Utility Endorsement_PREPA.pdf

PDF 41 MB Posted

Attached to
Landslide Repairs on PR-10 in the Municipality of Utuado
Solicitation number
693C73-22-R-000005
Issued by

About this file

This document provides details on a federal contract solicitation for landslide repair work on PR-10 in Utuado, Puerto Rico. The Department of Transportation Federal Highway Administration is seeking proposals for repairing damage caused by Hurricanes Irma and Maria between kilometers 41.6 and 47.5 of PR-10. The project scope includes embankment reconstruction, reinforced soil slope systems, drainage installation, landslide stabilization, retaining walls, soil nailing, box culvert construction, pavement restoration, guardrail replacement, traffic maintenance and control, multi-span bridge construction, and other miscellaneous work. The total project cost is expected to exceed $10,000,000 and will be split into multiple schedules or contract options. The request for proposals is anticipated to be issued on October 7, 2022 with a proposal due date specified in the solicitation. A pre-bid meeting and site visit will also be scheduled. Offerors must demonstrate experience with landslide repair and bridge construction projects and submit qualifications with their technical proposal in the two-step evaluation process.

View the file

Other files

File Type Posted
Amendment 0007 - PR ER PRMNT RPR(10).pdf PDF
Amendment 0006 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0005 - PR ER PRMNT RPR(10).pdf PDF
Amendment 0004 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0003 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0002 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0001 - PR ST ER PRMT RPR(10).pdf PDF
Plans 826579 - PR ER PRMNT RPR(10).pdf PDF
Report - Asbestos_AC-827579 Km 44.7 thru Km 45.2 Utuado.pdf PDF
Plans 827579 - PR ER PRMNT RPR(10)_Part 2.pdf PDF
Report - Lead_AC-827579 Km 44.7 thru Km 45.2 Utuado.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 1.pdf PDF
Categorical Exclusion Form (NEPA)_827579.pdf PDF
Report - Geotechnical_HWY_5 and 6_AC-826579.pdf PDF
PRHTA Standard Drawings.pdf PDF
PRHTA Material Testing Schedule.pdf PDF
Report - Lead and Asbestos_AC-826579.pdf PDF
Report - Geotechnical_HWY_14_AC-828579.pdf PDF
Report - Geotechnical_HWY_9_AC-827579.pdf PDF
Categorical Exclusion Form (NEPA)_828579.pdf PDF
Categorical Exclusion Form (NEPA)_828579_Appendices.pdf PDF
RFP Solicitation - PR ER PRMNT RPR(10).pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
USFWS Conservation Measures.pdf PDF
Report - Geotechnical_HWY_8_AC-827579.pdf PDF
Report - Asbestos_AC-827579 Km 46.7 thru Km 47.5 Utuado.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 2.pdf PDF
Plans 827579 - PR ER PRMNT RPR(10)_Part 1.pdf PDF
PRHTA Special Provisions applicable to the project.pdf PDF
Report - Asbestos_AC-828579.pdf PDF
Report - Lead_AC-827579 46.7 thru Km 47.5 Utuado.pdf PDF
Categorical Exclusion Form (NEPA)_827579_Appendices.pdf PDF
VETS-4212 Form.pdf PDF
Utility Endorsement_PRASA.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 3.pdf PDF
Categorical Exclusion Form (NEPA)_826579.pdf PDF
Report - Lead and Asbestos_AC-828579.pdf PDF
DTOP Manual de Senales de Transito (MST).pdf PDF
PRHTA Standard Specifications.pdf PDF
ADV_Subcontracting Plan - PR ER PRMNT RPR(10).doc DOC document
Report - Asbestos_AC-826579.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N/A

WR:5845832

SRC

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, email=luis.sotod@prepa.com, c=PR Date: 2021.05.04 15:24:02 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:26:49 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:31:30 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:32:19 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:32:47 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:33:18 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:33:52 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:34:26 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:35:16 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:36:02 -04'00'

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:36:51 -04'00'

SRC

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:37:31 -04'00'

SRC

Luis Ariel Soto de Jesus

Digitally signed by Luis Ariel Soto de Jesus DN: cn=Luis Ariel Soto de Jesus, o=Autoridad de Energía Eléctrica, ou=Departamento de Ingeniería - Región de Arecibo, Date: 2021.05.04 15:38:07 -04'00'

File details come from the government source that posted it. Updated .