USBC Drawings.pdf

PDF 7 MB Posted

Attached to
Bankruptcy Historic Courthouse Repair
Solicitation number
47PH0522R0011
Issued by

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Copyright

Architect

WITSELL EVANS RASCO

901 West Third Street Little Rock, Arkansas 72201

501.374.5300 www.WERarch.com

/2 /2

:0

:4

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

GSA PROJECT NO. 47PH0521F0060

USBC Water Damage Repairs

Repair & Replace Finishes From Water Damage

US BANKRUPTCY COURTHOUSE

300 W. 2ND STREET

LITTLE ROCK, AR 72201

P ro je c t N a m e

100 % FINAL DESIGN

DECEMBER 20, 2021

A0.01 GENERAL INFORMATION

A1.01 FIRST FLOOR PLAN

A1.02 SECOND FLOOR PLAN

A1.03 THIRD FLOOR PLAN

A1.04 FOURTH FLOOR PLAN

A1.05 FIRST FLOOR RCP

A1.06 SECOND FLOOR RCP

A1.07 THIRD FLOOR RCP

A1.08 FOURTH FLOOR RCP

A4.01 INTERIOR ELEVATIONS

A4.02 INTERIOR ELEVATIONS

A7.02 FINISH SCHEDULE

A7.03 FINISH SCHEDULE

AD1.01 FIRST FLOOR DEMO PLAN

AD1.02 SECOND FLOOR DEMO PLAN

AD1.03 THIRD FLOOR DEMO PLAN

AD1.04 FOURTH FLOOR DEMO PLAN

AD1.05 SECOND FLOOR DEMO RCP

INDEX OF DRAWINGS

A0.00 TITLE SHEET

ARCHITECTURAL

SITE VICINITY MAP

PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION

OR DISTRIBUTION OF THESE DRAWINGS, PLANS OR SPECIFICATIONS TO

UNAUTHORIZED PERSONS IS PROHIBITED. DO NOT REMOVE THIS NOTICE!

PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED.

US BANKRUPTCY COURTHOUSE

300 W. 2ND STREET

LITTLE ROCK, AR 72201

AB Anchor Bolt ACS Architectural Cast Stone ACT Acoustical Ceiling Tile AD Area Drain ADD Addendum ADD’L Additional ADJ Adjacent AFF Above Finished Floor AGGR Aggregate ALUM Aluminum ALT Alternate ANOD Anodized AP Access Panel APPROX Approximate ARCH Architectural AWP Acoustical Wall Panel BB Bulletin Board B.M. Bench Mark BD Board BETW Between BF Backface BG Bumper Guard BL Bed Locator BL Building Line BLDG Building BLKG Blocking BM Beam BOT Bottom BR Bumper Rail BRD Marker Board/ Chalk Board BRG Bearing BRK Brick BSMT Basement BU ROD Back-Up Rod BUR Built-Up Roof BW Bearing Wall C Compact Parking Space CDR Card Reader CEM Cement CGD Corner Guard CJ Control Joint CL Center Line CLG Ceiling CLR Clear CMB Concrete Masonry Base CMTS Cementitious CMU Concrete Masonry Unit COL Column COMM Communications CONC Concrete CONN Connection CONST Construction CONT Continuous COORD Coordinate CORR Corridor CPT Carpet CR Crash Rail CRJ Construction Joint CRT Ceramic Tile CSK Countersunk CTD Centered CTR Center CW Curtain Wall D Depth DBA Deformed Bar Anchor DET Detail DF Drinking Fountain DIA Diameter DIAPH Diaphragm DIM Dimension DISP Dispenser DJ Deflection Joint DK Desk DL Dead Load DN Down DS Down Spout DS Dishwasher DWG Drawing DWGS Drawings DWLS Dowels EA Each EF Each Face EIFS Exterior Insulation and Finish System EJ Expansion Joint EL Elevation ELEC Electric ELEV Elevator EQ Equal EQUIP Equipment ESC Escalator EW Each Way EWC Electric Water Cooler EXP BLT Expansion Bolt EXT Exterior FD Floor Drain FDN Foundation FE Fire Extinguisher FEC Fire Extinguisher Cabinet FF Finish Floor FHC Fire Hose Cabinet FIN Finish FLR Floor FMH Fume Hoods FOS Face of Stud FS Far Side FT Foot FTG Footing FV Field Verify FVC Fire Valve Cabinet FXS Fixed Seating GA Gauge GALV Galvanized GB Grade Beam GDC Ground Concrete GEN General GFRC Glass-Fiber Reinforced Concrete GI Galvanized Iron GL Glass GLS Glass Mosaic Tile GND Ground GRG Glass- Reinforced Gypsum GRT Grout GYP BD Gypsum Board HB Hose Bib HDW Hardware HDWD Hardwood HK Hook HM Hollow Metal HOR Horizontal HP High Point HR Hour HS Headed Stud HSKP Housekeeping HT Height HW Hand Wash ID Inside Diameter IM Ice Machine INSUL Insulation INT Interior IPC Interior Paint Color IPT Interior Paint JT Joint K Kips (1000 LB) KO Knock-Out KP Kickplate KPD Keypad KSP Kips Per Square Foot L Angle LAV Lavatory LG Long LKB Lockable LKR Locker

LL Live Load LLH Long Leg Horizontal LLV Long Leg Vertical LOC Location LP Low Point LT Light LVT Luxury Vinyl Tile LWC Lightweight Concrete MAS Masonry MAT'L Material MAX Maximum MBL Marble MECH Mechanical MEMB Membrane MFG Manufacturer MISC Miscellaneous MO Masonry Opening MOD BIT Modified Bitumen MOD Modified MSL Mean Sea Level MTL Metal MW Microwave N/A Not Applicable NA Not Available NIC Not in Contract NOM Nominal NS Near Side NTS Not to Scale NWC Normal Weight Concrete OA Over All OC On Center OD Outside Diameter OD Overflow Drain OFCI Owner Furnished, Contractor Installed OFOI Owner Furnished, Owner Installed OH Opposite Hand OPNG Opening OPP Opposite OSF Outside Face PL Plastic Laminate PC Precast Concrete PCF Pounds per Cubic Foot PCT Porcelain Tile PENT Penthouse PL Property Line PL Plate PLUMB Plumbing PLYWD Plywood PP Push Plate POL Polished PORT CEM Portland Cement PR Pair PREFAB Prefabricated PRP Plastic Resin Panel PSF Pounds per Square Foot PSI Pounds per Square Inch PT Point PTB Porcelain Tile Base PTD Painted R Riser RAD Radius RAF Rubberized Asphalt Flashing RAM Rubberized Asphalt Membrane RAU Rubberized Asphalt Underlayment RB Rubber Base RBB Rubber Base RBT Rubber Tile RCP Reflected Ceiling Plan RD Roof Drain REBAR Reinforcing Bar RECP Receptacle REF Refer or Reference REINF Reinforcing RELOC Relocate/ Relocated REQ'D Required RFVC Recessed Fire Valve Cab RM Room RO Rough Opening SAB Sound Attenuation Blanket SBC Standard Building Code SCHED Schedule SDL Superimposed Dead Load SECT Section SHT Sheet SHWR Shower SIM Similar SLC Sealed Concrete SO Structural Opening SOG Slab on Grade SP Stand Pipe SPA Space or Spacing SPEC Specification SQ Square SSC Solid Surface SS Stainless Steel STA Station STC Sound Transmission Class STC Stained Concrete STD Standard STIFF Stiffener STIR Stirrup STL Steel STRUC Structural SWC Specialty Wall Covering SYM Symmetrical SVL - Sheet Vinyl SYS System T Tread T&B Top and Bottom TB Twin Bed TC Top of Curb TEL Telephone TEMP Temperature TH Threshold THK Thick TLP Toilet Partition TLT Toilet TOB Top of Beam TOC Top of Concrete TOF Top of Footing TOP Top of Parapet TOS Top of Slab TOSTL Top of Steel TRZ Poured Terrazzo TT Treatment Table TW Top of Wall TYP Typical UNO Unless Noted Otherwise VAR Varies VCT Vinyl Composition Tile VERT Vertical VEST Vestibule VIF Verify In Field VWC Vinyl Wall Covering W/ With W/O Without W Width W.P. Waterproof(ing) WD Wood WDM Wood Millwork WF Wide Flange WL Wind Load WKS Walk Off System WNB Window Blinds WP Work Point WT Whirlpool Tub WWF Welded Wire Fabric

DRAWING ABBREVIATIONS

CEILING LEGEND

PENDANT LIGHT FIXTURE

2' x 4' FLUORESCENT LIGHT FIXTURE

RECESSED DOWN LIGHT RETURN AIR

SUPPLY AIR

EXIT SIGN - HATCH INDICATES EXIT

GYP. BOARD CEILING

/1 A101

ROOM NAME

ROOM NUMBER

VIEW NUMBER / SHEET

LOCATION

A101

SIM

SECTION NUMBER

SHEET

LOCATION

A.F.F.

1i

1'-0"

A101

SIM

CEILING MATERIAL

CEILING HEIGHT

DETAIL NUMBER

SHEET LOCATION

REFERENCE

ELEVATION

FLOOR LEGEND

Level Name

Elevation

1 REVISION

TAG

A100 A1 ELEVATION

TAG

ROOM

ELECTRICAL

1. ALL EXISTING LIGHT FIXTURES ARE TO BE CLEANED AND RELAMPED IN ALL ROOMS NOTED

2. ALL RECEPTACLES ARE TO BE TESTED TO VERIFY THERE IS NO DAMAGE

3. ALL HARDWARE CONNECTIONS TO EQUIPMENT IS TO BE TESTED TO VERIFY THERE IS NO DAMAGE TO WIRING

4. ALL LOW VOLTAGE NETWORK AND TELEPHONE CONNECTIONS ARE TO BE TESTED TO VERIFY THERE IS NO DAMAGE

5. CONTRACTOR IS TO ENGAGE THE COURTS PREFERRED VENDOR TO TEST ALL EQUIPMENT, WIRING, CONNECTIONS, ETC. FOR THE

COURTROOM AUDIO VISUAL SYSTEMS.

SPINITAR

JAY ROGINA, PRINCIPAL

JAY.ROGINA@SPINTAR.COM

949-322-9444

FIRE ALARM

1. ALL FIRE ALARMS DEVICES ARE TO BE TESTED TO VERIFY THERE IS NO DAMAGE TO DEVICES AND WIRING

MECHANICAL

1. TEST ALL HVAC THERMOSTATS IN ALL ROOMS TO ENSURE THERE IS NO DAMAGE TO DEVICES AND WIRING

HAZARDOUS MATERIALS

1. THERE IS EVIDENCE OF LEAD PAINT ON ORIGINAL PLASTER WALLS AND WOOD TRIM IN THE BUILDING. PRECAUTIONS WILL HAVE TO BE

TAKEN WHEN SANDING AND SCRAPING IN AREAS WHERE ORIGINAL MATERIALS ARE IMPACTED

MEP GENERAL NOTES

1. THE CONTRACTOR IS CAUTIONED THAT THIS IS A RENOVATION TO AN HISTORIC STRUCTURE AND CARE IS TO BE TAKEN TO AVOID DAMAGE TO EXISTING BUILDING PARTS TO REMAIN. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE RESTORATION OR REPLACEMENT OF ANY SUCH BUILDING PARTS DAMAGED DURING CONSTRUCTION.

2. BUILDING PARTS REMOVED SHOULD BE REPAIRED AND REUSED, TURNED OVER TO THE OWNER, O RNOTED IN THE PLANS. NO BUILDING PARTS SHOULD BE DISPOSED OF UNLESS APPROVED BY THE OWNER AND ARCHITECT.

3. WHERE EXISTING PROFILES ARE TO BE MATCHED, THE EXISTING SHALL BE REPRODUCED EXACTLY IN TERMS OF DIMENSIONS, PROFILE, COLOR, MATERIAL (SUCH AS WOOD SPECIES, TYPE OF METAL, ETC.) AND TEXTURE.

4. MANY DIMENSIONS ARE DEPENDENT UPON EXISTING BUILDING CONDITIONS; VERIFY ALL CONDITIONS AND DIMENSIONS

PRIOR TO BID. COORDINATE DISCREPANCIES WITH ARCHITECT PRIOR TO BID.

5. IT IS THE GOAL OF THIS PROJECT TO MAINTAIN THE HISTORIC FABRIC OF THIS STRUCTURE. THE CONTRACTOR IS REQUIRED TO RESTORE AND RE-USE AS MUCH REMAINING ORIGINAL HISTORIC FABRIC AS POSSIBLE. THE CONTRACTOR WILL NOT DISCARD OR DAMAGE ANY MATERIALS REMOVED FROM THE STRUCTURE DUE TO THE FACT THAT THEY ARE

IMPORTANT TO THE RENOVATION OF THE STRUCTURE AND ARE IRREPLACEABLE.

6. DRAWINGS SHOWING EXISTING CONSTRUCTION IS BASED ON CASUAL FIELD OBSERVATION ONLY. VERIFY THAT CONSTRUCTION AND UTILITY ARRANGEMENTS ARE AS SHOWN. REPORT DISCREPANCIES TO ARCHITECT BEFORE DISTURBING EXISTING INSTALLATION. BEGINNING OF ALTERATIONS WORK CONSTITUTES ACCEPTANCE OF EXISTING

CONDITIONS.

7. CONTRACTOR SHALL BE FAMILIAR WITH THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION AND SHALL HAVE A COPY ON SITE FOR REFERENCE. THESE GUIDELINES SHOULD BE USED BY THE CONTRACTOR TO GUIDE

THE REPAIR AND RESTORATION WORK ON THIS PROJECT.

8. PROTECT EXISTING MATERIALS AND SURFACES WHICH ARE NOT TO BE REMOVED. ALL EXISTING MATERIALS AND SURFACES ARE CONSIDERED TO BE HISTORIC UNLESS OTHERWISE NOTED ON THE CONTRACT DOCUMENTS.

9. PROTECT ALL WINDOWS AND DOORS DURING DEMOLITION AND CONSTRUCTION.

10. THE CONTRACTOR IS RESPONSIBLE FOR TAGGING MATERIALS REMOVED FROM THE STRUCTURE SO AS TO IDENTIFY WHERE THE MATERIAL CAME FROM ON THE STRUCTURE. SUCH TAGS SHOULD INCLUDE THE INFORMATION SHOWN BELOW AND ANY OTHER INFORMATION THAT WILL AID IN IDENTIFYING WHERE MATERIALS REMOVED WERE POSITIONED ON/IN STRUCTURE. THE CONTRACTOR SHOULD MAKE ANY OTHER DOCUMENTATION REQUIRED TO ASSURE CORRECT REINSTALLATION OR ASSEMBLY. THE CONTRACTOR SHALL USE PHOTOGRAPHS TO AID IN DOCUMENTING HOW REMOVED

ITEMS ARE TO BE CORRECTLY REINSTALLED.

SAMPLE: OBJECT: WOOD BENCH

FLOOR PLAN: FIRST FLOOR PLAN

WOOD BENCH EAST SIDE, 1ST FROM THE NORTH

11. THE CONTRACTOR IS REQUIRED TO CUT, MOVE, OR REMOVE ITEMS AS NECESSARY FOR ACCESS TO ALTERATIONS AND RENOVATION WORK. THE CONTRACTOR WILL REPLACE AND RESTORE THESE ITEMS TO MATCH THEIR EXISTING CONDITION AT COMPLETION OF THE WORK, WHETHER SPECIFIED IN THE CONSTRUCTION DOCUMENTS OR NOT.

12. THE CONTRACTOR SHALL REMOVE, CUT, AND PATCH WORK IN A MANNER TO MINIMIZE DAMAGE AND TO PROVIDE A MEANS OF RESTORING PRODUCTS AND FINISHES TO THE ORIGINAL CONDITION. QUALIFIED PERSONNEL SUCH AS FINISH

CARPENTERS SHOULD DO DEMOLITION WORK ON FINISH TRIM AND EXTERIOR TRIM.

13. WHERE NEW WORK ABUTS OR ALIGNS WITH EXISTING, PERFORM A SMOOTH AND EVEN TRANSITION. PATCH WORK AND

USE MATERIALS THAT MATCH EXISTING ADJACENT WORK IN TEXTURE AND APPEARANCE.

14. WHERE EXISTING MATERIAL CANNOT BE RESTORED AND RE-USED, THE CONTRACTOR IS TO PROVIDE NEW MATERIAL WHICH MATCHES THE EXISTING EXACTLY IN TERMS OF DIMENSIONS, PROFILE, MATERIAL (WOOD SPECIES, METAL, ETC.)

AND TEXTURE.

15. EXECUTE WORK BY METHODS WHICH WILL AVOID DAMAGE TO OTHER WORK. PROVIDE PROPER SURFACES TO RECEIVE

PATCHING AND FINISHING.

16. THE CONTRACTOR IS REQUIRED TO DOCUMENT THE WORK THROUGH DIGITAL PHOTOGRAPHY. DOCUMENTATION IS TO BEGIN BEFORE DEMOLITION WORK HAS STARTED BY DOCUMENTING THE AREAS THAT ARE TO BE RENOVATED THROUGH DIGITAL PHOTOGRAPHY. DOCUMENTATION THROUGH DIGITAL PHOTOGRAPHY IS TO BE DONE THROUGHOUT THE LENGTH OF THE PROJECT ON A DAILY BASIS DOCUMENTING THE WORK THAT HAS BEEN COMPLETED AND PARTS OF THE STRUCTURE THAT HAVE BEEN UNCOVERED. THE CONTRACTOR IS TO PROVIDE COPIES OF THE DIGITAL PHOTOGRAPHS VIA DISC OR E-MAIL ON A WEEKLY BASIS TO THE OWNER AND ARCHITECT. ALL CHANGES IN EXISTING CONSTRUCTION AND NEW CONSTRUCTION IS TO BE DIGITALLY PHOTOGRAPHED BY THE CONTRACTOR. THE CONTRACTOR IS REQUIRED TO TAKE AND PROVIDE DIGITAL PHOTOGRAPHS OF AREAS IN QUESTION DURING CONSTRUCTION. THE CONTRACTOR IS TO HAVE MEANS TO SEND DIGITAL PHOTOGRAPHS VIA E-MAIL FROM THE JOB SITE TO THE ARCHITECT AND THE OWNER TO

RESOLVE QUESTIONS AND PROBLEMS IN A TIMELY MANNER.

17. PROVIDE ACCESS TO AND FROM SITE AS REQUIRED BY LAW AND BY OWNER. DO NOT OBSTRUCT ROADWAYS, SIDEWALKS, OR OTHER PUBLIC WAYS WITHOUT PERMISSION FROM THE OWNER.

GENERAL NOTES FOR HISTORIC STRUCTURES

A. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD MEASURING OF EXISTING CONDITIONS PRIOR TO AND DURING CONSTRUCTION, AS NECESSARY TO ASSURE CONSTRUCTION ADHERENCE TO DRAWINGS. BY ENTERING INTO A CONSTRUCTION CONTRACT FOR THIS WORK, GENERAL CONTRACTOR HAS INDICATED HIS FAMILIARITY WITH THE FIELD CONDITIONS, ANY DIMENSION REVISIONS ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR REVIEW APPROVAL.

B. GENERAL CONTRACTOR SHALL COORDINATE DELIVERIES, INSPECTIONS, AND SITE VISITS FOR ALL TRADES AND

SUBCONTRACTORS AS REQUIRED.

C. GENERAL CONTRACTOR TO COORDINATE STORAGE AND STAGING AREAS WITH OWNERS REPRESENTATIVE TO AVOID

INTERFERENCE WITH OWNERS USE OF THE EXISTING BUILDING AND GROUNDS.

D. THE SECURITY OF THE BUILDING IS OF THE UTMOST PRIORITY. ALL WORK HOURS SHALL BE DONE AS DIRECTED BY GSA. BUILDING

WILL REMAIN ONLINE DURING THE DURATION OF THE RENOVATION.

E. ALL SPACES OUTSIDE THE SCOPE OF WORK THAT IS ACCESSED BY THE GC TO ACCESS OR TRANSPORT MATERIALS TO THE PROJECT LOCATION MUST BE PROTECTED THROUGHOUT CONSTRUCTION. THIS INCLUDES ALL PUBLIC LOBBIES, CORRIDORS, ELEVATORS, AND STAIR WELLS AND OTHER.

F. THE CONTRACTOR IS REQUIRED TO PROTECT ALL AREAS ADJACENT TO THE WORK AS NECESSARY TO PREVENT DAMAGE.

CONTRACTOR TO BE RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ITEMS DAMAGED DURING CONSTRUCTION.

G. ALL PRODUCTS USED ON THIS PROJECT THAT ARE USED IN CONJUNCTION WITH EACH OTHER OR ARE ADJACENT TO EACH OTHER

ARE REQUIRED TO BE COMPATIBLE.

H. OWNERS RETAIN THE RIGHT TO LET OTHER CONTRACTS IN CONNECTION WITH THE PROJECT WORK. GENERAL CONTRACTOR SHALL PROPERLY COOPERATE, COORDINATE AND INTERFACE CONSTRUCTION SCHEDULE WITH ANY SUCH CONTRACTORS/

VENDORS, ETC.

I. DRAWINGS SHOWING EXISTING CONSTRUCTION ARE BASED ON FIELD OBSERVATION ONLY. VERIFY THAT CONSTRUCTION IS AS SHOWN. REPORT DISCREPANCIES TO ARCHITECT BEFORE DISTURBING EXISTING INSTALLATION. BEGINNING OF ALTERATIONS

WORK CONSTITUTES ACCEPTANCE OF EXISTING CONDITIONS.

J. WHERE NEW WORK ABUTS OR ALIGNS WITH EXISTING, PERFORM A SMOOTH AND EVEN TRANSITION, PATCH WORK AND USE

MATERIALS THAT MATCH EXISTING ADJACENT WORK IN TEXTURE AND APPEARANCE.

K. EXECUTE WORK BY METHODS WHICH WILL AVOID DAMAGE TO OTHER WORK, PROVIDE PROPER SURFACE TO RECEIVE PATCHING

AND FINISHING.

L. FIT WORK TIGHT TO PIPES, SLEEVES, DUCTS, CONDUIT AND OTHER PENETRATIONS THROUGH SURFACE. MAINTAIN INTEGRITY OF

WALL, CEILING OR FLOOR CONSTRUCTION; COMPLETELY SEAL VOIDS.

PROJECT GENERAL NOTES

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:0

:5

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A0.01

GENERAL INFORMATION

No. Issue Date

COURTROOM

VESTIBULE

131A

SECURITY CONTROL

POINT

COURT

RECORDER

BENCH

DEPUTY/

LAW CLERK

WITNESS

2 3

1 2 1 2

PREP AND REPAINT DECORATIVE

PLASTER CORNICE ON SOUTH WALL

IN ITS ENTIRETY MATCH EXISTING

COLORS

DOOR SAGGING ON

PODIUM, TIGHTEN

HARDWARE AND

LEVEL DOOR PANELS

VESTIBULE

131B

CORRIDOR

F

G-1

A B C

D E 1

REFERENCE SHEET A4.01

FOR INTERIOR PHOTOS

A4.01

H4

H9

H14 H14

G-2

ATTORNEY

ATTORNEY

SIM

1. PREP AND PAINT TO MATCH EXISTING, ALL EXISTING PAINTED WOOD CASINGS, BASE,

WAINSCOT & TRIM IN ENTIRE ROOM OR WHERE INDICATED ON DRAWINGS.

2. PREP AND PAINT ALL EXISTING PLASTER WALLS OR GYP. WALLS IN ENTIRE ROOM OR

WHERE INDICATED ON DRAWINGS.

3. REFINISH, LIGHTLY SAND, REVARNISH TO MATCH EXISTING, WITH ONE COAT OF

VARNISH ALL EXISTING WOOD BASE, WAINSCOT, CASINGS, CROWN, CHAIR RAIL,

COLUMNS, PICTURE RAIL AND TRIM AT COURTROOM 128.

4. REPAIR AND REFINISH, TO MATCH EXISTING, ALL WOOD PANELING WHERE

INDICATED ON DRAWINGS.

5. REPLACE ALL CARPET AND PAD IN THIS ROOM.

6. WHERE HOLES ARE DRILLED INTO WALLS, PATCH / REPAIR PLASTER WALLS. PAINT

ENTIRE PLASTER WALL FROM CORNER TO CORNER. REFERENCE ELEVATIONS &

PHOTOS FOR EXTENT OF WORK.

7. INSTALL NEW TRUE WOOD OR METAL WINDOW BLINDS & HARDWARE TO MATCH

EXISTING.

8. CLEAN EXISTING WOOD RAILING & IRON BALUSTERS USING A MILD NON-ABRASIVE

SOAP & CLOTH.

9. REFINISH ALL BUILT IN COURTROOM FURNITURE TO MATCH EXISTING:

-- JUDGES BENCH

-- WITNESS BOX

-- COURT REPORTERS DESK

-- JURY BOX RAILING

-- GALLERY RAILING AND GATE

-- DEPUTY / LAW CLERK

-- ATTORNEY TABLE

10. REMOVE SPLIT WOOD CAP AND REATTACH USING WOOD DOWELS. SEAM IS NOT TO

BE VISIBLE, REINSTALL IN PLACE. REFINISH TO MATCH REMAINING COURTROOM

FINISH. REFERENCE PHOTO F ON SHEET A1.01.

11. REPAIR CRACKING / SPLITTING WOOD TRIM. REFER TO PHOTOS. PREP & PAINT OR

REFINISH, LIGHTLY SAND, REVARNISH WITH ONE COAT OF VARNISH. MATCH

EXISTING FINISH.

12. REPLACE AND INSTALL NEW LVT FLOORING.

13. REPAIR FAUX GRAIN FINISH. REFER TO PLAN & PHOTOS FOR SPECIFIC LOCATION.

14. REPAIR CRACK IN PLASTER, REFINISH OR PREP & PAINT. REFER TO PHOTOS FOR

SPECIFIC LOCATION.

15. REINSTALL SALVAGED JURY SEATING IN PLACE.

16. REPLACE RECESSED EXIT LIGHT. FIXTURE TO MATCH EXISTING.

17. REPAIR SPLIT WOOD ON JUDGES BENCH. REMOVE TOP, REFINISH, LIGHTLY SAND,

REVARNISH WITH ONE COAT OF VARNISH. REFERENCE PHOTO H ON SHEET A1.03.

18. INSTALL CLEANED DRAPES AND EXISTING HARDWARE.

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:0

:0

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.01

FIRST FLOOR PLAN

1/8" = 1'-0" A14

FIRST FLOOR PLAN

PREP & PAINT PEELING PAINT AT PLASTER

TRIM ON SOUTH WALL TO MATCH EXISTING

PREP AND REPAINT

SOUTH PLASTER WALL

REPAIR DECORATIVE PLASTER CORNICE ON

SOUTH WALL. PREP & PAINT TO MATCH EXISTING

REPAIR DECORATIVE PLASTER

CORNICE ON SOUTH WALL. PREP

& PAINT TO MATCH EXISTING

WOOD RAILING CAP IS SPLIT. REMOVE

AND REPLACE TO MATCH EXISTING.

REFER TO KEYNOTE 10.

PANELING BUCKLING

AND BOWING. REPAIR &

REFINISH

WATER DAMAGE AT WOOD WAINSCOTING,

PANEL BUCKING . REPAIR & REFINISH

ROOMS 123, 131, 131A AND 131B ROOM 128

B C D

E

F G-1

G-2

A

WOOD TRIM CRACKED

CORRIDOR

210B

VISITING CHAMBERS

CORRIDOR

210A

FACULTY

CONFERENCE ROOM

COURT RECORDER

GALLERY, STORAGE,

FILES

VESTIBULE

VISITING CHAMBER

RECEPTION

212A

CLOSET

224D

VESTIBULE

224C

CORRIDOR

WORKROOM

LAW CLERK

CONFERENCE

CHAMBERS

COURTROOM DEPUTY

2022 5 2 5

2 5 2 5

1 2 5

1 2 5 1 2 5

1 2 51 2 5

PAINT AND PLASTER IS

PEELING ABOVE DOORWAY,

WOOD TRIM AND CEILING

LEADING TO 206

CONFERENCE ROOM. REPAIR

AND PAINT TO MATCH

EXISTING

ELEC.

201A

JAN.

205A

TLT.

224B

VESTIBULE

211A

1 2 5

1 2 5

1 2

1 2

1 2

1 2 5

L

NO WORK

THIS ROOM

J

I

G

H

F

7 C D E

7 7

A

B

HEAD

CASING

& HEAD 13

CASING

SILL

13 DOOR

RAIL

13 SILL

1 2 5

NO WORK

THIS ROOM

PREP AND REPAINT DECORATIVE

PLASTER CORNICE ON SOUTH WALL

IN ITS ENTIRETY CORNICE HAS

MULTIPLE COLORS. MATCH EXISTING

COLORS

1 2

1 2

M

K

N

O

NO WORK

THIS ROOM

1. PREP AND PAINT TO MATCH EXISTING, ALL EXISTING PAINTED WOOD CASINGS, BASE,

WAINSCOT & TRIM IN ENTIRE ROOM OR WHERE INDICATED ON DRAWINGS.

2. PREP AND PAINT ALL EXISTING PLASTER WALLS OR GYP. WALLS IN ENTIRE ROOM OR

WHERE INDICATED ON DRAWINGS.

3. REFINISH, LIGHTLY SAND, REVARNISH TO MATCH EXISTING, WITH ONE COAT OF

VARNISH ALL EXISTING WOOD BASE, WAINSCOT, CASINGS, CROWN, CHAIR RAIL,

COLUMNS, PICTURE RAIL AND TRIM AT COURTROOM 128.

4. REPAIR AND REFINISH, TO MATCH EXISTING, ALL WOOD PANELING WHERE

INDICATED ON DRAWINGS.

5. REPLACE ALL CARPET AND PAD IN THIS ROOM.

6. WHERE HOLES ARE DRILLED INTO WALLS, PATCH / REPAIR PLASTER WALLS. PAINT

ENTIRE PLASTER WALL FROM CORNER TO CORNER. REFERENCE ELEVATIONS &

PHOTOS FOR EXTENT OF WORK.

7. INSTALL NEW TRUE WOOD OR METAL WINDOW BLINDS & HARDWARE TO MATCH

EXISTING.

8. CLEAN EXISTING WOOD RAILING & IRON BALUSTERS USING A MILD NON-ABRASIVE

SOAP & CLOTH.

9. REFINISH ALL BUILT IN COURTROOM FURNITURE TO MATCH EXISTING:

-- JUDGES BENCH

-- WITNESS BOX

-- COURT REPORTERS DESK

-- JURY BOX RAILING

-- GALLERY RAILING AND GATE

-- DEPUTY / LAW CLERK

-- ATTORNEY TABLE

10. REMOVE SPLIT WOOD CAP AND REATTACH USING WOOD DOWELS. SEAM IS NOT TO

BE VISIBLE, REINSTALL IN PLACE. REFINISH TO MATCH REMAINING COURTROOM

FINISH. REFERENCE PHOTO F ON SHEET A1.01.

11. REPAIR CRACKING / SPLITTING WOOD TRIM. REFER TO PHOTOS. PREP & PAINT OR

REFINISH, LIGHTLY SAND, REVARNISH WITH ONE COAT OF VARNISH. MATCH

EXISTING FINISH.

12. REPLACE AND INSTALL NEW LVT FLOORING.

13. REPAIR FAUX GRAIN FINISH. REFER TO PLAN & PHOTOS FOR SPECIFIC LOCATION.

14. REPAIR CRACK IN PLASTER, REFINISH OR PREP & PAINT. REFER TO PHOTOS FOR

SPECIFIC LOCATION.

15. REINSTALL SALVAGED JURY SEATING IN PLACE.

16. REPLACE RECESSED EXIT LIGHT. FIXTURE TO MATCH EXISTING.

17. REPAIR SPLIT WOOD ON JUDGES BENCH. REMOVE TOP, REFINISH, LIGHTLY SAND,

REVARNISH WITH ONE COAT OF VARNISH. REFERENCE PHOTO H ON SHEET A1.03.

18. INSTALL CLEANED DRAPES AND EXISTING HARDWARE.

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:0

:0

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.02

SECOND FLOOR PLAN

1/8" = 1'-0" A14

SECOND FLOOR PLAN

PAINT PEELING AT WOOD TRIM ABOVE

WINDOW, SAND AND REPAINT. REPAIR

FAUX GRAIN FINISH AT HEAD TRIM

PAINT PEELING AT WINDOW CASING.

SAND AND REPAINT. REPAIR FAUX

GRAIN FINISH AT WINDOW CASING.

PAINT PEELING AT DOOR CASING. SAND

AND REPAINT. REPAIR FAUX GRAIN FINISH

AT CASING.

PAINT PEELING AT BASE. SAND AND

REPAINT. REPAIR FAUX GRAIN FINISH

AT BASE.

REPAIR AND PAINT PLASTER WALL AT

DOOR TO 206 CONFERENCE ROOM.

REPAIR FAUX GRAIN FINISH

ROOM 206

REPAIR DAMAGED FAUX GRAIN

FINISH AT DOOR JAMB BETWEEN

ROOMS 202 AND 204

ROOM 202

ROOM 208

PAINT PEELING AT WOOD TRIM. SAND

AND PAINT TO MATCH EXISTING. REPAIR

FAUX GRAIN FINISH AT HEAD TRIM.

CORRIDOR 210

REPAIR CRACK IN WALL BY HISTORIC

ELECTRICAL PANEL. PAINT PLASTER

WALL CORNER TO CORNER.

PREP CONCRETE SLAB FOR

NEW FLOOR FINISH AND

INSTALL CARPET

REPAIR DAMAGED FAUX GRAIN

FINISH

ROOM 212

WOOD FRAME AT EXISTING DOOR

IS SEPARATING. REPAIR SPLITTING

WOOD TRIM. PAINT TO MATCH

EXISTING.

WOOD FRAME AT WINDOW IS

SEPARATING. REPAIR

CRACKING WOOD CASING.

PAINT TO MATCH EXISTING.

WOOD FRAME AT EXISTING DOOR

IS SEPARATING. REPAIR JOINT A T

WOOD CASING. PAINT TO MATCH

EXISTING.

A B C D E F

G H I J

K L M

ROOM 207

REPRESENTATION OF SPACE TO

RECEIVE NEW LVT.

CABINETS TO REMAIN.

CONTRACTOR TO PROTECT

EXISTING FINISH DURING

CONSTRUCTION.

N O

304A

CORRIDOR

304B

ATTORNEY / WITNESS

LAW CLERK

ATTORNEY'S

TABLE

ATTORNEY'S

TABLE

COURT

RECORDER

BENCH

WITNESS

DEPUTY

LAW CLERK

2 5

1 2 5

1 2

1 2

COURTROOM

ELEVATOR LOBBY

JAN

5 6

5 6

1 2 5

7 7

7 7 7

H

A4.02

J9

A14

H14A9

SILL & JAMB

CORNICE

ABCD

E F G

I

J

OP

K

M LN

WAINSCOT

DOOR

TYP. AT ALL

BENCHES

9 9

GATE GATE

RAIL

RAIL TABLE

TABLE

PODIUM

S

Q

R

1. PREP AND PAINT TO MATCH EXISTING, ALL EXISTING PAINTED WOOD CASINGS, BASE,

WAINSCOT & TRIM IN ENTIRE ROOM OR WHERE INDICATED ON DRAWINGS.

2. PREP AND PAINT ALL EXISTING PLASTER WALLS OR GYP. WALLS IN ENTIRE ROOM OR

WHERE INDICATED ON DRAWINGS.

3. REFINISH, LIGHTLY SAND, REVARNISH TO MATCH EXISTING, WITH ONE COAT OF

VARNISH ALL EXISTING WOOD BASE, WAINSCOT, CASINGS, CROWN, CHAIR RAIL,

COLUMNS, PICTURE RAIL AND TRIM AT COURTROOM 128.

4. REPAIR AND REFINISH, TO MATCH EXISTING, ALL WOOD PANELING WHERE

INDICATED ON DRAWINGS.

5. REPLACE ALL CARPET AND PAD IN THIS ROOM.

6. WHERE HOLES ARE DRILLED INTO WALLS, PATCH / REPAIR PLASTER WALLS. PAINT

ENTIRE PLASTER WALL FROM CORNER TO CORNER. REFERENCE ELEVATIONS &

PHOTOS FOR EXTENT OF WORK.

7. INSTALL NEW TRUE WOOD OR METAL WINDOW BLINDS & HARDWARE TO MATCH

EXISTING.

8. CLEAN EXISTING WOOD RAILING & IRON BALUSTERS USING A MILD NON-ABRASIVE

SOAP & CLOTH.

9. REFINISH ALL BUILT IN COURTROOM FURNITURE TO MATCH EXISTING:

-- JUDGES BENCH

-- WITNESS BOX

-- COURT REPORTERS DESK

-- JURY BOX RAILING

-- GALLERY RAILING AND GATE

-- DEPUTY / LAW CLERK

-- ATTORNEY TABLE

10. REMOVE SPLIT WOOD CAP AND REATTACH USING WOOD DOWELS. SEAM IS NOT TO

BE VISIBLE, REINSTALL IN PLACE. REFINISH TO MATCH REMAINING COURTROOM

FINISH. REFERENCE PHOTO F ON SHEET A1.01.

11. REPAIR CRACKING / SPLITTING WOOD TRIM. REFER TO PHOTOS. PREP & PAINT OR

REFINISH, LIGHTLY SAND, REVARNISH WITH ONE COAT OF VARNISH. MATCH

EXISTING FINISH.

12. REPLACE AND INSTALL NEW LVT FLOORING.

13. REPAIR FAUX GRAIN FINISH. REFER TO PLAN & PHOTOS FOR SPECIFIC LOCATION.

14. REPAIR CRACK IN PLASTER, REFINISH OR PREP & PAINT. REFER TO PHOTOS FOR

SPECIFIC LOCATION.

15. REINSTALL SALVAGED JURY SEATING IN PLACE.

16. REPLACE RECESSED EXIT LIGHT. FIXTURE TO MATCH EXISTING.

17. REPAIR SPLIT WOOD ON JUDGES BENCH. REMOVE TOP, REFINISH, LIGHTLY SAND,

REVARNISH WITH ONE COAT OF VARNISH. REFERENCE PHOTO H ON SHEET A1.03.

18. INSTALL CLEANED DRAPES AND EXISTING HARDWARE.

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:0

:0

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.03

THIRD FLOOR PLAN

1/8" = 1'-0" A14

THIRD FLOOR PLAN

WINDOW TRIM IS WARPED,

REPAIR TRIM AND PAINT

PREP AND REPAINT PLASTER

WALLS IN CORRIDOR

REPAIR SPLIT WOOD ON JUDGES

BENCH. REMOVE TOP, REPAIR AND

REINSTALL. SAND / STAIN / VARNISH

ROOM 310

ROOM 304A

H

O P K

ROOM 312

L M N

A B C D E F G

S

I

Q

J

R

ROOM 310 CONT.

THIRD FLOOR COURTROOM

CORRIDOR

CORRIDOR

JURY ROOM

ELEVATOR LOBBY

CORRIDOR

CORRIDOR

CLOSET

408a

SOUNDLOCK

408d

SOUNDLOCK

408c

2 5

2 5 6

2 5 6

PREP AND REPAINT / TOUCH-

UP DECORATIVE PAINTING

(GRAINING) ON DOOR TRIM,

BASEBOARD AND PLATFORM

OF BALCONY

BALCONY

DIRECTION OF NEW

LVT (EAST TO WEST)

DIRECTION OF LVT

(EAST TO WEST)

2 5

2 5 2 5

2 5

2 5

B

C

E

D

F

A

2 5

JAM

J

I

1. PREP AND PAINT TO MATCH EXISTING, ALL EXISTING PAINTED WOOD CASINGS, BASE,

WAINSCOT & TRIM IN ENTIRE ROOM OR WHERE INDICATED ON DRAWINGS.

2. PREP AND PAINT ALL EXISTING PLASTER WALLS OR GYP. WALLS IN ENTIRE ROOM OR

WHERE INDICATED ON DRAWINGS.

3. REFINISH, LIGHTLY SAND, REVARNISH TO MATCH EXISTING, WITH ONE COAT OF

VARNISH ALL EXISTING WOOD BASE, WAINSCOT, CASINGS, CROWN, CHAIR RAIL,

COLUMNS, PICTURE RAIL AND TRIM AT COURTROOM 128.

4. REPAIR AND REFINISH, TO MATCH EXISTING, ALL WOOD PANELING WHERE

INDICATED ON DRAWINGS.

5. REPLACE ALL CARPET AND PAD IN THIS ROOM.

6. WHERE HOLES ARE DRILLED INTO WALLS, PATCH / REPAIR PLASTER WALLS. PAINT

ENTIRE PLASTER WALL FROM CORNER TO CORNER. REFERENCE ELEVATIONS &

PHOTOS FOR EXTENT OF WORK.

7. INSTALL NEW TRUE WOOD OR METAL WINDOW BLINDS & HARDWARE TO MATCH

EXISTING.

8. CLEAN EXISTING WOOD RAILING & IRON BALUSTERS USING A MILD NON-ABRASIVE

SOAP & CLOTH.

9. REFINISH ALL BUILT IN COURTROOM FURNITURE TO MATCH EXISTING:

-- JUDGES BENCH

-- WITNESS BOX

-- COURT REPORTERS DESK

-- JURY BOX RAILING

-- GALLERY RAILING AND GATE

-- DEPUTY / LAW CLERK

-- ATTORNEY TABLE

10. REMOVE SPLIT WOOD CAP AND REATTACH USING WOOD DOWELS. SEAM IS NOT TO

BE VISIBLE, REINSTALL IN PLACE. REFINISH TO MATCH REMAINING COURTROOM

FINISH. REFERENCE PHOTO F ON SHEET A1.01.

11. REPAIR CRACKING / SPLITTING WOOD TRIM. REFER TO PHOTOS. PREP & PAINT OR

REFINISH, LIGHTLY SAND, REVARNISH WITH ONE COAT OF VARNISH. MATCH

EXISTING FINISH.

12. REPLACE AND INSTALL NEW LVT FLOORING.

13. REPAIR FAUX GRAIN FINISH. REFER TO PLAN & PHOTOS FOR SPECIFIC LOCATION.

14. REPAIR CRACK IN PLASTER, REFINISH OR PREP & PAINT. REFER TO PHOTOS FOR

SPECIFIC LOCATION.

15. REINSTALL SALVAGED JURY SEATING IN PLACE.

16. REPLACE RECESSED EXIT LIGHT. FIXTURE TO MATCH EXISTING.

17. REPAIR SPLIT WOOD ON JUDGES BENCH. REMOVE TOP, REFINISH, LIGHTLY SAND,

REVARNISH WITH ONE COAT OF VARNISH. REFERENCE PHOTO H ON SHEET A1.03.

18. INSTALL CLEANED DRAPES AND EXISTING HARDWARE.

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:0

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.04

FOURTH FLOOR PLAN

1/8" = 1'-0" A14

FOURTH FLOOR PLAN

WATER DAMAGE AT CEILING AND WOOD

TRIM. REPAIR AND PREP FOR PAINT

CARPET REMOVED.

CLEAN SUBFLOOR AND

PREP FOR NEW FLOORING

HANDRIAL, CLEAN USING A MILD NON-

ABRASIVE SOAP & CLOTH

PREP AND REPAINT DECORATIVE

PLASTER CORNICEA B

DC

F

E G

H

412 ELEVATOR LOBBY 403 CORRIDOR 416 CORRIDOR

409 BALCONY

TWO 1" HOLES, PREP, PATCH, REPAINT

TWO 1" HOLES, PREP, PATCH, REPAINT

417 CORRIDOR

I

417 CORRIDOR

REPRESENTATION OF SPACE TO RECEIVE

NEW LVT.

J REPRESENTATION OF SPACE TO RECEIVE

NEW LVT.

VESTIBULE

131B

SECURITY CONTROL

POINT

VESTIBULE

131A

CORRIDOR

4 51

1 4

41 6 1 4 41

COURTROOM

CORNICE

CORNICE

CORNICE

CORNICE

CORNICE

CORNICE

1 1 1

8 9

TYP.

IN 128

TYP.

IN 128

A B

1. CLEAN LIGHT FIXTURE AND REPLACE LAMPS

2. NEW LIGHT FIXTURE TO MATCH EXISTING

3. REPLACE ACOUSTICAL CEILING TILE AND GRID

4. CLEAN HVAC SUPPLY AND RETURNS

5. PREP AND REPAINT TO MATCH EXISTING PLASTER CEILING, OR AS INDICATED ON

DRAWING

6. PREP AND REPAINT TO MATCH EXISTING PLASTER CORNICE AS INDICATED ON

DRAWINGS BY HATCH

7. PREP AND REPAINT PLASTER BEAM AS INDICATED ON DRAWING BY HATCH

8. LIGHTLY SAND, REVARNISH WITH ONE COAT, WOOD BEAMS AND CROWN MOLDING -

TYPICAL IN COURTROOM 128

9. PREP AND REPAINT GYP. BOARD CEILING COFFERS - TYPICAL IN COURTROOM 128

10. ASSUME A TOTAL OF 200 LINEAR FEET OF DUCT INSULATION SEAMS TO REQUIRE

RETAPING ABOVE ACOUSTICAL CEILING. INSULATION IS DRY, BUT HAS BEEN PULLED

LOOSE.

11. REMOVE, TEST, REPAIR AND REINSTALL IR EMITTON FOR ASSISTED LISTENING

SYSTEM

12. CONTRACTOR IS TO ENGAGE THE COURTS PREFERRED VENDOR TO TEST ALL

EQUIPMENT, WIRING, CONNECTIONS, ETC. FOR THE COURTROOM AUDIO VISUAL

SYSTEMS.

SPINITAR

JAY ROGINA, PRINCIPAL

JAY.ROGINA@SPINTAR.COM

949-322-9444

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:4

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.05

FIRST FLOOR RCP

1/8" = 1'-0" A14

FIRST FLOOR REFLECTED CEILING PLAN

REATTACH DAMAGED DUCT INSULATION

ABOVE CEILING

NOT TO SCALE

P4

123, 131, 131A, 131B CORRIDOR CROWN DETAIL

A

B

INSULATION IS DRY, BUT NEEDS TO BE

RETAPED. APPROXIMATELY 30 LINEAR FEET

OF SEAMS TO BE TAPPED

ROOM 128

DESIGNATION HC XX REPRESENTS A

BENJAMIN MOORE PAINT COLOR. PAINT

COLORS TO BE MOCKED UP BY

CONTRACTOR AND FINALIZED BY

ARCHITECT AND OWNER AT A LATER

DATE.

COURTROOM DEPUTY

CHAMBERS

CORRIDOR

CONFERENCE

WORKROOM

VISITING CHAMBER

RECEPTION

212A

VESTIBULE

GALLERY, STORAGE,

FILES

VISITING CHAMBERS

CORRIDOR

210A

VESTIBULE

224C

CLOSET

224D

FACULTY

CONFERENCE ROOM

VESTIBULE

211A

CORRIDOR

210B

COURT RECORDER

ELEC.

201A

2 3

D

NO WORK

THIS ROOM

A

B C

F

E

JAN.

205A

LAW CLERK

2 3

1 1

NO WORK

THIS ROOM

432 10

432 10

432 10

432 10

432 10

432 10

432 10

432 10

432 10

4 10

2 3

1. CLEAN LIGHT FIXTURE AND REPLACE LAMPS

2. NEW LIGHT FIXTURE TO MATCH EXISTING

3. REPLACE ACOUSTICAL CEILING TILE AND GRID

4. CLEAN HVAC SUPPLY AND RETURNS

5. PREP AND REPAINT TO MATCH EXISTING PLASTER CEILING, OR AS INDICATED ON

DRAWING

6. PREP AND REPAINT TO MATCH EXISTING PLASTER CORNICE AS INDICATED ON

DRAWINGS BY HATCH

7. PREP AND REPAINT PLASTER BEAM AS INDICATED ON DRAWING BY HATCH

8. LIGHTLY SAND, REVARNISH WITH ONE COAT, WOOD BEAMS AND CROWN MOLDING -

TYPICAL IN COURTROOM 128

9. PREP AND REPAINT GYP. BOARD CEILING COFFERS - TYPICAL IN COURTROOM 128

10. ASSUME A TOTAL OF 200 LINEAR FEET OF DUCT INSULATION SEAMS TO REQUIRE

RETAPING ABOVE ACOUSTICAL CEILING. INSULATION IS DRY, BUT HAS BEEN PULLED

LOOSE.

11. REMOVE, TEST, REPAIR AND REINSTALL IR EMITTON FOR ASSISTED LISTENING

SYSTEM

12. CONTRACTOR IS TO ENGAGE THE COURTS PREFERRED VENDOR TO TEST ALL

EQUIPMENT, WIRING, CONNECTIONS, ETC. FOR THE COURTROOM AUDIO VISUAL

SYSTEMS.

SPINITAR

JAY ROGINA, PRINCIPAL

JAY.ROGINA@SPINTAR.COM

949-322-9444

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:2

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.06

SECOND FLOOR RCP

1/8" = 1'-0" A14

SECOND FLOOR REFLECTED CEILING PLAN

CEILING BOWING, PATCH AND

REPAIR, REPAINT

PAINT AND PLASTER IS PEELING ABOVE

DOORWAY, WOOD TRIM AND CEILING

LEADING TO 206 CONFERENCE ROOM.

REPAIR AND PAINT TO MATCH EXISTING

ROOM 206 ROOM 208

WATER DAMAGE ON CEILING AND FUR

DOWN REPLACE DAMAGED PLASTER

FINISH TO MATCH EXISTING FINISH

CORRIDOR 210

A C

D

B

E

F

NOT TO SCALE

K2

ROOM 208 CROWN DETAIL

NOT TO SCALE

M2

ROOM 202 AND 204 CROWN DETAIL

NOT TO SCALE

K5

ROOM 206 CROWN DETAIL

WATER DAMAGE ON CEILING, PATCH

AND REPAIR DAMAGED PLASTER FINISH

TO MATCH EXISTING FINISH

PLASTER IS PEELING REPAIR AND

PAINT TO MATCH EXISTING

STANDARD 2'X4'

RECESSED LIGHT TO BE

REPLACED WITH

EQUIVALENT FIXTURE

(KEY NOTE #2)

DESIGNATION HC XX REPRESENTS A

BENJAMIN MOORE PAINT COLOR. PAINT

COLORS TO BE MOCKED UP BY

CONTRACTOR AND FINALIZED BY

ARCHITECT AND OWNER AT A LATER

CORRIDOR

304B

CORRIDOR

304A

ATTORNEY / WITNESS

LAW CLERK

ELEVATOR LOBBY

JAN

41 6

41 6

41 6

D

C A

B

CORNICE

SEE A1.08 FOR

COURTROOM CEILING

1 1

1. CLEAN LIGHT FIXTURE AND REPLACE LAMPS

2. NEW LIGHT FIXTURE TO MATCH EXISTING

3. REPLACE ACOUSTICAL CEILING TILE AND GRID

4. CLEAN HVAC SUPPLY AND RETURNS

5. PREP AND REPAINT TO MATCH EXISTING PLASTER CEILING, OR AS INDICATED ON

DRAWING

6. PREP AND REPAINT TO MATCH EXISTING PLASTER CORNICE AS INDICATED ON

DRAWINGS BY HATCH

7. PREP AND REPAINT PLASTER BEAM AS INDICATED ON DRAWING BY HATCH

8. LIGHTLY SAND, REVARNISH WITH ONE COAT, WOOD BEAMS AND CROWN MOLDING -

TYPICAL IN COURTROOM 128

9. PREP AND REPAINT GYP. BOARD CEILING COFFERS - TYPICAL IN COURTROOM 128

10. ASSUME A TOTAL OF 200 LINEAR FEET OF DUCT INSULATION SEAMS TO REQUIRE

RETAPING ABOVE ACOUSTICAL CEILING. INSULATION IS DRY, BUT HAS BEEN PULLED

LOOSE.

11. REMOVE, TEST, REPAIR AND REINSTALL IR EMITTON FOR ASSISTED LISTENING

SYSTEM

12. CONTRACTOR IS TO ENGAGE THE COURTS PREFERRED VENDOR TO TEST ALL

EQUIPMENT, WIRING, CONNECTIONS, ETC. FOR THE COURTROOM AUDIO VISUAL

SYSTEMS.

SPINITAR

JAY ROGINA, PRINCIPAL

JAY.ROGINA@SPINTAR.COM

949-322-9444

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:4

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.07

THIRD FLOOR RCP

1/8" = 1'-0" A14

THIRD FLOOR REFLECTED CEILING PLAN

WATER DAMAGE ON CEILING, PATCH

AND REPAIR DAMAGED PLASTER FINISH

TO MATCH EXISTING FINISH

WATER DAMAGE ON CEILING, PATCH

AND REPAIR DAMAGED PLASTER FINISH

TO MATCH EXISTING FINISH

ROOM 310

A B C WATER DAMAGE ON CEILING, PATCH

AND REPAIR DAMAGED PLASTER FINISH

TO MATCH EXISTING FINISH

ROOM 308

D WATER DAMAGE ON CEILING, PATCH

AND REPAIR DAMAGED PLASTER FINISH

TO MATCH EXISTING FINISH

CORRIDOR 304A

CORRIDOR

CORRIDOR

CORRIDOR

JURY ROOM

ELEVATOR LOBBY

CORRIDOR

CORRIDOR

CLOSET

408a

SOUNDLOCK

408d

SOUNDLOCK

408c

BALCONY

41 5

41 6 41 6

41 5 41 5

41 5

4 6

D E

B A-1

C

1 5

F

11 11

5 5

41 5

41 5

41 5

A-2

1. CLEAN LIGHT FIXTURE AND REPLACE LAMPS

2. NEW LIGHT FIXTURE TO MATCH EXISTING

3. REPLACE ACOUSTICAL CEILING TILE AND GRID

4. CLEAN HVAC SUPPLY AND RETURNS

5. PREP AND REPAINT TO MATCH EXISTING PLASTER CEILING, OR AS INDICATED ON

DRAWING

6. PREP AND REPAINT TO MATCH EXISTING PLASTER CORNICE AS INDICATED ON

DRAWINGS BY HATCH

7. PREP AND REPAINT PLASTER BEAM AS INDICATED ON DRAWING BY HATCH

8. LIGHTLY SAND, REVARNISH WITH ONE COAT, WOOD BEAMS AND CROWN MOLDING -

TYPICAL IN COURTROOM 128

9. PREP AND REPAINT GYP. BOARD CEILING COFFERS - TYPICAL IN COURTROOM 128

10. ASSUME A TOTAL OF 200 LINEAR FEET OF DUCT INSULATION SEAMS TO REQUIRE

RETAPING ABOVE ACOUSTICAL CEILING. INSULATION IS DRY, BUT HAS BEEN PULLED

LOOSE.

11. REMOVE, TEST, REPAIR AND REINSTALL IR EMITTON FOR ASSISTED LISTENING

SYSTEM

12. CONTRACTOR IS TO ENGAGE THE COURTS PREFERRED VENDOR TO TEST ALL

EQUIPMENT, WIRING, CONNECTIONS, ETC. FOR THE COURTROOM AUDIO VISUAL

SYSTEMS.

SPINITAR

JAY ROGINA, PRINCIPAL

JAY.ROGINA@SPINTAR.COM

949-322-9444

KEY NOTES

FLOOR PLAN AND RCP LEGEND

HATCH INDICATES AREAS WHERE

PAINTING OCCURS

HATCH INDICATES DAMAGED

PLASTER FINISH TO BE PATCHED &

REPAIRED. PAINT TO MATCH.

A PHOTO KEY

5 KEYNOTE

SCOPE OF WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:2

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A1.08

FOURTH FLOOR RCP

1/8" = 1'-0" A14

FOURTH FLOOR REFLECTED CEILING PLAN

THIRD FLOOR COURTROOM

PREP AND REPAINT DECORATIVE PLASTER

CORNICE

REPLACE EXIT LIGHT AND TEST AV

EQUIPMENT

A.1 B C

A.2 D E

NOT TO SCALE

A5

ROOM 310 BEAM SECTION

NOT TO SCALE

E5

ROOM 310 CORNICE SECTION

F

DESIGNATION SW XXXX REPRESENTS A

SHERWIN WILLIAMS PAINT COLOR. PAINT

COLORS TO BE MOCKED UP BY

CONTRACTOR AND FINALIZED BY

ARCHITECT AND OWNER AT A LATER

2 2

3 3 3

BRASS CREST, CLEAN

USING A MILD NON-

ABRASIVE SOAP & CLOTH

3 3

3 3

BM HC-33

BM HC-33

BM HC-33

3 3

3 3

CLOCK, CLEAN USING

A MILD NON-ABRASIVE

SOAP & CLOTH

BM HC-33

BM HC-33

BM HC-33

3 3 3

2 2 2 2

3 3 3

3 3

BM HC-33

BM HC-33

BM HC-33

BM HC-33

3 3 3 3

3 33

1. PREP AND PAINT TO MATCH EXISTING, ALL EXISTING PAINTED WOOD CASINGS, BASE,

WAINSCOT & TRIM IN ENTIRE ROOM OR WHERE INDICATED ON DRAWINGS.

2. PREP AND PAINT ALL EXISTING PLASTER WALLS OR GYP. WALLS IN ENTIRE ROOM OR

WHERE INDICATED ON DRAWINGS.

3. REFINISH, LIGHTLY SAND, REVARNISH TO MATCH EXISTING, WITH ONE COAT OF

VARNISH ALL EXISTING WOOD BASE, WAINSCOT, CASINGS, CROWN, CHAIR RAIL,

COLUMNS, PICTURE RAIL AND TRIM AT COURTROOM 128.

4. REPAIR AND REFINISH, TO MATCH EXISTING, ALL WOOD PANELING WHERE

INDICATED ON DRAWINGS.

5. REPLACE ALL CARPET AND PAD IN THIS ROOM.

6. WHERE HOLES ARE DRILLED INTO WALLS, PATCH / REPAIR PLASTER WALLS. PAINT

ENTIRE PLASTER WALL FROM CORNER TO CORNER. REFERENCE ELEVATIONS &

PHOTOS FOR EXTENT OF WORK.

7. INSTALL NEW TRUE WOOD OR METAL WINDOW BLINDS & HARDWARE TO MATCH

EXISTING.

8. CLEAN EXISTING WOOD RAILING & IRON BALUSTERS USING A MILD NON-ABRASIVE

SOAP & CLOTH.

9. REFINISH ALL BUILT IN COURTROOM FURNITURE TO MATCH EXISTING:

-- JUDGES BENCH

-- WITNESS BOX

-- COURT REPORTERS DESK

-- JURY BOX RAILING

-- GALLERY RAILING AND GATE

-- DEPUTY / LAW CLERK

-- ATTORNEY TABLE

10. REMOVE SPLIT WOOD CAP AND REATTACH USING WOOD DOWELS. SEAM IS NOT TO

BE VISIBLE, REINSTALL IN PLACE. REFINISH TO MATCH REMAINING COURTROOM

FINISH. REFERENCE PHOTO F ON SHEET A1.01.

11. REPAIR CRACKING / SPLITTING WOOD TRIM. REFER TO PHOTOS. PREP & PAINT OR

REFINISH, LIGHTLY SAND, REVARNISH WITH ONE COAT OF VARNISH. MATCH

EXISTING FINISH.

12. REPLACE AND INSTALL NEW LVT FLOORING.

13. REPAIR FAUX GRAIN FINISH. REFER TO PLAN & PHOTOS FOR SPECIFIC LOCATION.

14. REPAIR CRACK IN PLASTER, REFINISH OR PREP & PAINT. REFER TO PHOTOS FOR

SPECIFIC LOCATION.

15. REINSTALL SALVAGED JURY SEATING IN PLACE.

16. REPLACE RECESSED EXIT LIGHT. FIXTURE TO MATCH EXISTING.

17. REPAIR SPLIT WOOD ON JUDGES BENCH. REMOVE TOP, REFINISH, LIGHTLY SAND,

REVARNISH WITH ONE COAT OF VARNISH. REFERENCE PHOTO H ON SHEET A1.03.

18. INSTALL CLEANED DRAPES AND EXISTING HARDWARE.

KEY NOTES

PLASTER REPAIR

REPAIR WORK LEGEND

PAINTING SCOPE OR WORK

SRQPNMLKJHGFEDCBA

A B C D E F G H J K L M N P Q R S

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.

12/20/21

JG

12/20/2021

USBC WATER DAMAGE REPAIRS

REPAIR & REPLACE FINISHES

FROM WATER DAMAGE

47PH0521F0060

TODD WRIGHT

US BANKRUPTCY COURTHOUSE

300 W 2ND STREET

LITTLE ROCK/AR/72201

AR-003322

WITSELL EVANS RASCO

CROMWELL ARCH/ENG

GS-07P-17-HHD-0001

EQ7PADE-21-0020

CLIENT PROGRAM MAN. OFFICE 7PAB

GREATER SOUTHWEST REGION 7

819 TAYLOR ST., 11th FLOOR

FORT WORTH, TX 76102-0181

C E

R T

IF

IC

A T

IO

N

S K

E Y

P L

A N

GENERAL SERVICES ADMINISTRATION

SHEET SIZE:

SHEET OF

DRAWING TITLE

FILE NAME

CHECKED BY

DRAWN BY DATE DRAFTED:

PROJECT NO.

GSA PM

SUB. DATE

SUBMISSION

DESCRIPTION

PROJECT

TITLE

BUILDING NOs.

OTHER

BUILDING NO.

CITY/ST./ZIP

STREET

NAME

SUB A/E

PRIME A/E

CONS. CONTR.

A/E CON. NO.

FLOOR NO.

CONSTR. CON.

FACILITY CODE

PROJECT

A/E TASK NO.

CONS. WORK

30 X 42

100 % FINAL DESIGN

SHEET

DRAWING

NO.

DISCIPLINE SHEET TYPE SEQUENCE

D R

A W

IN

G

P R

O J E

C T

B U

IL

D

IN

G

C O

N T

R A

C T

O R

S G

R A

P H

IC

S

C A

L E

R E

V

IS

IO

N

N O

T E

S

LD

/2 /2

:1

:0

P M

C U s e rs \m e lli s \D o c u m e n ts

\U S

ID

IQ

.1

-U S

B C

W a te r D a m a g e

R e p a ir s v

C E

N T

R A

L m e lli s .r v t

P ro je c t N a m e A4.01

INTERIOR ELEVATIONS

3/8" = 1'-0" H4

128 COURTROOM - NORTH ELEVATION

3/8" = 1'-0" H9

128 COURTROOM - SOUTH ELEVATION

3/8" = 1'-0" H14

128 COURTROOM - EAST ELEVATION (WEST ELEVATION SIMILAR)

3/8" = 1'-0"

A14

128 COURTOOM - RAILING ELEVATION

B C D

E F G

H J

A

I

DESIGNATION HC XX REPRESENTS A

BENJAMIN MOORE PAINT COLOR. PAINT

COLORS TO BE MOCKED UP BY

CONTRACTOR AND FINALIZED BY

ARCHITECT AND OWNER AT A LATER

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .