UPD 2- RFP 112-26 Form D Price Proposal Form 10.1.26.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- RFP 112-26 Centralized Train Control System
- Solicitation number
- BD-27-1206-40000-40000-132719
- Issued by
- Suffolk County, Massachusetts
About this file
This is a Form D Price Proposal document for the Massachusetts Bay Transportation Authority's RFP 112-26 Centralized Train Control (CTC) System replacement project. The form establishes a consistent evaluation basis for total CTC solution costs, encompassing implementation, software licensing, support, options, unit prices, and resource rates. Bidders must provide comprehensive pricing across multiple categories: 20 implementation cost line items (ranging from project management and system assessment through training and documentation), software licensing and subscription costs for core CTC software and related components, maintenance and support pricing structured across five years, enhanced capabilities options (EC-01 through EC-15), future expansion unit prices, and resource rates for 12 professional classifications. The RFP response deadline is September 9, 2026 at 4:00 p.m., with a pre-bid conference scheduled for August 26, 2026 at 11:00 a.m. via Microsoft Teams. The contract will require the successful bidder to operate and maintain the system for a minimum of fifteen years following implementation, with contract execution anticipated by September 30, 2026 and service commencement estimated for October 12, 2026.
The pricing proposal requires bidders to identify all software licenses, subscriptions, third-party products, hosted services, and recurring maintenance charges necessary to operate and maintain the proposed solution. All resource rates must be fully burdened, including wages, overhead, profit, administrative costs, and other expenses except approved reimbursable expenses. The form includes a constraint limiting recurring fee increases to no more than 2% annually from Contract Year 4, with a maximum cumulative increase of 15% over initial contract pricing, and reserves MBTA's right to review pricing at the end of contract years 5 and 10 to confirm reasonableness and competitiveness. The document also includes sections for unidentified required costs and assumptions that bidders must incorporate into their total price proposals. Bidders are instructed that all costs necessary to perform implementation and warranty, maintenance, and support must be included in their proposals, whether or not separately identified on the form.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| FORM D – PRICE PROPOSAL | CENTRAL TRAIN CONTROL SYSTEM | |
| Purpose | Provides a consistent basis for evaluating total CTC solution cost, including implementation, software/licensing, support, options, unit prices, and resource rates. |
| Base Price | Provide pricing for all applicable line items. All costs necessary to perform the Implementation shall be included in the Total Implementation Costs, whether or not separately identified. |
| Software Licensing | Identify all software licenses, subscriptions, third-party products, hosted services, maintenance, support, and other recurring charges necessary to operate and maintain the proposed solution. |
| Warranty, Maintenance & Support | Provide pricing for all applicable line items. All costs necessary for the Warranty, Maintenance and Support. |
| Enhanced Capabilities | Use the same Enhanced Capability identifiers used in the Technical Response. |
| Resource Rates | Resource rates shall be fully burdened and include wages, overhead, profit, administrative costs, and other costs except approved reimbursable expenses, if any. |
| Unidentified Required Costs and Assumptions | Any unidentified required costs and assumptions shall be include in the Bidder's proposed price proposal. |
Implementation Costs
IMPLEMENTATION COSTS
| Item | Description | Qty. | Unit Price | Extended Price |
| 1 | Project Management | 1 | $0.00 | |
| 2 | Current System Assessment / Discovery | 1 | $0.00 | |
| 3 | System Architecture & Detailed Design | 1 | $0.00 | |
| 4 | CTC Core Software / Platform | 1 | $0.00 | |
| 5 | System Configuration & Customization | 1 | $0.00 | |
| 6 | Primary OCC Implementation | 1 | $0.00 | |
| 7 | Backup OCC Implementation | 1 | $0.00 | |
| 8 | Required Server / Infrastructure Components | 1 | $0.00 | |
| 9 | User Interface Configuration | 1 | $0.00 | |
| 10 | Existing Signal System Interfaces | 1 | $0.00 | |
| 11 | Data Accessibility / APIs | 1 | $0.00 | |
| 12 | MBTA System Integrations | 1 | $0.00 | |
| 13 | Development, Test, Sandbox / QA Environments | 1 | $0.00 | |
| 14 | Test Benches / Simulators | 1 | $0.00 | |
| 15 | System Testing & Acceptance | 1 | $0.00 | |
| 16 | Installation & Deployment | 1 | $0.00 | |
| 17 | Cutover / Migration / Decommissioning Support | 1 | $0.00 | |
| 18 | Training | 1 | $0.00 | |
| 19 | Documentation / As-Builts | 1 | $0.00 | |
| 20 | Other Required Base-Scope Costs – Identify | 1 | $0.00 |
TOTAL IMPLEMENTATION COSTS $0.00
Software Licensing
| SOFTWARE, LICENSING & SUBSCRIPTION COSTS | |||||||
| Item | Software / Component | License Model | Qty. | Initial Cost | Annual Recurring Cost | Included Years | Notes / Third-Party Provider |
| 1 | Core CTC Software | MBTA expects this to be a perpetual license | |||||
| 2 | Dispatcher Client / User Licenses | MBTA expects this to be a perpetual license | |||||
| 3 | Server Software | ||||||
| 4 | Database Software | ||||||
| 5 | API / Integration Components | ||||||
| 6 | Training Simulator Software | ||||||
| 7 | Development / Test / QA Software | ||||||
| 8 | Cloud / Hosted Services, if applicable | ||||||
| 9 | Cybersecurity / Monitoring Software | ||||||
| 10 | Other – Identify |
TOTAL ANNUAL SOFTWARE COST $0.00 $0.00 $0.00
Note: Recurring fees shall not increase by more than 2% per year from Contract Year 4, with a maximum cumalative increase of 15% over the initial contract pricing. We reserve the right to review pricing at the end of contract years 5 and 10 to confirm that pricing remains reasonable and competitive. Any pricing adjustment resulting from such review shall require mutual written agreement and shall not automatically increase fees.
Maintenance & Support
MAINTENANCE & SUPPORT PRICING
| Year | Software Maintenance / Updates | Technical Support | Hosting / Subscription | Other Recurring Cost | Annual Total |
| Maintenance Option 1, Year 1 | $0.00 | ||||
| Maintenance Option 1, Year 2 | $0.00 | ||||
| Maintenance Option 1, Year 3 | $0.00 | ||||
| Maintenance Option 1, Year 4 | $0.00 | ||||
| Maintenance Option 1, Year 5 | $0.00 |
TOTAL MAINTENANCE and SUPPORT $0.00
Enhanced Capabilities
ENHANCED CAPABILITIES / OPTIONS
| Option ID | Enhanced Capability / Option | SOW / Technical Ref. | One-Time Price | Annual Recurring Price | Total Option Amount |
| EC-01 | $0.00 | ||||
| EC-02 | $0.00 | ||||
| EC-03 | $0.00 | ||||
| EC-04 | $0.00 | ||||
| EC-05 | $0.00 | ||||
| EC-06 | $0.00 | ||||
| EC-07 | $0.00 | ||||
| EC-08 | $0.00 | ||||
| EC-09 | $0.00 | ||||
| EC-10 | $0.00 | ||||
| EC-11 | $0.00 | ||||
| EC-12 | $0.00 | ||||
| EC-13 | $0.00 | ||||
| EC-14 | $0.00 | ||||
| EC-15 | $0.00 |
TOTAL DESIGNATED EVALUATED OPTIONS $0.00
Unit Prices
| FUTURE EXPANSION / UNIT PRICES | |||||
| Item | Description | Unit | Unit Price | Price Valid Through | Notes / Assumptions |
| 1 | Identify | Each | |||
| 2 | Identify | Each | |||
| 3 | Identify | Day | |||
| 4 | Identify | Session | |||
| 5 | Identify | Each | |||
| 6 | Identify | Each |
Resource Rates
RESOURCE RATES
| Classification | Base Pricing | Maintenance Options | ||||||
| Maintenance Option 1, Year 1 | Maintenance Option 1, Year 2 | Maintenance Option 1, Year 3 | Maintenance Option 1, Year 4 | Maintenance Option 1, Year 5 | Annual Escalation After Option 1 | Notes | ||
| Project Manager | ||||||||
| Systems Architect | ||||||||
| CTC / Train Control Engineer | ||||||||
| Software Engineer | ||||||||
| Integration Engineer | ||||||||
| Network Engineer | ||||||||
| Cybersecurity Engineer | ||||||||
| Configuration Engineer | ||||||||
| Testing / Commissioning Engineer | ||||||||
| Field Technician | ||||||||
| Trainer | ||||||||
| Other – Identify |
Unidentified Costs
UNIDENTIFIED REQUIRED COSTS AND ASSUMPTIONS
| Item | Description | Qty. | Unit Price | Extended Price |
| 1 | Provide description | 1 | $0.00 | |
| 2 | 1 | $0.00 | ||
| 3 | 1 | $0.00 | ||
| 4 | 1 | $0.00 | ||
| 5 | 1 | $0.00 | ||
| 6 | 1 | $0.00 | ||
| 7 | 1 | $0.00 | ||
| 8 | 1 | $0.00 | ||
| 9 | 1 | $0.00 | ||
| 10 | 1 | $0.00 |
TOTAL UNIDENTIFIED REQUIRED COSTS $0.00
File details come from the government source that posted it. Updated .