RFP - Rail Transit Train Control System -V2-8-24-2026.pdf
PDF 1 MB Posted
- Attached to
- RFP 112-26 Centralized Train Control System
- Solicitation number
- BD-27-1206-40000-40000-132719
- Issued by
- Suffolk County, Massachusetts
About this file
This is a Request for Proposals (RFP) issued by the Massachusetts Bay Transportation Authority (MBTA) for a Centralized Train Control (CTC) system replacement. The MBTA seeks a commercial, largely off-the-shelf solution to replace its current CTC system, which has been operational for over 25 years and manages dispatching across the Red Line, Orange Line, Blue Line heavy rail systems, and Green Line light rail, covering approximately 136 miles of revenue track and 43 miles of non-revenue track. The proposed system must integrate with existing signal systems and support future device additions across approximately 701 turnouts. Bidders must submit responses electronically via COMMBUYS by September 9, 2026 at 4:00 p.m., with a pre-bid conference scheduled for August 26, 2026 at 11:00 a.m. via Microsoft Teams. The deadline for bidder questions is August 28, 2026 at 5:00 p.m., with official answers published by August 31, 2026 at 2:00 p.m. In-person or virtual presentations are estimated for the week of September 21, 2026. Contract execution is anticipated by September 30, 2026, with a service start date estimated for October 12, 2026. The contract term is fifteen (15) years commencing on the effective date, with the MBTA intending to select a solution and begin implementation no later than October 2026.
Bidders must submit pricing for each contract year covering the full fifteen-year term using Form D. Recurring fees shall remain firm and fixed through Contract Year 3, with increases limited to no more than two percent (2%) per year beginning in Contract Year 4, and total cumulative increases not exceeding fifteen percent (15%) above Contract Year 1 pricing. The MBTA will review pricing at the end of Contract Years 5 and 10 to determine reasonableness and competitiveness. The MBTA encourages participation from certified minority-owned, women-owned, veteran-owned, disability-owned, and LGBT-owned business enterprises, with supplier diversity accounting for 25% of overall technical scoring. Evaluation will be conducted on a best-value basis combining technical criteria (bidder experience and qualifications at 15%, technical design and system capabilities at 20%, implementation plan and resources at 25%, information security and reliability at 10%, and software accessibility at 5%) with pricing. All responses must pass legal compliance and financial stability requirements. The MBTA has initiated a detailed assessment of the existing system environment and may require the successful bidder to assist with or complete this assessment. The acceptance period for bids is 180 calendar days from the response due date.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7. 1.
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
REQUEST FOR PROPOSALS (RFP)
RFP#: 112-26
COMMBUYS # BD- 27-1206-40000-40000-132719
CENTRALIZED TRAIN CONTROL SYSTEM
Date Issued: August 21, 2026
RFP: 112-26 - 1 - COMMBUYS #: BD- 27-1206-40000-40000-132719
Project Name: Centralized Train Control System Revision: 9/9/2025
Contents
1. INTRODUCTION
2. SCOPE OF WORK
2.1 CTC Baseline Requirements
2.2 Out of Scope Capabilities
2.3 System Scope
2.4 Reliability and Resilience
2.5 REserved. ..................................................................................Error! Bookmark not defined.
2.6 Installation, Operation, Maintenance & Support
2.7 Implementation & Project Management
2.8 Software Accessibility
2.9 Additional Services
3. BIDDERS INSTRUCTIONS AND PROCUREMENT PROCESS
3.1 Bidders’ Conference
3.2 Procurement Method
3.3 RFP Calendar and Delivery Instructions
3.4 Pre-Bid Conference
3.5 Dissemination of Confidential Information
3.6 Examination of RFP
3.7 Rules of Contact
3.8 Clarifications of Specifications, Questions and Answers
3.9 RFP Addendum
3.10 MBTA Standard Contract and Terms & Conditions
3.11 Confidentiality / Public Information Act Disclosure Requests
3.12 Business Conduct
3.13 Collusion
3.14 Prices
3.15 Acceptance Period
3.16 Eligible Entities
3.17 Pre-Contractual Expenses
3.18 Tax Exemption
3.19 Insurance
RFP: 112-26 - 2 - COMMBUYS #: BD- 27-1206-40000-40000-132719
4. SUBMISSION OF RESPONSE
4.1 Response Submissions
4.2 Power of Attorney
4.3 Acceptance of Response
4.4 Incomplete Response
5. MBTA POLICIES
5.1 Small, Minority, Women, and Other Disadvantaged Businesses
6. SELECTION PROCESS AND EVALUATION
6.1 Response Opening and Confidentiality
6.2 Responsiveness Review and Basis of Award
6.3 Evaluation and Notification
6.4 Pass/Fail Evaluation
6.5 Technical Response and Supplier Diversity Evaluation Criteria
6.6 Price Response Evaluation
6.7 Basis of Award: Best – Value Proposal
6.8 Successful Bidder
6.9 MBTA Reserved
6.10 Appeal / Protest Procedures
7. CONTRACT STRUCTURE
Form A: Pre-Award Bidder Evaluation Data Form
Form B: Technical Response
Form C: Small Business Program Attestation Form
Form D: Pricing Response
7.1 MBTA Standard Contract Instructions (Section 8.0)
7.2 MBTA Standard Terms & Conditions Instructions (Section 8.1)
8. Massachusetts Bay Transportation Authority Standard Contract
8.1 Standard Terms and Conditions
RFP: 112-26 - 3 - COMMBUYS #: BD- 27-1206-40000-40000-132719
Attn: Bidder/s
Request for Proposals (RFP) # 112-26
RFP Description: Centralized Train Control System
Dear Prospective Bidder:
The Massachusetts Bay Transportation Authority (“MBTA” or “Authority”), a corporate and a political subdivision of the Commonwealth of Massachusetts, existing pursuit to Mass. Gen. Laws, ch 161A (as amended) invites Bidders to participate in the competitive bid 112-26. The Scope of Work is outlined below in Section 2. The MBTA may at its own discretion award contract(s) to one or multiple Bidders.
All formal communication with the MBTA during the bidding period shall be only through the MBTA’s designated point of contact.
The MBTA’s designated point of contact for this solicitation will be:
Kiana Hall and Terunii Senevirratne
Massachusetts Bay Transportation Authority
10 Park Plaza, Room 2810
Boston, MA 02116
Email: RFPresponses@mbta.com
The RFP shall be launched through COMMBUYS and proposals must be submitted electronically no later than 9/9/2026 4:00 PM, in full compliance with this RFP including but not limited to Section 3, Bidders
Instructions and Procurement Process. This RFP shall remain in force until the execution of the Contract, or until modified or cancelled by the MBTA.
Respectfully, Kiana Hall and Terunii Senevirratne
Massachusetts Bay Transportation Authority
RFP # 112-26
COMMBUYS Bid # BD- 27-1206-40000-40000-132719
RFP: 112-26 - 4 - COMMBUYS #: BD- 27-1206-40000-40000-132719
1. INTRODUCTION
The Massachusetts Bay Transportation Authority (MBTA) seeks to replace its current Centralized Train
Control (CTC) system for its rail transit operations. The current CTC system has been in service for over
25 years and the MBTA is now seeking a commercial, largely off-the-shelf replacement to modernize this system.
The MBTA’s existing CTC system handles dispatching of four isolated subway lines. These lines are the
Red Line, Orange Line, and Blue Line heavy rail lines, as well as the Green Line light rail lines. The replacement system must cover the same lines and integrate with the current signal system devices, as well as allow for new devices and topologies to come online.
Currently, MBTA heavy rail dispatching is centrally managed by the Rail Operations Control Center
(OCC). Light rail dispatching is decentralized among officials in the field, with oversight from dispatchers in the Rail OCC.
MBTA Rail Transit operates under Roadway Worker Protection (RWP) Operating Rules and therefore is looking for a RWP-supportive CTC system.
The MBTA intends to select a solution and begin an implementation process no later than October 2026.
Overall objectives and requirements have been identified and are presented in this RFP; however, bidders are advised that the scope of work includes investigation of current state and development of an implementation plan that can adapt to unknowns within the MBTA environment.
1.1. Contract Term
The Contract term shall be fifteen (15) years commencing on the effective date of the Contract, unless otherwise specified by the MBTA.
Bidders shall provide pricing for each Contract Year for the full fifteen (15)-year Contract term in
Form D – Price Response.
1.2. Price Escalation
Any escalation of recurring fees during the Contract term must be included in the Bidder's pricing submitted in Form D at the time of proposal.
Recurring fees shall remain firm and fixed through Contract Year 3. Beginning in Contract Year 4, recurring fees may increase by no more than two percent (2%) from the immediately preceding Contract
Year. In no event shall the total cumulative increase exceed fifteen percent (15%) above the applicable
Contract Year 1 pricing during the Contract term. Any such increases must be included in the Bidder's pricing submitted in Form D at the time of proposal.
The MBTA may review pricing at the end of Contract Years 5 and 10 to determine whether pricing remains reasonable and competitive. Such review shall not entitle the Contractor to an increase in pricing or reopen the Contractor's submitted pricing for negotiation.
RFP: 112-26 - 5 - COMMBUYS #: BD- 27-1206-40000-40000-132719
2. SCOPE OF WORK
With the replacement of the current CTC system, the MBTA hopes to achieve a modern, reliable, and modular dispatching ecosystem. Procurement of a new CTC system is intended to increase safety and ability to protect workers on the ROW, give dispatchers additional visibility into and control over their territories, and enhance the reliability and resiliency of this system. Additionally, a new CTC system will allow the MBTA to better interface with other information management systems in use and position the
MBTA to take advantage of future technologies and capabilities, without creating dependencies on specific vendor integrations.
The replacement CTC system should cover the same lines and integrate with the current signal system devices, described in section 2.3.1, as well as allow for new devices and topologies to come online and be easily added to the CTC system. MBTA does not plan to transition to CBTC in the foreseeable future.
Under normal conditions, MBTA dispatchers monitor rail transit service from a centralized Operations
Control Center (OCC) location. A secondary backup of OCC location is also available at all times.
At present, dispatchers communicate with field officials to coordinate service management and incident response as necessary. Field officials use a variety of non-CTC tools to manage services, many developed in-house, which source information from the CTC. The current CTC is also used to feed real-time data to downstream rider information systems and analytics systems.
2.1. CTC Baseline Requirements
The CTC must:
• Ensure safe and efficient occupancy management across all lines
• Provide robust track authority and office blocking capabilities
• Receive and manage (from MBTA signal systems) standard indications and request mechanisms for every track and signal device, supporting granular control and real-time visibility for dispatchers
• Include remote routing ability and configurable office logic to enable flexible, automated route-setting and responsive management of train movements
• Include self-service interface configuration, allowing MBTA administrators and staff to tailor visualizations and workflows without extensive support
• Offer flexibility to enable modularity and future expansion
• Provide comprehensive real-time and historical APIs for both sending and receiving data, including APIs that would—for example—allow MBTA to manage functions such as analytics or terminal management using systems/interfaces external to the CTC
• Operate and be maintained predictably for at least fifteen (15) years following implementation.
2.2. Out of Scope Capabilities
The solution will not need to include any new signaling equipment or designs. The CTC system should be able to interface with existing and planned upgrades to signaling equipment and topologies.
RFP: 112-26 - 6 - COMMBUYS #: BD- 27-1206-40000-40000-132719
The CTC system does not need to provide extensive back-office capabilities such as rider information, analytics dashboards, or complex service management workflows. In lieu of these capabilities, the MBTA requires robust data access so that these needs can be performed in other, less-critical downstream systems.
2.3. System Scope
2.3.1. Integration with Existing Signal Systems
The proposed CTC system must integrate with the MBTA’s existing signal systems on each rail line and shall support the existing signaling equipment and protocols described in this section.
MBTA Transit Rail Network Overview
The MBTA operates a rail transit network consisting of the Red, Orange, Blue, Green, and Mattapan
Lines and includes approximately 136 miles of revenue track and 43 miles of non-revenue track.
The system includes both heavy rail and light rail operations and encompasses subway, elevated, at-grade exclusive right-of-way, surface reservation, and street-running environments. The network also contains approximately 701 turnouts, including 297 in revenue territory and 404 in non-revenue territory, which provides routing between tracks and access to terminals, yards, maintenance facilities, and other supporting infrastructure.
Current State of MBTA Train Protection Systems
Signaling and Train Control systems perform several key safety functions: preventing train-to-train collisions, preventing derailments due to overspeed, track conditions, preventing trains from traversing incorrectly positioned switches, and enforcing civil and temporary speed limits. The systems currently deployed across the MBTA vary in the manner and extent to which they perform these functions.
Systems which protect trains in an enforceable manner are often called Automatic Train Protection systems, or ATP.
The following subsections describe the existing train protection and signal systems currently deployed on each MBTA rail line and the environment with which the proposed CTC system will be required to interface.
2.3.1.1. Red Line and Orange Line
The Red Line and Orange Line signal system is a Cab Signal system and was upgraded between 2022 and
2026 to its current state. The system provides all critical functions of train protection, enforced through wayside signals at interlockings and cab signaling throughout. The safety-critical logic is implemented in software running on iVPI interlocking processors located in signal rooms along the alignment. Trains are detected using digital Audio Frequency Track Circuits (AFTC5), and those same AFTC5 units transmit the cab signals to the trains.
Cab signals are received and decoded by onboard controllers (ATP) on each of the revenue vehicles.
Those cab signal codes are translated to speed limits, which are enforced by the ATP through automatic brake applications if trains exceed the speed limit. The cab signal speed limits that are transmitted are programmed into the wayside equipment to ensure that train separation and red signals are protected, and
RFP: 112-26 - 7 - COMMBUYS #: BD- 27-1206-40000-40000-132719
trains cannot exceed the safe limits of operation.
• Signaling Vital (safety) Logic: Software on iVPI Processors
• Non-Vital Logic: Software on iVPI Processors
• Track Circuits: AFTC5
• Cab Signaling: 1005Hz (Orange) 4550/5525Hz (Red)
• Signals: LED, at interlockings only
• Traffic: Bi-directional (except Red Line Park to JFK and Ashmont Branch)
• Train Separation, Red Signals, Civil Speeds, and Temporary Speed all vitally enforced
• OCS Communication: Mod Bus RTU converted to Genisys Protocol
• Track Circuits (AC & AFTC5): Approximately 883 (347 Orange & 536 Red)
• Control Points: Approximately 36 (14 Orange & 22 Red)
• Track Switches: Approximately 294 (116 Orange & 178 Red)
• Wayside Signals: Approximately 375 (171 Orange & 204 Red
• Mechanical Train Stop (Trip Stops): Approximately 9 (7 Orange & 2 Red)
• Snow Melter Controls (Switch & 3rd Rail): Approximately 263 Locations (93 Orange & 170 Red)
• Road Crossings (Non-DOT): 3 (Orange Only – Wellington Yard)
• Departure Test Controls: Approximately 100+ (56+ Orange& 44+ Red)
• Dark Territory: YES - 4 Locations (Orange – Wellington Yard Storage Tracks. Red - Cabot Yard, Codman Yard and Mattapan High Speed Line)
2.3.1.2. Blue Line
The Blue Line signal system is an Automatic Block Signal system, which mostly dates back to the early
2000’s, and provides some of the critical functions of train protection. Train Separation and Red Signals are protected through the use of wayside signals and electromechanical trip stops, which are controlled by relay logic and older VPI vital processors. Train detection is through power frequency AC Track
Circuits, and there is no cab signaling.
The Automatic Block Signal system has a wayside signal and trip stop at every track circuit boundary.
The system clears and stops all signals in the normal traffic direction automatically based on the location of trains ahead, and the logic is designed to trip any train approaching too closely, and in some cases too quickly, towards a stopped signal or other train. Civil speed enforcement is provided in some areas through Grade Timing, a function which delays the trip stops from lowering to ensure a train is driving under the speed limit.
• Signaling Vital (safety) Logic: Software on VPI Processors, Relay Logic
• Non-Vital Logic: PLCs
• Track Circuits: AC Vane Relay
• Cab Signaling: None
• Signals: LED, at interlockings and all block boundaries
• Traffic: Normal Direction only
• Train Separation, Red Signals, Some Civil Speeds vitally enforced
• Some civil speeds unenforced, No Temporary Speed Restrictions
• OCS Communication: Mod Bus RTU converted to PLC’s to non-vital serial link
• Track Circuits (AC): Approximately 184
• Control Points: Approximately 10
RFP: 112-26 - 8 - COMMBUYS #: BD- 27-1206-40000-40000-132719
• Track Switches: Approximately 82
• Wayside Signals: Approximately 167
• Mechanical Train Stop (Trip Stops): Approximately 147
• Snow Melter Controls (Switch, Trips & 3rd Rail): Approximately 55 Locations
• Dark Territory: YES - 2 Locations (Orient Heights Yard & Bowdoin Storage Tracks)
The Blue Line is being considered for an upgrade to cab signaling in the same style as Red and Orange
Lines and to extend the line to connect to Red Line at MGH. This effort is currently at the Pre-Design
Study phase.
2.3.1.3. Green Line
The Green Line signal system is an Automatic Block Signal (ABS) system through much of the alignment, but the branches also have significant “street running” segment which lack any signal system.
The ABS system functions similarly to the Blue Line, in that there are signals at every block boundary, and those signals are automatically cleared and stopped based on the location of other trains, which are detected with AC track circuits. However, the Green Line signal system lacks any enforcement of those signals – no trip stops, and no cab signaling. Only the motorperson is relied upon to observe and correctly react to stopped signals, and to adhere to posted speed limits.
In the street running areas, there is no detection of trains nor any signals to warn train operators of conditions ahead. Signals are controlled in some areas (D Branch and GLX), otherwise rely on Automatic
Vehicle Identification (AVI) for train routing.
• Signaling Vital (safety) Logic: Software on various Processors, Relay Logic
• Non-Vital Logic: PLCs
• Track Circuits: AC Vane Relay, SE-3, except in street running
• Cab Signaling: None
• Signals: At interlockings and all block boundaries, except in street running
• Traffic: Normal Direction only
• Train Separation, Red Signals, are displayed to motorpersons but not enforced
• Civil and Temporary speed restrictions are posted on signs and are unenforced.
• OCS Communication: Mod Bus RTU converted to Genisys Protocol and Mod Bus RTU to PLC to discrete inputs and outputs (3 Locations)
• Track Circuits (AC): Approximately 469
• Control Points: Approximately 25
• Track Switches: Approximately 132
• Wayside Signals: Approximately 424
• Mechanical Train Stop (Trip Stops): 0
• Snow Melter Controls (Switch Only): Approximately 26 Locations
• Dark Territory: YES - Many Locations (Central Tunnel, E Branch, B Branch, C Branch, Multiple yards (Riverside, Reservoir, Lake St and Innerbelt Yards)
2.3.1.4. Automatic Vehicle Identification
The Automatic Vehicle Identification (AVI) systems permit vehicles to wayside communication for route requests to the signal system and location tracking information to the current CTC system for recording and visualization.
RFP: 112-26 - 9 - COMMBUYS #: BD- 27-1206-40000-40000-132719
There are a total of 26 AVI interrogator locations on the MBTA Green Line, with 72 AVI antenna locations (often referred to as ‘key points’). Of those, 13 interrogators can request a route from the signal system. All AVI interrogators provide train tracking information to OCS which is then disseminated to
OCC and real time information to customers.
The wayside AVI interrogator constantly monitors up to four antennas mounted between the rails with a
100kHz signal. A transponder mounted on each end of Green Line cars responds to that signal with route or train number and several other status bits in a 19 bit message. The AVI interrogator forwards all messages to the OCS system through a serial-to-ethernet converter. Each interrogator has two redundant converters with diverse network paths. Both devices are active, but OCS selects one of the two data streams at a time, ignoring the other until there is a network interruption.
2.3.1.5. Green Line Train Protection System
The Green Line Train Protection System (GLTPS) is currently being deployed on the Green Line. This is a new radio (Ultra-Wide Band, UWB) based system which will act as an overlay to the signal system.
The GLTPS will eventually give train location, protect against train-to-train collisions and enforce speed limits. GLTPS is a non-vital system.
2.3.2. Rail Yards
Some rail yards are currently signalized, and some are still dark. What applies to the rest of the system also applies to the yards; Any place on the system where there are signal system devices that are capable of sending indication or receiving wayside requests should be incorporated into the CTC solution as the default, with the capability for future expansion.
2.3.3. Functional Requirements
The system must meet the “Minimum Viable Product” capabilities listed in the table below. Features that are considered fundamental to modern train control systems may not be mentioned explicitly, such as train identification, train insertion, train tagging, etc… Solutions that meet some or all of the capabilities listed as “Enhanced Capability” are preferred.
Minimum Viable Product Enhanced Capability
Remote Control of
Signals
• System prohibits dispatcher from displaying conflicting/opposing routes
• System prohibits blocked signals from displaying a permissive signal indication
• Ability to clear route over blocked switch in set position
• Blocking capability at all fixed wayside signal locations/interlockings
• Error indication or notification of dark or imperfectly displayed signals
Train Routing
• Typical routing of trains with fleeting capability at remotely controlled locations
• Simple N/X Routing
• Schedule-based routing
• Stack routing – overlay/store multiple, sequential planned routes to display automatically.
• If stacking available, inability to automatically
RFP: 112-26 - 10 - COMMBUYS #: BD- 27-1206-40000-40000-132719
display conflicting stacked routes
Blocking Protection
• Ability to apply office blocks that restrict signal indication on all switches/signals at remotely controlled interlockings
• Track Blocks
• Exit Blocks
• Switch and Signal Blocks
• Multiple Blocks on one asset
• Label blocks/reason/link to authority.
Track Authority
• Integrated track authority form creation (or API) with capability to link blocking protection directly to track authority.
• Automated, exclusive, line-separated numbering system on track authority form creation.
• Authority identified on model board with blocks
• API access for reading/writing track authority data, for MBTA integration with incident management software, analytics, etc.
• Integrated track authority form creation with capability to link blocking protection directly to track authority, identify
RWIC, transmit confirmation of limits to
RWIC via tablet or device
Track authority linked to blocking protection
• Blocks directly linked with track authority
• Ability to add/blocks as needed when linked directly to track authority form
• Ability to add/release and remove blocks as needed when linked directly to track authority form
• Confirmation notification to dispatcher when linked block removal requested
• Re-link added blocks to track authority
RFP: 112-26 - 11 - COMMBUYS #: BD- 27-1206-40000-40000-132719
• Removal of all blocks associated with track authority at once with cancellation of track authority
AVI Locations
• Visualize locations of AVI loops and
AVI-controlled interlockings
Asset control and status alerts
• Ability to relinquish/return remote control of interlockings for hand operation or local control with confirmation
• Switch heater control
• Display status of interlockings, including switch position, correspondence of switches
• Notification of comms loss
• See status of fixed derails
• Control of Hold signals at station platforms
• Alerts of fire alarms/ emergency notification/ abnormal condition
• See status/position of fixed derails
• Remotely control fixed derails
Local Control/
Bungalow communication
• Ability to display status of control at interlocking locations
• Transfer control to bungalow location
• Ability to apply blocks bungalow location
• Ability to apply blocks and see currently applied blocks in bungalow locations.
• Inability to clear through established OCC blocking protection.
• Confirmation and active acceptance of local control at bungalow location
• Request local control capability (dispatcher alert)
• Active acceptance of returning local control to remote operation
SCADA/Power
• Visualization of power system energization/de-energization.
• Approval/request capability between OCC dispatcher and Power
Dispatcher.
• Visual indication of de-energized limits for OCC and Power Dispatcher
• Alert/confirmation if routing electric vehicle into limits of de-energization
RFP: 112-26 - 12 - COMMBUYS #: BD- 27-1206-40000-40000-132719
• Automatic enforcement of zero speed at limits of de-energization
Work/action logging
• Running time-stamp log of dispatcher actions, accessible via API.
• Recording and running log of block applications, Track authority issuance, accessible via API.
• Live feed of train movements accessible via API.
Office Functions
• Visual playback showing complete status of system as it appeared during time period under investigation.
• Training Simulator with the full capabilities of the system itself, allowing multiple users to access it at a time.
• Self-service visual interface configuration module
• Ingestion and integration of vehicle schedule data for automatic routing.
• Schedule data is integrated from open industry-standard formats, including GTFS (General
Transit Feed
Specification) and TODS
(Transit Operational Data
Standard).
2.3.4. User Interface Requirements
The CTC system will have a modern, interactive user interface (UI) that will enable dispatchers to be efficient and enhance the safety of railroad operations.
The UI will be intuitive, configurable per user, and shall combine a high-level overview with drill-down capabilities such as territory selection, navigation, pan, zoom, layers, filtering and configurable display functions. Additionally, important event information requiring dispatcher attention should be clearly visible at all levels of zooming.
The UI must be customizable to the MBTA context, including the ability to label and adjust display parameters of all locations, equipment, authority zones, blocks etc.
The system shall provide a remote web-based interface to be used as a read-only field operations tool.
2.3.5. Integration with MBTA Systems
The MBTA would like to avoid direct vendor-to-vendor integrations as this limits the MBTA’s and both vendors’ ability to investigate and troubleshoot issues or deliver new features. The MBTA expects to integrate CTC with the major adjacent systems below. However, it would prefer that the CTC vendor provide standard interface documents and APIs (See “Data Accessibility”) rather than implementing a direct vendor-to-vendor “black box" integration. This may mean in some cases that the MBTA creates and operates middleware to integrate the two systems.
At a minimum, the solution is expected to support the following integrations:
RFP: 112-26 - 13 - COMMBUYS #: BD- 27-1206-40000-40000-132719
• Ingestion of train schedules from HASTUS, ideally by the CTC consuming standard General
Transit Feed Specification (GTFS) and Transit Operations Data Standard (TODS) feeds provided by the MBTA.
• Ingestion of asset information and speed restriction information from Trapeze EAM.
• Ingestion of train location information.
• Availability of a real-time push-based data stream about train movements as an input into downstream MBTA systems such as GTFS-RT (realtime) feeds and in-house MBTA service management tooling.
• Availability of a real-time push-based data stream about track circuit occupancy, device status, AVI reads, etc. as an input into downstream MBTA applications.
• Publication of historical and “as operated” data as an input into MBTA data warehousing and analytics platforms, which include Snowflake and Tableau.
• API or alternative mechanism for integrating with external track authority form system, including creating blocking protection based on that form.
2.3.6. Data Accessibility and APIs
The system shall support industry standard data formats for exchanging real-time and historical data and commands with other systems. The system shall provide API(s) to exchange this data. These APIs will support downstream internal tools, rider-facing data touchpoints, operations analytics, and record-keeping. In general, any action that a user can accomplish in a User Interface should also be possible to accomplish through an API. Similarly, any data that a user can see through a User Interface should also be possible to extract through an API. This data extraction capability must include the ability for an API consumer to record a continuous stream of data, for example all train movements in a day or all dispatcher actions taken in a month.
The system shall be capable of restoring any extracted data for use in reporting, playback, simulation, or training.
The system should be capable of receiving vehicle location data via an API and visualizing it alongside the signal data.
2.4. RELIABILITY AND RESILIENCE
The Contractor will provide the approach and responsibilities in order to achieve an annual uptime SLA of 99.999%.
The Contractor will provide a description of remedies if SLA is not met.
The system will have a managed customer support and problem resolution process with committed response times based on issue severity. Any vendor-hosted components or services will have availability commitments.
User Permissions will be configurable and integrated with EntraID or Active Directory to enable enterprise user management. Administrators will be able to define and manage user identities, roles, privileges and access permissions.
RFP: 112-26 - 14 - COMMBUYS #: BD- 27-1206-40000-40000-132719
2.5. INFORMATION SECURITY
These requirements apply to the complete delivered System: the CTC application, the Contractor-supplied network, the field operations tool, all interfaces and APIs, and all Contractor-supplied test, development, training, and simulation environments. The CTC System is safety-critical and supports Roadway Worker Protection (RWP)
2.5.1. Standards and Compliance
2.5.1.1. The Contractor shall review Agency-provided cybersecurity standards, policies, and procedures and shall either adhere to them or propose superior standards or design for MBTA acceptance.
2.5.1.2. Comply with TSA Cybersecurity Directives 1580/1582 series, as amended, including: IT/OT segmentation such that OT continues to operate if IT is compromised; access control; continuous monitoring and detection; timely remediation of exploitable systems; a tested incident response plan; and reporting of cybersecurity incidents to CISA within 24 hours.
2.5.1.3. Design to NIST SP 800-53 Rev. 5 (Moderate and High baselines, with OT tailoring as applied by MBTA), NIST SP 800-82 Rev. 3, NIST SP 800-161, NIST SP 800-
218, and the CISA joint guidance Adapting Zero Trust Principles to Operational Technology (April 2026). Segment the network and build it from inherently secure components per the APTA rail transit security zone architecture recommended practice and IEC 62443-3-2, -3-3, -4-1, and -4-2. Where these differ from the
Federal requirements above, the Federal requirements govern.
2.5.1.4. The Massachusetts Department of Public Utilities is the State Safety Oversight
Agency; cybersecurity conditions affecting safe operation are addressed as hazards under MBTA's safety plan. The state imposes no separate OT cybersecurity standard on this System. Applicability determinations are reserved to MBTA.
2.5.1.5. Handle and protect all System information as Sensitive Security Information (SSI) per 49 CFR Part 1520. Route all requests for network diagrams, configurations, or interface details through the MBTA Information Security team.
2.5.2. Safety and Worker Protection
2.5.2.1. Vital wayside signal systems perform train protection independently of the CTC and shall continue to do so. No System function shall override, bypass, suppress, or delay a vital wayside function. Loss or compromise of the System shall not create an unsafe condition or prevent local control at interlocking and bungalow locations.
2.5.2.2. Blocking protection and track authority are worker-protection functions and shall be treated as the System's highest-consequence functions. An applied block shall persist through loss of communications, control-center failover, component restart, and database restore. A block shall be cleared only by authenticated release by an authorized user — never automatically, by timeout, or as a side effect of recovery or restore. A blocking device applied to any switch, signal, track segment, or interlocking shall render that asset unusable until the block is removed (a functional interlock, not an advisory reminder).
2.5.2.3. Where protection cannot be confirmed, the System shall alarm and display an unknown protection state rather than the last known value. (A stale indication is
RFP: 112-26 - 15 - COMMBUYS #: BD- 27-1206-40000-40000-132719
more dangerous than none.)
2.5.2.4. Every block and track-authority action shall be attributable to a named user, time-stamped, and written to a tamper-evident record that no account can modify or delete.
2.5.2.5. The Contractor shall identify each function for which the System is the sole means of enforcing a protective condition, document its failure modes, and specify the means of maintaining protection when the System is unavailable
2.5.3. Architecture, Zones and Conduits
2.5.3.1. Partition the System into security zones and conduits based on consequence of compromise, at minimum separating: the field/wayside interface (segmented per line), the CTC application, dispatcher operations, maintenance and engineering, and a data exchange zone. Submit the zone-and-conduit model and its risk assessment for MBTA acceptance before procuring any network or security equipment. The network shall permit authorized access from local and remote workstations and local and remote programming terminals.
2.5.3.2. The data exchange zone shall be the only zone permitted to communicate across the CTC boundary. All external interfaces and APIs shall terminate there, with the
CTC pushing or publishing data outward to a server, replica, or broker rather than accepting inbound requests. Egress from the CTC zone shall be one-directional where feasible (data diode / unidirectional gateway, or a hardened DMZ/broker).
No downstream, analytics, or rider-facing system shall write to or command the
CTC — directly or through any relay, proxy, tunnel, or shared credential — so that a compromised outside system reaches only a copy of the data and never the systems that move trains.
2.5.3.3. The Contractor shall document every conduit crossing a zone boundary: ports, protocols, direction of flow, and the trust boundary it crosses. Where MBTA operates middleware between the CTC and other systems, the security boundary shall be specified explicitly and enforced at the CTC egress.
2.5.3.4. Interfaces to other MBTA control systems, including traction power SCADA, shall be agreed with the owning organization before they are built. Traction power energization state shall derive from the power system's own indications and shall display as unknown when the interface is degraded or of uncertain currency.
2.5.3.5. Wireless communication of any kind — Wi-Fi, radio, or cellular — is prohibited unless approved in writing by MBTA. State whether any existing wireless or cellular path at an MBTA field location will be used, shared, or depended on.
2.5.3.6. The field operations tool shall default to observation-only. Any control, blocking, or track-authority capability shall be identified separately in the proposal, enabled by MBTA per role, and capable of being disabled by MBTA without vendor involvement.
2.5.4. Application Programming Interfaces (API)
2.5.4.1. The System shall expose documented APIs that allow MBTA to ingest external train location and position data — for example GPS/AVL light-rail data or an
MBTA-built middleware feed — for visualization alongside native signal and track-circuit data. The System shall not require a source-specific implementation;
RFP: 112-26 - 16 - COMMBUYS #: BD- 27-1206-40000-40000-132719
MBTA shall be able to publish conforming location data into the System without vendor involvement.
2.5.4.2. Externally ingested location and status data shall be treated as non-vital, advisory information. It shall not originate, modify, suppress, or influence any vital or protective function, and shall be visually distinguishable from signal-derived data.
2.5.4.3. Every API call shall be authenticated (OAuth 2.0 or mutual TLS). No hardcoded keys or shared static credentials shall be used; all secrets shall be rotatable and rotated on a defined schedule. Calls shall be authorized via RBAC and least privilege.
2.5.4.4. Command and write APIs shall be architecturally separated from read-only APIs.
Command/write capability shall never be exposed to downstream analytics, rider-facing, or lower-trust consumers; such consumers shall receive read-only data only, through the egress boundary/broker of Section 3.
2.5.4.5. All API traffic shall be encrypted in transit (TLS 1.2 or higher). All inputs shall be schema-validated to prevent injection or malformed commands from reaching the
CTC.
2.5.4.6. APIs shall be rate-limited and throttled with per-consumer quotas to prevent denial-of-service of a safety-related system.
2.5.4.7. Every API call — especially write/command calls — shall be logged with caller identity and forwarded to MBTA's SIEM (Section 6).
2.5.4.8. The Contractor shall provide a documented API security specification (e.g., OpenAPI). All APIs shall be delivered through, and consumable only via, an
MBTA-controlled API gateway.
2.5.5. Access Control and Authentication
2.5.5.1. All Contractor, subcontractor, and manufacturer remote access shall be through
MBTA's approved zero trust network access (ZTNA) platform with multi-factor authentication, enabled per maintenance window and recorded; out-of-band paths are prohibited. Disclose every remote, diagnostic, telemetry, cloud, and call-home capability of every item supplied. No warranty or service-level obligation shall be conditioned on a remote connection.
2.5.5.2. Enforce multi-factor authentication on all interactive and administrative access.
Provide role-based access control with least privilege and separation of duties, integrated with MBTA's enterprise identity provider and privileged access management (PAM) platform, including just-in-time elevation. Dispatching continuity shall not depend on an external authentication service.
2.5.5.3. Use unique named accounts only; shared or generic accounts are prohibited.
Enforce session timeout and re-authentication. All authentication and privilege-use events shall be logged and forwarded per Section 6.
2.5.5.4. Change or delete all default and vendor credentials before FAT, and deliver all administrative credentials to MBTA at acceptance.
2.5.6. Logging, Monitoring and Detection
RFP: 112-26 - 17 - COMMBUYS #: BD- 27-1206-40000-40000-132719
2.5.6.1. The System shall emit security-relevant logs — including authentication, privilege changes, configuration changes, integrity events, and communications anomalies
— in a standard format (syslog / CEF).
2.5.6.2. Forward all security-relevant events to MBTA's SIEM or nominated collection point, retaining 90 days online and 3 years archived.
2.5.6.3. The System shall support OT-aware intrusion and anomaly detection and integration with MBTA's Security Operations Center (SOC) and continuous-monitoring program.
2.5.6.4. Provide secure, authenticated time synchronization (NTP) across all components so that events are accurately time-stamped and can be correlated.
2.5.7. Software Assurance, Hardening and Secure Development
2.5.7.1. Harden all components before FAT to a per-device-class standard accepted by MBTA and to recognized hardening baselines (CIS Benchmarks / DISA STIGs) for all delivered operating systems and appliances: disable unnecessary services, ports, and interfaces; block unused USB and wireless module slots on field devices; and replace insecure management protocols. Deliver all configurations in native editable form, under version control, licensed in MBTA's name.
2.5.7.2. Deliver all software at a currently supported version; end-of-life software is not acceptable. Disclose components reaching end of support within five years, provide a software bill of materials (SBOM) and asset inventory, and support patching through the warranty period with a priced ten-year extension. No warranty shall be invalidated by MBTA applying a patch the Contractor has not identified in writing as incompatible within 30 days. Describe the version-control and update process by which the software will be kept current and prevented from reaching an end-of-life condition.
2.5.7.3. Provide evidence of a secure development lifecycle conforming to IEC 62443-4-
1.
2.5.7.4. FAT and SAT shall include explicit security test cases. An independent penetration test / security assessment of the integrated system shall be conducted before production cutover, with remediation of all high and critical findings as a go-live gate.
2.5.8. Resilience, Backup and Recovery (RTO / RPO)
2.5.8.1. Protective-state data — applied blocks, track authority, and the tamper-evident audit records of Section 2 — shall have a Recovery Point Objective of zero (no data loss) and shall survive all failover, restart, and restore events. This is the
System's highest-priority recovery obligation and governs where it conflicts with any other objective below.
2.5.8.2. Core CTC / dispatch function shall meet a Recovery Time Objective of [≤ 5 minutes] via automated failover and an operational-state Recovery Point
Objective of [≤ 1 minute].
2.5.8.3. Historical, playback, and log data shall meet a Recovery Time Objective of [≤ 24
RFP: 112-26 - 18 - COMMBUYS #: BD- 27-1206-40000-40000-132719
hours] and a Recovery Point Objective of [≤ 15 minutes].
2.5.8.4. All backups and data extracts — including those used for playback, simulation, and training — shall have integrity verification and access control so that recovered or reused data cannot be tampered with.
2.5.8.5. Demonstrate security controls, backup and restore, achievement of the RTO/RPO above, and survival of applied blocking through failover and restore at both FAT and SAT.
2.5.9. Incident Response and Vendor Obligations
2.5.9.1. The Contractor shall notify MBTA of any confirmed or suspected security incident affecting the product or any hosted component within [24–72 hours].
Vendor terms shall not delay MBTA's TSA obligation to report qualifying cybersecurity incidents to CISA within 24 hours.
2.5.9.2. The Contractor shall cooperate with MBTA and CISA incident response and shall preserve forensic evidence.
2.5.9.3. The Contractor shall support MBTA's Cybersecurity Incident Response Plan exercises.
2.5.9.4. Service-level agreements shall address security incidents, not only availability outages, including response and remediation obligations for security events.
2.5.10. Supply Chain - Software Bill of Materials (SBOM) Requirements
The Supplier shall provide complete, accurate, and machine-readable SBOMs for all software, firmware, and embedded components delivered under this contract. (SR-3 – Supply
Chain Controls and Processes; SR-5 – Acquisition Strategies, Tools, and Methods; SA-4 –
Acquisition Process). SBOM requirements apply to all TCS software, firmware, field devices, integration components, and containerized workloads that are provided by the selected bidder. (SR-3 – Supply Chain Controls and Processes; SA-4 – Acquisition Process;
SA-5 – System/Services Documentation)
2.5.10.1. Accepted SBOM Formats - SBOMs shall be provided in SPDX 3.x, CycloneDX
1.7.x+, SWID (or equivalent formats). (SA-4 – Acquisition Process; SR-5 –
Standardized Procurement Methods)
2.5.10.2. Minimum SBOM Content Requirements - SBOMs shall include component identifiers, versions, dependencies, licensing, provenance, and build metadata.
(SR-3 – Supply Chain Controls and Processes; SR-4 – Provenance; SI-7 –
Software Integrity; SA-8 – Security Engineering Principles)
2.5.10.3. Vulnerability Exploitability Exchange (VEX) - Supplier shall provide machine-readable VEX documents (or equivalent) identifying exploitability status
(affected, not affected, fixed, under investigation). (RA-5 – Vulnerability
Monitoring and Scanning; SI-2 – Flaw Remediation; IR-4 – Incident Handling;
SR-3 – Supply Chain Controls)
2.5.10.4. SBOM Generation and Delivery Cadence - SBOMs shall be generated at build time, delivered with each release, updated quarterly, and refreshed within 48 hours of critical vulnerability discovery. (SA-10 – Developer Configuration
Management; SA-11 – Developer Testing and Evaluation; SA-15 – Development
RFP: 112-26 - 19 - COMMBUYS #: BD- 27-1206-40000-40000-132719
Process; SR-6 – Supplier Reviews)
2.5.10.5. Integrity, Signing, and Secure Development Attestation - SBOMs and VEX (or equivalent) documents must be cryptographically signed and accompanied by attestation of conformance to secure development practices. (SI-7 – Software
Integrity; SA-15 – Development Process, Standards & Tools; SA-3 – SDLC; SA-
18 – Tamper Resistance)
2.5.10.6. Ingestion & Interoperability Requirements - SBOMs must support automated ingestion, analysis, and integration with agency tooling. PDF-only SBOMs are not acceptable. (SA-4 – Acquisition Process; SR-5 – Standardized Methods; PL-
8 – Security Architecture)
2.5.10.7. OT/ICS-Specific SBOM Requirements - SBOMs shall include firmware details, RTOS components, device-level drivers, and safety-certified component references for OT environments. (SR-4 – Provenance; SA-8 – Security
Engineering Principles; SI-7 – Software Integrity; RA-2 – Security
Categorization)
2.5.10.8. Vulnerability Management Integration - Supplier shall map SBOM entries to vulnerability sources and support cybersecurity incident workflows. (RA-5 –
Vulnerability Monitoring; SI-2 – Flaw Remediation; IR-4 – Incident Handling;
SR-3 – Supply Chain Controls)
2.5.10.9. Maintenance and Updates - SBOM and VEX information must be kept current throughout the software lifecycle and updated for component or vulnerability changes. (SR-6 – Supplier Assessments; SA-12 – Supply Chain Protection; SI-2
– Flaw Remediation)
2.5.10.10. Access and Confidentiality - SBOMs and VEX artifacts shall be shared with the
Agency and security partners; essential component data may not be withheld.
(AC-6 – Least Privilege; MP-4 – Media Protection; PL-2 – Security Planning;
SA-4 – Acquisition Process)
2.6. INSTALLATION, OPERATION, MAINTENANCE & SUPPORT
The Contractor will provide MBTA the administrative rights to the entire system and the appropriate training to assume these rights. The MBTA needs to be able to have full control of the entire system; to monitor, diagnose, configure, manager users and maintain the system.
2.6.1. Installation Requirements
The Contractor will document all installation requirements, including operating system dependencies, network equipment, environmental needs, and any prerequisite hardware or software necessary for deployment.
The Contractor will specify installation requirements across all system components, including servers, clients, test benches, and cloud or on-premise infrastructure (virtual or physical).
RFP: 112-26 - 20 - COMMBUYS #: BD- 27-1206-40000-40000-132719
The Contractor will provide as-built documentation, including specifications, equipment lists and all other technical records of the system as delivered.
2.6.2. Environment & Testing Requirements
The Contractor will define the number and purpose of all application environments (e.g., Development, Test, Sandbox, QA) required to support the Project.
The Contractor will deliver test benches, simulators, and associated environments necessary to validate integrations and configuration changes before production deployment.
The Contractor will support the ability to preview or “canary” rollout configuration changes (e.g., adding or modifying a signal) prior to deployment of a change appearing in the UI for Production use.
2.6.3. Maintenance, Management & Upgrade Requirements
The Contractor will provide the MBTA functions and training required to monitor, diagnose, configure, and maintain the system.
The Contractor will provide a comprehensive Maintenance Plan detailing required activities, schedules, staffing needs, and responsibilities.
The Contractor will provide a comprehensive Obsolescence Management Plan for the entire system, including but not limited to, all hardware and software components, keeping up to date with operating systems as industry standards evolve, making sure hardware installed is kept up to date, and cybersecurity related patches and antivirus definitions are kept up to date to keep the system secure at all times.
The Contractor will provide or maintain a robust software version control system for all code and configuration artifacts associated with the CTC. This system must support traceability of changes, rollback capability, and clear documentation of release history. New versions will be supplied to MBTA in a form compatible with modern deployment practices.
The Contractor will provide guidance and costs for changes that are user-configurable, vendor-configurable, or require vendor development.
The Contractor will provide a system with a 25% reserve capacity for future expansion.
2.6.4. Support & Warranty Requirements
The Contractor will provide a Warranty & Support structure that includes committed response times tied to issue severity.
The Contractor will maintain a managed customer support and problem resolution process.
RFP: 112-26 - 21 - COMMBUYS #: BD- 27-1206-40000-40000-132719
The Contractor will provide clear escalation paths, reporting mechanisms, and periodic support review processes.
The Contractor will provide Training & Staffing requirements, describing all resources necessary to maintain and support the system.
2.7. Implementation & Project Management
The Contractor will develop, lead, and effectively resource a comprehensive Project Plan including all aspects necessary to implement its system at the MBTA.
The MBTA recognizes that documentation associated with its current system and environment may be incomplete. The Contractor will be required to develop a flexible and scalable project plan that allows for discovery and documentation of the current environment.
2.7.1. Current System Assessment
The MBTA has initiated a detailed assessment of the existing system including:
• Overall system architecture, user interface, databases, interfaces, network topology, routing/switching, segmentation, VLANs/VRFs, QoS, firewall policies, remote access, monitoring, NTP, DNS, authentication, and logging
• Inventory of devices, circuits, carrier demarcations, copper/fiber plant, racks, power feeds, UPS dependencies, and cooling.
• Identification of all operational dependencies for ATC interfaces, SCADA communications, and other…
This is the start of the file's text. The full file is on GovTribe.