(USS KSG) Attachment S-7 Proposal Assessment.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Amendment 0006 - USS KEARSARGE (LHD 3) FY23 DOCKING SELECTED RESTRICTED AVAILABILITY (DSRA)
Solicitation number
N00024-22-R-4408
Issued by

About this file

This solicitation seeks proposals for the USS KEARSARGE (LHD 3) Fiscal Year 2023 Docking Selected Restricted Availability. The Naval Sea Systems Command requires maintenance, modernization, and repair services for this availability, to be completed over approximately 20 months from April 2023 through December 2024. Interested parties must register in the System for Award Management and Procurement Integrated Enterprise Environment in order to receive solicitation documents and submit proposals via the latter system. Proposals are due in or around November 2022, and award of a single contract is expected in or around November 2022. The requirement is not set aside for small businesses due to its complexity, magnitude, and duration. Services sought include drydocking and pier-side maintenance, with the contractor required to have dedicated facilities capable of berthing the vessel for the duration of the availability.

View the file

Other files

File Type Posted
N0002422R4408_A0006.pdf PDF
USS_KEARSARGE_QA6.xlsx XLSX spreadsheet
N0002422R4408_A0006_CONFORMED.pdf PDF
N0002422R4408_A0005_CONFORMED.pdf PDF
N0002422R4408_A0005.pdf PDF
USS_KEARSARGE_QA5.xlsx XLSX spreadsheet
N0002422R4408_A0004_CONFORMED.pdf PDF
N0002422R4408_A0004.pdf PDF
USS_KEARSARGE_QA4.xlsx XLSX spreadsheet
USS_KEARSARGE_QA3.xlsx XLSX spreadsheet
N0002422R4408_A0003_CONFORMED.pdf PDF
N0002422R4408_A0003.pdf PDF
N0002422R4408_A0002.pdf PDF
USS_KEARSARGE_QA2.xlsx XLSX spreadsheet
N0002422R4408_A0002_CONFORMED.pdf PDF
N0002422R4408_A0001_CONFORMED.pdf PDF
N0002422R4408_A0001.pdf PDF
USS KEARSARGE_QA1.xlsx XLSX spreadsheet
(USS KSG) Attachment J-5 Quality Assurance Surveillance Plan.docx DOCX document
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
(USS KSG) Attachment J-7 IPTD Events and SMR.docx DOCX document
(USS KSG) Attachment S-5 Eligibility Criteria Data Sheet.docx DOCX document
N00024-22-R-4408_USS KEARSARGE FY23 LHD.pdf PDF
CDRL A016 Enc (1) End of Avail Report Template.xlsx XLSX spreadsheet
(USS KSG) Attachment J-10 Open and Inspect Milestone Reports Due.xlsx XLSX spreadsheet
(USS KSG) CDRL Exhibit A.pdf PDF
(USS KSG) Attachment S-9 Past Performance Questionnaire.docx DOCX document
(USS KSG) Attachment S-3 Pre-Proposal Information (PPI) Form.xlsx XLSX spreadsheet
(USS KSG) CDRL Exhibit C.pdf PDF
(USS KSG) Attachment J-8 Government Furnished Material (GFM) List (E1).xlsx XLSX spreadsheet
(USS KSG) Attachment S-2 Past Performance CPARS References.docx DOCX document
(USS KSG) CDRL Exhibit B.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L & M Requirements

USS KEARSARGE (LHD 3) FY23 DSRAOfferor: [Insert Offeror Name]
SECTION L, IIYes, No
Electronic Submission - Price & Non-Price Proposal- Offerors are instructed to submit proposals electronically via the Solicitation Module in PIEE located at https://piee.eb.mil.

- Proposals must be submitted as one .zip file per ship/proposal, formatted so that each Volume 1 Price Volume and each Volume 2 Technical Volume are submitted in separate file folders clearly marked. Each Volume shall be formatted with separate files submitted for each Factor.

- All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable.

SECTION L, IVYes, No
Electronic Proposal Format8.5 x 11 inch paper with a one-inch margin.

Text: 12-point Times New Roman font.

Graphics pages text: Not smaller than 10-point font, legible, and readable.

SECTION L, V, A. VOLUME IYes, No, N/A (if N/A why)
Cover LetterPage limit of 3
Identified all enclosures included with the proposal
CAGE and DUNS numbers, name address and contact information for the Prime contractor
Provided notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).
Provided Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.
For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined) (although material is proposed), provide an explanation as to why.

For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable:

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

Signed SF 33Blocks 12 through 18 completed
All amendments acknowledged
Completed applicable “fill-ins”
Signed by representative authorized to contractually bind the company
Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs
Section K Representations, Certifications, and Other Statements provided and completed
Small Business Subcontracting plan per FAR Part 19, Large businesses onlyProvided rationale for any proposed goals that are lower than the statutory requirements identified

at https://www.sba.gov/contracting/contracting-officials/goaling.

Addressed FAR 52.219-9, including the requirements listed in FAR 52.219-9(d)(1) - FAR 52.219-9(d)(15).
Joint Venture / teaming agreementsIf applicable
Completed Section B, Carrying forward information from applicable Pricing WorkbookProposed on all CLINs
Complete all Section B Note fill-ins
Pricing Workbook SpreadsheetWork Item Pricing
Matches Section B CLIN pricing and notes
Daily Extension Rates
Dock Differential
IPD
Fully Burdened Ship Repair Labor Rate & Material Burden Rate, New Work and Growth Reservation.
Execution Milestones and Key Event DatesApplicable Attachment J-3
Completed Attachment S-7To be responsive, offerors should rely on the solicitation Sections L and M as this may not be a comprehensive list.
SECTION L, V, B. VOLUME IISECTION M, III, A and B
Factor 1 (Eligibility) (Section L)Factor 1 Evaluation Criteria (Section M)Proposal Reference
a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and dry-dock intended to be used for the proposed availability and indicates that the pier and dry-dock meet the minimum characteristics identified in Attachment S-5.Provide a completed Attachment S-5 that:

a) Identifies the specific pier(s) and dock(s) intended to be used for each proposed Availability, and

b) Indicates that those pier(s) and dock(s) meet the minimum characteristics of Table 1/Enclosure (1) of Attachment S-5.

b) Provide a completed Execution Milestones & Key Event Dates (Attachment J-3) and a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS KEARSARGE (LHD 3) without any modification to the vessel.1. Assess whether the offeror has ownership or committed access to a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3), in accordance with Section L.
c) In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions:

i. Contractor Navy Audit request.

ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.

iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.

iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.

v. Navy evaluation of the control inspection, operating, and maintenance procedures.

vi. Navy preparation of exit brief and formalized in a written report.

vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.

viii. Navy examination of actions to resolve deficiencies.2. Assess if the proposed drydock is certified in accordance with MIL-STD-1625, and remains certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Should the drydock be uncertified or certification lapse anytime during the period between the ‘Dock Vessel’ through ‘Undock Vessel’ milestones, assess whether the offeror has adequately described a plan for certification or recertification in accordance with MIL-STD-1625 and the requirements of Section L.
Factor 2 (Past Performance) (Section L)Factor 2 Past Performance (Section M)Proposal Reference
Offerors may provide past performance information for up to five (5) previous contracts. If the offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to https://piee.eb.mil and SAM.gov , information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).

Where the offeror does not have recent or relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider. The Past Performance factor will be rated on an Acceptable/Unacceptable basis. The Government will use information provided by the Offeror, as well as any other information deemed necessary as noted in Section L, V, B, 2 to assess the Offeror’s ability to meet the solicitation requirements. This assessment will be based on a demonstrated record of past performance, taking into consideration the recency and relevancy of the past performance information. The Government may also evaluate the past performance of the Offeror’s proposed subcontractors. In evaluating an Offeror’s past performance, the Government reserves the right to contact former customers, Government agencies, and other private and public sources of information.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, unknown past performance shall be considered acceptable. The evaluation will include information provided by the Offeror demonstrating compliance with the requirements of FAR 52.219-8 and 52.219-9.