Amendment 0002 - PR ER PRMNT RPR (10).pdf

PDF 6 MB Posted

Attached to
Landslide Repairs on PR-10 in the Municipality of Utuado
Solicitation number
693C73-22-R-000005
Issued by

About this file

This document provides details for a federal contract solicitation for landslide repair work along PR-10 in Utuado, Puerto Rico. The project involves embankment reconstruction, retaining walls, drainage, landslide stabilization, bridge construction, and other work. The total project cost is estimated to exceed $10 million and will be split into multiple schedules. A two-step RFP process will be used, requiring separate technical and price proposals due by December 2, 2022. Offerors must demonstrate experience with landslide repairs and bridge construction. The work includes repairing damage from Hurricanes Irma and Maria between kilometers 41.6 and 47.5 on PR-10. The Federal Highway Administration Eastern Federal Lands office will administer the contract.

View the file

Other files

File Type Posted
Amendment 0007 - PR ER PRMNT RPR(10).pdf PDF
Amendment 0006 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0005 - PR ER PRMNT RPR(10).pdf PDF
Amendment 0004 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0003 - PR ER PRMNT RPR (10).pdf PDF
Amendment 0001 - PR ST ER PRMT RPR(10).pdf PDF
Plans 826579 - PR ER PRMNT RPR(10).pdf PDF
Utility Endorsement_PREPA.pdf PDF
Report - Asbestos_AC-827579 Km 44.7 thru Km 45.2 Utuado.pdf PDF
Plans 827579 - PR ER PRMNT RPR(10)_Part 2.pdf PDF
Report - Lead_AC-827579 Km 44.7 thru Km 45.2 Utuado.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 1.pdf PDF
Categorical Exclusion Form (NEPA)_827579.pdf PDF
Report - Geotechnical_HWY_5 and 6_AC-826579.pdf PDF
PRHTA Standard Drawings.pdf PDF
PRHTA Material Testing Schedule.pdf PDF
Report - Lead and Asbestos_AC-826579.pdf PDF
Report - Geotechnical_HWY_14_AC-828579.pdf PDF
Report - Geotechnical_HWY_9_AC-827579.pdf PDF
Categorical Exclusion Form (NEPA)_828579.pdf PDF
Categorical Exclusion Form (NEPA)_828579_Appendices.pdf PDF
RFP Solicitation - PR ER PRMNT RPR(10).pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
USFWS Conservation Measures.pdf PDF
Report - Geotechnical_HWY_8_AC-827579.pdf PDF
Report - Asbestos_AC-827579 Km 46.7 thru Km 47.5 Utuado.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 2.pdf PDF
Plans 827579 - PR ER PRMNT RPR(10)_Part 1.pdf PDF
PRHTA Special Provisions applicable to the project.pdf PDF
Report - Asbestos_AC-828579.pdf PDF
Report - Lead_AC-827579 46.7 thru Km 47.5 Utuado.pdf PDF
Categorical Exclusion Form (NEPA)_827579_Appendices.pdf PDF
VETS-4212 Form.pdf PDF
Utility Endorsement_PRASA.pdf PDF
Plans 828579 - PR ER PRMNT RPR(10)_Part 3.pdf PDF
Categorical Exclusion Form (NEPA)_826579.pdf PDF
Report - Lead and Asbestos_AC-828579.pdf PDF
DTOP Manual de Senales de Transito (MST).pdf PDF
PRHTA Standard Specifications.pdf PDF
ADV_Subcontracting Plan - PR ER PRMNT RPR(10).doc DOC document
Report - Asbestos_AC-826579.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7322R000005 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: CONSTRUCTION

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: ACQUISITIONS

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1411/10/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/07/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project PR ER PRMNT RPR (10)

The purpose of this Amendment is to:

1) Revise the Solicitation Bid Schedule (B Pages) as follows:

a) Replace the Price Proposal Bid Schedules and Price Proposal Summary to add and delete bid items, and update quantities, descriptions, and pay units for various bid items.

b) See B Pages Changes Summary_Amendment 2.pdf for details.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Subsection 153.02(c) to revise requirements for material testing technicians (testers).

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 55

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693C7322R000005/0002

b) Subsection 154.02B to correct a reference.

c) Subsection 638-3.01(k) to correct its last sentence.

d) See SCR Changes_Amendment 2.pdf for details.

3) Provide FHWA's Bridge Preservation Guide.

4) Provide a summary of responses to questions/clarifications asked by potential bidders.

5) Reschedule RFP Proposal Package (both Technical and Price Proposals) due date to December 2, 2021 at 2:00 p.m. EST.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No. 0002

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0002 Project PR ER PRMNT RPR(10)

Puerto Rico Highway and Transportation Authority Landslide Repairs on PR-10 in the Municipality of Utuado

Solicitation # 693C73-22-R-000005

The purpose of this Amendment is to:

1) Revise the Solicitation Bid Schedule (B Pages) as follows:

a) Replace the Price Proposal Bid Schedules and Price Proposal Summary to add and delete bid items, and update quantities, descriptions, and pay units for various bid items.

b) See B Pages Changes Summary_Amendment 2.pdf for details.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Subsection 153.02(c) to revise requirements for material testing technicians

(testers).

b) Subsection 154.02B to correct a reference.

c) Subsection 638-3.01(k) to correct its last sentence.

d) See SCR Changes_Amendment 2.pdf for details.

3) Provide FHWA’s Bridge Preservation Guide.

4) Provide a summary of responses to questions/clarifications asked by potential bidders.

5) Reschedule RFP Proposal Package (both Technical and Price Proposals) due date to December 2, 2021 at 2:00 p.m. EST.

B-1

B I D S C H E D U L E Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

15001-0000

Line A0020 ALL LPSM $

15100-1000

Line A0040 ALL LPSM $

15102-0000

Line A0060 1 CTSM $ 1,681,000.00

15401-0000

Line A0080 ALL LPSM $

15401-1000

Line A0100 ALL LPSM $

15501-0000

Line A0120 ALL LPSM $

20100-0000

Line A0140 10.50 Cuerda $ $

20100-2000

Line A0160 9 Each $ $

20200-0000

Line A0180 ALL LPSM $

20300-0000

Line A0200 70,100 m3 $ $

20301-0000

Line A0220 37,905 m3 $ $

20500-0000

Line A0240 30,635 m3 $ $

20600-1000

Line A0260 3,630 m3 $ $

20700-1000

Line A0280 455 m3 $ $

20800-0000

Line A0300 14 Each $ $

20800-1000

Line A0320 11 Each $ $

20800-2000

Line A0340 4 Each $ $

21000-2000

Line A0360 2,495 m 10.00$ 24,950.00$

21000-3000

Line A0380 115 m $ $

Construction survey and staking

Mobilization

Reimbursement for Municipality Tax Payments

Contractor testing

Contractor Testing (Biological Species Monitoring)

Construction schedule

Soil erosion control, diversion berm

Unclassified Excavation for Structure

Foundation Fill

Inclinometers

Clearing and Grubbing

Cutting and Removing Trees, Small

Removal Structures and Obstructions

Unclassified Excavation

Borrow Class B

Trench Excavation

Piezometers

Settlement Gages

Soil erosion control, silt fence

Schedule Total: ________________________

Submitted by: _________________________

B-2

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

21000-5000

Line A0400 2,660 Each 15.00$ 39,900.00$

21001-3000

Line A0420 4 Each $ $

21001-4000

Line A0440 206 Each $ $

21001-6000

Line A0460 1 Each $ $

21001-7000

Line A0480 7,850 m2 $ $

21100-0000

Line A0500 380 m3 $ $

30101-0000

Line A0520 585 m3 $ $

30400-3000

Line A0540 315 m3 $ $

30500-1000

Line A0560 35 m3 $ $

40300-1000

Line A0580 4,910 m3 $ $

42100-7000

Line A0600 4,440 TON $ $

42100-9000

Line A0620 8,830 TON $ $

60200-0000

Line A0640 609,500 LBS $ $

60300-1000

Line A0660 15 m $ $

60300-2000

Line A0680 270 m $ $

60300-4000

Line A0700 85 m $ $

60300-5000

Line A0720 70 m $ $

60300-6000

Line A0740 45 m $ $

60300-7000

Line A0760 30 m $ $

60300-8000

Line A0780 60 m $ $

HPM Bituminous Pavement Mix Type B (75)(34)

Reinforcing Steel

12" PVC Pipe SCH 40

Soil erosion control, straw bales

Soil erosion control, construction entrance

Bridge Approach Embankment

Subbase Course

Aggregate Base Course

Lean Concrete Base

Asphalt Cold Milling

HPM Bituminous Pavement Mix Type S (75)(12)

Soil erosion control, sand bags

Sediment Basin Type I

Soil erosion control, Temporary Blanket

10" PVC Pipe SCH 40

36" RCP Pipe (Class IV)

48" Polyethylene Pipe, Stiffness 17

24" RCP Pipe (Class IV)

18" RCP Pipe (Class IV)

72" RCP Pipe (Class IV)

B-3

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

60300-9000

Line A0800 60 m $ $

60301-0000

Line A0820 65 m $ $

60301-1000

Line A0840 65 m $ $

60301-2000

Line A0860 162 m $ $

60301-3000

Line A0880 190 m $ $

60301-4000

Line A0900 45 m $ $

60302-0000

Line A0920 20 m $ $

60400-0000

Line A0940 3 m3 $ $

60400-1000

Line A0960 4 Each $ $

60400-2000

Line A0980 1 Each $ $

60400-3000

Line A1000 3 Each $ $

60400-4000

Line A1020 1 Each $ $

60400-5000

Line A1040 7 Each $ $

60400-6000

Line A1060 1 Each $ $

60400-7000

Line A1080 3 Each $ $

60500-3000

Line A1100 120 m $ $

60600-1000

Line A1120 2,045 m $ $

60600-4000

Line A1140 1,970 m $ $

60600-8000

Line A1160 4 Each $ $

60604-3000

Line A1180 7 Each $ $

54" PEP Pipe, Stiffness 16

54" RCP, Class IV

36" Polyethylene Pipe, Stiffness 22

Manhole

Miscellaneous Structure Adjustments

Special Inlet Type A

Special Inlet Type B

Manhole Type B, Diam. 1.50, Height 3-6m

Inlet Type 4A

42" Polyethylene Pipe, Stiffness 19

60" PEP Pipe, Stiffness 14

60" RC Pipe Class IV

6 inch PEP Pipe Stiffness 50

Portland Cement Concrete for Drainage Structures

Bridge End Inlet

6" Under Drain

W-beam Guardrail, Single Face

Removal, Storage and Delivery of Guardrail

New Crashworthy End Terminal Type I, TL-3

Thrie-Beam Transition Section, Type I

B-4

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

60700-0000

Line A1200 1,080 m $ $

60700-2000

Line A1220 1 Each $ $

60700-5000

Line A1240 30 m $ $

60900-4000

Line A1260 180 m $ $

60900-5000

Line A1280 125 m $ $

61000-0000

Line A1300 20 m $ $

61101-0000

Line A1320 35 mo $ $

61300-1000

Line A1340 3 Each $ $

61300-2000

Line A1360 3 Each $ $

61300-3000

Line A1380 2 Each $ $

61300-4000

Line A1400 3 Each $ $

61300-5000

Line A1420 4 Each $ $

61300-6000

Line A1440 6 Each $ $

61300-7000

Line A1460 2 Each $ $

61300-8000

Line A1480 2 Each $ $

61300-9000

Line A1500 4 Each $ $

61301-0000

Line A1520 4 Each $ $

61301-1000

Line A1540 1 Each $ $

61301-2000

Line A1560 2 Each $ $

61301-3000

Line A1580 1 Each $ $

Chain-Link Gate, Type A Two Leaves, W 3.05m

Chain-Link Fence, Type A

Concrete Curb Type A

Concrete Curb Type F

Concrete Barrier, Case I, Type A

Field Office

Barbed Wire Fence, Type A

Traffic Sign Assembly, Code 7

Traffic Sign Assembly, Code 8

Traffic Sign Assembly, Code 9

Traffic Sign Assembly, Code 10

Traffic Sign Assembly, Code 11

Traffic Sign Assembly, Code 12

Traffic Sign Assembly, Code 1

Traffic Sign Assembly, Code 2

Traffic Sign Assembly, Code 3

Traffic Sign Assembly, Code 4

Traffic Sign Assembly, Code 5

Traffic Sign Assembly, Code 6

Traffic Sign Assembly, Code 13

B-5

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

61301-4000

Line A1600 2 Each $ $

61301-5000

Line A1620 1 Each $ $

61301-6000

Line A1640 1 Each $ $

61301-7000

Line A1660 2 Each $ $

61301-8000

Line A1680 2 Each $ $

61301-9000

Line A1700 1 Each $ $

61302-0000

Line A1720 1 Each $ $

61302-1000

Line A1740 1 Each $ $

61302-2000

Line A1760 2 Each $ $

61302-3000

Line A1780 2 Each $ $

61302-4000

Line A1800 1 Each $ $

61302-5000

Line A1820 1 Each $ $

61302-6000

Line A1840 1 Each $ $

61302-7000

Line A1860 2 Each $ $

61302-8000

Line A1880 1 Each $ $

61302-9000

Line A1900 1 Each $ $

61400-2000

Line A1920 1,205 m3 $ $

61600-0000

Line A1940 13,050 LBS $ $

61700-1000

Line A1960 610 m2 $ $

61700-2000

Line A1980 600 m2 $ $

Traffic Sign Assembly, Code 19

Traffic Sign Assembly, Code 20

Traffic Sign Assembly, Code 21

Traffic Sign Assembly, Code 22

Traffic Sign Assembly, Code 23

Traffic Sign Assembly, Code 24

Traffic Sign Assembly, Code 14

Traffic Sign Assembly, Code 15

Traffic Sign Assembly, Code 16

Traffic Sign Assembly, Code 17

Traffic Sign Assembly, Code 18

Structural Steel, Furnished, Fabricated and Erected

Concrete Paved Waterway

Concrete Paved Waterway Type I

Traffic Sign Assembly, Code 25

Traffic Sign Assembly, Code 26

Traffic Sign Assembly, Code 27

Traffic Sign Assembly, Code 28

Traffic Sign Assembly, Code 29

Gabions

B-6

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

61700-4000

Line A2000 540 m2 $ $

61700-5000

Line A2020 15 m2 $ $

61700-9000

Line A2040 200 m3 $ $

61800-1000

Line A2060 4,520 m $ $

61800-2000

Line A2080 6,000 m $ $

61800-3000

Line A2100 15 Each $ $

61800-4000

Line A2120 473 Each $ $

61800-5000

Line A2140 198 Each $ $

61800-6000

Line A2160 136 Each $ $

61800-7000

Line A2180 66 Each $ $

61800-8000

Line A2200 119 Each $ $

61800-9000

Line A2220 2,150 m $ $

61801-0000

Line A2240 105 Each $ $

62200-1000

Line A2260 1,690 m3 $ $

62200-2000

Line A2280 635 m3 $ $

62200-4000

Line A2300 350 m3 $ $

62200-5000

Line A2320 100 m3 $ $

62300-0000

Line A2340 1,900 m2 $ $

62500-1000

Line A2360 2,040 m3 $ $

62600-5000

Line A2380 2 Each $ $

Concrete Paved Waterway Type III

Concrete Paved Waterway Type IV

Bed Course Material

Reflective Raised Pavement Markings (two way yellow/red)

Reflective Raised Pavement Markings (two way clear/red)

Removal of Existing Pavement Markings

Reflective Raised Pavement Markings (one way white)

Dumped Rip-rap Class IV

Filter Blanket

Pavement Markings Thermoplastic (Yellow)

Pavement Markings Thermoplastic (White)

Pavement Markings Thermoplastic Symbols and letters (White)

Reflective Raised Pavement Markings (one way clear)

Reflective Raised Pavement Markings (one way yellow)

Reflective Raised Pavement Markings (two way yellow)

Riprap Class IV

Filter Blanket Type A

Articulated Concrete Block

Furnishing and placing loamy topsoil

Palms (Roystonea Borinquena)

B-7

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

62600-6000

Line A2400 16 Each $ $

62700-0000

Line A2420 145 m2 $ $

62800-0000

Line A2440 6,290 m2 $ $

63000-0000

Line A2460 21 Each $ $

63200-0000

Line A2480 80 m $ $

63500-0000

Line A2500 2 Each $ $

63500-1000

Line A2520 1 Each $ $

63500-2000

Line A2540 2 Each $ $

63500-3000

Line A2560 2 Each $ $

63500-4000

Line A2580 1 Each $ $

63500-5000

Line A2600 2 Each $ $

63500-6000

Line A2620 2 Each $ $

63500-7000

Line A2640 2 Each $ $

63500-8000

Line A2660 2 Each $ $

63500-9000

Line A2680 2 Each $ $

63501-0000

Line A2700 ALL LPSM $

63501-2000

Line A2720 700 m $ $

63501-3000

Line A2740 200 m $ $

63501-4000

Line A2760 700 m $ $

63502-4000

Line A2780 1 CTSM 5,000.00$

Seeding

Sodding

AASHTO Deck Bulb Tee Deck BT-65

Cleaning and Repair of Storm Sewers (Waterway)

Utility Concrete Pole, Class H-6, 60'-0"

PREPA CP-C1

Maria (Calophyllum Antillanium)

PREPA M16-4

PREPA M2-1

Removal of Existing PREPA Facilities

Conductor #1/0 ACSR.

Conductor #3/0 AL. ACSR.

Conductor #266 ACSR.

PREPA CP-C5

PREPA CP-C6

PREPA 38-PC-7

PREPA 38-PC-6

PREPA M16-2

PREPA M16-3

Utility Company Compensation (PREPA)

B-8

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

63600-3000

Line A2800 2 Each $ $

63600-4000

Line A2820 170 m $ $

63600-5000

Line A2840 ALL LPSM $

63600-6000

Line A2860 85 m $ $

63600-7000

Line A2880 60 m $ $

63600-8000

Line A2900 2 Each $ $

63600-9000

Line A2920 1 Each $ $

63602-1000

Line A2940 1 CTSM 5,000.00$

63800-1000

Line A2960 ALL LPSM $

66000-0000

Line A2980 2 Each $ $

66100-1000

Line A3000 1 Each $ $

66400-0000

Line A3020 1,130 m $ $

66400-1000

Line A3040 790 m $ $

83400-0000

Line A3060 515 m3 $ $

83700-0000

Line A3080 1 m3 $ $

83700-1000

Line A3100 4 m2 $ $

83700-2000

Line A3120 4 m $ $

83700-3000

Line A3140 4 m2 $ $

83900-0000

Line A3160 1 Each $ $

83900-1000

Line A3180 1 Each $ $

8" Gate Valve

3/4" Air Vent

Utility Company Compensation (PRASA)

Maintenance of Traffic

Name Plates

Project Funding Sign

4" Gate Valve

4" PVC, SDR-14

Removal of exis. PRASA facilities

8" Ductile Iron Pipe, Class 350, Mech. Joint. Rest.

8" PVC, Gasketed AWWA C-900

Full-Depth Removal of Concrete - pneumatic

Vertical Shaft Type-I

Vertical Shaft Type-II

Milled Shoulder Rumble Strip (MSRS)

Milled Centerline Rumble Strip (MCRS)

Uncompacted Porous Granular Material

Concrete Patching Material

Impregnating of Corrosion Inhibitor

Sealing of Joints with Epoxy Injection

B-9

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

90100-0000

Line A3200 515 m $ $

91001-3000

Line A3220 1 Each $ $

91001-6000

Line A3240 3 Each $ $

91001-7000

Line A3260 4 Each $ $

91200-0000

Line A3280 155 m2 $ $

91300-4000

Line A3300 10 Each $ $

91600-0000

Line A3320 2 Each $ $

91900-0000

Line A3340 320 m $ $

91900-1000

Line A3360 320 m $ $

92400-0000

Line A3380 6,845 m2 $ $

92401-0000

Line A3400 20,295 m2 $ $

92500-4000

Line A3420 270 m $ $

92500-5000

Line A3440 50 m $ $

92500-6000

Line A3460 710 m $ $

93101-3000

Line A3480 ALL LPSM $

93400-0000

Line A3500 930 m3 $ $

93400-1000

Line A3520 340 m3 $ $

93400-2000

Line A3540 660 m3 $ $

93400-4000

Line A3560 10 m3 $ $

93501-0000

Line A3580 20 Each $ $

Drilled Shafts, 36 inch Diameter

Bridge Transition Upgrade

New Transition Module (More than 45 mph)

Erosion Control Blanket

Turf Reinforcement Mat

Trench Drain Type I

Trench Drain Type II

Trench Drain Type-III

Removal and Disposal of Lead Based Paint

New Transition Module

Prefabricated Drainage Composite

Removal of Existing Traffic Signs

Bi-Directional Static Load Test

Dewatering Wells

Ground Water Treatment System

Class IV (General Use), Level of Permeability (2)

Class V (Bridge Deck), Level of Permeability (2)

Class V (General Use), Level of Permeability (2)

Class III (General Use)

Locate Utility, Test Pit

B-10

Schedule A

Project No:

PR ER PRMNT RPR(10) Schedule A Name: PR-10 HWY IDs 5, 6, 8, and 9

Item No.

Quantity Unit Unit Price Amount

93700-0000

Line A3600 115 m $ $

95500-0000

Line A3620 1 Each $ $

96300-1000

Line A3640 150 m2 $ $

96300-2000

Line A3660 220 m2 $ $

97100-0000

Line A3680 210 m $ $

97600-0000

Line A3700 1 Each $ $

97600-1000

Line A3720 1 Each $ $

98800-0000

Line A3740 195 m2 $ $

98800-1000

Line A3760 1,660 m3 $ $

99100-0000

Line A3780 6,500 m2 $ $

99200-0000

Line A3800 58,200 m3 $ $

99500-0000

Line A3820 680 m $ $

99500-1000

Line A3840 1 Each $ $

99500-2000

Line A3860 2 Each $ $

Mailboxes Installation

Soil nail system no. 1

Soil nail system no. 2

Plugging and Abandon of exist. Culvert

Ornamental Steel Gate Type Two Leaf and Width 4.56 m

Ornamental Steel Gate Type Two Leaf and Width 4.08 m

Sealing of construction joints in patching areas

Load Test Verification of Micropiles

Welded Wire Temporary Retaining Wall

Granular Material

Mechanically Stabalized Earth Slope

Special Borrow Embankment

Micro-Piles, 7 IN. O.D. W 1/2 IN. Wall ThicknessCasing

Load Test Proof of Micropiles

B-11

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

15001-0000

Line A0020 ALL LPSM $

15100-1000

Line A0040 ALL LPSM $

15102-0000

Line A0060 1 CTSM 3,135,000.00$

15401-0000

Line A0080 ALL LPSM $

15401-1000

Line A0100 ALL LPSM $

15501-0000

Line A0120 ALL LPSM $

20100-0000

Line A0140 10 Cuerda $ $

20100-1000

Line A0160 60 Each $ $

20100-2000

Line A0180 209 Each $ $

20200-0000

Line A0200 ALL LPSM $

20300-0000

Line A0220 253,500 m3 $ $

20301-0000

Line A0240 61,000 m3 $ $

20500-0000

Line A0260 850 m3 $ $

20600-1000

Line A0280 6,945 m3 $ $

21000-2000

Line A0300 2,990 m 10.00$ 29,900.00$

21000-4000

Line A0320 3,765 m 15.00$ 56,475.00$

21001-3000

Line A0340 5 Each $ $

21100-0000

Line A0360 3,285 m3 $ $

30500-1000

Line A0380 2,545 m3 $ $

Construction survey and staking

Mobilization

Reimbursement for Municipality Tax Payments

Contractor testing

Contractor Testing (Biological Species Monitoring)

Construction schedule

Lean Concrete Base

Trench Excavation

Unclassified Excavation for Structure

Soil erosion control, silt fence

Clearing and Grubbing

Cutting and Removing Trees, Large

Cutting and Removing Trees, Small

Removal Structures and Obstructions

Unclassified Excavation

Borrow Class B

Soil erosion control, straw bales

Soil erosion control, construction entrance

Bridge Approach Embankment

Amendment No. 0002

Submitted by: _________________________

Schedule Total: ________________________

B-12

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

40300-1000

Line A0400 1,460 m3 $ $

42100-7000

Line A0420 1,825 TON $ $

42100-9000

Line A0440 2,785 TON $ $

60200-0000

Line A0460 2,285,470 LBS $ $

60300-2000

Line A0480 200 m $ $

60300-6000

Line A0500 930 m $ $

60301-5000

Line A0520 60 m $ $

60301-6000

Line A0540 25 m $ $

60301-7000

Line A0560 185 m $ $

60301-8000

Line A0580 10 m $ $

60302-0000

Line A0600 25 m $ $

60400-0000

Line A0620 30 m3 $ $

60400-1000

Line A0640 4 Each $ $

60400-4000

Line A0660 5 Each $ $

60400-8000

Line A0680 2 Each $ $

60400-9000

Line A0700 5 Each $ $

60500-3000

Line A0720 220 m $ $

60600-1000

Line A0740 285 m $ $

60600-4000

Line A0760 465 m $ $

60600-8000

Line A0780 1 Each $ $

Portland Cement Concrete for Drainage Structures

Bridge End Inlet

Special Inlet Type A

Asphalt Cold Milling

HPM Bituminous Pavement Mix Type S (75)(12)

10" PVC Pipe SCH 40

30" RC Pipe Class IV

24" Slotted Pipe

48" PEP Pipe Stiffness 17 (temporary)

60" PEP Pipe Stiffness 17 (temporary)

6 inch PEP Pipe Stiffness 50

HPM Bituminous Pavement Mix Type B (75)(34)

Reinforcing Steel

24" RCP Pipe (Class IV)

W-beam Guardrail, Single Face

Removal, Storage and Delivery of Guardrail

New Crashworthy End Terminal Type I, TL-3

Manholes Type A Diam.1.50m Height 3-6m

Inlet Type 4

6" Under Drain

B-13

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

60604-3000

Line A0800 6 Each $ $

61000-1000

Line A0820 165 m $ $

61000-2000

Line A0840 30 m $ $

61101-0000

Line A0860 15 mo $ $

61300-1000

Line A0880 3 Each $ $

61300-2000

Line A0900 1 Each $ $

61300-3000

Line A0920 1 Each $ $

61300-4000

Line A0940 2 Each $ $

61300-5000

Line A0960 1 Each $ $

61300-6000

Line A0980 1 Each $ $

61300-7000

Line A1000 1 Each $ $

61300-8000

Line A1020 2 Each $ $

61300-9000

Line A1040 2 Each $ $

61400-2000

Line A1060 7,415 m3 $ $

61600-0000

Line A1080 58,825 LBS $ $

61700-2000

Line A1100 75 m2 $ $

61700-3000

Line A1120 1,450 m2 $ $

61700-4000

Line A1140 350 m2 $ $

61700-5000

Line A1160 10 m2 $ $

61700-6000

Line A1180 30 m2 $ $

Thrie-Beam Transition Section, Type I

Concrete Barrier F Shape,Type B

Concrete Barrier F Shape, Type C

Traffic Sign Assembly, Code 6

Traffic Sign Assembly, Code 7

Traffic Sign Assembly, Code 8

Traffic Sign Assembly, Code 9

Gabions

Structural Steel, Furnished, Fabricated and Erected

Field Office

Traffic Sign Assembly, Code 1

Traffic Sign Assembly, Code 2

Traffic Sign Assembly, Code 3

Traffic Sign Assembly, Code 4

Traffic Sign Assembly, Code 5

Concrete Paved Waterway Type I

Concrete Paved Waterway Type II

Concrete Paved Waterway Type III

Concrete Paved Waterway Type IV

Concrete Paved Waterway Type V

B-14

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

61700-7000

Line A1200 1,300 m2 $ $

61700-8000

Line A1220 100 m2 $ $

61800-1000

Line A1240 2,440 m $ $

61800-2000

Line A1260 3,083 m $ $

61800-4000

Line A1280 279 Each $ $

61800-6000

Line A1300 105 Each $ $

62200-1000

Line A1320 4,420 m3 $ $

62200-2000

Line A1340 2,595 m3 $ $

62200-6000

Line A1360 2,130 m3 $ $

62200-7000

Line A1380 1,970 m3 $ $

62200-8000

Line A1400 730 m3 $ $

62500-1000

Line A1420 3,215 m3 $ $

62600-5000

Line A1440 63 Each $ $

62600-6000

Line A1460 228 Each $ $

62600-7000

Line A1480 106 Each $ $

62600-8000

Line A1500 106 Each $ $

62700-0000

Line A1520 325 m2 $ $

63000-1000

Line A1540 30 Each $ $

63000-2000

Line A1560 15 Each $ $

63000-3000

Line A1580 30 Each $ $

Concrete Paved Waterway Type VII

Pavement Markings Thermoplastic (Yellow)

Pavement Markings Thermoplastic (White)

Reflective Raised Pavement Markings (one way clear)

Reflective Raised Pavement Markings (two way yellow)

Dumped Rip-rap Class IV

Concrete Paved Waterway Type VI

Maria (Calophyllum Antillanium)

Roble Nativo (Tabebuia heterophylla)

Moca (Andira inermis)

Seeding

AASHTO Deck Bulb Tee Deck BT-65, L=35.10 for spans 1 &3

AASHTO Deck Bulb Tee Deck BT-65, L=34.60 for span 2

Filter Blanket

Special Dumped Riprap

Grouted Riprap Class VIII

Dumped Riprap Class IX

Furnishing and placing loamy topsoil

Palms (Roystonea Borinquena)

AASHTO Deck Bulb Tee Deck BT-65, L=35.10 for spans 1 &2

B-15

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

63000-4000

Line A1600 28 Each $ $

63000-5000

Line A1620 56 Each $ $

63400-0000

Line A1640 ALL LPSM $

63400-1000

Line A1660 ALL LPSM $

63501-0000

Line A1680 ALL LPSM $

63502-4000

Line A1700 1 CTSM 5,000.00$

63800-1000

Line A1720 ALL LPSM $

66000-0000

Line A1740 6 Each $ $

66100-1000

Line A1760 1 Each $ $

66400-0000

Line A1780 840 m $ $

66400-1000

Line A1800 505 m $ $

83400-0000

Line A1820 725 m3 $ $

90100-0000

Line A1840 1,285 m $ $

90100-1000

Line A1860 900 m $ $

90100-2000

Line A1880 435 m $ $

90100-3000

Line A1900 65 m $ $

91001-6000

Line A1920 6 Each $ $

91200-0000

Line A1940 340 m2 $ $

91600-0000

Line A1960 16 Each $ $

92400-1000

Line A1980 20,570 m2 $ $

Utility Company Compensation (PREPA)

Maintenance of Traffic

Name Plates

Project Funding Sign

Mille Shoulder Rumble Strip (MSRS)

Mille Centerline Rumble Strip (MCRS)

AASHTO Deck Bulb Tee Deck BT-65, L=35.10 for spans 1 & 6

AASHTO Deck Bulb Tee Deck BT-65, L=34.60 for spans 2 to 4

Adjustment of Facilities of PRTC

Adjustment of Facilities of ATT

Removal of Existing PREPA Facilities

Prefabricated Drainage Composite

Bi-Directional Static Load Test

Erosion Control Blanket Type 4

Uncompacted Porous Granular Material

Drilled Shafts, 36 inch Diameter

Drilled Shafts, 60 inch Diameter

Permanent Casing, 60 inch Diameter

Permanent Casing, 71.65 inch Diameter

New Transition Module (More than 45 mph)

B-16

Schedule B

Project No:

PR ER PRMNT RPR(10) Schedule B Name: PR-10 HWY ID 14

Item No.

Quantity Unit Unit Price Amount

92401-0000

Line A2000 32,115 m2 $ $

93101-3000

Line A2020 ALL LPSM $

93400-0000

Line A2040 165 m3 $ $

93400-1000

Line A2060 1,590 m3 $ $

93400-2000

Line A2080 3,145 m3 $ $

93400-3000

Line A2100 25 m3 $ $

93501-0000

Line A2120 12 Each $ $

93700-0000

Line A2140 890 m $ $

96200-0000

Line A2160 ALL LPSM $

96300-0000

Line A2180 2,570 m2 $ $

97100-0000

Line A2200 620 m $ $

99100-0000

Line A2220 12,210 m2 $ $

99100-1000

Line A2240 86,500 m3 $ $

Turf Reinforcement Mat

Removal and Disposal of Lead Based Paint

Class IV (General Use), Level of Permeability (2)

Soil nail system

Plugging and Abandon of exist. Culvert

Mechanically Stabalized Earth Slope

Special Borrow Embankment

Class V (Bridge Deck), Level of Permeability (2)

Class V (General Use), Level of Permeability (2)

Class VI (General Use), Level of Permeability (2)

Locate Utility, Test Pit

Sealing of construction joints in patching areas

Cultural Resources Protection and Monitoring (Historic Bridge)

B - 17

PRICE PROPOSAL SUMMARY

Project PR ER PRMNT RPR(10)

(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________

(2) Schedule B (Government Option 1) Bid Total (from Page B-11) = (2) $____________________

Total Price of Project (for evaluation purposes only)

EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________

Maximum Time Allowed for the Contract if all schedules are Awarded at the Same Time

If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 1530 calendar days.

If Schedules A and B are NOT awarded at the same time:

If the Government awards the contract as Schedule A only, the performance period to complete all contract work will be 1080 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period of the contract will be extended 450 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.

B Pages Changes Summary

B Pages changes

1. Delete the Price Proposal Bid Schedules and Price Proposal Summary, pages B-1 through B-

17, and substitute with the amended Cost Proposal Bid Schedules and Price Proposal Bid Summary, pages B-1 through B-17.

a. Revised bid item description for Pay Item15102-0000 to Reimbursement for Municipality Tax Payments in Schedules A and B.

b. Revised bid quantities for the following Schedule A pay items:

1. Pay Item 15102-0000 Reimbursement for Municipality Tax Payments

2. Pay Item 61800-1000 Pavement Markings Thermoplastic (Yellow)

3. Pay Item 61800-2000 Pavement Markings Thermoplastic (White)

4. Pay Item 61800-4000 Reflective Raised Pavement Markings (one way clear)

5. Pay Item 61800-5000 Reflective Raised Pavement Markings (one way yellow)

6. Pay Item 61800-6000 Reflective Raised Pavement Markings (two way yellow)

7. Pay Item 91600-0000 Bi-Directional Static Load Test

c. Revised bid quantities for the following Schedule B pay items:

1. Pay Item 15102-0000 Reimbursement for Municipality Tax Payments

2. Pay Item 61800-1000 Pavement Markings Thermoplastic (Yellow)

3. Pay Item 61800-2000 Pavement Markings Thermoplastic (White)

4. Pay Item 61800-6000 Reflective Raised Pavement Markings (two way yellow)

d. Add Pay Items on Schedule A:

1. Pay Item 93101-3000 Removal and Disposal of Lead Based Paint

e. Add Pay Items on Schedule B:

1. Pay Item 62200-7000 Grouted Riprap Class VIII

2. Pay Item 62200-8000 Dumped Riprap Class IX

3. Pay Item 93101-3000 Removal and Disposal of Lead Based Paint

f. Delete Pay Item on Schedule A:

1. Pay Item 91600-3000 Drilled Shaft Load Test

g. Delete Pay Item on Schedule B:

1. Pay Item 61801-0000 Reflective Raised Pavement Markings (one way white)

2. Pay Item 91600-3000 Drilled Shaft Load Test

h. Revised Pay Items unit of measurement on Schedule A:

1. Pay Item 92500-4000 Trench Drain Type I

2. Pay Item 92500-5000 Trench Drain Type II

SCR Changes 1 of 1

Special Contract Requirement (J Pages) changes

1. Delete Subsection 153.02(c) and substitute with the following:

(c) Testers. Provide testers with at least one year experience in the type of sampling and testing required, with PRHTA’s Technician Training Certification Program (TTCP) accreditation, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program [such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)];

or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

2. Delete the first sentence of Subsection 154.02B, page J-95, and substitute with the following:

Perform the work described in the Section 107.10(i) and on the CRPM plan for site HWY- 111 included on the NEPA documents.

3. Delete the last sentence of Subsection 638-3.01(k), page J-257, and substitute the following:

Refer to subsection 108.05.

i

Bridge Preservation Guide Maintaining a Resilient Infrastructure to Preserve Mobility

Spring 2018

Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for use of the information contained in this document. This report does not constitute a standard, specification, or regulation.

The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document.

Quality Assurance Statement The Federal Highway Administration provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement.

Cover photo: Deception Pass Bridge on Washington State Route 20, connecting Whidbey Island to Fidalgo Island.

iBridge Preservation Guide – Maintaining a Resilient Infrastructure to Preserve Mobility

Contents Introduction

Definitions and Related Commentaries

Asset Management

Maintenance

Routine Maintenance

Bridge Preservation

Preventive Maintenance

Cyclical Maintenance Activities

Condition-Based Maintenance Activities

Rehabilitation

Replacement

Summary

National Bridge Inventory General Condition Ratings

Bridge and Culvert Classification

Bridge Element Condition State

Design Life

Service Life

Establishing a Bridge Preservation Program

What Is a Bridge Preservation Program?

How to Establish a Bridge Preservation Program

Bridge Preservation Program Summary

Appendix A. Common Actions Based on National Bridge Inventory General Condition Ratings

Appendix B. Common Actions Based on Bridge Element Condition States

Appendix C. Resources ii

List of Figures Figure 1. Bridge snow removal

Figure 2. Bridge action categories

Figure 3. Bridge washing

Figure 4. Broadcasting aggregate on sealer

Figure 5. Deck showing halo effect

Figure 6. Substructure repair

Figure 7. Before bridge maintenance painting (left) and after (right)

Figure 8. Joint replacement

Figure 9. Joint seal replacement

Figure 10. Pier being prepared for ECE treatment

Figure 11. Bridge components in various ratings

Figure 12. Culvert coded as Item 62. Superstructure and substructure coded as N

Figure 13. Diaphragms in straight steel bridges are not NBEs because they are not primary load-carrying elements, but they can be added as an ADE

Figure 14. Bridge condition over time

Figure 15. Steps for establishing a bridge preservation program

Figure 16. Examples showing the effects of BME preservation on NBEs

Figure 17. A comparison of bridge condition over time with and without bridge preservation

Figure 18. Measuring preservation performance

Figure 19. Example website dashboard showing an analysis for bridge conditions

List of Tables Table 1. Examples of routine maintenance activities

Table 2. Examples of cyclical maintenance activities

Table 3: Examples of condition-based maintenance activities

Table 4. Federal funds eligibility summary

Table 5. Examples of cyclical agency rule

Table 6. Example of a condition-based agency rule iii

Acronyms and Abbreviations AASHTO ......... American Association of State Highway and Transportation Officials

ADE ................ Agency Developed Elements

BME ................ Bridge Management Elements

BMS ................ Bridge Management System

BSIR ................. Bridge Safety Inspection Report

CP .................. cathodic protection

DOT ................ Department of Transportation

ECE ................. electrochemical extraction

ECR ................ epoxy-coated rebar

FAST Act ......... Fixing America’s Surface Transportation Act

FHWA ............. Federal Highway Administration

GCR ............... general condition rating

HBP ................. Highway Bridge Program

HBRRP ............ Highway Bridge Replacement and Rehabilitation Program

LCP ................. Life Cycle Plan

MAP-21 .......... Moving Ahead for Progress in the 21st Century Act

NBI .................. National Bridge Inventory

NBE ................. National Bridge Elements

PM .................. preventive maintenance

TSP 2 ............... Transportation System Preservation Technical Services Program iv

Ph ot o so ur ce

: F

HW

A

Bridge Preservation Guide Maintaining a Resilient Infrastructure to Preserve Mobility

Introduction State departments of transportation (DOTs), local agencies, and other bridge owners face significant challenges in addressing the needs of their aging infrastructure. Due to limited funds and increased competition for funds among highway assets, bridge owners are challenged to cost effectively preserve and maintain their bridges to support overall highway mobility. However, having a “worst-first” approach to bridge management by focusing only on replacing poor bridges while ignoring the maintenance needs of good and fair bridges is inefficient and cost-prohibitive in the long term.

A successful bridge program seeks a balanced approach to preservation and rehabilitation/ replacement. Bridge owners are striving to be more strategic by adopting and implementing systematic processes for bridge preservation as an integral component of their overall asset management.

Purpose

This guide defines bridge preservation terms and identifies commonly practiced bridge preservation activities. It also provides guidance to State governments and other bridge-owning agencies on establishing or improving existing bridge preservation programs as part of an asset management program.

Scope

This guide is intended for Federal, State, and local bridge engineers; bridge owners; and bridge preservation practitioners to support the Federal-Aid Highway Program.

Eligibility

Over several decades, the Federal Highway Administration’s (FHWA) Highway Bridge Replacement and Rehabilitation Program (HBRRP), later known as the Highway Bridge Program (HBP), was the primary source of Federal funding for bridges. The HBP afforded State DOTs discretion to use funds not only for bridge rehabilitation and replacement, but also for a broad array of preventive maintenance activities. Bridge owners have taken advantage of the flexibilities in the HBP and have maintained their inventory in good to fair condition under constrained resources.

The Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America’s Surface Transportation (FAST) Act recognized preservation as a vital component of achieving and sustaining a desired state of good repair of highway facilities. Bridge preservation is eligible for Federal funding.1 However, it is important to differentiate between routine maintenance and cost-effective preservation activities that extend the service life of a structure. Routine maintenance is not eligible for Federal funding.2

1 Section 1103 of MAP-21 amended the definition of “construction” in 23 U.S.C. 101 and adds preservation as an eligible cost of construction.

2 23 U.S.C. 116 (b)

Definitions and Related Commentaries Several definitions are presented in this section along with commentary. The definitions are offered as a means of establishing clear and consistent terminology for bridge owners and preservation practitioners.

Asset Management Definition: Asset management is defined as a “strategic and systematic process of operating, maintaining, and improving physical assets, with a focus on both engineering and economic analysis based on quality information, to identify a structured sequence of maintenance, preservation, repair, rehabilitation, and replacement actions that will achieve and sustain a desired state of good repair over the life cycle of the assets at a minimum practicable cost.”3

Commentary: MAP-21 brought transformative changes to the Federal-Aid Highway Program with its performance management and asset management requirements.4 Asset management plans are an important highway infrastructure management tool to improve and preserve the condition of assets and system performance.

Maintenance5

Definition: Maintenance describes work that is performed to maintain the condition of the transportation system or respond to specific conditions or events that restore the highway system to a functional state of operations. Maintenance is a critical component of an agency’s asset management plan that includes both routine and preventive maintenance.

Routine Maintenance Definition: Routine maintenance encompasses work that is performed in reaction to an event, season, or activities that are done for short-term operational need that do not have preservation value. This work requires regular reoccurring attention.

Figure 1. Bridge snow removal.

3 MAP-21 added this definition in 23 U.S.C. 101(a)(2).

4 The core performance management requirements are codified in 23 U.S.C. 150 and 23 U.S.C. 119. Asset management requirements are codified in 23 U.S.C. 119.

5 FHWA Guidance on Highway Preservation and Maintenance dated Feb. 25, 2016.

Ph ot o co ur te sy o f O re go n

D O

T

Commentary: Per 23 U.S.C. 116 (d), States and owner agencies are required to properly maintain projects financed with Federal-aid funds. Therefore, routine maintenance activities are not eligible for Federal funds. Examples of routine maintenance are listed in Table 1.

Bridge Preservation Definition: Bridge preservation is defined as actions or strategies that prevent, delay, or reduce deterioration of bridges or bridge elements; restore the function of existing

Table 1. Examples of routine maintenance activities.

These are examples of routine maintenance activities not eligible for Federal funds:

Trash, Litter, and Dead Animal Removal

Snow Removal/Application of Salt/Deicing Chemicals

Graffiti Removal Hazardous Material Removal

Asphalt Patch with No Membrane on Concrete Deck

Accident Damage to Bridge and Its Appurtenances

Storm Damage bridges; keep bridges in good or fair condition; and extend their service life. Preservation actions may be cyclic or condition-driven.

Figure 2. Bridge action categories.

Commentary: Effective bridge preservation actions are intended to delay the need for costly rehabilitation or replacement while bridges are still in good or fair condition and before the onset of serious deterioration.

Bridge preservation encompasses both cyclical and condition-based activities applied to highway structures (see Figure 2). Best practices for bridge preservation include the following:

• A needs identification method that is uniform, specific, and repeatable. It can be based on National Bridge Inventory (NBI) major component condition ratings, detailed inspections and scopes, or element-level condition data.

• A commitment by agency management to asset preservation.

• Resource allocation determined by agency network goals and a bridge management system directed to preservation actions.

• A process for categorization and/or prioritization that integrates agency objectives.

• Verification and feedback on work completed.

Bridge Asset Management

Preservation/ Preventive

Maintenance

Cyclical Maintenance

Condition-Based Maintenance

Rehabilitation

Replacement

Preventive Maintenance Definition: Preventive maintenance (PM) is a cost-effective means of extending the service life of highway bridges.

Commentary: PM for highway bridges is a strategy of extending service life by applying cost-effective treatments to bridge elements. PM activities retard future deterioration and avoid large expenses in bridge rehabilitation or replacements.

PM includes cyclical and condition-based activities, as illustrated in Figure 2. Examples are listed in Table 2 and Table 3.

Cyclical Maintenance Activities Definition: Cyclical maintenance activities are performed on pre-determined intervals that aim to preserve and delay deterioration of bridge elements or component conditions.

Commentary: The frequency of cyclical PM activities can change as a result of environmental or condition changes. For example, superstructure cleaning that was occurring at a 3-year interval based on past accumulation of debris buildup could change if pigeons start routinely nesting on superstructure elements.

Examples of cyclical PM activities that may be considered by bridge owners for implementation on good and fair condition bridges and components are shown in Table 2.

Bridge cleaning and/or washings: Cleaning of decks, joints, drains, superstructure, and substructure elements slows the deterioration of concrete and steel elements that would otherwise be accelerated by debris, bird droppings, and contaminants.

Deck sealers: Deck sealers protect the reinforcing steel from corrosion by stopping or minimizing the intrusion of water and chloride through the concrete.

Table 2. Examples of cyclical maintenance activities.

Cyclical Maintenance Activity Bridge Component

Clean/Wash Bridge Deck and/or Super/Substructure

Clean and Flush Drains Deck

Clean Joints Deck Deck/Parapet/Rail Sealing and Crack Sealing Deck

Seal Concrete Super/Substructure

Condition-Based Maintenance Activities Definition: Condition-based maintenance activities are performed on bridge components or elements in response to known defects. Condition-based maintenance improves the condition of that portion of the element, but may or may not result in an increase in the component condition rating.

Commentary: Condition-based maintenance activities are identified through an inspection process.

Condition ratings may be improved by a condition-based PM activity. One example is a substructure element that was once rated fair due to spalled concrete and exposed reinforcement.

After maintenance removed loose concrete, cleaned the exposed reinforcement, and formed and placed new concrete, the inspection rating for the substructure was changed to good condition.

Examples of condition-based maintenance activities that may be considered by bridge owners for implementation on fair condition bridges and components are shown in Table 3.

Ph ot o co ur te sy o f W as hi ng to n

St at e D

O T

Figure 3. Bridge washing.

Ph ot o co ur te sy o f G

PI

Figure 4. Broadcasting aggregate on sealer.

Figure 5. Deck showing halo effect.

Halo Effect

The “halo effect” (see Figure 5) in bridge decks results when a delaminated area (due to reinforcement corrosion resulting from chlorides and moisture in the concrete) is removed and repair material (containing no chlorides) is put in its place. If a high concentration of chlorides remains in the area surrounding the replaced concrete, the corrosion potential will lead to rapid corrosion in the area surrounding the repair.

Table 3: Examples of condition-based maintenance activities

Examples of Condition-Based Maintenance Activity Bridge Component

Drains, Repair/Replace Deck

Joint Seal Replacement Deck

Joint Repair/Replace/Elimination Deck Electrochemical Extraction (ECE)/Cathodic Protection (CP) Deck

Concrete Deck Repair (see halo effect below) in Conjunction with Overlays, CP Systems or ECE Treatment

Deck

Deck Overlays (thin polymer epoxy, asphalt with waterproof membrane, rigid overlays) Deck

Repair/Replace Approach Slabs Approach

Seal/Patch/Repair Superstructure Concrete Superstructure

Protective Coat Concrete/Steel Elements Superstructure

Spot/Zone/Full Painting Steel Elements Superstructure

Steel Member Repair Superstructure

Fatigue Crack Mitigation (pin-and-hanger replacement, retrofit fracture critical members)

Superstructure

Bearing Restoration (cleaning, lubrication, resetting, replacement) Superstructure

Movable Bridge Machinery Cleaning/Lubrication/Repair Superstructure

Patch/Repair Substructure Concrete Substructure/Culvert

Protective Coat/Concrete/Steel Substructure Substructure/Culvert

ECE/CP Substructure/Culvert

Spot/Zone/Full Painting Steel Substructure Substructure

Pile Preservation (jackets/wraps/CP) Substructure

Channel Cleaning / Debris Removal Channel

Scour Countermeasure (installation/repair) Channel

Ph ot o co ur te sy o f V ec to r C or ro sio n

Te ch no lo gi es

Rehabilitation6

Definition: Rehabilitation involves major work required to restore the structural integrity of a bridge, as well as work necessary to correct major safety defects.

Commentary: Bridge rehabilitation projects provide complete or nearly complete restoration of bridge elements or components. Rehabilitation work can be done on one or multiple elements and/or components of a structure. Agencies may choose to combine preservation activities on several elements while a component is being rehabilitated. These projects require significant engineering resources for design, a lengthy completion schedule, and considerable costs.

Examples of bridge rehabilitation include, but are not limited to: partial or complete deck replacement, superstructure replacement, and substructure/culvert strengthening or partial/full replacement.

Incidental widening is often associated with some of these activities.

Figure 7. Before bridge maintenance painting (left) and after (right).

6 23 CFR 650.403(c)

Ph ot o co ur te sy o f G

PI

Figure 6. Substructure repair.

Ph ot os c ou rte sy o f W as hi ng to n

St at e D

O T

Replacement Definition: Total replacement of an existing bridge with a new facility constructed in the same general traffic corridor.

Commentary: The replacement structure must meet the current geometric, construction, and structural standards required for the types and volume of projected traffic on the facility over its design life. Replacement includes a nominal amount of approach work sufficient to connect the new facility to the existing roadway or to return the grade line to an attainable touchdown point.

Similar to bridge rehabilitation, bridge replacement projects require engineering resources for design, a substantial and complex completion schedule, and considerable costs. Life-cycle costs and other economic factors are usually considered when weighing rehabilitation versus replacement costs.

Ph ot o co ur te sy o f O re go n

D O

T

Figure 8. Joint replacement.

Ph ot o co ur te sy o f W as hi ng to n

St at e D

O T

Figure 9. Joint seal replacement.

Ph ot o co ur te sy o f V ec to r C or ro sio n

Te ch no lo gi es

Figure 10. Pier being prepared for ECE treatment.

Summary Table 4 summarizes actions that are either eligible or not eligible for Federal funds.

National Bridge Inventory General Condition Ratings NBI general condition ratings (GCRs) are used to describe the existing, in-place bridge or culvert as compared to the as-built condition. The materials used in the bridge are considered, as well as the physical condition of the deck, superstructure, and substructure components. This information is used to determine GCRs on a numerical scale that ranges from 0 (failed condition) to 9 (excellent condition) as described in the FHWA Coding Guide.7

Appendix A provides a description for each of these numeric values. The GCRs are used in evaluating bridge decks (NBI Item 58), bridge superstructures (NBI Item 59), bridge substructures (NBI Item 60), and culverts (NBI Item 62).

Figure 11. Bridge components in various ratings.

Bridge and Culvert Classification8 Good…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .