This document is Addendum No. 6 to RFP 112-26 issued by the Massachusetts Bay Transportation Authority (MBTA) on November 5, 2026, regarding a Centralized Train Control (CTC) system replacement. The MBTA seeks a commercial, largely off-the-shelf CTC solution to modernize its current system, which manages dispatching for the Red Line, Orange Line, Blue Line heavy rail lines, and Green Line light rail across approximately 136 miles of revenue track and 43 miles of non-revenue track. The addendum provides clarification on the MBTA's objectives and procurement approach in response to recurring questions from prospective bidders. The MBTA is offering optional one-on-one confidential meetings with interested bidders during the solicitation period to facilitate discussion and clarification regarding RFP requirements, technical specifications, operational aspects, and implementation considerations. The Authority is evaluating an extension to the current proposal due date, with notification of any revised deadline to be communicated through a formal addendum via COMMBUYS. Participation in these meetings is voluntary and will not provide any bidder with competitive advantage or preferential treatment in the evaluation or award process. Meetings will be conducted virtually on a first-come, first-served basis, with each session lasting approximately sixty minutes, and bidders are encouraged to limit attendance to approximately five participants representing a multidisciplinary team.

The addendum clarifies the MBTA's approach to minimizing customization by emphasizing a largely off-the-shelf solution with standard components, while remaining open to alternative approaches for features falling outside standard vendor offerings or for delivering non-standard needs through MBTA-developed middleware or alternative systems. The Authority emphasizes the need for comprehensive application programming interfaces (APIs) and data availability to avoid direct vendor-to-vendor interfaces, with the MBTA accepting responsibility for creating and operating middleware to integrate systems as needed. The addendum addresses schedule-based routing and terminal management functionality, acknowledging current operational practices and the need for improved integration between the CTC and other MBTA operational systems to enhance dispatcher coordination and service consistency. Information obtained during one-on-one meetings may be utilized by the MBTA to improve the procurement process, with broadly applicable insights communicated to all prospective bidders through generalized written addenda that do not identify source bidders or disclose proprietary information.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Bay Transportation Authority Ten Park Plaza, Boston, MA 02116 mbta.com

November 5, 2026

Attention Bidder(s):

SUBJECT: RFP# 112-26 MBTA ENTRALIZED TRAIN CONTROL SYSTEM

Additional Procurement Context and Bidder Engagement Information Addendum No. 6

Introduction The MBTA has reviewed questions and comments received from prospective bidders and has identified several recurring themes that would benefit from additional explanation and context. This addendum is intended to provide further insight into the Authority's objectives, operating environment, and procurement approach to support the development of complete and responsive proposals.

The information below is intended to clarify the MBTA's expectations regarding the use of commercial solutions, system integrations, operational requirements, and upcoming bidder engagement opportunities. The MBTA believes that providing additional context at this stage will improve bidder understanding, promote efficient proposal development, and support a competitive procurement process that delivers the best value to the Authority.

1. “Largely Off-the-Shelf” Solution The introduction to the RFP states that “the MBTA is now seeking a commercial, largely off-the-shelf replacement to modernize” its current Centralized Train Control (CTC) system. The MBTA recognizes that no CTC is truly "off-the-shelf" given the unique operating nature and underlying systems (particularly signal systems) for each rail transit authority. However, the purpose of this approach is to minimize the amount of feature customization and MBTA-specific features that a CTC vendor must create and maintain.

The MBTA also recognizes that this approach may require tradeoffs. For example, the MBTA’s current CTC provides custom functionality in several areas where a new vendor may need to develop extensive (and possibly expensive) customizations to match features (e.g., custom reporting integrations and real-time data views). To minimize these development drivers, the MBTA is deliberately not asking for 1:1 replacement of every existing CTC feature. Instead, if an existing feature falls outside of standard CTC vendor offerings, the MBTA is open to delivering those features and functions using an alternative approach (e.g., an alternative vendor/system, in-house technology systems), examining how existing CTC features might achieve the same outcome or considering whether that feature is truly necessary for the MBTA’s current operating context.

On the other hand, some potentially less common features (e.g., ingestion of GPS/AVL light-rail data mentioned in Section 2.5.4) are truly necessary and the MBTA has attempted to define those in the RFP. Yet even in those cases, the MBTA welcomes vendors proposing alternative, efficient approaches that might reduce the need for customization.

The MBTA believes this procurement approach provides value to the Authority (e.g., through reduced cost of customizations and greater consistency with transit industry standard practices) and also to vendors (e.g., because more of the delivery to the MBTA will be standard components with consistent support procedures across customers).

2. APIs and Data Integrations The RFP requests extensive application programming interfaces (APIs) and data availability from bidders. As discussed in Section 2.3.5, the MBTA wants to avoid direct vendor-to-vendor data interfaces.

The preference for broad, general-purpose APIs reflects a desire to reduce expectations on vendors to create bespoke, integration specific interfaces that are expensive and difficult for both vendors and transit agencies to maintain. By receiving a set of multi-purpose APIs, the MBTA believes it can be a "good customer" and use existing standard data interfaces rather than requesting new bespoke interfaces from the CTC vendor as use cases arise. The MBTA recognizes that this means downstream MBTA teams may need to change their own data ingestion pipelines and this is acceptable and as noted in Section 2.3.5 "This may mean in some cases that the MBTA creates and operates middleware to integrate the two systems."

This also supports the “largely-off-the-shelf" procurement approach noted above. By providing a largely standard CTC solution and robust APIs, a CTC vendor allows the MBTA to handle non-standard needs (e.g., unusual data visualization, in-house systems integration) with minimal demand for the CTC vendor to change their solution or develop code that has limited value to other potential customers.

3. Schedule and Terminal Management The need for CTC schedule-based routing and terminal management functionality is mentioned in a few locations in the RFP (Section 2 “CTC Baseline Requirements”, Table in Section 2.3.3).

This part of the addendum provides additional context about the MBTA’s operations relevant to this requirement.

Presently, dispatchers use the MBTA’s CTC to manage departures from heavy rail (Red, Orange, and Blue Line) terminals. The signal system includes devices for terminal management (e.g., start light, “ring off” bell, next train light, terminal interlockings) that can receive commands from the CTC. Typically, dispatchers use a feature in the current CTC called Automated Terminal Dispatching (ATD) to manage departures according to schedules loaded into the CTC. When ATD is active, the CTC issues commands to the relevant terminal devices so that trains are released according to schedule. Dispatchers may use the CTC interface to issue minor schedule adjustments that ATD respects (e.g., “offsets” by a few minutes to a scheduled departure time).

While ATD works well when service is running mostly according to schedule, it does not handle well service disruptions where dispatchers must make larger interventions. For example, a dispatcher might need to reassign a train to a different trip/departure than originally planned.

But this action has a cascading impact on other trains/trips since the system generally only allows one train assigned for each scheduling block. These kinds of dependencies and impacts can be unclear to dispatchers and tedious to troubleshoot and lead to the MBTA disabling ATD and dispatchers manually releasing trains despite disadvantages of manual release.

And though the current CTC imports the same underlying schedule data as other operational systems (e.g., rider real-time systems, HASTUS), same-day adjustments (e.g., offset departure time, train reassignments) are not synced between the CTC and other systems/tools used by Operations. This can make it harder for dispatchers to coordinate interventions with officials in the field. E.g., a field operations official at a terminal might not be informed a departure time adjustment a control center dispatcher records in the CTC.

On light rail lines, field officials (not dispatchers) use “trainsheets” in a separate in-house application (Glides) to manage service and terminals. Although some light rail terminals now have signal system terminal devices (e.g., ring-offs), these are not integrated with schedule functions in the CTC, Glides, or other systems.

The MBTA is hence interested in vendor solutions for schedule-based routing and terminal management, recognizing that they may be different from the approaches used today. As noted in the RFP, the MBTA is also particularly interested in APIs and data integrations around terminal management. These might, for example, allow downstream applications/users to have greater awareness of changes made in the CTC, or even allow schedule adjustments made in other systems to be available to dispatchers. These solutions will, consequently, allow the MBTA’s users in the field and the OCC to stay consistently in sync and deliver efficient service.

4. Optional One-on One Confidential Vendor Meetings and Proposal Due Date The MBTA has observed significant interest in this procurement and appreciates the level of engagement demonstrated by prospective bidders. Through bidder questions received to date, the Authority recognizes that additional discussion and clarification may be beneficial to both the MBTA and industry participants.

To further support bidder understanding and improve proposal quality, the MBTA will offer optional one-on-one confidential meetings with interested bidders during the solicitation period.

The MBTA also recognizes that providing these meetings may warrant additional time within the procurement schedule. Accordingly, the Authority is evaluating an extension to the current proposal due date for RFP No. 112-26. While a revised submission deadline has not yet been finalized, the MBTA is considering such an extension in conjunction with the bidder meetings described below.

The intent is to provide a dedicated opportunity for clarification and discussion now, thereby reducing the likelihood that repeated schedule extensions will be necessary. The MBTA believes that investing additional time in bidder engagement at this stage will improve the efficiency of the procurement, promote a common understanding of the requirements, and support the submission of more complete and responsive proposals.

The MBTA will communicate any revised proposal due date through a formal addendum issued via COMMBUYS once the updated schedule has been established.

Participation in these meetings is voluntary and is not a condition of proposal submission.

However, the MBTA strongly encourages participation by prospective bidders who believe additional discussion would benefit their understanding of the procurement.

Participation in a one-on-one meeting shall not alter, supersede, or take precedence over the requirements, terms, conditions, specifications, or instructions contained in RFP No. 112-26, as issued and amended through COMMBUYS.

Participation in a one-on-one meeting shall not provide any bidder with a competitive advantage, preferential treatment, or favorable consideration in the evaluation or award process. Information exchanged during these meetings is intended solely to facilitate bidder understanding of the procurement and to provide the MBTA with industry perspectives and insights.

The purpose of these meetings is to provide bidders with an opportunity to:

• Ask questions regarding the RFP requirements, specifications, and project objectives

• Seek clarification on technical, operational, contractual, and implementation-related aspects of the solicitation.

• Identify and dispel assumptions that may affect proposal development.

Use of Information The MBTA reserves the right to utilize information obtained during these meetings to improve the procurement process and clarify solicitation requirements.

If information, questions, observations, or insights discussed during the meetings are determined by the MBTA to be broadly applicable or beneficial to all prospective bidders, the MBTA may communicate such information through written addenda to the RFP.

Any information shared through addenda will be presented in a generalized manner and will not identify the source bidder or disclose proprietary, confidential, or competitively sensitive information.

Meeting Logistics Meetings will be conducted virtually and scheduled on a first-come, first-served basis, subject to availability. Each meeting will be approximately sixty (60) minutes in duration.

Bidders interested in participating should submit a request via email to RFPresponse@mbta.com with the subject line:

"RFP #112-26 Meeting Requested"

Upon receipt of the request, the MBTA will provide available meeting dates and times directly to the requesting bidder.

To facilitate productive discussions, bidders are encouraged to limit attendance to approximately five (5) participants and to provide a multidisciplinary team. Such participants may include an Account Executive, Project Manager, Systems Architect, SMEs, and other key personnel associated with the proposal effort.