Updated Section B_Schedule of Items _GAOA Ideal Cove Trail -_12032021 cj.pdf
PDF 110 KB Posted
- Solicitation number
- 1240BJ22R0001_0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation amendment updates contract documents for a trail reconstruction project on the Ideal Cove Trail located in the Tongass National Forest. The Forest Service seeks bids to reconstruct over 4,000 linear feet of an existing trail segment including installing boardwalks, retaining logs, aggregate surfacing, stone steps and drainage features. Bids are due by December 15, 2021 and must provide pricing for all line items using actual quantities as well as a lump sum price for mobilization and installing sign bases, rest areas and naturalizing an abandoned trail section. This amendment eliminates replacing an existing bridge and makes clarifications to installation requirements for several items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
GAOA Ideal Cove Trail Reconstruction Petersburg Ranger District, Tongass National Forest Petersburg, Alaska
B.1 SCHEDULE OF ITEMS
NOTE: Offerors must provide an offer on ALL ITEMS, INCLUDING ALL ADDITIVE ITEMS.
PAY DESCRIPTION METHOD OF EST. UNIT TOTAL
ITEM MEASUREMENT* QTY. UNIT PRICE AMOUNT
BASE BID: Trail Segment 0+00 thru 41+35
907(01) Mobilization LS 1 EA $ $____________
913(01) Demo/Removal/Recycling of wood trail structures LS 4150 LF $ $____________
937(01) Double Post Trail Map Sign Base LS 2 EA $ $____________
937(02) Boardwalk Type A (BW-A) AQ 1078 LF $ $____________
937(03) Boardwalk Type B (BW-B) AQ 67 LF $ $____________
937(04) Retaining Log (RL) AQ 37 LF $ $____________
937(05) Boardwalk Bridge (BWB) AQ 170 LF $ $____________
941(01) Aggregate Surfacing (AS) AQ 2554 LF $ $____________
941(02) Aggregate Surfacing AQ 123 EA $ $____________ w/ Corduroy (ASC)
941(03) Ditching AQ 186 LF $ $____________
941(04) Stone Riser Step (SRS) AQ 2 EA $ $____________
941(05) Stone Retaining Wall (SRW) AQ 81 SF $ $____________
941(06) Stone Open Drain (SOD) AQ 17 EA $ $____________
941(07) Stone Pitching (SP) AQ 46 LF $ $____________
941(08) Rootwad Spur Rest Area LS 7 EA $ $____________
941(09) Saltwater Trailhead Rest Area LS 1 EA $ $____________
942(01) Concrete Step (CS) AQ 42 EA $ $____________
980(01) Naturalize Abandoned Trail Bed LS 150 LF $ $____________
TOTAL BASE BID PRICE: $
OPTION ITEM #1:
941(10) Stone Bench Rest Areas 1 & 2 LS 1 EA $ $____________
TOTAL OPTION ITEM #1: $
TOTAL BASE AND ALL OPTION ITEMS: $
* METHOD OF MEASUREMENT: AQ = ACTUAL QUANTITIES; DQ = DESIGNED QUANTITIES;
LSQ = LUMP SUM QUANTITIES; VQ = VEHICLE QUANTITIES
BIDDER: (TEL.NO.) ________________________
BY: ______________________________________________________________________
(Signature) (Title) (Date)
OFFEROR MUST ALSO COMPLETE "OFFER" PORTION ON PAGES 2 & 3 OF STANDARD FORM 1442.
File details come from the government source that posted it. Updated .