Updated_GAOA Ideal Cove Trail_Drawings_NoBrdg_12032021 cj.pdf

PDF 5 MB Posted

Attached to
Trail Reconstruction for the Ideal Cove Trail - Tongass National Forest
Solicitation number
1240BJ22R0001_0001
Issued by

About this file

This solicitation is for a trail reconstruction project for the Ideal Cove Trail located in the Tongass National Forest. The project includes reconstructing sections of the existing trail to make it more accessible and sustainable, installing two optional rest areas along the trail, and clarifying installation details for various signage and trail features. Responses are due by December 15, 2021. This amendment updates all contract documents to remove the replacement of Hill Lake Bridge and related work from the scope of work. It also clarifies installation requirements for some signage and makes minor corrections. The work will be awarded to the offeror who provides the best value to the government, considering technical acceptability, past performance, and price. The soliciting agency is the U.S. Department of Agriculture Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12" OR AS SHOWN IN TRAIL LOG

PROVIDE 3" MIN. AGGREGATE

SURFACING BEDDING IF STONES DO

NOT BEAR ON MINERAL SOIL

SIDE STONES

S

EE

T

RA

IL

LO

G

BED SIDE STONES

6" MIN BELOW

BOTTOM OF DRAIN

APPROACH TRAIL 2

12"

FL

O

W

LENGTH AS REQ'D TO SPAN

TRAIL AND CONTAIN AS

MATERIAL EACH SIDE

12"x12" DRAINAGE DITCH

TO DAYLIGHT

PLAN VIEW

SECTION VIEW

NOT TO SCALE

NOT TO SCALE

STONE OPEN DRAIN (SOD)

IDEAL COVE TRAIL RECONSTRUCTION DATE:

DATE:

DATE:

AUTOCAD FILENAME:

SHEET OF

DRAWN:

USDA FOREST SERVICE

PETERSBURG RANGER DISTRICT

TONGASS N.F.

CHECKED:

DESIGNED: SOD.DWG

__/2021__

05/2017BH,CJ

05/2017FSSTANDARD,BH,CJ

· SELECT STONES FOR FIT

· BED SIDE STONES FOR FULL STABILITY; ANGLE STONES BACK INTO

ADJACENT TRAIL BED AS SHOWN TO PREVENT TIPPING INTO SOD

WITH USE.

· TOP OF SIDE STONES TO BE 1" ABOVE COMPACTED AGGREGATE

TRAIL

01b CoverSheet_Ideal Cove Trl Reconstr_12032021 cj
02 AS_Ideal Cove Trl Reconstr_12012021 cj
03 RL_Ideal Cove Trl Reconstr_12012021 cj
04 SP_Ideal Cove Trl Reconstr_12012021 cj
05 SRS_Ideal Cove Trl Reconstr_12012021 cj
06 CS_Ideal Cove Trl Reconstr_12012021 cj
07 CS_Ideal Cove Trl Reconstr_12012021 cj
08 SRW_Ideal Cove Trl Reconstr_12012021 cj
09 SOD_Ideal Cove Trl Reconstr_12012021 cj
10 DD_Ideal Cove Trl Reconstr_12012021 cj
11 BW-A_Ideal Cove Trl Reconstr_12012021 cj
12 BW-B_Ideal Cove Trl Reconstr_12012021 cj
13 BWB_Ideal Cove Trl Reconstr_12012021 cj
14 SignPosts_Ideal Cove Trl Reconstr_12012021 cj
14b SignPosts_Ideal Cove Trl Reconstr_12032021 cj
15 SW Trlhd_Ideal Cove Trl Reconstr_12012021 cj
15b SW Trlhd_Ideal Cove Trl Reconstr_12032021 cj
16 RA1_Ideal Cove Trl Reconstr_12012021 cj
17 RW Spur_Ideal Cove Trl Reconstr_12012021 cj
18 RA2_Ideal Cove Trl Reconstr_12012021 cj

File details come from the government source that posted it. Updated .