USIDIQ16.19 RESILIENT FLOORING-REVISED
USBC Water Damage Repairs 09 6500 - 1 ADD#1-05/24/2022
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICAL USE ONLY
SECTION 09 6500
RESILIENT FLOORING-REVISED
PART 1 GENERAL V.20
1.01 SECTION INCLUDES
A. Resilient tile and sheet flooring.
B. Resilient base.
C. Resilient stair accessories.
D. Installation accessories.
1.02 RELATED REQUIREMENTS
A. Section 09 0561 - Flooring Preparation: Concrete slab moisture and alkalinity testing and remediation procedures.
1.03 REFERENCE STANDARDS
A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring 2019, with Editorial Revision (2020).
B. ASTM F1066 - Standard Specification for Vinyl Composition Floor Tile 2004 (Reapproved 2018).
C. ASTM F1700 - Standard Specification for Solid Vinyl Floor Tile 2020.
D. ASTM F1861 - Standard Specification for Resilient Wall Base 2021.
E. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride 2016a.
F. ASTM F2169 - Standard Specification for Resilient Stair Treads 2015 (Reapproved 2020).
G. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes 2019a.
H. BAAQMD 8-51 - Bay Area Air Quality Management District Regulation 8, Rule 51, Adhesive and Sealant Products; www.baaqmd.gov; 2002.
I. RFCI (RWP) - Recommended Work Practices for Removal of Resilient Floor Coverings 2011.
J. SCAQMD 1168 - South Coast Air Quality Management District Rule No.1168; current edition;
www.aqmd.gov.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.
C. Selection Samples: Submit manufacturer's complete set of color samples for Architect's initial selection.
D. Certification: Prior to installation of flooring, submit written certification by flooring manufacturer and adhesive manufacturer that condition of subfloor is acceptable.
E. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.
F. Maintenance Materials: Furnish the following for GSA's use in maintenance of project.
1. See Section 01 6000 - Product Requirements, for additional provisions.
2. Extra Flooring Material: 10 percent or 45 square feet of each type and color.
3. Extra Wall Base: 20 linear feet of each type and color.
4. Extra Stair Materials: Quantity equivalent to 5 percent of each type and color.
USBC Water Damage Repairs 09 6500 - 2 ADD#1-05/24/2022
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICAL USE ONLY
1.05 DELIVERY, STORAGE, AND HANDLING
A. Protect roll materials from damage by storing on end.
1.06 FIELD CONDITIONS
A. Maintain temperature in storage area between 55 degrees F and 90 degrees F.
B. Store materials for not less than 48 hours prior to installation in area of installation at a temperature of 70 degrees F to achieve temperature stability. Thereafter, maintain conditions above 55 degrees F.
PART 2 PRODUCTS
2.01 TILE FLOORING
A. Luxury Vinyl Tile: Solid vinyl with color and pattern throughout thickness.
1. Manufacturers:
a. Mannington; Collection: Amtico Signature Collection, Style: Wood:
manningtoncommercial.com.
b. Substitutions: See Section 01 6000 - Product Requirements.
2. Minimum Requirements: Comply with ASTM F1700, of Class corresponding to type specified.
3. Plank Tile Size: 3 by 36 inch.
4. Wear Layer Thickness: 40 mil
5. Wear Layer: Quantum Guard Elite
6. Total Thickness: 0.098 inch.
7. Color: To be selected by Architect from manufacturer's full range. Regency Walnut
(AROW8200).
2.02 RESILIENT BASE
A. Resilient Base - Type RBB: ASTM F1861, Type TS rubber, vulcanized thermoset; top set Style B, Cove.
1. Height: 4 inch.
2. Thickness: 0.125 inch.
3. Finish: Satin.
4. Color:
a. RBB-01: 29 Moon Rock
b. RBB-02: 55 SIlver Grey
2.03 ACCESSORIES
A. Subfloor Filler: White premix latex; type recommended by adhesive material manufacturer.
B. Leveling and Patching compound: As recommended by flooring manufacturer.
C. Moisture Membrane: As required or recommended by flooring manufacturer.
D. Primers, Adhesives, and Seam Sealer: Waterproof; types recommended by flooring manufacturer.
1. Provide only products having lower volatile organic compound (VOC) content than required by the more stringent of the South Coast Air Quality Management District Rule No.1168 and the Bay Area Air Quality Management District Regulation 8, Rule 51.
2. Provide product compatible with concrete subfloor relative humidity and ph levels.
E. Moldings, Transition and Edge Strips: Rubber Stripe.
1. Products: Tarkett; Slim Line Transition SLT-29-A.
F. Filler for Coved Base: Plastic.
G. Sealer and Wax: Types recommended by flooring manufacturer.
USBC Water Damage Repairs 09 6500 - 3 ADD#1-05/24/2022
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICAL USE ONLY
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surfaces are flat to tolerances acceptable to flooring manufacturer, free of cracks that might telegraph through flooring, clean, dry, and free of curing compounds, surface hardeners, and other chemicals that might interfere with bonding of flooring to substrate.
B. Verify that wall surfaces are smooth and flat within the tolerances specified for that type of work, are dust-free, and are ready to receive resilient base.
C. Cementitious Sub-floor Surfaces: Verify that substrates have fully cured and ready for resilient flooring installation by testing for moisture, pH and compression strength.
1. Test as Follows:
a. Alkalinity (pH): ASTM F710.
b. Internal Relative Humidity: ASTM F2170.
c. Moisture Vapor Emission: ASTM F1869.
2. Obtain instructions if test results are not within limits recommended by resilient flooring manufacturer and adhesive materials manufacturer.
3. Verify cementitious sub-floor and any fillers have reached minimum 3000 psi strength.
3.02 PREPARATION
A. Remove existing resilient flooring and flooring adhesives; follow the recommendations of RFCI
(RWP).
B. Prepare floor substrates as recommended by flooring and adhesive manufacturers. Remove curing compounds, surface hardeners or other chemicals that may interfere with adhesive bonding. Where subfloor moisture levels are higher than acceptable installation range, prepare or condition space as necessary to permit installation. The use of moisture barrier membrane is acceptable.
C. Remove subfloor ridges and bumps. Fill minor low spots, cracks, joints, holes, and other defects with subfloor filler to achieve smooth, flat, hard surface.
D. Prohibit traffic until filler is fully cured.
E. Clean substrate.
3.03 INSTALLATION - GENERAL
A. Starting installation constitutes acceptance of subfloor conditions.
B. Install in accordance with manufacturer's written instructions.
C. Where type of floor finish, pattern, or color are different on opposite sides of door, terminate flooring under centerline of door. Where flooring is similar, continue seamlessly through opening.
D. Install edge strips at unprotected or exposed edges, where flooring terminates, and where indicated.
E. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances to produce tight joints.
F. Install flooring in recessed floor access covers, maintaining floor pattern.
G. At movable partitions, install flooring under partitions without interrupting floor pattern.
H. Install feature strips where indicated.
3.04 INSTALLATION - SHEET FLOORING
A. Lay flooring with joints and seams parallel to longer room dimensions, to produce minimum number of seams. Lay out seams to avoid widths less than 1/3 of roll width; match patterns at seams.
USBC Water Damage Repairs 09 6500 - 4 ADD#1-05/24/2022
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICAL USE ONLY
B. Cut sheet at seams in accordance with manufacturer's instructions.
C. Seal seams by heat welding where indicated.
D. Chemically bond seams using seam sealer where indicated.
E. Coved Base: Install as detailed on drawings, using coved base filler as backing at floor to wall junction. Extend sheet flooring vertically to height indicated, and cover top edge with metal cap strip.
3.05 INSTALLATION - TILE FLOORING
A. Mix tile from container to ensure shade variations are consistent when tile is placed, unless otherwise indicated in manufacturer's installation instructions.
B. Lay flooring with joints and seams parallel to building lines to produce symmetrical pattern.
C. Install tile to match patterns as indicated on drawings. Allow minimum 1/2 full size tile width at room or area perimeter.
D. Install plank tile with a random offset of at least 6 inches from adjacent rows.
3.06 INSTALLATION - RESILIENT BASE
A. Fit joints tightly and make vertical. Use coil stock when available and install in longest runs with minimal joints possible.
B. Miter internal corners. At external corners, 'V' cut back of base strip to 2/3 of its thickness and fold.
C. Install base on solid backing. Bond tightly to wall and floor surfaces.
D. Scribe and fit to door frames and other interruptions.
3.07 INSTALLATION - STAIR COVERINGS
A. Adhere over entire surface. Fit accurately and securely.
3.08 CLEANING
A. Remove excess adhesive from floor, base, and wall surfaces without damage.
B. Clean in accordance with manufacturer's written instructions.
3.09 PROTECTION
A. Prohibit traffic on resilient flooring for 48 hours after installation.
B. Seal and Wax resilient flooring with two coats and/as recommended by manufacturer. For products that do not require wax, provide temporary protection until project completion.
END OF SECTION