Breakdown
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0141 | 626A4-20-104 | Upgrade Nurse Call System | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 00 00 | General Requirements | |
| 01 32 16.15 | Project Schedules (Small Projects - Design/Bid/Build | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| Attachment A Contrator's Quality Control Report (QCR) | |
| 01 74 19 | Construction Waste Management | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 |
| 02 41 00 | Demolition | |
| 02 82 13.13 | Glovebag Asbestos Abatement | |
| 02 83 33.13 | Lead Based Paint Removal and Disposal | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 |
| 06 10 00 | Rough Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acoustic Ceiling | |
| 09 91 00 | Painting | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirement for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 24 16 | Panelboards | |
| 26 27 26 | Wiring Devices | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communications Systems | |
| 27 05 33 | Raceways and Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call and Code Blue Systems | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.
Alternate Deduct 1
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0141 | 626A4-20-104 | Upgrade Nurse Call System | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 00 00 | General Requirements | |
| 01 32 16.15 | Project Schedules (Small Projects - Design/Bid/Build | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| Attachment A Contrator's Quality Control Report (QCR) | |
| 01 74 19 | Construction Waste Management | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 |
| 02 41 00 | Demolition | |
| 02 82 13.13 | Glovebag Asbestos Abatement | |
| 02 83 33.13 | Lead Based Paint Removal and Disposal | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 |
| 06 10 00 | Rough Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acoustic Ceiling | |
| 09 91 00 | Painting | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirement for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 24 16 | Panelboards | |
| 26 27 26 | Wiring Devices | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communications Systems | |
| 27 05 33 | Raceways and Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call and Code Blue Systems | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.
Alternate Deduct 2
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0141 | 626A4-20-104 | Upgrade Nurse Call System | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 00 00 | General Requirements | |
| 01 32 16.15 | Project Schedules (Small Projects - Design/Bid/Build | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| Attachment A Contrator's Quality Control Report (QCR) | |
| 01 74 19 | Construction Waste Management | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 |
| 02 41 00 | Demolition | |
| 02 82 13.13 | Glovebag Asbestos Abatement | |
| 02 83 33.13 | Lead Based Paint Removal and Disposal | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 |
| 06 10 00 | Rough Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acoustic Ceiling | |
| 09 91 00 | Painting | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirement for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 24 16 | Panelboards | |
| 26 27 26 | Wiring Devices | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communications Systems | |
| 27 05 33 | Raceways and Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call and Code Blue Systems | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.
Alternate Deduct 3
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0141 | 626A4-20-104 | Upgrade Nurse Call System | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 00 00 | General Requirements | |
| 01 32 16.15 | Project Schedules (Small Projects - Design/Bid/Build | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| Attachment A Contrator's Quality Control Report (QCR) | |
| 01 74 19 | Construction Waste Management | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 |
| 02 41 00 | Demolition | |
| 02 82 13.13 | Glovebag Asbestos Abatement | |
| 02 83 33.13 | Lead Based Paint Removal and Disposal | |
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 |
| 06 10 00 | Rough Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 29 00 | Gypsum Board | |
| 09 51 00 | Acoustic Ceiling | |
| 09 91 00 | Painting | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirement for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 24 16 | Panelboards | |
| 26 27 26 | Wiring Devices | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communications Systems | |
| 27 05 33 | Raceways and Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call and Code Blue Systems | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.