VA250-17-B-0970-0003000.docx

DOCX document 29 KB Posted

Attached to
Building 26 Addition
Solicitation number
VA25017B0970
Issued by

About this file

VA250-17-B-0970 0003 VA250-17-B-0970 0003.docx

View the file

Other files

File Type Posted
36C25018C0186-003.docx DOCX document
VA250-17-B-0970-0004001.pdf PDF
VA250-17-B-0970-0004000.docx DOCX document
VA250-17-B-0970-0003001.pdf PDF
VA250-17-B-0970-00002000.docx DOCX document
VA250-17-B-0970-00002001.pdf PDF
VA250-17-B-0970-00001000.docx DOCX document
VA250-17-B-0970-00001001.pdf PDF
VA250-17-B-0970-021.pdf PDF
VA250-17-B-0970-019.pdf PDF
VA250-17-B-0970-020.pdf PDF
VA250-17-B-0970-025.pdf PDF
VA250-17-B-0970-022.pdf PDF
VA250-17-B-0970-016.pdf PDF
VA250-17-B-0970-024.pdf PDF
VA250-17-B-0970-017.pdf PDF
VA250-17-B-0970-018.pdf PDF
VA250-17-B-0970-023.pdf PDF
VA250-17-B-0970-015.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-06-2018 538-115

701/AL

Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare System 2780 Airport Dr, Suite 340 Columbus OH 43219

701/AL

Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare System 2780 Airport Dr, Suite 340 Columbus OH 43219 To all Offerors/Bidders

VA250-17-B-0970

06-06-2018

X X X X The purpose of this amendment is to provide all potential bidders with the following information:

1) Answers to all properly submitted RFI questions that arrived before the deadline. Please see the continuation pages of this amendment for details.

2) Addendum #2. Addendum #2 supplements and amends the drawings and specifications associated with this project.

Please see the continuation pages of this amendment for Addendum #2.

All other terms and conditions remain unchanged and in full effect.

CONTINUATION PAGE

RESOLVE SAFETY/PRIVACY/ENVIRONMENTAL ISSUES ON MENTAL HEALTH UNIT, BUILDING 26 PROJECT FOR THE CHILLICOTHE VETERANS AFFAIRS MEDICAL CENTER (VAMC)—CHILLICOTHE, OH

PROJECT NUMBER: 538-115

QUESTIONS AND RESPONSES TO INVITATION FOR BID (IFB) NUMBER

VA250-17-B-0970

IFB AMENDMENT NUMBER A00003

1. Can the building elevators be used during construction?

Response: Yes. The elevators are fully operational and can be used by the construction contractor. However, the VA requires that upon project completion the elevators are fully operational. Any damages that occur during construction shall be repaired by the contractor, at no cost to the Government.

2. Do the security cameras have to remain operational throughout the construction project?

Response: Security cameras do not have to remain operational during construction but must be returned to a fully operational state once construction is complete.

3. Is Building 26 occupied?

Response: Building 26 is currently empty and being used for storage. Storage materials will be moved before construction begins.

4. What is the status of the store front system?

Response: Store front system is currently in VA possession – VA will get it to its original location

5. What is the job site parking situation?

Response: The parking lot and road are available and unregulated parking is available on the inside circle

6. How many vehicle traffic routes are available to access the construction site.

Response: There is one vehicular route. An all-weather gravel road can be built; however, it must be reclaimed in accordance with the project’s drawings and specifications.

7. What type of fencing is required to secure the construction site?

Response: A 6-foot chain link fence is required to secure the construction site.

8. What utilities are active in Building 26?

Response: Water, power, fire alarm, and heat

9. Must existing HVAC systems be maintained through construction?

Response: Potential bidders should strive, to the extent necessary, to not degrade the building.

10. Can you advise which rate the landscapers should use for quoting on this project, since there is no specific rate listed for landscaping?

Response: The VA cannot advise on labor rates. Potential bidders may wish to go to the Department of Labor’s wage determination website, for more information.

11. Bid Addendum 1 references use of a 13” x 13” linoleum floor tile product. Locations for the use of this product include 12” wide flooring accent strips at doorways. Where there is a flooring product transition at a doorway, the contract documents require the transition to be centered under the door. This may require installation of a sliver of tile beside the full 13” wide tile. How do you want the flooring installer to handle this detail?

Response: Reference PARTIAL FLOOR FINISH PLANS (AS701-AS704) for locations of 12” wide flooring accent strips at Patient Room doorways, and Install full 13” x 13” linoleum floor tile product at these doorways, which will extend the linoleum tile flooring 1” under these doors. Refer to GENERAL PROJECT NOTE 13 Drawing AS000 for other floor transition conditions.

12. Is there an option for one of my abatement subcontractors that wasn’t able to attend the pre-bid to get into the building?

Response: No

13. We are requesting information regarding basement finish on Building 26. Page SS101, foundation note #1 6mil vapor barrier over 3” compacted stone elevation 698’-7”. Page SS201 Detail # 8,10,11,12, show top of 6mil vapor barrier. Page AS301 Detail # 2 & 3 show slab elevation 699’. Page AS302 Detail # 1 & 2 Show what appear to be slab on metal and referring to Page AS304 Detail # 10 which shows insulation and slab. All with elevation of 699’.

Response: This inquiry is addressed by the plan revisions in Addendum #2.

14. The spec seems to refer to a double hung window but the details show a triple glazed blinded window. I haven’t been able to find a window manufacture that can provide the double hung, tripled glazed blinded unit. In 2013 we replaced some windows in this building. Is the VA wanting a similar window?

Response: Reference is made to the following specific locations in the plans and specifications:

Window Schedule/AS303 Details 4 and 7/AS304 08 80 00 Glazing 08 51 13 Aluminum Windows, Part 2.4

Market research by the A/E team during design indicated Graham product series 6800 could accommodate the design elements. However, the VA has not designated this product as a sole source item.

15. Can you please confirm or give clarification to the following:

The structural drawings call for gravel and vapor barrier as the finish product of the basement floor in the new addition while the architectural drawings appear to show a slab-on-grade with no indication of thickness or reinforcing. Does the basement level get a concrete slab-on-grade (if so, please provide details) or just grave and vapor barrier?

Response: Please see Addendum #2.

16. On page EP501, it shows Panel 26DP1 as existing, but they want new breakers for this existing panel. I need to know the manufacturer and model for this panel to get a quote for the breakers please.

Response: Existing panel 26DP1 is a PRL4 panelboard manufactured by Eaton.

17. Also, the ATS is owner furnished, but the contractor is responsible for quoting factory representative startup & programming. What do you want me to do about this?

Response: The contractor shall contact ASCO or a duly certified ASCO representative for ATS start-up and programming.

18. Div. 12 24 00 Window Shades: what is the specific fabric type? Are side and sill channels required?

Response: Reference is made to Section 12 24 00 Paragraph 2.1 A. 2. a, Paragraph 2.4 B. 2., and Paragraph 2.4 B. 4.

19. Div. 14 42 00 do you have a basis of design for the vertical lift platform?

Response: Reference is made to Section 14 42 00 Paragraph 1.3 Qualifications. That being said, the A/E team based Section 14 42 00 on information from the following manufacturers:

Symmetry Elevating Solutions Toll Free: 877-568-5804 Website: www.symmetryelevators.com

Garaventa Lift; United States Toll Free: 800-663-6556.

Website: www.garaventalift.com

The VA does not require that vertical lift platforms be purchased from these vendors.

20. What is the anticipated award date?

Response: The VA is unable to provide an anticipated award date, at this time.

21. What I the anticipated start work onsite date?

Response: The VA is unable to provide a notice to proceed date, at this time.

22. Typical Patient Bathroom Vanity elevations show 1 ½” countertop nosing with a separation line where the apron of the plumbing shield begins. Ref: Elevations 6, 12/AS402. However Section 9/AS500 shows solid surface drop down nosing that returns to the HPL sloped plumbing shield panel. I don’t see how this detail can work when the plumbing shield doesn’t run the full width of the countertop. Could you please clarify?

23. Patient Room Bathrooms 124A, 125A, 127A, 151A, 152A, 153A, 154A, 157A. The solid surface vanity tops stop short of the wall on one end by about 6”. None of the enlarged restroom plans show it like this. How would you like us to figure these tops? Wall to wall? Or stopping short on one end by about 6?

See attached document: 538-115_Addendum_02.