UPD 2- RFP 112-26 Form D Price Proposal Form 10.1.26.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
RFP 112-26 Centralized Train Control System
Solicitation number
BD-27-1206-40000-40000-132719
Issued by
Suffolk County, Massachusetts

About this file

This is a Form D Price Proposal document for the Massachusetts Bay Transportation Authority's RFP 112-26 Centralized Train Control (CTC) System replacement project. The form establishes a consistent evaluation basis for total CTC solution costs, encompassing implementation, software licensing, support, options, unit prices, and resource rates. Bidders must provide comprehensive pricing across multiple categories: 20 implementation cost line items (ranging from project management and system assessment through training and documentation), software licensing and subscription costs for core CTC software and related components, maintenance and support pricing structured across five years, enhanced capabilities options (EC-01 through EC-15), future expansion unit prices, and resource rates for 12 professional classifications. The RFP response deadline is September 9, 2026 at 4:00 p.m., with a pre-bid conference scheduled for August 26, 2026 at 11:00 a.m. via Microsoft Teams. The contract will require the successful bidder to operate and maintain the system for a minimum of fifteen years following implementation, with contract execution anticipated by September 30, 2026 and service commencement estimated for October 12, 2026.

The pricing proposal requires bidders to identify all software licenses, subscriptions, third-party products, hosted services, and recurring maintenance charges necessary to operate and maintain the proposed solution. All resource rates must be fully burdened, including wages, overhead, profit, administrative costs, and other expenses except approved reimbursable expenses. The form includes a constraint limiting recurring fee increases to no more than 2% annually from Contract Year 4, with a maximum cumulative increase of 15% over initial contract pricing, and reserves MBTA's right to review pricing at the end of contract years 5 and 10 to confirm reasonableness and competitiveness. The document also includes sections for unidentified required costs and assumptions that bidders must incorporate into their total price proposals. Bidders are instructed that all costs necessary to perform implementation and warranty, maintenance, and support must be included in their proposals, whether or not separately identified on the form.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

FORM D – PRICE PROPOSAL | CENTRAL TRAIN CONTROL SYSTEM
PurposeProvides a consistent basis for evaluating total CTC solution cost, including implementation, software/licensing, support, options, unit prices, and resource rates.
Base PriceProvide pricing for all applicable line items. All costs necessary to perform the Implementation shall be included in the Total Implementation Costs, whether or not separately identified.
Software LicensingIdentify all software licenses, subscriptions, third-party products, hosted services, maintenance, support, and other recurring charges necessary to operate and maintain the proposed solution.
Warranty, Maintenance & SupportProvide pricing for all applicable line items. All costs necessary for the Warranty, Maintenance and Support.
Enhanced CapabilitiesUse the same Enhanced Capability identifiers used in the Technical Response.
Resource RatesResource rates shall be fully burdened and include wages, overhead, profit, administrative costs, and other costs except approved reimbursable expenses, if any.
Unidentified Required Costs and AssumptionsAny unidentified required costs and assumptions shall be include in the Bidder's proposed price proposal.

Implementation Costs

IMPLEMENTATION COSTS

ItemDescriptionQty.Unit PriceExtended Price
1Project Management1$0.00
2Current System Assessment / Discovery1$0.00
3System Architecture & Detailed Design1$0.00
4CTC Core Software / Platform1$0.00
5System Configuration & Customization1$0.00
6Primary OCC Implementation1$0.00
7Backup OCC Implementation1$0.00
8Required Server / Infrastructure Components1$0.00
9User Interface Configuration1$0.00
10Existing Signal System Interfaces1$0.00
11Data Accessibility / APIs1$0.00
12MBTA System Integrations1$0.00
13Development, Test, Sandbox / QA Environments1$0.00
14Test Benches / Simulators1$0.00
15System Testing & Acceptance1$0.00
16Installation & Deployment1$0.00
17Cutover / Migration / Decommissioning Support1$0.00
18Training1$0.00
19Documentation / As-Builts1$0.00
20Other Required Base-Scope Costs – Identify1$0.00

TOTAL IMPLEMENTATION COSTS $0.00

Software Licensing

SOFTWARE, LICENSING & SUBSCRIPTION COSTS
ItemSoftware / ComponentLicense ModelQty.Initial CostAnnual Recurring CostIncluded YearsNotes / Third-Party Provider
1Core CTC SoftwareMBTA expects this to be a perpetual license
2Dispatcher Client / User LicensesMBTA expects this to be a perpetual license
3Server Software
4Database Software
5API / Integration Components
6Training Simulator Software
7Development / Test / QA Software
8Cloud / Hosted Services, if applicable
9Cybersecurity / Monitoring Software
10Other – Identify

TOTAL ANNUAL SOFTWARE COST $0.00 $0.00 $0.00

Note: Recurring fees shall not increase by more than 2% per year from Contract Year 4, with a maximum cumalative increase of 15% over the initial contract pricing. We reserve the right to review pricing at the end of contract years 5 and 10 to confirm that pricing remains reasonable and competitive. Any pricing adjustment resulting from such review shall require mutual written agreement and shall not automatically increase fees.

Maintenance & Support

MAINTENANCE & SUPPORT PRICING

YearSoftware Maintenance / UpdatesTechnical SupportHosting / SubscriptionOther Recurring CostAnnual Total
Maintenance Option 1, Year 1$0.00
Maintenance Option 1, Year 2$0.00
Maintenance Option 1, Year 3$0.00
Maintenance Option 1, Year 4$0.00
Maintenance Option 1, Year 5$0.00

TOTAL MAINTENANCE and SUPPORT $0.00

Enhanced Capabilities

ENHANCED CAPABILITIES / OPTIONS

Option IDEnhanced Capability / OptionSOW / Technical Ref.One-Time PriceAnnual Recurring PriceTotal Option Amount
EC-01$0.00
EC-02$0.00
EC-03$0.00
EC-04$0.00
EC-05$0.00
EC-06$0.00
EC-07$0.00
EC-08$0.00
EC-09$0.00
EC-10$0.00
EC-11$0.00
EC-12$0.00
EC-13$0.00
EC-14$0.00
EC-15$0.00

TOTAL DESIGNATED EVALUATED OPTIONS $0.00

Unit Prices

FUTURE EXPANSION / UNIT PRICES
ItemDescriptionUnitUnit PricePrice Valid ThroughNotes / Assumptions
1IdentifyEach
2IdentifyEach
3IdentifyDay
4IdentifySession
5IdentifyEach
6IdentifyEach

Resource Rates

RESOURCE RATES

ClassificationBase PricingMaintenance Options
Maintenance Option 1, Year 1Maintenance Option 1, Year 2Maintenance Option 1, Year 3Maintenance Option 1, Year 4Maintenance Option 1, Year 5Annual Escalation After Option 1Notes
Project Manager
Systems Architect
CTC / Train Control Engineer
Software Engineer
Integration Engineer
Network Engineer
Cybersecurity Engineer
Configuration Engineer
Testing / Commissioning Engineer
Field Technician
Trainer
Other – Identify

Unidentified Costs

UNIDENTIFIED REQUIRED COSTS AND ASSUMPTIONS

ItemDescriptionQty.Unit PriceExtended Price
1Provide description1$0.00
21$0.00
31$0.00
41$0.00
51$0.00
61$0.00
71$0.00
81$0.00
91$0.00
101$0.00

TOTAL UNIDENTIFIED REQUIRED COSTS $0.00

File details come from the government source that posted it. Updated .