VA250-17-B-0970-00002001.pdf
PDF 1 MB Posted
- Attached to
- Building 26 Addition
- Solicitation number
- VA25017B0970
About this file
VA250-17-B-0970 00002 538-115_Addendum_01.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018C0186-003.docx | DOCX document | |
| VA250-17-B-0970-0004001.pdf | ||
| VA250-17-B-0970-0004000.docx | DOCX document | |
| VA250-17-B-0970-0003001.pdf | ||
| VA250-17-B-0970-0003000.docx | DOCX document | |
| VA250-17-B-0970-00002000.docx | DOCX document | |
| VA250-17-B-0970-00001000.docx | DOCX document | |
| VA250-17-B-0970-00001001.pdf | ||
| VA250-17-B-0970-021.pdf | ||
| VA250-17-B-0970-019.pdf | ||
| VA250-17-B-0970-020.pdf | ||
| VA250-17-B-0970-025.pdf | ||
| VA250-17-B-0970-022.pdf | ||
| VA250-17-B-0970-016.pdf | ||
| VA250-17-B-0970-024.pdf | ||
| VA250-17-B-0970-017.pdf | ||
| VA250-17-B-0970-018.pdf | ||
| VA250-17-B-0970-023.pdf | ||
| VA250-17-B-0970-015.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DYNAMIX ENGINEERING LTD.
855 GRANDVIEW AVENUE, 3RD FLOOR
COLUMBUS, OHIO 43215
May 15, 2018
Addendum # 1
TO THE SPECIFICATIONS & DRAWINGS FOR
Correct Privacy/Safety/Environmental Issues in Building 26
Project Number: 538-115
This Document supplements and amends the original Contract Drawings and Specifications issued pursuant to Solicitation NO. VA25017B0970 and shall become a part thereof.
Item:
SPECIFICATION REVISIONS
1.1 SECTION 09 65 43 LINOLEUM TILE FLOORING
1) Delete existing SECTION 09 65 43 LINOLEUM TILE FLOORING entire and substitute revised SECTION 09 65 43 LINOLEUM TILE FLOORING entire, issued as an attachment herewith.
DRAWING REVISIONS
1.2 SHEET AS705 SIGNAGE SCHEDULE AND FINISH MATERIAL SCHEDULE
1) Delete existing SHEET AS705 SIGNAGE SCHEDULE AND FINISH MATERIAL SCHEDULE and substitute revised 30” x 42” SHEET AS705 SIGNAGE SCHEDULE AND FINISH
MATERIAL SCHEDULE attached.
ATTACHMENTS
SECTION 09 65 43 LINOLEUM TILE FLOORING
Addendum Drawing AS705 SIGNAGE SCHEDULE AND FINISH MATERIAL SCHEDULE, inclusive; 30” x42”, dated May 15, 2018.
CORRECT PRIVACY/SAFETY/ENVIRONMENTAL ISSUES ON BUILDING 26
DEPARTMENT OF VETERANS AFFAIRS, VA MEDICAL CENTER, CHILLICOTHE, OHIO
PROJECT NO. 538-115 Revised and Reissued per Addendum # 1 May 15, 2018
09 65 43 - 1
SECTION 09 65 43
LINOLEUM TILE FLOORING
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the installation of linoleum tile flooring, and accessories required for a complete installation.
1.2 RELATED WORK
A. Sustainable Design Requirements: Section 01 81 11, SUSTAINABLE DESIGN
REQUIREMENTS.
B. Concrete and Moisture Vapor Barrier: Section 03 30 00, CAST-IN-PLACE
CONCRETE.
C. Subsurface preparation for floor finishes Section 09 05 16, SUBSURFACE
PREPARATION FOR FLOOR FINISHES.
D. Color, Pattern and Texture for Linoleum Tile Flooring and Accessories:
Section 09 06 00, SCHEDULE FOR FINISHES.
E. Resilient base over base of lockers, equipment and casework: Section 09
65 13, RESILIENT BASE AND ACCESSORIES.
1.3 QUALITY CONTROL-QUALIFICATIONS:
A. The COR shall approve products or service of proposed manufacturer, suppliers, and installers, and the Contractor shall submit certification that:
1. Installer is carries current certification approved by manufacturer of materials and has technical qualifications, experience, trained personnel, and facilities to install specified items.
2. Installation company will submit installers names and certification information to general contractor prior to installing material.
3. Manufacturer's product submitted has been in satisfactory operation, on three installations similar and equivalent in size to this project for three years. Submit list of installations.
B. The linoleum tile floor coverings shall meet fire performance characteristics as determined by testing products, per ASTM test method, indicated below by Underwriters Laboratories, Inc. (UL) or another recognized testing and inspecting agency acceptable to authorities having jurisdiction.
1. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per
ASTM E648.
2. Smoke Density: Less than 450 per ASTM E662.
09 65 43 - 2
C. The floor covering manufacturer shall certify that products supplied for installation comply with local regulations controlling use of volatile organic compounds (VOC’s).
1.4 SUBMITTALS
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES, submit following:
B. Manufacturer's Literature and Data:
1. Description of resilient material and accessories to be provided.
2. Resilient material manufacturer's recommendations for adhesives, sealants, and underlayment.
3. Application and installation instructions.
C. Samples:
1. Tile: Each type, color, thickness and finish.
2. Floor Edge Strip (Molding): 152 mm (6 inches) long of each color and type specified.
3. Base Edge Strip (Molding): 152 mm (6 inches) long of each color specified.
4. Feature Strips: Each type, color, thickness and finish.
D. Shop Drawings and Certificates: Layout of joints showing patterns where joints are expressed, and type and location of obscure type joints.
Indicate orientation of directional patterns.
E. Certificates: Quality Control Certificate Submittals and lists specified in paragraph, QUALIFICATIONS.
1.5 PROJECT CONDITIONS
A. Maintain temperature of floor materials and room, where work occurs, above 18 C (65 F) and below 38 C (100 F) 27 C (82 F) for 48 72 hours before, during and for 48 72 hours after installation. After above period, room temperature shall not fall below 13 C (55 F). Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances.
B. Construction in or near areas to receive flooring work shall be complete, dry and cured. Do not install resilient flooring over slabs until they have been cured and are sufficiently dry to achieve a bond with adhesive. Follow flooring manufacturer’s recommendations for bond and moisture testing.
C. Building shall be permanently enclosed. Schedule construction so that floor receives no construction traffic when completed.
09 65 43 - 3
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to site in original sealed packages or containers;
labeled for identification with manufacturer's name and brand.
B. Deliver linoleum tile flooring completely enclosed in factory wrap, clearly marked with the manufacturer's number, type and color, production run number and manufacture date.
C. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
D. Move linoleum tile floor coverings and installation accessories into spaces where they will be installed at least 48 hours in advance of installation.
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. American Society For Testing Materials (ASTM):
E648-10.................Critical Radiant Flux of Floor-Covering Systems
Using a Radiant Energy Source.
E662-12.................Specific Optical Density of Smoke Generated by
Solid Materials.
ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive
Resilient Flooring
F1303-04(2009)..........Sheet Vinyl Floor Covering with Backing.
F1869-10................Moisture Vapor Emission Rate of Concrete
Subfloor using Anhydrous Calcium Chloride
F1913-04(2010)..........Sheet Vinyl Flooring without Backing
F2170-09................Determining Relative Humidity in Concrete Floor
Slabs using In-situ Probes
F 2195 Standard Specification for Linoleum Floor Tile
C. Resilient Floor Covering Institute (RFCI):
Recommended Work Practices for Removal of Resilient Floor Coverings.
D. National Fire Protection Association (NFPA):
NFPA 253 Standard Method of Test for Critical Radiant Flux of Floor
Covering Systems Using a Radiant Heat Energy Source
NFPA 258 Standard Test Method for Measuring the Smoke Generated by Solid
Materials
09 65 43 - 4
1.8 SCHEDULING
Interior finish work such as plastering, drywall finishing, concrete, ceiling work, and painting work shall be complete and dry before installation. Mechanical, electrical, and other work above ceiling line shall be completed. Heating, ventilating, and air conditioning systems shall be installed and operating in order to maintain temperature and humidity requirements.
1.9 WARRANTY:
Submit written warranty, in accordance with FAR clause 52.246-21, Warranty of Construction requirements except that warranty period shall be extended to include five (5) years.
PART 2 - PRODUCTS
2.1 LINOLEUM TILE FLOOR COVERINGS
A. Linoleum Tile Floor Coverings: a polyurethane-coated acrylic-coated homogeneous mixture of linoleum cement (linseed oil, natural tree resins, drying oil catalysts), wood flour, limestone, color pigments mixed and calendered onto a synthetic fabric backing. Colors and pattern detail shall be dispersed throughout the thickness of the wear layer.
B. Linoleum tile shall conform to the requirements of ASTM F 2195, Type I, “Standard Specification for Linoleum Floor Tile"
C. Pattern and Color: selected from the standard range available from the manufacturer.
D. Size: 12 in. x 24 in. (305 mm x 609.6 mm] 13 in. x 13. (33.3cm x
33.3cm).
E. Thickness: 0.080in. (2.0mm).
F. Each color and pattern of linoleum tile flooring shall be of same production run.
2.2 APPLICATION MATERIALS AND ACCESSORIES
A. Floor and Base Adhesive: Type recommended by linoleum tile flooring material manufacturer for conditions of use.
B. Mastic Underlayment (for concrete floors): Provide products with latex or polyvinyl acetate resins in mix. Condition to be corrected shall determine type of underlayment selected for use.
2.3 LINOLEUM TILE FLOORING
A. ASTM F2195, Type I, ISO 24011.
B. Minimum nominal thickness 2 mm (0.08 inch); 1800 mm (6 ft) minimum width.
C. Critical Radiant Flux: 0.45 watts per sq.cm or more, Class I, per ASTM
E648.
09 65 43 - 5
D. Smoke density: less than 450 per ASTM E662.
2.4 ADHESIVES
Water resistant type recommended by the linoleum tile flooring manufacturer for the conditions of use. VOC not to exceed 50g/L Provide high moisture adhesives, for each area, if recommended by the manufacturer based upon field verification of relative humidity/moisture testing results.
2.5 LEVELING COMPOUND (FOR CONCRETE FLOORS)
Provide cementitious products with latex or polyvinyl acetate resins in the mix.
2.6 PRIMER (FOR CONCRETE SUBFLOORS)
As recommended by the adhesive or linoleum tile flooring manufacturer.
2.7 SEALANT
A. As specified in Section 07 92 00, JOINT SEALANTS.
B. Compatible with linoleum tile flooring.
2.8 ACCESSORIES
A. For sealing joints between wall base or cove cap and irregular wall surfaces such as masonry, provide plastic filler applied according to the manufacturer's recommendations.
B. Metal:
1. Aluminum, pinless, mechanically fastened concealed anchorage type designed for the linoleum tile flooring being installed.
2. Provide metal edge strips of Manufacturer, Color and Style of Edge
Strip per Section 09 06 00, SCHEDULE FOR FINISHES as transition/reducing strips tapered to meet abutting materials (TS-3), and of required thickness to protect exposed edges of the flooring.
Provide units of maximum available length to minimize the number of joints. Use butt-type metal edge strips mechanically fastened for concealed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish.
PART 3 - EXECUTION
3.1 PROJECT CONDITIONS
A. Maintain temperature of linoleum tile flooring above 36 C (65 F), for
48 hours before installation.
B. Maintain temperature of rooms where linoleum tile flooring work occurs above 36 C (65 F), for 48 hours, before installation and during installation.
C. After installation, maintain temperature at or above 36 C (65 F.)
D. Building is permanently enclosed.
09 65 43 - 6
E. Wet construction in or near areas to receive linoleum tile flooring is complete, dry and cured.
3.2 SUBFLOOR PREPARATION
A. Concrete Subfloors: Verify that concrete slabs comply with ASTM F710.
1. Installer shall examine surfaces on which linoleum tile flooring is to be installed, and shall advise Contractor, in writing, of areas which are unacceptable for installation of flooring material.
Installer shall advise Contractor which methods are to be used to correct conditions that will impair proper installation. Installation shall not proceed until unsatisfactory conditions have been corrected.
2. Slab substrates dry, free of curing compounds, sealers, hardeners, and other materials which would interfere with bonding of adhesive.
Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by Resilient Floor Covering Institute recommendations in manual RFCI-MRP.
B. Broom or vacuum clean substrates to be covered by linoleum tile floor coverings immediately before installation. Following cleaning, examine substrates to determine if there is visually any evidence of moisture, alkaline salts, carbonation, or dust.
C. Primer: If recommended by flooring manufacturer, prior to application of adhesive, apply concrete slab primer in accordance with manufacturer’s directions.
D. Correct conditions which will impair proper installation, including trowel marks, pits, dents, protrusions, cracks or joints.
E. Fill cracks, joints, depressions, and other irregularities in concrete with leveling compound.
1. Do not use adhesive for filling or leveling purposes.
2. Do not use leveling compound to correct imperfections which can be corrected by spot grinding.
3. Trowel to smooth surface free of trowel marks, pits, dents, protrusions, cracks or joint lines.
F. Clean floor of oil, paint, dust and deleterious substances. Leave floor dry and cured free of residue from existing curing or cleaning agents.
G. Moisture Testing: Perform moisture and pH test as recommended by the flooring and adhesive manufacturers. Perform test locations starting on the deepest part of the concrete structure. Proceed with installation only after concrete substrates meet or exceed the manufacturer’s requirements. In the absence of specific guidance from the flooring or adhesive manufacturer the following requirements are to be met:
09 65 43 - 7
1. Perform moisture vapor emission tests in accordance with ASTM F1869.
Proceed with installation only after substrates have a maximum moisture-vapor-emission rate of 1.36 kg of water/92.9 sq. m (3lb of water/1000 sq. ft.) in 24 hours.
2. Perform concrete internal relative humidity testing using situ probes in accordance with ASTM F2170. Proceed with installation only after concrete reaches maximum 75 85 percent relative humidity level measurement.
H. Preparation shall include the removal of existing floor materials and existing adhesive. Do not use solvents to remove adhesives. Coordinate with Asbestos Abatement Section if asbestos abatement procedures will be involved.
I. Remove existing flooring and adhesive completely in accordance with
Resilient Floor Covering Institute recommendations in manual RFCI-WP.
3.3 INSTALLATION OF FLOORING
A. Install work in strict compliance with manufacturer's instructions and approved layout drawings.
B. Maintain uniformity of linoleum tile floor covering direction and avoid cross seams.
C. Match edges of linoleum tile floor coverings for color shading and pattern at seams.
E. Where linoleum tile flooring abuts other flooring material floors shall finish level.
F. Extend linoleum tile floor coverings into toe spaces, door reveals, closets, and similar openings.
G. Inform the COR of conflicts between this section and the manufacturer's instructions or recommendations for auxiliary materials, or installation methods, before proceeding.
H. Install linoleum tile flooring in full coverage adhesives.
1. Air pockets or loose edges will not be accepted.
2. Scribe, trim and fit linoleum tile flooring materials to touch in the length of intersection at pipes and vertical projections; seal joints at pipe with waterproof cement or sealant.
I. Keep joints to a minimum; avoid small filler pieces or strips.
J. Follow manufacturer’s recommendations for seams at butt joints. Do not leave any open joints that would be readily visible from a standing position.
K. Follow manufacturer’s recommendations regarding pattern match, if applicable.
09 65 43 - 8
3.4 CLEANING
A. Clean small adhesive marks during application of linoleum tile flooring and base before adhesive sets, excessive adhesive smearing will not be accepted.
B. Remove visible adhesive and other surface blemishes using methods and cleaner recommended by floor covering manufacturers.
C. Clean and polish materials per flooring manufacturer’s written recommendations.
D. Vacuum floor thoroughly.
E. Do not wash floor until after period recommended by floor covering manufacturer and then prepare in accordance with manufacturer’s recommendations.
F. Upon completion, COR shall inspect floor and base to ascertain that work was done in accordance with manufacturer's printed instructions.
G. Perform initial maintenance according to flooring manufacturer’s written recommendations.
3.5 PROTECTION:
A. Protect installed flooring as recommended by flooring manufacturer against damage from rolling loads, other trades, or placement of fixtures and furnishings.
B. Keep traffic off linoleum tile flooring for 24 hours after installation.
C. Where construction traffic is anticipated, cover linoleum tile flooring with reinforced kraft paper protective coverings of a type and material appropriate to provide adequate protection against damage, properly secured and maintained until removal is authorized by the COR.
D. Where protective materials are removed and immediately prior to acceptance, repair any damage, re-clean linoleum tile flooring, lightly re-apply polish and buff floor.
- - - E N D - - -
ROBERT
BARGA
07459
S
TA
TE
OF OH
IO
R E G I S
T E RED A RC
H
I T E C
TD.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHILLICOTHE VA MEDICAL CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
Office of Construction and
Facilities Management
CONSULTANTS:
© Copyright 2014
2690 W. Dublin-Granville Rd Columbus, OH 43235 p. 614.267.6603 www.DesignLeveLarchitecture.com
DesignLeveL planning interior design architecture
C U s e rs
\D e s ig n L e v e L \D o c u m e n ts
\2 -B
-A rc h -C e n tr a l1
D e s ig n L e v e L -T
K .r v t
1 Addendum 1 May 15, 2018
BID DOCUMENTS
AS705
DLLDLL
SIGNAGE SCHEDULE AND FINISH
MATERIAL SCHEDULE
5/22/2017
538-115CORRECT PRIVACY/
SAFETY/ENVIRONMENTAL
ISSUE ON BUILDING 26
855 Grandview Avenue, 3rd Floor Columbus, OH 43215
Phone: (614) 443-1178 Fax: (614) 443-1594
Email: dynamix@dynamix-ltd.com
Facility Engineering Consultants
Engineering Ltd.
DEL # 140120
SIGNAGE SCHEDULE
Room Number Room Name Sign Designation Sign Type Notes
C104 Corridor C104.2 IN-01.01.01
C105 Corridor C105.1 IN-01.03
C106 Corridor C106.1 IN-01.08
C106 Corridor C106.2 IN-01.08
C106 Corridor C106.3 IN-01.02
C106 Corridor C106.4 IN-01.08
C106 Corridor C106.5 IN-01.08
C106 Corridor C106.6 IN-01.08
C106 Corridor C106.7 IN-01.01.01
C107 Corridor C107.1 IN-01.04
C107 Corridor C107.2 IN-01.08
C108 Corridor C108.1 IN-01.01.01
C108 Corridor C108.2 IN-01.02
C108 Corridor C108.3 IN-01.08
C108 Corridor C108.4 IN-01.08
C109 Corridor C109.1 IN-01.03
C110 Corridor C110.1 IN-01.08
C110B Phone Alcove C110B.1 IN-18.01 See 5/AS505 for graphics
C112 Corridor C112.1 IN-01.08
S1-1 Existing Stair S1-1.1 IN-01.03, IN-09.08
S2-1 Existing Stair S2-1.1 IN-01.03, IN-09.08
S3-1 Existing Stair S3-1.1 IN-01.03, IN-09.08
S4-1 Existing Stair S4-1.1 IN-01.03, IN-09.08
S5-1 Existing Stair S5-1.1 IN-01.03, IN-09.08
SIGNAGE SCHEDULE
Room Number Room Name Sign Designation Sign Type Notes
100 Nurse Station 100.1 IN-03.01
100 Nurse Station 100.2 IN-03.01
100 Nurse Station 100.3 IN-01.03
100A Med Room 100A.1 IN-03.01
101 Day Room 101.1 IN-03.01
101 Day Room 101.2 IN-18.01 Insert text to read "NO EXIT"
102 Group Room 102.1 IN-04.03 Insert text to read "Group Room"
102A Group Room Storage 102A.1 IN-03.01
103 Group Room 103.1 IN-04.03 Insert text to read "Group Room"
104 Toilet 104.1 IN-03.01
104 Toilet 104.2 IN-09.01
105 Nurse Work 105.1 IN-04.03 Insert text to read "Nursing"
105A Visitor Toilet 105A.1 IN-03.01
105A Visitor Toilet 105A.2 IN-09.01
106 Clean Linen 106.1 IN-04.03 Insert text to read "Clean Linen"
107 Patient Room 107.1 IN-04.04
108 Patient Room 108.1 IN-04.04
109 Patient Room 109.1 IN-04.04
110 Isolation Room 110.1 IN-04.03 Insert text to read "Isolation Room"
111 Patient Room 111.1 IN-04.04
112 Consult Room 112.1 IN-04.03 Insert text to read "Consult Room"
113 Consult Room 113.1 IN-04.03 Insert text to read "Consult Room"
114 Patient Room 114.1 IN-04.04
115 Electric 115.1 IN-03.01
116 Toilet 116.1 IN-03.01
116 Toilet 116.2 IN-09.01
117 Treatment Team Room 117.1 IN-04.03 Insert text to read "Treatment Team Room"
118 Tub Room 118.1 IN-04.03 Insert text to read "Tub Room"
119 Med Room 119.1 IN-03.01
120 Nurse Station 120.1 IN-03.01
120 Nurse Station 120.2 IN-01.03
120A Storage 120A.1 IN-04.03 Insert text to read "Storage"
121 Patient Room 121.1 IN-04.04
122 Patient Room 122.1 IN-04.04
123 Closet 123.1 IN-04.03 Insert text to read "Storage"
124 Patient Room 124.1 IN-04.04
125 Patient Room 125.1 IN-04.04
126 Patient Room 126.1 IN-04.04
127 Patient Room 127.1 IN-04.04
128 Patient Room 128.1 IN-04.04
129 Med Gas 129.1 IN-04.03 Insert text to read "Storage"
130 Linen Vestibule 130.1 IN-04.03 Insert text to read "Linen Chute"
131 HAC 131.1 IN-04.03 Insert text to read "HAC"
132 Exam Room 132.1 IN-04.03 Insert text to read "Exam Room"
133 Shared Workroom 133.1 IN-04.03 Insert text to read "Staff"
135 Visitor Room 135.1 IN-04.03 Insert text to read "Visitor Room"
136 Visitor Room 136.1 IN-04.03 Insert text to read "Visitor Room"
137 Vestibule 137.1 IN-01.04
137 Vestibule 137.2 IN-03.01
138 Intake Room 138.1 IN-04.03 Insert text to read "Intake Room"
138 Intake Room 138.2 IN-04.03 Insert text to read "Intake Room"
139 IT/Data Room 139.1 IN-03.01
140 Storage 140.1 IN-04.03 Insert text to read "Storage"
141 Toilet 141.1 IN-03.01
141 Toilet 141.2 IN-09.01
142 Equipment Storage 142.1 IN-04.03 Insert text to read "Storage"
143 Conference Room 143.1 IN-04.03 Insert text to read "Conference Room"
144 Staff Lounge/Lockers 144.1 IN-04.03 Insert text to read "Break Room"
145 Electric 145.1 IN-03.01
146 Shared Workroom 146.1 IN-04.03 Insert text to read "Staff"
147 Semi-Private Patient Room 147.1 IN-04.03
148 Semi-Private Patient Room 148.1 IN-04.03
149 HAC 149.1 IN-04.03 Insert text to read "HAC"
150 Patient Room 150.1 IN-04.04
151 Patient Room 151.1 IN-04.04
152 Patient Room 152.1 IN-04.04
153 Patient Room 153.1 IN-04.04
154 Patient Room 154.1 IN-04.04
155 Closet 155.1 IN-04.03 Insert text to read "Storage"
156 Patient Room 156.1 IN-04.04
157 Patient Room 157.1 IN-04.04
158 Nurse Station 158.1 IN-03.01
158 Nurse Station 158.2 IN-01.03
158A Storage 158A.1 IN-04.03 Insert text to read "Storage"
159 Med Room 159.1 IN-03.01
160 Patient Laundry 160.1 IN-04.03 Insert text to read "Laundry"
161 Electric 161.1 IN-03.01
162 Toilet 162.1 IN-03.01
162 Toilet 162.2 IN-09.01
163 Treatment Team Room 163.1 IN-04.03 Insert text to read "Treatment Team Room"
164 Patient Room 164.1 IN-04.04
165 Quiet Room 165.1 IN-04.03 Insert text to read "Quiet Room"
166 Nurse Manager 166.1 IN-04.03 Insert text to read "Nurse Manager"
167 Patient Room 167.1 IN-04.04
168 Patient Room 168.1 IN-04.04
169 Patient Room 169.1 IN-04.04
170 Patient Room 170.1 IN-04.04
171 Day Room 171.1 IN-04.03 Insert text to read "Day Room"
172 Soiled Utility 172.1 IN-03.01
172 Soiled Utility 172.2 IN-01.22
173 Recreation 173.1 IN-04.03 Insert text to read "Recreation"
174 Toilet 174.1 IN-03.01
174 Toilet 174.2 IN-09.01
175 Dining 175.1 IN-18.01 Insert text to read "NO EXIT"
175A Servery 175A.1 IN-04.03 Insert text to read "Servery"
176 Clean Utility 176.1 IN-04.03 Insert text to read "Clean Utility"
C100 Corridor C100.1 IN-01.02
C101 Corridor C101.1 IN-01.08
C103 Corridor C103.1 IN-01.08
C103 Corridor C103.2 IN-01.08
C103B Phone Alcove C103B.1 IN-18.01 See 5/AS505 for graphics
C104 Corridor C104.1 IN-01.08
FINISH MATERIAL SCHEDULE
FOR REFERENCE ONLY
| 538-115 2018-05-11 Addendum #1_0 |
| 09 65 43 Linoleum Tile Flooring_Add01 |
| 201410-B26-AS705 - SIGNAGE SCHEDULE AND FINISH MATERIAL SCHEDULE |
| Sheets |
| AS705 - SIGNAGE SCHEDULE AND FINISH MATERIAL SCHEDULE |
File details come from the government source that posted it.