Upgrade Nurse Call Drawings Part1.pdf

PDF 8 MB Posted

Attached to
Z2DZ-- Project 626A4-20-104 - Upgrade Nurse Call System
Solicitation number
36C24921R0141
Issued by

About this file

This solicitation seeks proposals for an upgrade to the nurse call system at the Alvin C. York VA Medical Center campuses in Murfreesboro and Nashville, Tennessee. The project involves general construction and electrical work including labor, materials, equipment, and supervision to upgrade the nurse call system wiring and equipment in accordance with provided specifications and drawings. Proposals are due by July 19, 2021 for consideration, with the contractor expected to complete the work expeditiously once awarded. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 9 for Project 626A4-20-104.

View the file

Other files

File Type Posted
36C24921R0141 0008.docx DOCX document
JA Brand Name Nurse Call System.pdf PDF
36C24921R0141 0007.docx DOCX document
36C24921R0141 0006.docx DOCX document
36C24921R0141 0005.docx DOCX document
WD TN20220083 01-07-2022 Davidson County TN.pdf PDF
36C24921R0141 0004.docx DOCX document
WD TN20220100 01-07-2022 Rutherford County TN.pdf PDF
36C24921R0141 0003.docx DOCX document
36C24921R0141 0002.docx DOCX document
Government Answers to Industry Questions Upgrade Nurse Call System.pdf PDF
Nashville Nurse Call Site Visit 12.20.21.pdf PDF
36C24921R0141 0001.docx DOCX document
Murfreesboro Nurse Call Site Visit 12.21.21.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.pdf PDF
WD TN20210083 07_09_2021_Davidson.pdf PDF
Upgrade Nurse Call Drawings Part4.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
36C24921R0141_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
PPQ-Template.pdf PDF
Upgrade Nurse Call Drawings Part3.pdf PDF
Upgrade Nurse Call Drawings Part2.pdf PDF
Upgrade Nurse Call Drawings Part5.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Specs Combined Upgrade Nurse Call.pdf PDF
Upgrade Nurse Call Drawings Part6.pdf PDF
WD TN20210100 07_09_2021_Rutherford.pdf PDF
RFI Form 36C24921R0141.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPGRADE NURSE CALL SYSTEM

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S,

NASHVILLE, TENNESSEE 37212

VA PROJECT #: 626A4-20-104

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

JULY 19, 2021

LG

KK

626A4-20-104

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S, NASHVILLE, TENNESSEE 37212

20-171

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Nash:1

Engineers Architects U.S. Department of Veterans Affairs

UPGRADE NURSE CALL SYSTEM

NASHVILLE/MURFREESBORO

CAMPUS

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE, MURFREESBORO, TENNESSEE 37129

Murf:1,2,3,4,5,7,8,9,11

17,106,116,117,120

100% CONSTRUCTION DOCUMENTS

G-001

COVER SHEET

1 5

PROJECT SITE MAP

NASHVILLE/MURFREESBORO CAMPUS

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE,

MURFREESBORO, TENNESSEE 37129

VAMC NASHVILLE, TENNESSEE

PROJECT LOCATION MAP

PROJECT

SITE

PROJECT SITE MAP

VAMC MURFREESBORO, TENNESSEE

PROJECT LOCATION MAP

PROJECT SITE

VAMC NASHVILLE, TENNESSEE

VAMC MURFREESBORO, TENNESSEE

NORTH

NORTH

NORTH

NORTH

DRAWING LIST

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

DocuSign Envelope ID: 902C8DA2-A23F-4D0E-8CC1-1FDD1FE07EFF

7/19/2021

G-002

CAMPUS KEY PLAN AND NOTES

2 5

LGKK

VAMC MURFREESBORO, TENNESSEECAMPUS KEY PLAN

VAMC NASHVILLE, TENNESSEECAMPUS KEY PLAN

EXISTING BUILDING - PART OF SCOPE

BUILDING ENTRANCE

NORTH

NORTH

BID ALTERNATES

REFERENCE SECTION 01 00 00 OF THE SPECIFICATIONS FOR THE SCHEDULE OF BID

ALTERNATES TO BE INCLUDED WITH THE BID PACKAGE. SEE TECHNOLOGY SHEETS FOR

ADDITIONAL INFORMATION ON BID ALTERNATES.

BASE BID ITEM, GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION,

ELECTRICAL WORK; INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION TO

PERFORM THE REQUIRED ELECTRICAL AND LOW VOLTAGE WORK TO UPGRADE THE

NURSE CALL SYSTEM.

BID ITEM 1: INCLUDES ALL WORK IN BASE BID, BUT EXCLUDE ALL WORK SHOWN ON

SHEETS 17TD111 AND 17TN111.

BID ITEM 2: SAME AS BID ITEM 1 BUT EXCLUDE ALL WORK IN BUILDING 106.

BID ITEM 3: SAME AS BID ITEM 2 BUT EXCLUDE ALL WORK ASSOCIATED WITH ROOMS

LABELED "EXAM" WITHIN THE DEFINED LIMITS ON SHEETS 117TN111.

BIDDER SHALL PROVIDE A SEPARATE BID PRICE FOR THIS WORK. IF THE BID DEDUCT

ALTERNATE IS NOT ACCEPTED, THE AREA WILL BE RENOVATED PER DRAWINGS AND

SPECIFICATIONS.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

JULY 19, 2021

626A4-20-104

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S, NASHVILLE, TENNESSEE 37212

20-171

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Nash:1

Engineers Architects U.S. Department of Veterans Affairs

UPGRADE NURSE CALL SYSTEM

NASHVILLE/MURFREESBORO

CAMPUS

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE, MURFREESBORO, TENNESSEE 37129

Murf:1,2,3,4,5,7,8,9,11

17,106,116,117,120

100% CONSTRUCTION DOCUMENTS

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY

AGREEMENT BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS

RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND

SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT

OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE OWNER PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE

ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE OWNER PRIOR TO PROCEEDING WITH

THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.

11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.

13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE WITH OWNER.

4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING

CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH OWNER.

6. NOTIFY OWNER OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.) REPAIR OR REPLACE ITEMS DAMAGED

DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION OF THE

PROJECT.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.

10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE OWNER, PROVIDE DEMOLITION OF THESE

AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

12. ALL ITEMS TO BE TEMPORARILY REMOVED TO ACCOMMODATE INSTALLATION OF NEW WORK BY OTHER TRADES (INCLUDING, BUT NOT LIMITED TO ACOUSTICAL TILE AND CEILING MOUNTED DEVICES) SHALL BE CAREFULLY REMOVED AND REINSTALLED TO

IT'S ORIGINAL AND OPERATIONAL STATE, FOLLOWING THE COMPLETION OF THE WORK. CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED ITEMS AND EXISTING AREAS DURING CONSTRUCTION ACTIVITIES TO MATCH EXISTING CONDITIONS AT NO

ADDITIONAL COST.

13. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR

CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE OWNER.

14. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.

15. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY OWNER AND ARCHITECT OF ANY CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.

16. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING SALVAGED BY THE VA TO BE REMOVED AND

DISPOSED OF BY THE CONTRACTOR IN APPROVED MANNER.

17. CONTRACTOR SHALL NOTIFY OWNER OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS).

AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

18. COORDINATE WITH OWNER FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA. COORDINATE WITH OWNER FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR USE OF FREIGHT ELEVATOR (AS

REQUIRED).

DEMOLITION NOTESGENERAL NOTES LEGEND

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

UPGRADE NURSE CALL SYSTEM

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

PLEASE USE ALTERNATE EXITS AS MARKED

1'-5"

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X

D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

DUCT TO OUTSIDE

OF BUILDING

G-102

4/5

G-102

G-102

HARD WALLS AND

DOORS BARRIER

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V I F

V

I F

V.I.F.

V I F

E X

I S

T I N

G

W

A L L

V I F

E X

I S

T I N

G

W

A L L

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX

OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

Class III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction

Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2

Medium Risk

Group 1

Low Risk

- Therapy Areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE

D

TYPE

C

TYPE

B

TYPE

A

Group 4

Highest Risk

Group 3

High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD

- AMCU

- Respiratory Isolation Rooms

III

TYPE DTYPE CTYPE B

o r control procedures are necessary.

C L A

S S

I V

C L A

S S

I I

During Construction Project

C L A

S S

I

C L A

S S

I I I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area.

Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III.

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers.

Shoe covers must be changed each ime the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove work area barriers until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

Class IV

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control

Precautions depending upon the Area Class Designation

II

I

LOW Risk Group 1

HIGH Risk Group 3

HIGHEST Risk Group 4

MEDIUM Risk Group 2

IV

IV

IV

III/IV

III/IV

III/IV

III/IV

III

III

III

I

A P

P R

O X

A

F

F

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

G-102

A P

P R

O X

A

F

F

DOOR IN HARD

ICRA BARRIER

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

G-102

A

M

G-100

TYPICAL ICRA DETAILS

Scale: No Scale

ILSM SIGNAGE

Scale: No Scale

ILSM BARRIER TAG

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 1/2" = 1'-0"

TYPICAL ICRA CROSS SECTION

Scale: 1/2" = 1'-0"

TYPICAL ICRA ROOM ELEVATION (CLASS IV)

1.

2.

3.

4.

TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION.

THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER

AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ANY CEILING ACCESS PANELS OPENED FOR

INVESTIGATION BEYOND SEALED AREAS SHALL BE

SEALED IMMEDIATELY WHEN UNATTENDED.

AT COMPLETION, REMOVE CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND

CLEAN ALL SURFACES FREE OF DUST AFTER THE

REMOVAL.

NOTE:

TAG SHALL BE PLACED ON ALL ILSM

TEMPORARY BARRIERS. FINAL LOCATION BY G.C.

CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE VA

NASHVILLE/MURFREESBORO ICRA PERSONNEL,

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION

ACTIVITY.

5.

Scale: 1/2" = 1'-0"

TYPICAL ICRA ROOM ELEVATION (CLASS II)

JULY 19, 2021

LG

KK

626A4-20-104

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S, NASHVILLE, TENNESSEE 37212

20-171

FULLY SPRINKLERED

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Nash:1

Engineers Architects U.S. Department of Veterans Affairs

UPGRADE NURSE CALL SYSTEM

NASHVILLE/MURFREESBORO

CAMPUS

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE, MURFREESBORO, TENNESSEE 37129

Murf:1,2,3,4,5,7,8,9,11

17,106,116,117,120

100% CONSTRUCTION DOCUMENTS

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

MECH

CONGRE BATH

ELEC.

6'-0"

CLEAR

MIN.

4 5 6

ONE BED ROOM

RESTROOM

WITH

SHOWER

366A

C L

E A

R

M I N

4 5 6

RESTROOM

WITH SHOWER

327A

326329

TWO BED ROOM

TWO BED ROOM

4 5 6

TOILET

409A

LINEN

DATA

MENTAL

ON CALL

MENTAL

ON CALL

CLEAN

C L E

A R

M I N

4 5 6

TOILET

ELECTRICAL

2-BED

RM

TOILET

110A

TOILET

109A

CORRIDOR

COMM

TOILET

ELECTRICAL

4 5 6

CORRIDOR

HAC

TREATMENT

6'-0"

CLEAR

MIN.

4 5 6

CORRIDOR

NURSE

STATION

ELEVATOR

LOBBY

WARD

CLERK

125B

CHARTING

125A

CORRIDOR

NOURISHMENT

KITCHEN

5'-0"

CLEAR

MIN

C

L

E

A

R

M

I

N

ALCOVE

CORRIDOR

TWO

BEDRM

TOILET

237A

ONE

BEDRM

6'-0"

CLEAR

6'-0"

CLEAR

TWO

BEDRM

TOILET

236A

C L E

A R

M I N

STAFF

TOILET

CORRIDOR

TOILET

247B

STORAGE

STORAGE

247A

QUIET

248A

ANTE

4 5 6

4 5 6

CLOSET

103B

CORRIDOR

FEMALE TOILET

109BED RM

BED RM

C L

E A

R

M I N

OFFICE

CLOSET

121A

NURSING RM

113A

4 5 6

Bedroom #14

Bath #15 Bath #14

Bath #13

Clo 4

C L

E A

R

4 5 6

TOILET

C134A

2- BED RM

C134

6'-0"

CLEAR

4 5 6

CORRIDOR

C013

LINEN

C132

ELECTRICAL

C116

TOILET

C117A

CONGREGATE

BATH

C117

HAC

C115

TOILET

C114A

C L E

A R

4 5 6

LINEN

112I

STAFF

TOILET

112C

PACU

CONTROL

112L

ISOLATION

112G

MED

112K

PATIENT

NUTRITION

112D

STORAGE

112A

OFFICE

112E

ANTE

112F

STATION

STATION

STATION

STATION

STATION

STATION

4 5 6

CUBICLE-10

105L

NURSE MGR

ELEC

HAC

CORRIDOR

LOUNGE

TLT

103A

CLEAN UTILITY

MECH

103E

ON CALL

RECEPTION

WAITING

d e s k v v m a t v

120M

120N

C L E

A R

M I N

4 5 6

HAC

TELE

SURGERY

MINOR

7A

7B

A

M

G-102

TYPICAL ICRA PLANS -

MURFREESBORO CAMPUS

5 5

Scale: 1/8" = 1'-0"

TYPICAL CONGREGATE BATH

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL ONE AND TWO BEDRM/

TOILET (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL BED RM/ FEMALE

TOILET (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL OFFICE

(CLASS II)

Scale: 1/8" = 1'-0"

TYPICAL BEDROOM/ BATH

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL 2 - BED RM/ TOILET

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL CONGREGATE BATH

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL ONE BEDROOM/

REST RM/ SHOWER (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL TWO BED ROOM/ RESTROOM

WITH SHOWER (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL MENTAL ON CALL/

TOILET (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL RECEPTION

(CLASS II)

Scale: 1/8" = 1'-0"

TYPICAL TELE

ROOM (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL 2-BED/ TOILET

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL COMM ROOM

(CLASS II)

Scale: 1/8" = 1'-0"

TYPICAL TREATMENT ROOM

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL NURSE STATION

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL BEDRM/ TOILET

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL TOILET/ ANTE/

STORAGE (CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL PACU

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL CUBICLE

(CLASS IV)

Scale: 1/8" = 1'-0"

TYPICAL ELEC ROOM

(CLASS II)

Scale: 1/8" = 1'-0"

TYPICAL LOUNGE

(CLASS II)

1. PROVIDE TEMPORARY PLASTIC BARRIER

PARTITION TO THE UNDERSIDE OF

CEILING WITH ZIPPER ENTRY. PARTITION

SHALL BE INSPECTED BY VA ICRA STAFF

PRIOR TO START OF CONSTRUCTION IN

SPACE. MAINTAIN NEGATIVE PRESSURE

VENTILATION IN THE CONSTRUCTION

SPACE.

2. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL

PHASES.

3. WORK TO BE PERFORMED AT THE

MASTER AND SLAVE CONTROL PANEL

LOCATIONS SHALL BE PERFORMED AT

ONE LOCATION AT A TIME.

4. USE A PORTABLE DUST EXTRACTOR

AND AIR SCRUBBER WITH HEPA

FILTRATION SYSTEM.

5. CONTRACTOR SHALL COVER ALL

FURNITURE WITHIN ROOM WITH

PLASTIC, PRIOR TO COMMENCING

WORK IN A SPACE AND REMOVE PRIOR

TO POST-CONSTRUCTION TERMINAL

CLEANING.

6. THE AIR WITHIN THE CONSTRUCTION

AREA SHALL BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND

WITH NO DISRUPTION OF AIR SYSTEMS

OF ADJACENT AREAS. USE OF THE

NEGATIVE AIR PRESSURE SYSTEM

WITHIN THE ENCLOSURE TO REMOVE

DUST SHALL PASS AIR THROUGH AN

INDUSTRIAL GRADE, PORTABLE HEPA

FILTER CAPABLE OF FILTRATION RATES

OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY

TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST INTO A ROOM, A

PRE-FILTER AND HEPA FILTER SHALL BE

USED BEFORE EXHAUST.

7. INSTALL HARD DUCT WITH NON-FLANGE

HANGER, OR SOFT DUCT WITH

SUPPORTING STRAPS AS REQUIRED

HUNG FROM CEILING ABOVE. BOTTOM

OF DUCT SHALL BE A MINIMUM OF 7'-2''

ABOVE FINISH FLOOR. DUCT SHALL BE

ROUTED THROUGH EXISTING

MECHANICAL EQUIPMENT ROOM, OR

TEMPORARILY ROUTED THROUGH

CORRIDOR OR COR APPROVED PATH TO

EXTERIOR WINDOW. CONTRACTOR TO

TEMPORARILY REMOVE AND REINSTALL

WINDOW AFTER CONSTRUCTION

COMPLETION.

7A. CONTRACTOR TO DETERMINE NUMBER

OF EXHAUST FANS REQUIRED TO

MAINTAIN NEGATIVE PRESSURE LEVEL

INSIDE CONSTRUCTION AREA.

7B. TURN UP EXHAUST ON EXTERIOR SIDE,

CONTRACTOR SHALL VERIFY LOCATION

OF AIR INTAKES AT THE PROPER

DISTANCE FROM EXHAUST. VERIFY

LOCAL JURISDICTION CODE AND VA

REQUIREMENTS FOR DISTANCE PRIOR

STARTING WORK.

1. REMOVE ALL TRASH DAILY FROM THE WORK AREA.

2. THESE DRAWINGS ARE BASED ON FIELD SURVEY

AND EXISTING PLANS. VERIFY ALL FIELD

CONDITIONS.

3. COORDINATE WITH VA COR FOR OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING ACCESS

FOR HOSPITAL STAFF AND VISITORS, PRIOR TO

ERECTING TEMPORARY BARRIERS.

4. CONSULT WITH VA SAFETY DEPARTMENT TO

MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND

HALLWAYS.

5. EXISTING WINDOWS THAT NEED TO BE

TEMPORARILY REMOVED TO ACCOMMODATE

DISCHARGED AIR EXHAUST DUCT, SHALL BE

RE-INSTALLED AFTER CONSTRUCTION.

6. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE VA

NASHVILLE/MURFREESBORO ICRA PERSONNEL,

PRIOR TO THE COMMENCEMENT OF

CONSTRUCTION ACTIVITY.

7. ROOM TYPES SHOWN ON THIS SHEET ARE TYPICAL

FOR THE MURFREESBORO CAMPUS.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

JULY 19, 2021

LG

KK

626A4-20-104

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S, NASHVILLE, TENNESSEE 37212

20-171

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Nash:1

X

Engineers Architects U.S. Department of Veterans Affairs

UPGRADE NURSE CALL SYSTEM

NASHVILLE/MURFREESBORO

CAMPUS

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE, MURFREESBORO, TENNESSEE 37129

Murf:1,2,3,4,5,7,8,9,11

17,106,116,117,120

100% CONSTRUCTION DOCUMENTS

WALL RATINGS

1 HR FIRE WALL

1 HR FIRE SMOKE WALL

2 HOUR FIRE SMOKE WALL

2 HOUR FIRE WALL

SMOKE WALL

NON RATED SMOKE PARTITION

CORRIDOR WALL IN NON SPRINKLERED

AREA

HAZARDOUS

11811

KO

RLA K . KUDJ IKU

CHARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER

REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVR DIGITAL VIDEO RECORDER

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

FA FIRE ALARM

FAP FIRE ALARM PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RX REQUEST TO EXIT

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

TEL TELEPHONE

TGB TELECOMM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOMM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOMM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

DVC DIGITAL VOICE COMMAND

SS STAINLESS STEEL

E EXISTING DEVICES

BOD BASIS OF DESIGN

CLG CEILING

EG EQUIPMENT GROUND

NCE NURSE CALL EQUIPMENT

SM SINGLE MODE FIBER

CATV CABLE TELEVISION

UNO UNLESS NOTED OTHERWISE

AWG AMERICAN WIRE GUAGE

GND GROUND

TECHNOLOGY SYMBOL LEGEND

SYMBOL HEIGHT DESCRIPTION

NURSE CALL PATIENT BED INTERFACE RECEPTACLE (37 PIN)

ENHANCED NURSE CALL, STAND ALONE, CODE BLUE

STATION WITH CLEAR BUTTON COVER

NURSE CALL EMERGENCY STATION WITH PULL CORD WITH AUDIO IN

RESTROOM (+40"), NO AUDIO IN SHOWER (V - VANDAL RESISTANCE, PB - PUSH BUTTON

INSTEAD OF CALL CORD, HS - HIGH SECURITY STEEL COVER PLATE)

NURSE CALL DUTY STATION

NURSE CALL MASTER STATION/CONSOLE

NURSE CALL DOME LIGHT

(Z - ZONE LIGHT, V - VANDAL RESISTANCE)

NURSE CALL EQUIPMENT CABINETNCE

18"

HEADWALL

/40"

40",72"

18"

60"

CEILING

6' TO

TOP

NURSE CALL PATIENT STATION WITH CALL CORD INCLUDES:

- CODE BLUE

- STAFF ASSIST

- AUDIO

- CLEAR BUTTON COVER

(2 - DUAL PATIENT STATION, HS - VANDAL RESISTANT HIGH SECURITY STEEL COVER

PLATE)

HEADWALL

ABOVE

DOOR NURSE CALL DOME LIGHT

M

N

N

C

E

B

P

D

A NURSE CALL AUXILIARIESHEADWALL

/40"

R

PB

NURSE CALL PATIENT STATION

(PB - PUSH BUTTON, M - MICROPHONE, K -KEYED, HS - HIGH SECURITY STEEL

COVER PLATE)

N M

42"

Z

B2 P

BUTTON STATION WITH CLEAR BUTTON COVER

NUMBER OF BUTTONS (1 - SINGLE BUTTON, 2 - DOUBLE BUTTON)

BUTTON PROGRAMMING (B - CODE BLUE, P - PUSH FOR HELP, S - STAFF ASSIST)

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

NOTE: NOT ALL SYMBOLS ARE USED.

FOUR POST OIT EQUIPMENT RACK

OIT EQUIPMENT CABINET

HEADWALL

FLOOR

FLOOR

S

TWO POST OIT EQUIPMENT RACKFLOOR

NURSE CALL PATIENT STATION WITH PILLOW SPEAKER (GET WELL) INCLUDES:

- CODE BLUE

- STAFF ASSIST

- AUDIO

- CLEAR PLASTIC COVER

(2 - DUAL PATIENT STATION, HS - VANDAL RESISTANT HIGH SECURITY STEEL COVER

PLATE)

T

40" NURSE CALL STAFF TERMINAL

TV OUTLET WALL MOUNTED. COMBINATION ANTENNA AND WIRED REMOTE

RECEPTACLE WITH 1/4", 1-GANG, FDA LISTED, 3-CONDUCTOR PHONE JACK WITH

STAINLESS STEEL FACEPLATE.

84"/96"

CEILING

60"

TV OUTLET WALL MOUNTED. COMBINATION ANTENNA AND WIRED REMOTE

RECEPTACLE WITH 1/4", 1-GANG, FDA LISTED, 3-CONDUCTOR PHONE JACK WITH

STAINLESS STEEL FACEPLATE.

A

TECHNOLOGY SYMBOL LINE TYPE EXPLANATIONS

SYMBOLS THAT ARE GRAY/HALF-TONE IN APPEARANCE ARE DEVICES THAT ARE EXISTING TO REMAIN.

THESE LINES MATCH THE TONE OF THE BUILDING'S LINES. THESE SYMBOLS CAN APPEAR ON SHEETS WITH EITHER DEMOLITION OR NEW WORK PLANS. THEY ARE TYPICALLY ACCOMPANIED WITH A SHEET

NOTE OR KEY NOTE.

A SYMBOLS THAT ARE DARK AND DASHED IN APPEARANCE ARE DEVICES THAT ARE EXISTING TO BE

DEMOLISHED. THESE SYMBOLS SHOULD ONLY APPEAR ON DEMOLITION SHEETS UNLESS NOTED

OTHERWISE.

A SYMBOLS THAT ARE DARK IN APPEARANCE AND ARE NOT DASHED ARE NEW DEVICES TO BE

INSTALLED. THESE SYMBOLS SHOULD ONLY APPEAR ON SHEETS WITH NEW WORK PLANS UNLESS

NOTED OTHERWISE.

TYPICAL

SYMBOL DESCRIPTION

ELECTRICAL GENERAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT

AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE

BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE

WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND

THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED

MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO

AVOID CONFLICT DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR

SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO

INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR

MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE

ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR

PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

11. CONDUCTORS TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON

THE DEVICE'S SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT

UNLESS NOTED OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED

ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR

UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS

LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY

AN APPROVED THIRD PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE

SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC

PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE

MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT

BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS

DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DED: DEDICATED CIRCUIT

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

SYMBOL HEIGHT DESCRIPTION

18"

18"

18"

18"

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTIONAS

NOTED

E

208V DUPLEX RECEPTACLE18"

18"

120V DUPLEX RECEPTACLE FLOOR BOX

120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

120V QUADUPLEX RECEPTACLE FLOOR BOX

120V QUADUPLEX RECEPTACLE EMERGENCY

FLOOR BOX OUTLET AND COVER PLATE SHALL BE

RED IN COLOR

CLNG

J

J

J

JUNCTION BOX, CEILING MOUNTED, PURPOSE AS

NOTED

JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS

NOTED

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO

INDICATE OPENING SIDE OF RECESSED PANELBOARDS.

SEE PANELBOARD IDENTIFICATION FOR DESIGNATION

CODES.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL

DESIGNATION AND CIRCUIT DESIGNATION ARE SHOWN

ADJACENT TO THE HOME RUN ARROW. CIRCUIT

BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN

IN THE PANEL SCHEDULE WITH THE CORRESPONDING

PANEL AND CIRCUIT DESIGNATION.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN';

CIRCUITS 1, 3, 5.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT

TO SYMBOLS INDICATE A UNIT TYPE. SEE APPROPRIATE

SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

ELECTRICAL SYMBOL LEGEND

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

JULY 19, 2021 ADRJVE

626A4-20-10420-171

100% CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A. 107Engineers Architects

U.S. Department of Veterans Affairs

TVHS- NASHVILLE CAMPUS

1310 24TH AVE S,NASHVILLE, TENNESSEE 37212

TVHS- ALVIN C. YORK CAMPUS

3400 LEBANON PIKE, MURFREESBORO, TENNESSEE 37129

UPGRADE NURSE CALL SYSTEM

NASHVILLE/MURFREESBORO

CAMPUS

T-001

TECHNOLOGY SYMBOLS, NOTES AND

ABBREVIATIONS

TECHNOLOGY GENERAL NOTES

1. ALL COMMUNICATIONS DEVICES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE

WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES

ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI

STANDARDS, VA TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATION SYSTEMS

DESIGN MANUAL.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND

ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN

ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING

REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. PROVIDE DRAWINGS SHOWING ALL PENETRATIONS. ALL CABLING SHALL COMPLY WITH

THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION METHOD MANUAL AND

ANSI/TIA/EIA PUBLICATIONS.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 607 - STANDARD FOR

TELECOMMUNICATION BONDING COMMERCIAL BUILDING.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568 - 2006 STANDARD FOR INSTALLATION

COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING.

7 COMPLY WITH THE LATEST ANSI/TIA/EIA 569 - COMMERCIAL BUILDING STANDARD FOR

TELECOMMUNICATIONS PATHWAYS AND SPACES.

8. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

9. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

10. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

11. COMPLY WITH THE LATEST OIT DESIGN GUIDE.

12. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO

AS TO AVOID CONFLICT DURING CONSTRUCTION.

13.

14.

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR

EQUIPMENT UNLESS NOTED OTHERWISE.

15.

ALL CONDUITS SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED.

16.

ALL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

17.

ANY DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR, ARCHITECT, AND ENGINEER OF RECORD FOR CLARIFICATION.

THE MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

18.

19.

ALL COPPER OUTLETS/CONNECTORS SHALL BE TIA/EIA CAT 6A.

20.

ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6A KEYSTONE JACK WIRED PER T568B AS

DIRECTED BY THE VA COR.

21.

LABELING SHALL BE ACCORDING TO LATEST ANSI/TIA 606A&B EDITION AS WELL AS THE

STANDARDS SET FORTH BY VA HOSPITAL OIT.

INSTALL NURSE CALL SYSTEM PER VA TELECOMMUNICATIONS AND SPECIAL

TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL.

PROGRAM ALL NURSE CALL SYSTEM PER VA REQUIREMENT FOR EACH AREA.

A. CONTRACTOR SHALL COORDINATE PATIENT ROOM(S) WORK WITH THE

NURSE MANAGER AND COR.

B. ROOM(S) WILL BE TURNED OVER TO THE CONTRACTOR FOR WORK AND

WILL BE AT THE DIRECTION OF THE NURSE MANAGER AND COR.

C. THE NURSE CALL WORK SHALL BE DONE ON ONE OR TWO PATIENT

ROOM(S) AT A TIME.

D. AFTER THE FIRST PATIENT ROOM(S) ARE COMMISSIONED ON THE NEW

NURSE CALL SYSTEM, THE CONTRACTOR CAN MOVE TO THE NEXT SET

OF PATIENT ROOM(S).

E. WORK SHALL BE LIMITED TO ONE OF THE WINGS AT A TIME.

F. PRIOR TO CONDUCTING WORK WITHIN SPECIFIC WINGS THE

CONTRACTOR SHALL DO THE FOLLOWING:

F.A. INSTALL NURSE CALL EQUIPMENT CABINETS.

F.B. INSTALL NURSE CALL CONSOLES.

F.C. CONNECT NURSE CALL EQUIPMENT CABINETS TO THE VA IT

NETWORK.

F.D. INSTALL ALL CABLING AND WIRING IN EXISTING OR NEW RACEWAY.

F.E. COMMISSION NEW MASTER CONSOLE AND REMOTE CONSOLES AND

TRAIN STAFF ON FLOOR IN OPERATION OF THE NEW SYSTEM.

F.F. REPLACE ALL NURSE CALL DEVICES WITH NEW DEVICES IN EACH

PATIENT ROOM(S) AND COMMISSION THESE DEVICES.

F.G. REPEAT PROCESS ON WING UNTIL COMPLETE.

F.H. REPEAT PROCESS FOR OTHER WINGS, UNTIL ALL WORK IS

COMPLETE.

F.I. PERFORM FINAL TEST OF THE COMPLETED SYSTEM INCLUDING ALL

NURSE CALL STATIONS, DEVICES, WIRING, TV INTERFACE, AND

LIGHTING INTERFACE. PROVIDE A SPREAD SHEET FOR EACH TASK

ON AN EXCEL SPREAD SHEET.

F.J. ONCE ALL ROOMS FOR ALL FLOORS ARE COMPLETE, THEN REMOVE

THE EXISTING NURSE CALL EQUIPMENT CABINET, MASTER

CONSOLE AND TURN OVER ALL EXISTING NURSE CALL EQUIPMENT

AND DEVICES TO THE VA/COR.

PHASING NOTES

22. ALL NURSE CALL CABLING SHALL BE IN MINIMUM 3/4" CONDUIT.

24. BASIS OF DESIGN IS FACILITY STANDARD:

· DASHBOARDS AND REPORTS

· CENSUS BOARDS

· ENTERPRISE CONFIGURATION

· PATIENT MANAGEMENT INTEGRATION - STAFF ASSIGNMENT AND SHARING

INTEGRATION

· PHONE INTEGRATION

· EVENT INTEGRATION

· STAFF DASHBOARDS AND REPORTS

· STAFF LOCATION AND DURESS INTEGRATION

· CLINICAL MOBILE STAFF APP CAPABLE

DEDUCT ALTERNATE NO. 1: INCLUDES ALL WORK IN BASE BID, BUT EXCLUDE ALL WORK SHOWN

ON SHEETS 17TD111 AND 17TN111.

DEDUCT ALTERNATE NO. 2: SAME AS DEDUCT ALTERNATE NO. 1 BUT EXCLUDE ALL WORK IN

BUILDING 106.

DEDUCT ALTERNATE NO. 3: SAME AS DEDUCT ALTERNATE NO. 2 BUT EXCLUDE ALL WORK

ASSOCIATED WITH ROOMS LABELED "EXAM" WITHIN THE DEFINED

LIMITS ON SHEETS 117TN111.

DEDUCT ALTERNATE #

23. CONTRACTOR SHALL REMOVE ALL OLD NURSE CALL WIRING, DEVICES, DOME

LIGHTS, NURSE CALL EQUIPMENT PANELS, CODE BLUE PANELS, CODE BLUE

ANNUNCIATOR IN OPERATOR'S OFFICE, NURSE CALL PANIC BUTTONS, CODE BLUE

BUTTONS, BATHROOM PULL STATIONS, SERVERS AND CABLING TO SERVERS,

UNUSED CONDUITS ABOVE CEILINGS, AND ANY OTHER COMPONENTS OF THE

EXISTING SYSTEMS THAT ARE BEING REPLACED UNLESS OTHERWISE NOTED OR

INDICATED ON THE DRAWINGS. COORDINATE WITH COR PRIOR TO ANY REMOVAL.

DocuSign Envelope ID: BA659FA3-E303-449B-A1FA-811899152E7D

AREAWAY

STAIR

Ra mp

U p

HISTO LAB

P&H STORAGE

(11'x24')

HAZZARD WASTE

(8'x12')

NO 9

CRAWL SPACE

WAITING SPACE

CB-14A

STRETCHER

ALCOVE

CB-24A

TOILET

E-18B

OTHER

F-7C

TELEPHONE CLOSET

F-2A

HONEYWELL RM

D-72

TOILET

LINEN

D-23

DRESS

D-53A

DRESS

D-54A

TOILET

D-53B

TOILET

D-54B

TOILET

D-51B

TOILET

D-52B

CHASE

C-04A

BD

ELECTRICAL

CLOSET

D-30

TELE CLOSET

C-07E

BC ELEC

CLOSET

C-07D

ELECTRICAL

CLOSET

C-07C

CLOSET

MALE

TOILET

C-08D

FEMALE

TOILET

C-08B

FEMALE

STAFF

TOILET

G-51

FEMALE

STAFF

TOILET

G-55

CLOSET

G-46

CLOSET

G-08A

ELECTRICAL

CLOSET

A-22A

ELECTRICAL

CLOSET

BB

FROZEN

SECTION

G-18 B-A118

PEST CONTROL

WORK RM

E-18A

PETT SCAN

D-40

CORRIDOR

CB-23

OFFICE

F-11A

ELEVATOR LOBBY

CB-F1

CORRIDOR

CB-4

SWITCH GEAR

E-11

BSLE LAB

D-12D

CORRIDOR

CB-12

AREAWAY

CORRIDOR

CB-15

CORRIDOR

CB-13

BOILER RM

E-25F

CORRIDOR

CB-9C

CORRIDOR

CB-3

SCRUB UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

FAN RM - 4

B-B105

MECH RM

AHU-26

FAN RM 11

C-07I

CLEAN

ALCOVE

C-07

MED

PREP

C-07A

C-07J

C-07K

C-07L

CLINICAL

NURSE

LEADER

C-07M

STORAGE

ALCOVE

SPD

C-07N

C-07O

C-07P

STORAGE

ALCOVE

SHOWER /

TOILET

C-07Q

C-07R

C-07S

C-07T

C-07U13

C-07V

EMERGENCY

GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

MECH EQUIP

F-10

CORRIDOR

CB-14

RECEIVING

AND

SHIPPING

DOCK

CORRIDOR

CB-18

STORAGE

E-23

STORAGE

E-23A

RECEIVING & ISSUE AREA

EQUIP STORAGE FORMS

STORAGE

E-22

CORRIDOR

CB-17

STORAGE

E-09A

STAFF

TOILET

E-08

STORAGE

D-68C

E-10

E-10A

MAIL RM

E-14

ELEVATOR

EQUIP

E-13

CORRIDOR

CB-16

CORRIDOR

CB-16B

CORRIDOR

D-26

CORRIDOR

CB-20

CORRIDOR

CB-19

STORAGE

D-13

FILTER STORAGE

F-6A

STORAGE

F-5

OFFICE

F-4

DUCT SHAFT

OFFICE

F-3

ELECTRICAL

CLOSET

F-2

JANITOR

CLOSET

F-1

VACANT

HOUSE

KEEPING

F-6

OFFICE

F-6B

IRM

F-6A

STORAGE

F-9C

TOILET

D-16

BIOMED SHOP

D-15

CONTROL RM

F-11B

F-11

COMPRESSOR RM

F-12

CLOSET

F-12A

MECH EQUIP

CRAWL SPACE

F-8

TRANSFORMER RM

F-14

ELECTRICAL

F-13

SHOP

F-9

PIT

OFFICE

F-9A CB-F4

STORAGE

F-9B

STORAGE

D-14

CORRIDOR

CB-24

CORRIDOR

CB-24

CORRIDOR

CB-11

CYTO LAB

D-05

CORRIDOR

CB-10

CORRIDOR

CB-9D

CORRIDOR

CB-9

CORRIDOR

CB-16E

CORRIDOR

CB-16C

CORRIDOR

CB-16A

MECH

E-5

BIOMED ENG

REPAIRING &

DEVELOPMENT

E-01

CONTROL RM

D-18MRI

D-17

ELECTRICAL SHOP STORAGE

D-68A

ELECTRONICS

D-68B

KEY SHOP

D-69

MULTI PURPOSE

E-09E

OFFICE

E-11A

VESTIBULE

E-09

TOILET

E-12

ELEVATOR

P-9

EQUIP RM

E-19

OFFICE

E-22A

MED GAS

E-21

MED GAS

E-20

PEST

CONTROL

OFFICE

E-18ELECTRICAL

E-17

OFFICE

E-14A

SIGNAL

E-15

SIGNAL

E-16

SVC RM

E-26

GROUNDS EQUIP

E-25

CLOSET

E-25A

BOILER OPERATOR

E-25E

A/C OPERATIONS

SHOP

E-25B

FIRE EXT

FLAM

STORAGE

E-24

E-25C

GROUNDS

& TRANS

E-25D

CORRIDOR

CB-19

CORRIDOR

CB-22

PACU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

EQUIP STORAGE & TESTING

B-01

DISPATCH AREA

B-01A

DECONTAMINATION RM

B-02

PREPARATION, ASSEMBLY

& STERILIZATION

B-02B

STERIS RM

B-01B

OFFICE

B-02A

EQUIP

B-01C

VESTIBULE

CB-19A

EMERGENCY

GENERATOR RM

E-25G

EMERGENCY

GENERATOR RM

E-25H

CORRIDOR

CB-7

ELECTRICAL

CLOSET

A-16

CORRIDOR

CB-8

SCRUB

CB-3B

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

OFFICE

A-04B

CORRIDOR

CB-6

EMBALMING

A-03

CHEMISTRY

A-17

BLOOD BANK

A-14

TOILET

C-02

SIGNAL

CLOSET

C-01

WAITING

C-03

ELECTRICAL

CLOSET

A-15

BA2

COMM

CLOSET

A-17A

OFFICE

A-14A

CENTRAL STORAGE

A-17G

FEMALE

TOILET

A-06

ELEVATOR

EQUIP

A-05

ELEVATOR

S-1

AUTOPSY

A-02

A-01BA-01D

A-01C

CHEM SUPER

LEAD TECH

A-17F

LEAD TECH

A-17E

LEAD TECH

A-17D

OFFICE

A-07

HAC

A-08

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE

TOILET

A-10

FEMALE

TOILET

A-11

MULTI PURPOSE

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

OFFICE

D-06A

ELEVATOR

FS-1

ELEVATOR

FS-2

MRI

D-19

FILM PROCESSING LAB

D-24

CORRIDOR

CB-12

RADIOGRAPHIC

FLUOROSCOPIC

D-54

MULTI PURPOSE

D-73A

ELECTRICAL ENG

D-70 OFFICE

D-71

STAFF

D-65B

STAFF

D-65A

WAITING

D-02

MALE TOILET

D-49

RADIOGRAPHIC

FLUOROSCOPIC

RM

D-51

RADIOGRAPHIC

FLUOROSCOPIC

D-52

RADIOGRAPHIC

FLUOROSCOPIC

D-53

COMPUTER

RM

D-57CONTROL

D-24A

MICRO LAB

D-12

T C LAB

D-12E

GEN WASH

D-09

ELECTRICAL

CLOSET

A-26

READING RM

D-04

CUTTING RM

D-05A

SAW RM

MULTI PURPOSE

D-05C

SCREENIING

D-06

FEMALE TOILET

D-07

MALE TOILET

D-08

BLK STORAGE

D-05D

MICRO OFFICE

D-05E

WORK RM

D-12C

ANTE RM

D-12B

OFFICE

D-12A

BD2

D-11

BD1

D-10

ELECTRICAL

CLOSET

D-29

STORAGE

D-28E

SCRUB/WORK

AREA

D-24B

DARK RM

CONTROL

D-51C

CONTROL

D-52C

DARK RM

D-22A

MAMMOGRAPHY

D-22

READING RM

D-21

VESTIBULE

D-20

HC TOILET

D-20A

HC TOILET

D-20B

LOUNGE/LOCKERS

D-58

CONTROL

D-53C

CONTROL

D-54C

HAC

D-55

STORAGE

D-56

CHEST RM

D-62

TOILET

D-63

TOILET

D-64

CONTROL RM

D-61

AUTOMATED

RADIOGRAPHIC

D-60

PROCEDURE

ROOM

D-59

ELECTRIC SHOP

D-68

SWITCHBOARD RM

D-67

D-66

OFFICE

E-09B

OFFICE

E-09C

OFFICE

E-09D OFFICE

E-09F

OFFICE

E-09G

OFFICE

E-09H

BUSINESS

RM

E-09I

OFFICE

E-09J

C-07H

A/C SHOP

E-27

MAINT

FOREMAN

E-07

OFFICE

E-08

OFFICE

E-08A

A/C

FOREMAN

E-06

PAINT

SHOP

E-05

CARPENTER

SHOP

E-04

MACH

SHOP

E-03 ELECTRICAL

CLOSET

BE

E-26A

PLUMBING SHOP

E-02

OFFICE

E-01C

BIOMEDICAL

ENGG

STORAGE

E-01B

RECEIVING &

CLEANING

E-01A

ELECTRICAL RM

B-01F

BLDG MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG MGT

TOILET

B-03A

VESTIBULE

CONSULT/

MEDITATION

C-03A

SOILED

C-07G

SOILED

UTILITY

G-56A

RECOVERY

STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL

CLOSET

SIGNAL

G-49B

CLEAN

LINEN

G-56D

SIGNAL

G-49A

RECOVERY

CLEAN

UTILITY

G-56E

RECOVERY

NURSE

STATION

RECOVERY

ISOLATION

BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY

ISOLATION

BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

NURSE

MANAGER

C-07W

HAC

C-06

CLOSET

C-07B

C-07F

CLEAN EQUIP /

SUPPLY

C-05

ELECTRICAL

CLOSET

C-04

GAS STORAGE NURSE

MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

MALE

TOILET

B-01P

FEMALE

TOILET

B-01N

FEMALE

LOCKERS

B-01M

HAC

B-01L

SPD CHIEF

& ASSIST

B-01K

LOGISTICS

SUPV

B-01J

SPD ADMIN

B-01I

LOGISTICS ITEM

MGRS

B-01H

BREAKOUT AREA

B-01G

LOGISTICS ITEM

MGRS

B-06

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

OFFICE

D-73

OFFICE

D-74

STORAGE

D-74A

OFFICE

D-73D

OFFICE

D-73C

CLERICAL OFFICE

D-73B

STAFF

D-65C

STAFF

D-65D

STAFF

D-65E

RESIDENT/

INTERN

D-65F

CONFERENCE/ CLASS RM

D-65G

ADP

D-01

SIG

CLOSET

D-02G

CHIEF TECH

D-50

SVC CHIEF

D-65

SEC

D-65I

RECEPTION & SEC

D-65H

ELEVATOR

S-2

ELEVATOR

S-1

FEMALE TOILET

D-48

TECH

D-03A

HOT LAB

D-40D

TREAT

D-40E

TREAT

D-40F

TOILET

D-40C

CTRL RM

D-40B

MULTI

VIEWING

D-41

MULTI

VIEWING

CB-12D

D-42

STORAGE

CB-12C

D-43

MULTI

VIEWING

D-44

MULTI

VIEWING

D-45

OFFICE

D-46

ADP

COORD

D-47

ELECTRICAL

CLOSET

D-02F

OFFICE

D-02E

OFFICE

D-02D

GANTRY

D-40A

OFFICE

D-02C

OFFICE

D-02B

OFFICE

D-02A

ADP COMPUTER RM

D-03

FEC

ELEVATOR

P-8

OFFICE

A-19D

LAB SEC

A-19

TISSUE TYP

A-20

FLOW CYTO

A-20A

ANCILLARY LISTING

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

ULTRASOUND 2

A-25K

VIEWING/

CONFERENCE

A-25J

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

ULTRASOUND 3

A-25L

ULTRASOUND 4

A-25M

ELECTRICAL

CLOSET

A-25R

BA2

EXAM

EQUIP STORAGE

A-25S

OFFICE

A-19E

OFFICE

A-19F

MULTI-PURPOSE

A-19A

OFFICE

A-18

OFFICE

A-19B

OFFICE

A-19C

ELECTRICAL

CLOSET

A-27

COMPUTER RM

A-25U

NUCLEAR IMAGING

A-25T

HAC

A-25W

ULTRASOUND 1

A-0V

WAITING RM

A-25X

RCPT &

FILES

A-25

TOILET

A-25A

STAFF

TOILET

A-25B

OFFICE

HOUSE

STAFF

A-25C

STAFF

LOUNGE

A-25D

EXIST

FIRE

ALARM

PANELS

A-23

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST EQUIP

STOR

SCRUB-UP

ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

CORRIDOR

CB-2

CHIEF

G-08

OFFICE

G-11

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24BMALE TOILET

& SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

ELEVATOR

P-6

ELEVATOR

P-7 FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN

LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB UP

ALCOVE

G-29

SCRUB-UP

ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER &

SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING RM

GENERAL

G-27

SUB STERILE

G-26A

OPERATING RM

GENERAL

G-26

GENERAL

OPERATING RM

G-25SUB

STERILE

G-21A

OPERATING RM

GENERAL

G-21

OPERATING RM

GENERAL

G-19

SCRUB

SUB

STERILE

G-19A

REC & OR

HEAD NURSES

G-01

ELECTRICAL

CLOSET

G-22

PHONE/SGNL RM

G-20A

G-20B

G-20C

EQUIPMENT

G-20

HOLDING

G-17

OFFICE

G-02A

ANESTHESIOLOGY

SERVICE

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

OFFICE

G-02B

CONTROL

G-03

OFFICE

G-15

ON CALL

G-16

OFFICE

G-04

STAFF

TOILET

G-15A

STAFF

TOILET

G-15B

OFFICE

G-07

SEC

G-13

CONFERENCE RM

G-14

HAC

G-12

ELEVATOR

LOBBY

CB-10A

ELEVATOR

LOBBY

CB-16D

NUCLEAR

CARDIOLOGY

A-25Q

HAZ.

HAZ.

45 & 30 KVA

MENS

RESTROOM

WOMENS

RESTROOM

45 KVA

HOUSE KEEPING

STORAGE

75 KVA

EQUIP

F-7A PEN

D-19A

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER

ALCOVE

WC

ALCOVE

STRETCHER

ALCOVE

WC

ALCOVE

STERILE STORAGE

30KVA

112.5 KVA

MULTI-PURPOSE

B-G127S

TLT

B-B101G

ALCOVE

B-G127V

CL

EA

N

SU

PP

LY

B\ -G

7R

PV CV LAB #1

B-B101I

EPS CV LAB #2

B-G127J

CONTROL #1

B-B101J

CV LAB #3

B-B101O

CONTROL #2

B-B101Q

CORRIDOR

B-G127F

VIEW

B-G127O

CV EQUIP #2

B-B101N

SOILED UTIL

B-B101E

PREP/HOLDING

B-G127T

H.A.C B-B101H

CRASH CART

ALCOVE

B-B101R

TLT

1-G127W

CV EQUIP #3

B-B101P

ALCOVE

B-G127W

ALCOVE

B-G127X

CHANGE

B-G127Y

COR.

B-G127Z

CLEAN LINEN

B-G127AA

ALCOVE

B-G127BB

CV

E

QU

IP

#2 B-

B1

N

G-44G-35

G-09H

G-09G

OFFICE

G-04

REFRIGERATOR

STORAGE

OFFICE

ELECTRICAL

CLOSET

G-22

STAIR

F-1

STAIR

NO. 2

STAIR

NO. 1

STAIR

NO. 10

STAIR

NO. 8

STAIR

NO. 7

STAIR

NO. 6

STAIR

NO. 4

MULTIPURPOSE

CB-15

WAITING

OFFICE

D-27G

HOLDING

D-27D

CHANGING

TOILET

D-27E

CT-9

D-27C

CT-…

This is the start of the file's text. The full file is on GovTribe.