TAG - VV. REFER TO

SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

NOTE:

THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS

AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19

ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE

INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS

DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL

COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION

REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION

REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND

CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE

SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING

INSTALLATIONS.

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

1 Revision 1 Date 1

BID DOCUMENTS

AS703

DLLDLL

PARTIAL FLOOR FINISH PLAN -

FIRST FLOOR AREA C

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA C

S

S

S

S

S

S

S

S S

SS

S

S

S

12.0

11.0

10.0

9.0

8.0

7.0

L.1 M.0

7.2

U.0S.5 T.0S.0 S.9S.1Q.0P.0N.0 Q.5P.2N.3M.5 N.2 V.0R.0

Q.2P.1N.5M.1

J.5

13.0

10.1

9.1

8.8

7.6

7.5

PATIENT

BATHROOM

TYPE 1A

170A

PATIENT

ROOM

TYPE 'A'

PATIENT

ROOM

TYPE 'A'

PATIENT

BATHROOM

TYPE 1A

167A

PATIENT

BATHROOM

TYPE 1A

168A

PATIENT

ROOM

TYPE 'A

QUIET

ROOM

TOILET

TOILET

SOILED

UTILITY

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1D

164A

ELEC.

PATIENT

LAUNDRY

TREATMENT

TEAM

ROOM

STORAGE

158A

MED ROOM

NURSE

STATION

NURSE

STATION

RECREATION

DINING

NURSE

MANAGER

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1A

169A

COURTYARD

CORRIDOR

C112

CORRIDOR

C111

CORRIDOR

C110

CLEAN

UTILITY

DAY ROOM

1/

AS

1/

AS

1/AS704

1/AS702

1/

AS

1/AS701

1/

AS

1/

AS

CORRIDOR

C100

PHONE

ALCOVE

C110B

PATIENT

COMPUTER

ACCESS

C110A

ALCOVE

C111B

ALCOVE

C111A

EXISTING

STAIR

S4-1

S4-1

C106

5B

100-B

C

9-

B

175A-A

175A-B

159-A

TY

P

2'

0"

LN-4 LN-4 LN-4 LN-4

LN

-4

LN-6 LN-6

LN-5

LN-5

PL-1

PL-1

PT-7

0.

2.

4.

6.

170.1 169.1 168.1

171.1 166.1

175.1

167.1

165.1 164.1

162.1

161.1 163.1

S4-1.1

160.1

158.1

159.1

158A.1

C112.1

C110.1

C108.4

1/AS704

1/

AS

U N

O 1'

0"

T

YP

UNO

2' - 0" TYP

ALIGN ALIGN

162.2

4.

SERVERY

175A

C108.1

175A.1

173.1

C110B.1

172.2

100.3

158.2 C106.6

PT-3

PT-1

COLUMN WRAP

PL

-1

L.3

CONC-S

CONC-S

LN

-4

LN

-4

LN

-4

LN

-4

LN

-4

PT

-4

PT

-4

PT

-4

PT

-4

LN-4

PT-4

PT

-4

PT

-3

PT

-3

LN-3

PT-3

FLOOR PATTERN

FLOOR PATTERN

UNO

1' - 0" TYP

U N

O 1'

0"

T

YP

UNO

1' - 0" TYP

U N

O 1'

0"

T

YP

1. REFER TO SPECIFICATION SECTION 09 06 00 FINISH MATERIAL

SCHEDULE ON AS705 FOR MATERIAL TYPES.

2. REFER TO ROOM FINISH SCHEDULE ON AS600 FOR ROOM

MATERIALS.

3. SIGNAGE -VV. REFER TO SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

4. ALIGN FLOOR PATTERN AT PATIENT ROOM DOORS WITH OUTSIDE

OF FRAME ON HINGE SIDE OF DOOR, TYP UNO.

5. PROVIDE FLOOR TRANSITION STRIP BETWEEN ALL DISSIMILAR

MATERIALS. REFER TO DETAILS IN AS600 SERIES DRAWINGS.

FLOOR FINISH PLAN GENERAL NOTES

FLOOR FINISH PLAN LEGEND

FLOOR PATTERN - SEE PLAN FOR MATERIAL AND

COLOR TYPE

XXX ROOM SIGNAGE AND TAG - VV. REFER TO

SIGNAGE SCHEDULE ON AS705 FOR

REFERENCE ONLY.

NOTE:

THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS

AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19

ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE

INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS

DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL

COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION

REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION

REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND

CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE

SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING

INSTALLATIONS.

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

BID DOCUMENTS

AS704

DLLDLL

PARTIAL FLOOR FINISH PLAN -

FIRST FLOOR AREA D

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

1/4" = 1'-0"1 FIRST FLOOR FINISH PLAN - AREA D

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

BID DOCUMENTS

AS705

DLLDLL

SIGNAGE SCHEDULE AND FINISH

MATERIAL SCHEDULE

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

SIGNAGE SCHEDULE

Room Number Room Name Sign Designation Sign Type Notes

C104 Corridor C104.2 IN-01.01.01 C105 Corridor C105.1 IN-01.03 C106 Corridor C106.1 IN-01.08 C106 Corridor C106.2 IN-01.08 C106 Corridor C106.3 IN-01.02 C106 Corridor C106.4 IN-01.08 C106 Corridor C106.5 IN-01.08 C106 Corridor C106.6 IN-01.08 C106 Corridor C106.7 IN-01.01.01 C107 Corridor C107.1 IN-01.04 C107 Corridor C107.2 IN-01.08 C108 Corridor C108.1 IN-01.01.01 C108 Corridor C108.2 IN-01.02 C108 Corridor C108.3 IN-01.08 C108 Corridor C108.4 IN-01.08 C109 Corridor C109.1 IN-01.03 C110 Corridor C110.1 IN-01.08 C110B Phone Alcove C110B.1 IN-18.01 See 5/AS505 for graphics C112 Corridor C112.1 IN-01.08 S1-1 Existing Stair S1-1.1 IN-01.03, IN-09.08 S2-1 Existing Stair S2-1.1 IN-01.03, IN-09.08 S3-1 Existing Stair S3-1.1 IN-01.03, IN-09.08 S4-1 Existing Stair S4-1.1 IN-01.03, IN-09.08 S5-1 Existing Stair S5-1.1 IN-01.03, IN-09.08

SIGNAGE SCHEDULE

Room Number Room Name Sign Designation Sign Type Notes

100 Nurse Station 100.1 IN-03.01 100 Nurse Station 100.2 IN-03.01 100 Nurse Station 100.3 IN-01.03 100A Med Room 100A.1 IN-03.01 101 Day Room 101.1 IN-03.01 101 Day Room 101.2 IN-18.01 Insert text to read "NO EXIT" 102 Group Room 102.1 IN-04.03 Insert text to read "Group Room" 102A Group Room Storage 102A.1 IN-03.01 103 Group Room 103.1 IN-04.03 Insert text to read "Group Room" 104 Toilet 104.1 IN-03.01 104 Toilet 104.2 IN-09.01 105 Nurse Work 105.1 IN-04.03 Insert text to read "Nursing" 105A Visitor Toilet 105A.1 IN-03.01 105A Visitor Toilet 105A.2 IN-09.01 106 Clean Linen 106.1 IN-04.03 Insert text to read "Clean Linen" 107 Patient Room 107.1 IN-04.04 108 Patient Room 108.1 IN-04.04 109 Patient Room 109.1 IN-04.04 110 Isolation Room 110.1 IN-04.03 Insert text to read "Isolation Room" 111 Patient Room 111.1 IN-04.04 112 Consult Room 112.1 IN-04.03 Insert text to read "Consult Room" 113 Consult Room 113.1 IN-04.03 Insert text to read "Consult Room" 114 Patient Room 114.1 IN-04.04 115 Electric 115.1 IN-03.01 116 Toilet 116.1 IN-03.01 116 Toilet 116.2 IN-09.01 117 Treatment Team Room 117.1 IN-04.03 Insert text to read "Treatment Team Room" 118 Tub Room 118.1 IN-04.03 Insert text to read "Tub Room" 119 Med Room 119.1 IN-03.01 120 Nurse Station 120.1 IN-03.01 120 Nurse Station 120.2 IN-01.03 120A Storage 120A.1 IN-04.03 Insert text to read "Storage" 121 Patient Room 121.1 IN-04.04 122 Patient Room 122.1 IN-04.04 123 Closet 123.1 IN-04.03 Insert text to read "Storage" 124 Patient Room 124.1 IN-04.04 125 Patient Room 125.1 IN-04.04 126 Patient Room 126.1 IN-04.04 127 Patient Room 127.1 IN-04.04 128 Patient Room 128.1 IN-04.04 129 Med Gas 129.1 IN-04.03 Insert text to read "Storage" 130 Linen Vestibule 130.1 IN-04.03 Insert text to read "Linen Chute" 131 HAC 131.1 IN-04.03 Insert text to read "HAC" 132 Exam Room 132.1 IN-04.03 Insert text to read "Exam Room" 133 Shared Workroom 133.1 IN-04.03 Insert text to read "Staff" 135 Visitor Room 135.1 IN-04.03 Insert text to read "Visitor Room" 136 Visitor Room 136.1 IN-04.03 Insert text to read "Visitor Room" 137 Vestibule 137.1 IN-01.04 137 Vestibule 137.2 IN-03.01 138 Intake Room 138.1 IN-04.03 Insert text to read "Intake Room" 138 Intake Room 138.2 IN-04.03 Insert text to read "Intake Room" 139 IT/Data Room 139.1 IN-03.01 140 Storage 140.1 IN-04.03 Insert text to read "Storage" 141 Toilet 141.1 IN-03.01 141 Toilet 141.2 IN-09.01 142 Equipment Storage 142.1 IN-04.03 Insert text to read "Storage" 143 Conference Room 143.1 IN-04.03 Insert text to read "Conference Room" 144 Staff Lounge/Lockers 144.1 IN-04.03 Insert text to read "Break Room" 145 Electric 145.1 IN-03.01 146 Shared Workroom 146.1 IN-04.03 Insert text to read "Staff" 147 Semi-Private Patient Room 147.1 IN-04.03 148 Semi-Private Patient Room 148.1 IN-04.03 149 HAC 149.1 IN-04.03 Insert text to read "HAC" 150 Patient Room 150.1 IN-04.04 151 Patient Room 151.1 IN-04.04 152 Patient Room 152.1 IN-04.04 153 Patient Room 153.1 IN-04.04 154 Patient Room 154.1 IN-04.04 155 Closet 155.1 IN-04.03 Insert text to read "Storage" 156 Patient Room 156.1 IN-04.04 157 Patient Room 157.1 IN-04.04 158 Nurse Station 158.1 IN-03.01 158 Nurse Station 158.2 IN-01.03 158A Storage 158A.1 IN-04.03 Insert text to read "Storage" 159 Med Room 159.1 IN-03.01 160 Patient Laundry 160.1 IN-04.03 Insert text to read "Laundry" 161 Electric 161.1 IN-03.01 162 Toilet 162.1 IN-03.01 162 Toilet 162.2 IN-09.01 163 Treatment Team Room 163.1 IN-04.03 Insert text to read "Treatment Team Room" 164 Patient Room 164.1 IN-04.04 165 Quiet Room 165.1 IN-04.03 Insert text to read "Quiet Room" 166 Nurse Manager 166.1 IN-04.03 Insert text to read "Nurse Manager" 167 Patient Room 167.1 IN-04.04 168 Patient Room 168.1 IN-04.04 169 Patient Room 169.1 IN-04.04 170 Patient Room 170.1 IN-04.04 171 Day Room 171.1 IN-04.03 Insert text to read "Day Room" 172 Soiled Utility 172.1 IN-03.01 172 Soiled Utility 172.2 IN-01.22 173 Recreation 173.1 IN-04.03 Insert text to read "Recreation" 174 Toilet 174.1 IN-03.01 174 Toilet 174.2 IN-09.01 175 Dining 175.1 IN-18.01 Insert text to read "NO EXIT" 175A Servery 175A.1 IN-04.03 Insert text to read "Servery" 176 Clean Utility 176.1 IN-04.03 Insert text to read "Clean Utility" C100 Corridor C100.1 IN-01.02 C101 Corridor C101.1 IN-01.08 C103 Corridor C103.1 IN-01.08 C103 Corridor C103.2 IN-01.08 C103B Phone Alcove C103B.1 IN-18.01 See 5/AS505 for graphics C104 Corridor C104.1 IN-01.08

FINISH MATERIAL SCHEDULEFOR REFERENCE ONLY

LIFT

TOILET

ELEC.

INTAKE

ROOM

IT/DATA

ROOM

SHARED

WORKROOM

VESTIBULE

137136

EXAM

ROOM

WAITING

134HAC

LINEN

VESTIBULE

LINEN

CHUTE

130A

133A

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1A

122A

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1B

121A

STORAGE

120A

MED ROOM

TREATMENT

TEAM

ROOM

TUB ROOM

ELEC.

CONSULT

ROOM

CONSULT

ROOM

NURSE

STATION

ISOLATION

ROOM

110A

PATIENT

BATHROOM

TYPE 1D

114A

PATIENT

ROOM -

TYPE B

SHELL

SPACE

DAY ROOM

SHELL

SPACE

SHELL

SPACE

TOILET

TOILET

MED ROOM

100A

SOILED

UTILITY

PATIENT

ROOM

TYPE B

PATIENT

BATHROOM

TYPE 1D

164A

ELEC.

PATIENT

LAUNDRY

TREATMENT

TEAM

ROOM

STORAGE

158A

MED ROOM

NURSE

STATION

PATIENT

BATHROOM

TYPE 1B

157A

PATIENT

ROOM

TYPE A

PATIENT

ROOM

TYPE A

PATIENT

BATHROOM

TYPE 1A

156AEXISTING

STAIR

S3-1

SEMI-PRIVATE

PATIENT

ROOM

SEMI-PRIVATE

PATIENT

ROOM

EXISTING

STAIR

S5-1

EXISTING

STAIR

S2-1

PATIENT

BATHROOM

TYPE 1C

147A

PATIENT

BATHROOM

- TYPE 1C

148A

PATIENT

BATHROOM

TYPE 1B

152A

NURSE

STATION

DAY ROOM

RECREATION

DINING

PATIENT

BATHROOM

1B 138A

CORRIDOR

C108

CORRIDOR

C104

CORRIDOR

C103

CORRIDOR

C102

CORRIDOR

C100

CORRIDOR

C101

CORRIDOR

C112

CORRIDOR

C111

CORRIDOR

C110

COURTYARD

COURTYARD

NURSE

MANAGER

VISITOR

ROOM

PATIENT

COMPUTER

ACCESS

C110A

CLEAN

LINEN

CORRIDOR

C107

MED GAS

GROUP

ROOM

CLEAN

UTILITY

PATIENT

COMPUTER

ACCESS

C103A

HAC

CORRIDOR

C106

GROUP

ROOM

VISITOR

TOILET

105A

PATIENT

TOILET

TYPE 1D

110B

STORAGE

SERVERY

175A

NURSE

WORK

Storage

2 Bed Room

Storage

Storage

1 Bed Room

Patient Dining Room

1 Bed Room

Storage

Storage

2 Bed Room

Storage

2 Bed Room

Toilet/ Shower 139A

Toilet/ Shower 143A

Corridor 100I

Kitchenette

Toilet/ Shower 118A

Toilet/ Shower 122A

2 Bed Room

2 Bed Room

1 Bed Room

2 Bed Room

Tub/ Laundry Room

Ante Room

SHELL

SPACE

SHELL

SPACE

SHELL

SPACE

ISOLATION

ANTE ROOM

TOILET

UP

UP

UP

UP

UP UP

AS801

AS801

(DEDUCT

ALTERNATE 3-

DEMOLITION)

(DEDUCT

ALTERNATE 3)

AS801

AS801 (DEDUCT

ALTERNATE 4-

DEMOLITION)

(DEDUCT ALTERNATE 4)

DEDUCT ALTERNATE 3

DEDUCT ALTERNATE 1

DEDUCT ALTERNATE 4

DEDUCT

ALTERNATE 2

DEDUCT ALTERNATE 2

DEDUCT ALTERNATE 2

DEDUCT ALTERNATE 2

DEDUCT ALTERNATE 2

FL

O O

R F

IN

IS

H T

O R

EM

AI

N

FL

O O

R F

IN

IS

H T

O R

EM

AI

N

ALIGNALIGN

P6CP6C

P6CP6C

P6B

(TYP)

P6B

(TYP)

CONSTRUCT EXTERIOR WALL PER BASE BID DOCUMENTS.

DO NOT INSTALL INTERIOR FINISH BOARD.

CONSTRUCT EXTERIOR WALL PER BASE BID DOCUMENTS.

DO NOT INSTALL INTERIOR FINISH BOARD.

CONSTRUCT

WALLS PER BASE

BID DOCUMENTS.

P6B

P6B

P6B P6B

P6B

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

BID DOCUMENTS

AS800

AuthorChecker

OVERALL FIRST FLOOR

PLAN-ALTERNATES

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

ALTERNATES LIST

NOTE: HATCHED AREAS REPRESENT

ARCHITECTURAL SCOPE OF DEDUCT ALTERNATE.

1/8" = 1'-0"1 OVERALL FLOOR PLAN-ALTERNATES

5.0

4.0

B.0 C.0 C.1

A.0

TUB/LAUNDRY

ROOM

5.0

4.0

U.0T.0S.9

V.0

ANTE ROOM

PATIENT

BATHROOM

TYPE 1A

156A

PATIENT

ROOM TYPE A

P4B

P4B

P6B

P6B

P6BP6B

1'

6"

REUSE EXISTING

DOOR FRAME, DOOR

PANEL, AND DOOR

HARDWARE

5.0

4.0

B.0 C.0 C.1

A.0

TUB/LAUNDRY

ROOM

PATIENT

BATHOOM

TYPE 1A

122A

PATIENT ROOM

TYPE A

2 BED ROOM

P6B

P6B

P4B

P4B

P6B

5.0

4.0

U.0T.0S.9

V.0

1 BED ROOM

ANTE ROOM

5'

3/

8"

2'

3"

6 1/8"

2 BED ROOM

DEMOLITION FLOOR PLAN LEGEND

1. COORDINATE SCOPE AND SEQUENCE OF DEMOLITION WORK WITH

COR INCLUDING ALL TEMPORARY ENCLOSURES AND ROUTING OF

BUILDING'S ENTRIES AND EXITS, TO MINIMIZE DISRUPTION OF THE

NORMAL DAILY FUNCTIONS OF THE OWNER'S OCCUPIED AREAS,

INLCUDING ABOVE AND BELOW THE FIRST FLOOR.

2. CHECK AND VERIFY ALL DIMENSIONS AND JOB CONDITIONS BEFORE

COMMENCEMENT OF WORK AND BE RESPONSIBLE FOR THEIR

ACCURACY. REPORT ANY DISCREPANCIES BETWEEN FIELD

CONDITIONS AND THE DOCUMENTS OR WITHIN THE DOCUMENTS TO

THE COR IMMEDIATELY. NOTIFY COR SHOULD EXISTING FIRE

RESISTANT RATED ASSEMBLIES BE COMPROMISED.

3. ALL DESIGNATED WALLS TO BE REMOVED ARE ASSUMED TO BE

NON-LOAD BEARING. BRING TO THE ATTENTION OF THE COR

BEFORE PROCEEDING, ANY CONDITIONS FOUND TO BE OTHERWISE,

AND ANY EXISTING STRUCTURE, SHOWN OR NOT SHOWN WHICH MAY

BE IN CONFLICT WITH NEW CONSTRUCTION PLANS AND DETAILS.

CUTTING OF EXISTING STRUCTURAL ELEMENTS IS PROHIBITED.

BRACE ALL EXISTING STRUCTURAL ELEMENTS AS NECESSARY

DURING CONSTRUCTION.

4. MAINTAIN EXISTING SERVICES AND UTILITIES IN ADJACENT

DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY

THESE SERVICES AND UTILITIES. COORDINATE ALL DISRUPTION OR

DISCONTINUATION OF SERVICES AND UTILITIES WITH THE COR.

5. PROTECT EXISTING FINISHES, ITEMS, AND EQUIPMENT SCHEDULED

TO REMAIN IN PLACE (AND LEFT IN PLACE) DURING DEMOLITION

ACTIVITIES. REPAIR ALL FINISHES AND ITEMS TO MATCH EXISTING

ORIGINAL CONDITION WHENEVER WORK OF THIS CONTRACT CAUSES

DAMAGE OR EXPOSES UNFINISHED CONDITIONS (INCLUDING

REMOVALS FOR DEMOLITION OF MECHANICAL, ELECTRICAL,

PLUMBING, FIRE PROTECTION AND TECHNOLOGY COMPONENTS

OUTSIDE OF LIMITS OF CONSTRUCTION.).

6. PROVIDE TEMPORARY PARTITIONS IN ACCORDANCE WITH OSHA,

INFECTION CONTROL REQUIREMENTS, AND EGRESS REQUIREMENTS.

MAINTAIN REQUIRED MEANS OF EGRESS AT ALL TIMES COORDINATE

WITH COR. COORDINATE ALL DEMOLTION WORK WITH OVERALL

LIFE SAFETY PLAN WHICH IS TO BE MAINTAINED AT ALL TIMES.

7. DO NOT REMOVE TEMPORARY PARTITIONS UNTIL APPROVAL IS

GRANTED BY THE COR.

8. REMOVE ALL ROOM SIGNAGE, ARTWORK, PHOTOGRAPHS, ETC.

COORDINATE THE REMOVAL OR RELOCATION OF ARTWORK,

PHOTOGRAPHS, ETC. PRIOR TO DEMOLITON WITH THE COR.

9. COORDINATE WITH COR PRIOR TO DEMOLITION, ANY ITEMS TO BE

SALVAGED AND TURNED OVER TO COR.

10. REMOVE EXISTING FLOOR FINISHES (INCLUDING ADHESIVES,

MASTICS, SETTING BEDS FASTENERS, ETC.), UNO. UPON

DEMOLITION AND REMOVAL OF EXISTING FLOORING MATERIALS,

PATCH EXISTING FLOOR SLAB AS REQUIRED (INCLUDING, BUT NOT

LIMITED TO INFILLING, LEVELING, GRINDING, SLOPING, ETC.) TO

ACHIEVE A SMOOTH SEAMLESS FLOOR FINISH SUBSTRATE SUITABLE

TO RECEIVE NEW FINISH FLOORING MATERIALS AS SCHEDULED.

11. REMOVE ALL EXISTING WALL BASE, UNO. UPON DEMOLITION AND

REMOVAL OF EXISTING WALL BASE, PATCH EXISTING WALLS AS

REQUIRED TO ACHIEVE A SMOOTH GYPSUM WALLBOARD SUSTRATE

SUITABLE TO RECEIVE NEW WALL BASE AS SCHEDULED.

12. ALL EXISTING WALLS, CELINGS AND SOFFITS ARE TO BE PAINTED.

PATCH ALL GYPSUM WALLBOARD AS REQUIRED TO ACHIEVE A

SMOOTH SUBSTRATE SUITABLE TO RECEIVE NEW FINISH PAINT

(PATCH ALL NICKS, BLEMISHES, ETC. AFTER PRIME COAT. PATCHES

SHALL BE PRIMED BEFORE 1ST TOP COAT.) REMOVE ALL EXISTING

WALL HUNG ITEMS AND/OR COVER PLATES PRIOR TO PAINTING AND

REINSTALL AFTER ACCEPTANCE OF FINISHING PAINTING.

13. THE DEMOLITION DRAWINGS PROVIDE GENERAL DEMOLITION

GUIDELINES ONLY AND ARE NOT NECESSARILY INCLUSIVE OF ALL

ITEMS, MATERIALS, SYSTEMS, ETC. REQUIRED TO BE REMOVED IN

ORDER TO COMPLETE THE PROPOSED NEW CONSTRUCTION.

COORDINATE AND COMPLETE ALL DEMOLITION REQUIRED

SPECIFICALLY SHOWN OR NOT ON THE DEMOLITION DRAWINGS.

14. REPAIR ALL FINISHES AND ITEMS TO MATCH EXISTING ORIGINAL

CONDITIONS WHENEVER WORK OF THIS CONTRACT CAUSES

DAMAGE OR EXPOSES UNFINISHED CONDITIONS (INCLUDING

REMOVALS FOR DEMOLITION OF MECHANICAL, ELECTRICAL,

PLUMBING, FIRE PROTECTION AND TECHNOLOGY COMPONENTS).

PATCH ALL SURFACES AS REQUIRED TO ACHIEVE A SMOOTH

SUBSTRATE SUITABLE TO RECEIVE NEW FINISHES.

15. IN GENERAL, AREAS SHOWING DEMOLITION OR ALTERATION OF

EXISTING CONDITIONS SHALL REQUIRE REMOVAL OF ALL FINISHES,

AND CEILING SYSTEMS (INCLUDING ALL CONCEALED COMPONENTS),

DOWN TO EXISTING SUBSTRATE OR STRUCTURE. INCLUDE ALL

PARTITIONS, DOORS, FRAMES, HARDWARE, CASEWORK, ETC., UNO.

OR SHOWN WHETHER SPECIFICALLY SHOWN OR NOT ON THE

DEMOLITION PLAN. SEE MECHANICAL, ELECTRICAL, PLUMBING AND

TECHNOLOGY DOCUMENTS FOR EXTENT OF MECHANICAL,

ELECTRICAL, PLUMBING, FIRE PROTECTION AND TECHNOLOGY

SYSTEMS.

16. VERIFY, MAINTAIN AND BRING INTO COMPLIANCE THE INTEGRITY OF

FIRE RATED ASSEMBLIES AND THE STRUCTURAL INTEGRITY OF

FLOOR SLABS, AND FILL ALL OPENINGS IN WALL AND FLOORS

REMAINING AFTER DEMOLITION OF DUCTWORK, PIPES AND CONDUIT,

ETC. PENETRATING WALLS AND FLOORS TO CONFORM TO CURRENT

FIRE RESISTIVE REQUIREMENTS LISTED IN THE BUILDING CODE

INFORMATION ON THE LIFE SAFTEY PLANS. INFILL FLOOR

SUBSTRATE SMOOTH AND FLUSH WITH EXISTING FLOOR SUBSTRATE.

17. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF

DEMOLITION.

18. SEE PROJECT MANUAL FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

DEMOLITION FLOOR PLAN GENERAL

NOTES

1. REMOVE EXISTING CASEWORK, MILLWORK AND ALL COUNTER AND

CABINET SUPPORTS.

2. REMOVE EXISTING STOREFRONT SYSTEM.

3. REMOVE EXISTING TUB AND TURN OVER TO COR.

4. REMOVE EXISTING EXTERIOR WALL INCLUDING ALL WALL MOUNTED

AND CONCEALED ITEMS, AS REQUIRED TO COMPLETE THE

PROPOSED NEW CONSTRUCTION.

5. REMOVE EXISTING EXTERIOR WINDOW INCLUDING ALL TRIM

AROUND THE WINDOWS AND ANY WINDOW TREATMENTS.

6. REMOVE ALL EXISTING EXTERIOR WALL FINISH (WALLBOARD,

PLASTER, ETC.) INCLUDING ALL CONCEALED FRAMING AND

ELEMENTS DOWN TO EXISTING CONCRETE BLOCK, INCLUDING @

WINDOW RECESSES

7. REMOVE EXISTING PHONE AND TURN OVER TO COR.

8. REMOVE EXISTING EXTERIOR DOOR INCLUDING ALL TRIM FRAME

AND HARDWARE.

9. REPAINT EXISTING HOLLOW METAL DOOR AND FRAME (BOTH

SIDES).

10. REMOVE EXISTING WINDOW FILM.

DEMOLITION FLOOR PLAN CODED

NOTES

EXISTING TO BE

REMOVED

EXISTING DOOR TO BE

REMOVED

NOTE:

THIS PROJECT INCLUDES THE ABATEMENT OF ACM FLOORING MATERIALS

AND MASTIC AS DESCRIBED IN SPECIFICATION SECTION 02 82 13.19

ASBESTOS FLOOR TILE AND MASTIC ABATEMENT. IT ALSO INCLUDES THE

INSTALLATION OF NEW FLOORING PRODUCTS WITH ADHESIVES AS

DESCRIBED IN SPECIFICATION DIVISION 09 - FINISHES. ALL TRADES SHALL

COORDINATE THEIR WORK SO AS TO MEET ALL SPECIFICATION

REQUIREMENTS AS WELL AS ALL MANUFACTURER’S INSTALLATION

REQUIREMENTS. THIS SHALL INCLUDE COMPLIANCE WITH ALL TERMS AND

CONDITIONS AS NECESSARY TO ASSURE ISSUANCE TO VA OF THE

SPECIFIED MANUFACTURER’S WARRANTIES FOR THE NEW FLOORING

INSTALLATIONS.

FLUSH

(FL)

DOOR TYPES

FLUSH WITH

HALF GLAZED

PANEL

(FLHG)

8"

6" 10"

3'

- 7

FLUSH WITH

WIDE VISION

PANEL

(FLWVP)

10"6"

8" 3'

- 7

FLUSH WITH

FULL GLAZED

PANEL

(FLFG)

ALUMINUM

AND GLASS

(ALGL)

DOOR LEGEND

TYP.

4"

DOOR MARK

PAIR DUAL

EGRESS

PAIR

1. PLAN INDICATION

2. ALL DOORS TO BE 1 3/4" THICK, UNO

3. DOOR FRAME NOTES: ALL FRAMES TO BE DOUBLE RABITTED WITH 2" FACE AND

1/2" RETURN EACH. SEE AS4-00 FOR DETAILS.

4. LABELED, LEAD LINED DOORS WITH GLASS SHALL BE GLAZED WITH FRG AND

LEADED GLASS

NOTE: REFER TO SHEET AS400 FOR DOOR SCHEDULE

DESIGNATIONS

EXISTING TO REMAIN

NEW CONSTRUCTION

ROOM NAME

ROOM NUMBER

FLOOR PLAN CODED NOTES

VA PROVIDED, VA INSTALLED (VV) OR VA

FURNISHED, CONTRACTOR INSTALLED (VC)

EQUIPMENT/FURNISHINGS

CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED (CC)

NOTE: DIMENSIONS ARE FROM FINISHED FLOOR TO BOTTOM OF VISION GLASS PANEL

8"

8" 10"

1. MOP RECEPTOR

2. BEDSIDE TABLE - VV

3. PATIENT BED - VV

4. PATIENT CHAIR - VV

5. TASK CHAIR - VV

6. SIDE CHAIR - VV

7. WASTE RECEPTACLE - VV

8. COMPUTER WORK STATION - VV

9. WALL MOUNTED SHARPS CONTAINER -VC

10. WALL MOUNTED GLOVE BOX - VC

11. MEDICAL RAIL -VC

12. SYPHGMOMANOMETER (RAIL MOUNTED) - VV

13. EXAM TABLE - VV

14. OTOSCOPE (RAIL MOUNTED) - VV

15. PHYSICIAN STOOL - VV

16. CUSTOM VIRTUAL FIREPLACE

17. WALL MOUNTED CLOCK - SHOWN FOR COORDINATION

ONLY - COR TO PROVIDE FINAL LOCATIONS

18. COFFEE MACHINE - PLUMBED -VV

19. WALL MOUNTED TELEVISION (VV) AND BRACKET (VV)

20. PHONE (W = WALL PHONE, D = DESK PHONE)

21. OVERHEAD BIN FOR CHARTS - VC

22. WALL MOUNTED BIN SYSTEM - VC. INSTALL TOP OF

PANELS @ 72" UNO

23. MEDICATION CART - VV

24. MEDICATION DISTRIBUTION SYSTEM - VV

25. TREADMILL- VV

26. ELLIPTICAL MACHINE - VV

27. ICE MACHINE - VV

28. HOSTESS CART - VV

29. CRASH CART - VV

30. SIGNAGE - VV. REFER TO SIGNAGE SCHEDULE ON

AS705 FOR REFERENCE ONLY.

31. COILING DOOR - VV

32. LINEN CART - VV

33. SMART BOARD - VV

34. COUNTERTOP - REFER TO DETAIL12/AS500, PS-2.

35. SUPPLY CART - VV

36. SHELVING - VV

37. COMMERCIAL WASHER/DRYER COMBO - VV

38. MAGAZINE RACK - VV

39. PAMPHLET RACK - VV

40. ABA FIXED LOCKER BENCH

41. FOOD DISTRIBUTION CART - VV

42. UTILITY TUB - SEE P-SERIES DRAWINGS

43. INSTALL WINDOW FILM ON EXISTING WINDOW, A =

OPAQUE, B = 70% TRANSLUCENCY, C= OPAQUE BLACK

44. INTUMESCENT COATING AT EXPOSED COLUMNS

45. ALIGN

46. CONSTRUCT MTL. STUD TIGHT TO EXISTING COLUMN

47. ALIGN NEW TYPE "X" GYPSUM WALLBOARD WITH

FINISH FACE OF WINDOW OPENING. REFER TO

16/AS602

48. WINDOW SHADES (WS-1). MOUNT TIGHT TO WINDOW

FRAME. PROVIDE 2X6 IN WALL FRTW SURROUND FOR

HEAD/TRACK SECUREMENT.

49. MOVABLE WALL PARTITION - VV

50. FURNITURE-VV

CABINET DESIGNATIONS / ABBREVIATIONS

AG

BP

C

CB

CCT

D

DD

DF

DO

DS

ED

EP

F

FE

FV

HD

KBT

KS

MC

MF

MKBD

MW

O

OSC

PL/PLAM

PS

PTR

REF/FRZ

S

SA

SB

SC

SD

SH

SS

TD

TS

TL

TKBD

UCR

ACCESS GROMMET

BLANK PANEL

CART

COUNTERTOP BRACE

CUBICLE CURTAIN TRACK

DOOR BASE CABINET

DRAWER/DOOR BASE CABINET

DRAWER/FILE BASE CABINET

DRAWER/OPEN

DOOR(S) SLIDING

EQUAL DRAWERS

EMERGENCY POWER

FILLER PIECE 3/4" MIN - 2 1/2" MAX

FINISHED END OR FIXED EQUIPMENT

FIELD VERIFY

DOOR WALL CABINET

KEYBOARD TRAY

KNEE SPACE

MICROWAVE CABINET

MOBILE DRAWER/FILE CABINET

MARKERBOARD

MICROWAVE

OPEN FACE CABINET

OPEN SINK CABINET

PLASTIC LAMINATE

PEDESTAL SUPPORT PANEL

PRINTER

REFRIGERATOR/FREEZER

SINK

HAND SANITIZER

SINK BASE

STORAGE CABINET

SOAP DISPENSER

SHELF

STAINLESS STEEL

TOWEL DISPENSER

TACK SURFACE

TASK LIGHT

TACKBOARD

UNDER COUNTER REFRIGERATOR

W- WINDOW DESIGNATION. REFER TO SHEET

AS303 FOR SIZE, STYLE, AND TYPE

SEE SHEET AS000 FOR OTHER LEGEND ABBREVIATIONS

1. ALL WALLS TO REMAIN ARE TO RECEIVE NEW GYPSUM WALLBOARD

FINISH.

2. ANY EXPOSED PIPING TO REMAIN IS SHAL BE WRAPPED WITH 5/8"

TYPE "X" GYPSUM WALLBOARD ON METAL STUDS.

3. ALL SLAB INFILL IS TO MAINTAIN THE FIRE RATING PER THE CODE

ANALYSIS ON THE ASL-SERIES DRAWINGS.

FLOOR PLAN GENERAL NOTES

NOTE: NOT ALL CODED NOTES ARE NECESSARILY USED ON THIS SHEET.

ROBERT

BARGA

07459

ST

AT

E OF OHIO

R E G I S

T E RED A RC

H

I T E C

TD.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and

Facilities Management

CONSULTANTS:

© Copyright 2014

2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\D es ig nL ev eL

\D oc um en ts \2

0- B2

6- Ar ch -C en tra l1 _D es ig nL ev eL -T

K.

rv t

BID DOCUMENTS

AS801

DLLDLL

ENLARGED PLANS AND

DETAILS-ALTERNATES

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUE ON BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443‐1178 Fax: (614) 443‐1594

Email: dynamix@dynamix‐ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

1/4" = 1'-0"3

ENLARGED DEMOLITION FLOOR PLAN

DETAIL- FIRST FLOOR_DEDUCT

ALTERNATE 3

1/4" = 1'-0"6

ENLARGED FLOOR PLAN DETAIL- FIRST

FLOOR_DEDUCT ALTERNATE 4

1/4" = 1'-0"4

ENLARGED FLOOR PLAN DETAIL- FIRST

FLOOR_DEDUCT ALTERNATE 3

1/4" = 1'-0"5

ENLARGED DEMOLITION FLOOR PLAN

DETAIL- FIRST FLOOR_DEDUCT

ALTERNATE 4

PS

EQ EQ

12" 36"

PLAN APPROVAL PURPOSES

THIS DRAWING IS NOT BEING SUBMITTED FOR

FIRE PROTECTION SYMBOLS LEGENDFIRE PROTECTION GENERAL NOTESSPRINKLER LOCATION IN CEILING TILE /

FS

DOMESTIC WATER SERVICE (U/G)

FIRE PROTECTION WATER SERVICE (U/G)

DOMESTIC COLD WATER (CW)

BALL OR BUTTERFLY VALVE

DRY PENDANT SPRINKLER

FIRE DEPARTMENT CONNECTION (EXPOSED)

FIRE PUMP TEST HEADER (CONCEALED)

DRY SIDEWALL SPRINKLER

VALVE W/ TAMPER SWITCH

PIPE-FLOOR PENETRATION (2ND FL.)

EQUIPMENT SERVED ON FLOOR ABOVE

CONNECTION POINT, NEW TO EXISTING

ELECTRICAL CONTRACTOR

FIRE HOSE CABINET

KITCHEN EQUIPMENT CONTRACTOR

PRESSURE GAUGE

A.F.F.

EXG.

K.E.C

SR.

P.C.

FHC

G.C.

H.C.

C.P.

D.I.

E.C.

C.I.

F1

EXISTING

GENERAL CONTRACTOR

HVAC CONTRACTOR

SUPPLY RISER

PLUMBING CONTRACTOR

PRESSURE SWITCH

FLOW SWITCH

CAST IRON

CHROME PLATED

DUCTILE IRON

ABOVE FINISHED FLOOR

FDC.

FH

FTH.

PIV.

FIRE

F/L W/L

GATE VALVE

OS&Y GATE VALVE

FIRE HYDRANT

CURB BOX VALVE

POST INDICATING VALVE

UPRIGHT SPRINKLER

PENDANT SPRINKLER

CONCEALED SPRINKLER

SIDEWALL SPRINKLER

FIRE SPRINKLER MAIN

PIPE CAP (OR PLUG)

PIPE DOWN

PIPE UP

DP DRY PIPE

BF BULK FEED

DRY PIPE VALVE

ALARM VALVE

DETAIL REFERENCE SYMBOL, DETAIL "A" SHOWN ON SHEET "FP2.1"FP2.1

A

D TEST / DRAIN PIPING

FIRE PROTECTION CONTRACTORF.C.

2' x 4' CEILING TILE

SCALE: NONE

2' x 2' CEILING TILE2' x 4' CEILING TILE W/ DIVIDER

SPRINKLER SPRINKLER SPRINKLER

(EITHER LOCATION)

CL

CLLC

LC

1.- PROVIDE COMPLETE WET PIPE FIRE SPRINKLER PROTECTION PER NFPA 13

AND WET STANDPIPE PROTECTION PER NFPA 14 (COMBINED SYSTEM)

THROUGHOUT THE RENOVATION AS FOLLOWS:

(A) SPRINKLER SYSTEM DESIGN SHALL BE BASED ON LIGHT HAZARD

OCCUPANCY IN LOBBIES, OFFICES, & SIMILAR AREAS, HYDRAULICALLY

CALCULATED W/ A DENSITY OF .10 GPM/SQ. FT. FOR 1500 SQ. FT. REMOTE

AREA OF SPRINKLER OPERATION FOR EACH DESIGN AREA. SPRINKLER SPACING

SHALL NOT EXCEED 225 SQ. FT. PER SPRINKLER IN FINISHED SPACES. (180 SQ.

FT. PER SPRINKLER IN SHELLED SPACES).

(B) SPRINKLER SYSTEM DESIGN SHALL BE BASED ON ORDINARY HAZARD

OCCUPANCY IN MECH. EQUIP. ROOMS & STORAGE AREAS HYDRAULICALLY

CALCULATED WITH A DENSITY OF .15 GPM/SQ. FT. FOR 1500 SQ. FT. REMOTE

AREA OF SPRINKLER OPERATION FOR EACH DESIGN AREA. SPRINKLER SPACING

SHALL NOT EXCEED 130 SQ. FT. PER SPRINKLER.

(C) STANDPIPE SYSTEM SHALL BE CLASS I WITH FIRE VALVE CABINETS

CONTAINING 2-1/2" FIRE HOSE VALVES WITH FACTORY ADJUSTED PRESSURE

REGULATORS. MINIMUM FLOW RATE FOR THE HYDRAULICALLY MOST REMOTE

STANDPIPE SHALL BE 500 GPM AND 250 GPM FOR ADDITIONAL STANDPIPES

NOT TO EXCEED 1250 GPM. A MINIMUM RESIDUAL PRESSURE OF 100 PSI AT

THE OUTLET OF THE HYDRAULICALLY MOST REMOTE 2-1/2" HOSE

CONNECTION SHALL BE PROVIDED.

2.- SPRINKLERS SHALL BE LOCATED IN RELATIONSHIP TO LIGHTING FIXTURES &

HVAC DIFFUSERS. SPRINKLERS SHALL BE CENTERED IN CEILING TILES (OR AT

THE "QUARTER" POINTS) & MAINTAIN A SYMMETRICAL PATTERN FOR AN

AESTHETICALLY PLEASING EFFECT. NO PIPING SHALL BE EXPOSED W/ THE

EXCEPTION OF PIPING IN AREAS OF EXPOSED CONSTRUCTION. GYMNASIUMS,

LABS & ANY OTHER PUBLIC SPACES W/ EXPOSED STRUCTURE SHALL HAVE ALL

PIPING ABOVE THE BOTTOM CHORD OF TRUSSES. ADDITIONAL

COORDINATION W/ HVAC, ELECTRICAL, PLUMBING, & CEILING CONT'RS. WILL

BE NECESSARY.

3.- FIRE PROTECTION RISERS AND MAINS ARE SHOWN FOR COORDINATION

PURPOSES AND SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO LOCATIONS

INDICATED ON THIS PLAN.

4.- ALL PIPING SHALL BE CONCEALED IN AREAS OF FINISHED CONSTRUCTION.

FINISHED AREAS WITH EXPOSED STRUCTURE SHALL HAVE ALL PIPING RUN

ABOVE THE BOTTOM CHORD OF TRUSSES UNLESS NOTED OTHERWISE.

5.- ALL FIRE PROTECTION INSTALLATION SHALL BE IN STRICT ACCORDANCE

WITH THE LATEST EDITIONS OF THE OHIO BUILDING CODE & NFPA

STANDARDS.

6.- THESE PLANS WERE NOT PREPARED FOR SUBMITTAL & APPROVAL OF FIRE

PROTECTION SYSTEMS.

7.- THIS PLAN IS PROVIDED TO ASSIST CONTRACTORS IN PREPARING A

COMPLETE FIRE PROTECTION BID. THE CONTRACTOR SHALL INCLUDE ALL

WORK AND COSTS OF MATERIALS AND INSTALLATION, AND PREPARATION OF

DRAWINGS AND HYDRAULIC CALCULATIONS.

8.- SUBMIT COMPLETE SPRINKLER / PIPING DRAWINGS AND HYDRAULIC

CALCULATIONS TO AUTHORITIES HAVING JURISDICTION.

9.- PROVIDE SUPERVISORY SWITCHES FOR ALL VALVES CONTROLLING THE FIRE

SPRINKLER AND STANDPIPE SYSTEMS. SUPERVISORY SWITCHES AND FLOW

SWITCHES SHALL BE INSTALLED BY F.P. CONTRACTOR AND WIRED BY

ELECTRICAL CONTRACTOR.

10.- FIRE PROTECTION CONTRACTOR SHALL PERFORM A NEW FLOW TEST

PRIOR TO PREPARING HYDRAULIC CALCULATIONS.

11.- PRIOR TO FABRICATION OR INSTALLATION OF PIPING, THE FIRE

PROTECTION CONT'R. SHALL COORDINATE LOCATIONS & ELEVATIONS OF

OTHER EQUIPMENT, INCLUDING, BUT NOT LIMITED TO LIGHT FIXTURES,

DIFFUSERS, DUCTWORK, CONDUITS, PIPING, & CEILING GRID. OBTAIN

SIGNATURES OF OTHER TRADES ON THE COORDINATION DRAWING.

THIS PLAN IS PREPARED TO ASSIST FIRE PROTECTIONS (SUB)CONTRACTORS

IN SUBMITTING A BID. SUCCESSFULL (SUB)CONTRACTORS SHALL PREPARE

DETAILED DRAWINGS, PAY FOR PLAN APPROVAL FEES, OBTAIN PERMITS,

AND SUBMIT DRAWINGS TO AUTHORITY(IES) HAVING JURISDICTION OVER

THE PROJECT.

P

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

© Copyright 2017

2690 W. Dublin-Granville Road, Columbus, OH 43214

p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\m sp en gl er \D oc um en ts

\1

0-

B2 6-

Pl um bF P-

C en tra l_ m sp en gl er dy na m ix

-lt d.

co m

.rv t

BID DOCUMENTS

FX000

DELDEL

FIRE PROTECTION LEGENDS

AND DETAILS

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUES IN BUILDING 26

FIRE PROTECTION SHEET INDEX

FX000 FIRE PROTECTION LEGENDS AND DETAILS

FX100 BASEMENT FIRE PROTECTION PLAN

FX101 FIRST FLOOR FIRE PROTECTION PLAN

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443-1178 Fax: (614) 443-1594

Email: dynamix@dynamix-ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

GI

RS

S

R P

F E

O

E E T

L

I G

S

N A O N

RE

E

D

I

R

S

E N

E

HTA

T

S

E OF

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

UP

PIPE BASEMENT

CORRIDOR

(BASEMENT)

C32A

3 4 3 4

FI

RE

FI

RE

FI

RE

FI

RE

FIRE(E)

FI

RE

(E

FI

RE

(E

FI

RE

(E

Storage

Stair S2-0

Linen

Linen Storage

EMS Supervisor

MER

CIO

P1 Equipment

Equipment 9A

Elec Closet

4D

Toilet 4A

HAC

Recreation 2A

EMS Storage

EMS Storage

Recreation Clinic

Storage 4C

Craft 4B

Stair S1-0

Men's Toilet

Women's Toilet

HAC

Tele 27A

Social Work Service

EMS Office

EMR

Stair S5-0

Cooridor

Chapel

Canteen Storage

Storage 25A Toilet

23A

MER

Stair S3-0

Employee Health Rest Area 18A

Storage 18B

Occupational Safety & Health Manager

18C

Employee Health Exam 18D

Employee Health Phy Extender

18E

Employee's Health Program Support Clerk

18F

Industrial Hygenist 18G

GEMS Coordinator 18H

Safety Program Support Specialist

18I

Employee Health

MER

Canteen Storage

Supply Room

EMS Storage 24A

Stair S4-0

3 3

EXG. BACKFLOW PREVENTOR

EXG. FIRE ENTRANCE

EXG. FIRE DEPARTMENT

CONNECTION

FIRE(E)

EXG. SPRINKLER DRAIN

4"

3"

3"

PLAN NOTES

1.- EXISTING SPRINKLER SYSTEM TO REMAIN.

2.- EXISTING 4" SPRINKLER STANDPIPE TO REMAIN.

3.- EXTEND NEW SPRINKLER MAIN TO NEW ADDITION BASEMENT AS

REQUIRED. PROVIDE UPRIGHT SPRINKLER HEADS FOR ADEQUATE COVERAGE

OF AREA WITHOUT CEILING.

4.- ORDINARY HAZARD GROUP I AREA.

5.- MODIFY EXISTING SPRINKLER HEADS & RELATED PIPING AS NECESSARY TO

PROVIDE ADEQUATE COVERAGE OF NEW ROOMS. COORDIANTE SPRINKLER

HEAD LOCATION W/ NEW CEILING LAYOUT.

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHILLICOTHE VA MEDICAL CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

© Copyright 2017

2690 W. Dublin-Granville Road, Columbus, OH 43214

p. 614.267.6603 www.DesignLeveLarchitecture.com

DesignLeveL planning interior design architecture

C :\U se rs

\m sp en gl er \D oc um en ts

\1

0-

B2 6-

Pl um bF P-

C en tra l_ m sp en gl er dy na m ix

-lt d.

co m

.rv t

BID DOCUMENTS

FX100

DELDEL

BASEMENT FIRE

PROTECTION PLAN

5/22/2017

538-115CORRECT PRIVACY/

SAFETY/ENVIRONMENTAL

ISSUES IN BUILDING 26

855 Grandview Avenue, 3rd Floor Columbus, OH 43215 Phone: (614) 443-1178 Fax: (614) 443-1594

Email: dynamix@dynamix-ltd.com

Facility Engineering Consultants

Engineering Ltd.

DEL # 140120

SCALE: 1/8" = 1'-0"

BASEMENT FIRE PROTECTION PLAN

GI

RS

S

R P

F E

O

E E T

L

I G

S

N A O N

RE

E

D

I

R

S

E N

E

HTA

T

S

E OF

MACE E-50556

O

OI

MONTGOMERY E-66852

GRIFFIN E-57049

NON RATED SMOKE PARTITION

1-HOUR SMOKE BARRIER

1 HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

WALL RATING LEGEND

STAFF LOUNGE /

LOCKERS

CONFERENCE

ROOM

EQUIPMENT

STORAGE

TOILET

ELEC.

INTAKE ROOM

IT/DATA ROOM

SHARED

WORKROOM

VESTIBULE

VISITOR ROOM

SHARED

WORKROOM

EXAM ROOM

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1D 128A

PATIENT ROOM

TYPE B

WAITING

HAC

LINEN VESTIBULE

LINEN CHUTE

130A

STORAGE

133A

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1B 125A

PATIENT ROOM

TYPE B

PATIENT ROOM

TYPE A

PATIENT

BATHROOM TYPE

1B 127A

PATIENT

BATHROOM TYPE

1B 124A

PATIENT

BATHROOM TYPE

1A 122A

PATIENT ROOM

TYPE A

PATIENT

BATHROOM TYPE

1B 121A

STORAGE

120A

MED ROOM

TREATMENT TEAM

ROOM

TUB ROOM

ELEC.

TOILET

CONSULT ROOM

CONSULT ROOM

NURSE STATION

ISOLATION ROOM

110A

PATIENT

BATHROOM TYPE

1D 114A

PATIENT ROOM -

TYPE B

ISOLATION ANTE

ROOM

PATIENT ROOM

TYPE A

PATIENT

BATHROOM

TYPE1A

109A

PATIENT

BATHROOM TYPE

1A 111A

PATIENT ROOM

TYPE A

PATIENT ROOM

TYPE A

PATIENT ROOM

TYPE A

DAY ROOM

PATIENT

BATHROOM TYPE

1A 108A

PATIENT

BATHROOM TYPE

1A 107A

PATIENT

BATHROOM TYPE

1A 170A

PATIENT ROOM

TYPE 'A'

PATIENT ROOM

TYPE 'A'

PATIENT

BATHROOM TYPE

1A 167A

PATIENT

BATHROOM TYPE

1A 168A

PATIENT ROOM

TYPE 'A

QUIET ROOM

TOILET

TOILET

TOILET

MED ROOM

100A

SOILED UTILITY

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1D 164A

ELEC.

PATIENT LAUNDRY

TREATMENT TEAM

ROOM

STORAGE

158A

MED ROOM

NURSE STATION

PATIENT

BATHROOM TYPE

1B 157A

PATIENT ROOM

TYPE A

PATIENT ROOM

TYPE A

PATIENT

BATHROOM TYPE

1A 156A

EXISTING STAIR

S3-1

SEMI-PRIVATE

PATIENT ROOM

SEMI-PRIVATE

PATIENT ROOM

EXISTING STAIR

S5-1

EXISTING STAIR

S2-1

PATIENT

BATHROOM TYPE

1C 147A

PATIENT

BATHROOM - TYPE

1C 148A

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1B 152A

PATIENT ROOM

TYPE B

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1B 154A

PATIENT ROOM

TYPE B

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1B 151A

PATIENT

BATHROOM TYPE

1B 153A

DIRTY LINEN

C109A

NURSE STATION

DAY ROOM

RECREATION

DINING

DIRTY LINEN

C105A

PATIENT ROOM

TYPE B

PATIENT

BATHROOM TYPE

1B 126A

PATIENT

BATHROOM 1B

138A

VISITOR ROOM

NURSE MANAGER

PATIENT ROOM

TYPE A

PATIENT

BATHROOM TYPE

1A 169A

COURTYARD

2"

FIRE(E)

FI

RE

FI

RE

FI

RE

(E

FI

RE

(E

FI

RE

(E

FIRE FIRE

FI

RE

(E

FI

RE

(E

FIRE(E)

CORRIDOR

C105

CORRIDOR

C104

CORRIDOR

C103

CORRIDOR

C102

CORRIDOR

C101

CORRIDOR

C112

CORRIDOR

C100

CORRIDOR

C111

CORRIDOR

C110

CORRIDOR

C108

CORRIDOR

C109

CORRIDOR

C107

CLEAN LINEN

PATIENT

BATHROOM TYPE

1D 150A

PATIENT

COMPUTER

ACCESS

C110A

MED GAS

GROUP ROOM

CLEAN UTILITY

PATIENT

COMPUTER

ACCESS

C103A

CORRIDOR

C106

HAC

GROUP ROOM

VISITOR TOILET

105A

NURSE WORK

PATIENT TOILET

TYPE 1D

110B

CLOSET

EXISTING STAIR

S1-1

EXISTING STAIR

S4-1

PHONE ALCOVE

C103B

PHONE ALCOVE

C110B

ALCOVE

C102B

ALCOVE

C102A

ALCOVE

C111B

ALCOVE

C111A

STORAGE

CLOSET

4 4

1 1/2"

4 4

DEDUCT ALTERNATE 3

DEDUCT ALTERNATE 1

DEDUCT ALTERNATE 4 8

DEDUCT ALTERNATE 2 9

DEDUCT ALTERNATE 2 9

DEDUCT ALTERNATE 29

DEDUCT

ALTERNATE 2

DEDUCT ALTERNATE 2 10

EXG. FLOW

SWITCH

COURTYARD

CLOSET

102A

PLAN NOTES

1.- EXG. 4" FIRE PROTECTION RISER DOWN TO BASEMENT TO REMAIN.

2.- PROVIDE NEW SPRINKLER MAIN & EXTEND TO NEW ADDITION AS REQUIRED.

3.- ORDINARY HAZARD GROUP I AREA.

4.- ORDINARY HAZARD GROUP II AREA.

5.- AREA WITHIN REGION IS NEW WORK. ALL OTHER AREA OUTSIDE IS TO BE

RENOVATED.

6.- ALTERNATE 3: IF ALTERNATE 3 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS

AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES

WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR

ALTERNATE INFORMATION.

7.- ALTERNATE 1: IF ALTERNATE 1 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS

AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES

WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR

ALTERNATE INFORMATION.

8.- ALTERNATE 4: IF ALTERNATE 4 IS ACCEPTED, THIS SPACE IS TO REMAIN AS IS

AND IS NOT TO BE RENOVATED. ALL EXISTING FIRE PROTECTION SERVICES

WITHIN THIS AREA ARE TO REMAIN. REFER TO SPECIFICATION 01 00 00 FOR

ALTERNATE INFORMATION.

9.- ALTERNATE 2: IF ALTERNATE 2 IS ACCEPTED, THIS SPACE IS TO BE SHELL

SPACE ONLY. PROVIDE UPRIGHT SPRINKLER HEADS FOR ADEQUATE SPRINKLER

COVERAGE OF SHELL SPACE WITH NO CEILING. REFER TO SPECIFICATION 01 00

00 FOR ALTERNATE INFORMATION.

10.- ALTERNATE 2: IF ALTERNATE 2 IS ACCEPTED, THIS SPACE IS TO BE UTILIZED

AS A DUAL OCCUPANCY ROOM. ADJUST SPRINKLER HEAD LOCATIONS AS

NECESSARY TO ACCOMMODATE NEW CEILING & ROOM LAYOUT. REFER TO

SPECIFICATION 01 00 00 FOR ALTERNATE INFORMATION.

Drawing Title

Approved:

Proje…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.