About this file

This notice solicits bids for a service-disabled veteran-owned small business set-aside contract to replace domestic hot water systems at three buildings at the Castle Point VA Medical Center campus in Wappingers Falls, New York. The project includes demolishing existing systems, installing new steam-fired water heaters and associated piping in each building, connecting to electrical panels, and maintaining hot water throughout construction. The cost estimate is $500,000 to $1 million and the period of performance is 270 calendar days from notice to proceed. Bids are due by March 26, 2021. Respondents must be SDVOSBs registered in SAM.gov and VIP.vetbiz.gov. The solicitation will be posted on beta.SAM.gov on or around March 26 with response instructions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

SHEET NO. DESCRIPTION

GI001 TITLE SHEET

GI002 GENERAL NOTES

AF001 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS

AF101 BUILDING 19, 20, 21 ARCHITECTURAL PLAN

H-101 BUILDING 19, 20, 21 LEAD ABATEMENT PLAN

IC-101 BUILDING 19, 20 INFECTION CONTROL PLAN

IC-102 BUILDING 21 INFECTION CONTROL PLAN

FX101 BUILDING 19 FIRE PROTECTION PLAN

FX102 BUILDING 20 FIRE PROTECTION PLAN

FX103 BUILDING 21 FIRE PROTECTION PLAN

MH001 MECHANICAL ABBREVIATIONS AND SYMBOLS

MH101 BUILDING 19, 20, 21 MECHANICAL PLAN

E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS

EP101 BUILDING 19, 20, 21 ELECTRICAL PLAN

EP102 BUILDING 19, 20, 21 EXISTING PANEL LOCATIONS

EL201 BUILDING 19, 20, 21 LIGHTING PLAN

EP501 ELECTRICAL SCHEDULES AND DETAILS

PP001 PLUMBING ABBREVIATIONS AND SYMBOLS

PD101 BUILDING 19 DEMOLITION PLAN

PD102 BUILDING 20 DEMOLITION PLAN

PD103 BUILDING 21 DEMOLITION PLAN

PD104 TUNNEL PIPING DEMOLITION PLAN

PP101 BUILDING 19 PLUMBING PLAN

PP102 BUILDING 20 PLUMBING PLAN

PP103 BUILDING 21 PLUMBING PLAN

PP501 PLUMBING SCHEDULES AND DETAILS

PP601 PLUMBING P&ID

TITLE SHEET

GI001

VA PLUMBING DESIGN MANUAL , MAY 2018

VA ELECTRICAL DESIGN MANUAL, DECEMBER 2019

INTERNATIONAL MECHANICAL CODE, 2015

NFPA 70, NATIONAL ELECTRICAL CODE, 2017

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

REPLACE DOMESTIC HOT WATER

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 620A4-19-122 CASTLE POINT, NY

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE LOCATION

AutoCAD SHX Text

LIST OF APPLICABLE REFERENCES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

GENERAL NOTES

GI002

GENERAL NOTES:

1. THE GENERAL NOTES ON THIS SHEET APPLY TO ALL THE DRAWING DISCIPLINES.

2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL ASPECTS OF THE DESIGN, TO INCLUDE THE WORK

OF SUB-TRADES, PRIOR TO SUBMITTING A BID.

3. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW

EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, CLEARANCE, ETC. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SURVEY ALL WORK AREAS AND SUBMIT FINAL, DETAILED COORDINATED SHOP DRAWINGS FOR REVIEW BY THE DESIGNER OF RECORD TO ENSURE THAT THE DESIGN INTENT WILL BE MET AND THAT ALL TRADES ARE PROPERLY COORDINATED. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. ANY MAJOR DISCREPANCIES SHALL BE CLARIFIED PRIOR TO SUBMITTAL OF BID.

4. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, CLEARANCES, POSSIBLES CLASHES, AND ACCESSORIES THAT MAY BE REQUIRED. COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING COORDINATED

SHOP DRAWINGS FOR REVIEW PRIOR TO STARTING INSTALLATION.

5. CONTRACTOR SHALL VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID.

REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO SUBMITTAL OF BID.

6. IF A JOB REQUIRES TYING INTO ANY EXISTING MECHANICAL SYSTEM, THE CONTRACTOR SHALL CONDUCT NECESSARY PRE TEST, ADJUST, AND BALANCING (TAB) ACTIVITIES TO VERIFY BASELINE SOURCE CAPACITY FROM THE FACILITY, UNLESS THE OWNER CAN PROVIDE SUFFICIENT FACILITY MECHANICAL TREND LOGS TO ESTABLISH THAT SUFFICIENT SOURCE CAPACITY EXISTS. UPON DETERMINING INSUFFICIENT SOURCE CAPACITY, THE CONTRACTOR SHALL IMMEDIATELY REPORT FINDINGS TO THE OWNER AND ENGINEER FOR RECORD FOR

ADDITIONAL GUIDANCE BEFORE PROCEEDING.

7. IF A JOB REQUIRES TYING INTO ANY EXISTING ELECTRICAL SYSTEM, THE CONTRACTOR SHALL CONDUCT NECESSARY VERIFICATION TO DETERMINE THAT SUFFICIENT ELECTRICAL SOURCE CAPACITY EXISTS FROM THE NEAREST FEED IMMEDIATLEY UPSTREAM OF THE CONNECTION POINT, UNLESS THE OWNER CAN PROVIDE SUFFICIENT FACILITY ELECTRICAL TREND LOGS TO ESTABLISH THAT SUFFICIENT SOURCE CAPACITY EXISTS.

8. THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS THAT ARE EITHER WRITTEN ON THE DRAWINGS OR

SEPARATELY IN A SPECIFICATIONS BOOK.

9. WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO CONSTRUCTION, MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT SHALL BE UTILIZED OR INSTALLED. THE MOST STRINGENT SHALL BE DEFINED AS THE SPECIFICATION OR REQUIREMENT THAT ALLOWS ALL SPECIFICATIONS OR REQUIREMENTS THAT ARE IN CONFLICT TO BE SATISFIED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE

CONTRACTOR BECAUSE OF THIS INTERPRETATION.

10. CONTRACTOR SHALL NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND COORDINATED SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND COORDINATED SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE OWNER'S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE OWNER'S

REPRESENTATIVE.

11. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE INTERNATIONAL BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE OWNER'S REPRESENTATIVE PRIOR

TO BEGINNING THE INSTALLATION.

12. UNLESS STATED OTHERWISE, ALL EXISTING MATERIAL AND EQUIPMENT SHALL REMAIN THE PROPERTY OF THE

PROJECT OWNER.

13. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN AND WORK SCHEDULE WITH ALL PHASING, STAGING, AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS WORK SCHEDULE, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST BE DONE DURING

"OFF HOURS".

14. WITH THE EXCEPTION OF SIGNIFICANT NOISE GENERATING ACTIVITIES SUCH AS CORE DRILLING, ETC., WORK OUTSIDE OF THE OCCUPIED SPACES, SUCH AS ON THE ROOF, ETC., MAY BE PERFORMED DURING NORMAL WORKING

HOURS.

15. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOWN IS NEW AND SHALL BE

FURNISHED AND INSTALLED BY THE CONTRACTOR.

16. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AND IS SUBJECT TO THEIR

CONTINUOUS APPROVAL.

17. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL AND MUST FOLLOW MANUFACTURER RECOMMENDATIONS FOR PROPER INSTALLATION. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, CLEARANCE, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS.

ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT A/E AND THE OWNER'S REPRESENTATIVE.

18. BEFORE ANY DEMOLITION OR CONSTRUCTION WORK IS BEGUN, THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SURVEY THE EXISTING BUILDING AREA TO BE MODIFIED AND/OR REPLACED TO ACCURATELY DOCUMENT EXISTING CONDITIONS. THIS SURVEY WILL BE USED BY THE OWNER'S REPRESENTATIVE AT JOB COMPLETION TO DETERMINE WHICH BUILDING/SITE COMPONENTS MUST BE REPLACED WITH NEW.

19. UNLESS STATED OTHERWISE, REQUEST APPROVAL FROM THE OWNER'S REPRESENTATIVE SEVEN DAYS IN

ADVANCE FOR THE SHUTDOWN OF ANY EXISTING SYSTEM.

20. UNLESS STATED OTHERWISE, FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE OWNER'S

REPRESENTATIVE PRIOR TO THE PROPOSED SHUTDOWN OF ANY SYSTEM.

21. THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE OWNER'S REPRESENTATIVE; NOTIFY LOCAL

AUTHORITIES AS REQUIRED.

22. PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE

CONSTRUCTION PERIOD.

23. CONTRACTOR SHALL NOT PENETRATE OR CUT ANY STRUCTURAL MEMBERS NOT SPECIFICALLY SHOWN ON THE DRAWINGS (E.G., JOISTS, BEAMS, ETC.). IF STRUCTURAL MEMBERS CONFLICT WITH ROUTING, CONTACT THE OWNER'S REPRESENTATIVE FOR DIRECTION BEFORE PROCEEDING. EXERCISE CAUTION IN CUTTING CONCRETE FLOORS AND WALLS TO AVOID EXISTING UTILITIES WHICH MAY BE LOCATED IN AND UNDER CONCRETE SURFACES.

24. THE CONTRACTOR SHALL PROVIDE NEW OPENINGS IN WALLS, FLOOR, AND ROOF, AND PATCH EXISTING OPENINGS IN CONJUNCTION WITH THE DEMOLITION AND INSTALLATION OF THE NEW BUILDING COMPONENTS, INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, AND GENERAL CONTRACTOR'S ITEMS. ALL NECESSARY FRAMING, COUNTER-FLASHING, ETC. SHALL BE INCLUDED.

25. FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE EXISTING STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC.

26. ALL EXISTING DUCTWORK, PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE OWNER'S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT, IN WHICH CASE IT SHALL BE DELIVERED TO

THE LOCATION DESIGNATED BY THE OWNER'S REPRESENTATIVE.

27. FOR EACH PHASE AND BEFORE INTERRUPTING EACH EXISTING UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA. DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR

RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.

28. THE FLOOR AREAS BELOW OVERHEAD WORK, WHERE WELDING "HOT WORK" IS TO BE PERFORMED, SHALL BE CLEARED TO A MINIMUM DISTANCE OF 36 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD "HOT WORK".

ALL FLAMMABLE MATERIALS SHALL BE CLEARED TO A DISTANCE 50 FEET BEYOND THE POINT DIRECTLY BELOW THE

OVERHEAD "HOT WORK".

29. EXISTING DUCTWORK, DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, CHILLED AND HEATING HOT WATER PIPING, WASTE, VENT, FIRE SPRINKLER LINES, FIRE ALARM EQUIPMENT, ELECTRICAL CONDUIT, TELEPHONE CONDUIT, COMMUNICATION CONDUIT, PNEUMATIC TUBING, ETC., MAY HAVE TO BE RELOCATED TO FACILITATE THE INSTALLATION OF THE NEW WORK. THE CONTRACTOR SHALL DETERMINE ALL EXISTING SERVICES THAT REQUIRE RELOCATION PRIOR TO SUBMITTING HIS BID AND INCLUDE ALL COSTS IN THE BID. THERE WILL BE NO EXTRA

COMPENSATION TO THE CONTRACTOR FOR THIS WORK.

30. THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE ELECTRICAL WORK, REFRIGERANT LINE ROUTING, CONTROL

MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU'S, ETC.

31. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT

CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.

32. ANY DEVICE THAT REQUIRES ACCESS FOR ADJUSTMENT OR ROUTINE MAINTENENANCE, SUCH AS BUT NOT LIMITED TO VALVES, VOLUME DAMPERS, CONTROL DEVICES, VAVS, ETC. SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.

33. ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE

PROTECTION IS REQUIRED.

34. PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO

BE REUSED.

35. REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.

36. WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO

EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR REFERENCED.

37. WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK

DETAILED OR NOTED ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE

OWNER'S REPRESENTATIVE.

38. ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR'S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION. SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.

39. WHEREVER NEW WALL, FLOOR, OR CEILING FINISHES ARE INDICATED, THE CONTRACTOR SHALL BRING EXISTING ELECTRICAL, MECHANICAL, PLUMBING, AND OTHER BUILDING COMPONENTS FLUSH WITH THE NEW FINISHED

SURFACES IF APPROPRIATE.

40. THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL

FRAMING AND FURRING SHALL BE REPAIRED WHERE DAMAGE BY THE CONTRACTOR'S WORK.

41. PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.

42. ANY ANTICIPATED HAZARDOUS MATERIALS (HAZMAT) IS INDICATED ON THE DRAWINGS, HOWEVER, IT IS

IMPOSSIBLE TO PREDICT WHERE EXACTLY ALL HAZMAT MAY BE ENCOUNTERED. IF HAZMAT IS ENCOUNTERED OR SUSPECTED AT ANY POINT DURING CONSTRUCTION, CEASE ALL WORK IMMEDIATELY AND CONTACT THE OWNER'S

REPRESENTATIVE FOR GUIDANCE.

43. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE IF THERE IS ENOUGH SPACE AND/OR COMPATABILITY EXISTS TO USE EXISTING CONTROLLERS OR OTHER ASSOCIATED EXISTING CONTROLS EQUIPMENT. IF COMPATIBILITY AND/OR SPACE DOES NOT EXIST, IT IS THE CONTROLS CONTRACTOR RESPONSIBILITY TO PROVIDE THE REQUIRED CONTROLLERS, BRIDGES, ETC. TO ALLOW FULL INTEGRATION OF REQUIRED POINTS AND TO SATISFY THE SEQUENCE OF OPERATIONS. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF THE PROJECT.

44. UNLESS THE OWNER CHOOSES TO USE THEIR OWN THIRD PARTY COMMISSIONING AGENCY, THE CONTRACTOR SHALL UTILIZE A THIRD PARTY COMMISSIONING AGENCY FOR ALL NECESSARY FINAL TESTING, ADJUSTING, AND BALANCING (TAB) AND BUILDING SYSTEM COMMISSIONING. FULL DOCUMENTATION, TO INCLUDE NECESSARY FACILITY STAFF TRAINING, SHALL BE COMPLETED AND SUBMITTED TO ALLOW FOR REQUIRED CONTINUED

OPERATION AND MAINTENANCE.

45. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL THREE PHASE PANELS ARE BALANCED WITH RESPECT TO LOAD ON EACH PHASE TO FULLEST EXTENT POSSIBLE, TO INCLUDE BUT NOT LIMITED TO METERING

EACH PHASE FOR VERIFICATION.

PHASING NOTES:

1. THIS PROJECT SHALL BE PHASED SO THAT UTILITIES WILL BE AVAILABLE 24/7 TO EACH OF

THE THREE BUILDING (19, 20, AND 21) AND THAT THE HOSPITAL SERVICE IS NOT

INTERRUPTED DURING CONSTRUCTION.

2. THE CONTRACTOR SHALL NOT PROCEED WITH ANY DEMOLITION OR CUTTING OF ANY

PIPING UNTIL ALL CONNECTION POINTS ARE FIELD VERIFIED. THE CONTRACTOR SHALL

PHYSICALLY SURVEY, VERIFY, AND MARK ALL CONNECTION POINTS WITH MARKING PAINT

(E.G. ORANGE SPRAY PAINT) AND REPORT BACK TO ENGINEER FOR FIELD CONFIRMATION

PRIOR TO PROCEEDING.

3. THE CONTRACTOR SHALL FURNISH TEMPORARY HOT WATER HEATERS THAT EITHER

MATCH OR EXCEED EXISTING EQUIPMENT AND SHALL MAINTAIN A MINIMUM N+1 FOR

REDUNDANCY FOR THE DURATION OF ANY OUTAGES.

PROPOSED PHASING:

1. INSTALL NEW HOT WATER HEATERS, CONDENSATE PUMP AND ASSOCIATED PIPING IN

BUILDING 19 (ROOM C-001) AND BRING ON-LINE, TEST AND COMMISSION.

2. INSTALL NEW HOT WATER HEATERS, CONDENSATE PUMP AND ASSOCIATED PIPING IN

BUILDING 20 (ROOM B-003) AND BRING ON-LINE, TEST AND COMMISSION.

3. REMOVE ALL EXISTING PIPING INSULATION IN ROOM C-001 AND REPAIR ANY DAMAGED

PIPING AND INSTALL NEW INSULATION ON ALL PIPING.

4. REMOVE ALL EXISTING PIPING INSULATION IN ROOM B-003 AND REPAIR ANY DAMAGED

PIPING AND INSTALL NEW INSULATION ON ALL PIPING.

5. REMOVE ALL EXISTING PIPING INSULATION IN ROOM A-001 AND REPAIR ANY DAMAGED

PIPING AND INSTALL NEW INSULATION ON ALL PIPING.

6. INSTALL NEW HOT WATER HEATER, CONDENSATE PUMP AND ASSOCIATED PIPING IN

BUILDING 21 (ROOM A-002) AND BRING ON-LINE, TEST AND COMMISSION.

7. DEMOLISH EXISTING SEMI-INSTANTANEOUS STEAM HOT WATER HEATERS, CONDENSATE

PUMPS AND ASSOCIATED IN BUILDING 21 (ROOM A-002).

SCOPE OF WORK:

1. THIS PROJECT WILL REPLACE THE EXISTING INSTANTANEOUS HOT WATER SUPPLY

SYSTEMS WITH A NEW HOT WATER HEATING SYSTEM IN EACH BUILDING (19, 20, AND 21).

2. THE NEW SYSTEM WILL BE COMPRISED OF THREE (3) NEW SEPARATE INSTANTANEOUS HOT

WATER SUPPLY SYSTEMS. EACH SYSTEM WILL PROVIDE HOT WATER TO ONE DESIGNATED

BUILDING.

3. THE PROJECT WILL INCLUDE RENOVATIONS OF MECHANICAL ROOMS, INCLUDING

NECESSARY ROOM CONFIGURATIONS, EXPANSIONS/ADDITION, LIGHTING, NEW DOORS,

LOUVERS, EQUIPMENT SUPPORT PADS, AND VENTILATION.

4. THE NEW SYSTEM WILL HAVE A DIGITAL CONTROL SYSTEM THAT WILL INTEGRATE WITH THE

EXISTING BMS SYSTEM.

5. NEW WALL MOUNTED PROPELLER EXHAUST FANS SHALL SHALL BE INSTALLED TO REPLACE

THE EXISTING FANS IN EACH MECHANICAL ROOM.

APPLICABLE CODES

THE VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTIONS. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT THE VA FOLLOWS ON ITS PROJECTS:

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE

ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

INTERNATIONAL BUILDING CODE (IBC)

• NFPA 101 LIFE SAFETY CODE

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• NATIONAL ELECTRIC CODE (NEC)

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

INTERNATIONAL PLUMBING CODE

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE

(PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATIONS STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULIT-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU) EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

ARCHITECTURAL

ABBREVIATIONS AND SYMBOLS

AF001

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL MANUFACTURERS

ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM² SQUARE CENTIMETER

CM³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR FIBERGLASS

REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MM MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE DIMENSION

OD OUTSIDE DIMENSION OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR, OR SOAP

DISPENSER;

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL TEMPERATURE CONTROL

PANEL; TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

CONTRACT LIMIT LINE

FIRE RESISTIVE RATED LINE, 4 HOUR

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

DOOR OPENING/BORROWED LIGHT IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

ARCHITECTURAL SYMBOLS

CENTER LINE

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

GRAPHIC SCALE, 18"=1'-0"

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

ROOM NAME AND NUMBER

CG

COLUMN GRID

KEYNOTE

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

MATERIALS LEGEND

EXISTING

CONSTRUCTION TO

REMAIN

EXISTING

CONSTRUCTION TO BE

REMOVED

NEW CONSTRUCTION

CONCRETE

EARTH

BASE

COURSE

RIGID

INSULATION

BATT

INSULATION

V V ITEM - VA SUPPLIED & INSTALLED

VC ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED &

INSTALLED

BUILDING SECTION INDICATOR

DETAIL INDICATOR

AutoCAD SHX Text

DRAWING BLOCK TITLE

AutoCAD SHX Text 1 1/2" = 1'-0"

AutoCAD SHX Text C4

AutoCAD SHX Text 1 1/2'

AutoCAD SHX Text 1/2'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text A-201

AutoCAD SHX Text A4

AutoCAD SHX Text

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text A2

AutoCAD SHX Text A-202

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A-202

AutoCAD SHX Text A2

AutoCAD SHX Text A-201

AutoCAD SHX Text A4

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

FEC

AutoCAD SHX Text

NORTH

AutoCAD SHX Text A4

AutoCAD SHX Text A-201

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE REF.

AutoCAD SHX Text

SHEET WHERE DRAWN

AutoCAD SHX Text

AutoCAD SHX Text A3.1

AutoCAD SHX Text A4.3

AutoCAD SHX Text

AA

AutoCAD SHX Text

A

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

BUILDING 19, 20, 21

ARCHITECTURAL PLAN

AF101

KEYED NOTES

SCALE: 3/8" = 1'-0"

BUILDING 19 ARCHITECTURAL PLANF1

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 3/8" = 1'-0"

BUILDING 20 ARCHITECTURAL PLANF5

SCALE: 3/8" = 1'-0"

BUILDING 21 ARCHITECTURAL PLANC5

REPLACE EXISTING DOOR AND FRAME. SEE DOOR

SCHEDULE. ZIP WALL SHALL BE PROVIDED.

2 EXISTING FLOORS SHALL BE REFINISHED WITH

STONHARD STONGARD MR OR EQUIVALENT

3 EXISTING WALLS IN ROOM SHALL BE PAINTED.

REFER TO SCHEDULES FOR DETAILS.

SCALE: 3/8" = 1'-0"

BUILDING 20 ARCHITECTURAL PLANF8

2 3

DOOR HARDWARE SCHEDULE

SET NO. HINGES LOCK SERIES

PUSH

PLATES CLOSERS PLATES REMARKS

11C A8112 (3) F07 - C02011 J102

MECHANICAL ROOM - REFER TO

SPECIFICATION

NOTES:

1. LOCK SERIES F07 - STOREROOM LOCK

2. CLOSER - SELF CLOSING

3. KICKPLATE - PROVIDE A 16" TALL PLATE

4. PROVIDE WALL STOP - ROCKWOOD 426 OR EQUIVALENT

DOOR SCHEDULE

NO. ROOM SIZE MATERIAL FRAME LABEL HARDWARE REMARKS

1 A-001 4'-0" X 7'-0" X 1 3/4" HOLLOW METAL HOLLOW METAL 1 11C

2 A-002 3'-6" X 7'-0" X 1 3/4" HOLLOW METAL HOLLOW METAL 2 11C

3 B-001 3'-6" X 7'-0" X 1 3/4" HOLLOW METAL HOLLOW METAL 3 11C

4 B-005 3'-6" X 7'-0" X 1 3/4" HOLLOW METAL HOLLOW METAL 4 11C

5 C-001 3'-6" X 7'-0" X 1 3/4" HOLLOW METAL HOLLOW METAL 5 11C

ROOM FINISH SCHEDULE

RO

O

M N

U M

BE

R

ROOM NAME FL

O

O R

FI

N

IS

H

WALL FINISH CEILINGS

RE

M

AR

KS

PL

AN

N O

RT

H

PL

AN

E

AS

T

PL

AN

S O

U

TH

PL

AN

W

ES

T

C O

VE

B

AS

E

(A

LL

W

AL

LS

FI

N

IS

H

A-001 TANK RM

STONGARD MR

PEWTER WHITE WHITE WHITE WHITE

ST

O

N G

AR

D

O

VE

R

LA

YM

EN

T

PE

W

TE

R

EXISTING

A-002 MECHANICAL

STONGARD MR

PEWTER WHITE WHITE WHITE WHITE EXISTING

B-001 TANK RM

STONGARD MR

PEWTER WHITE WHITE WHITE WHITE EXISTING

B-005 MECHANICAL

STONGARD MR

PEWTER WHITE WHITE WHITE WHITE EXISTING

C-001 TANK RM

STONGARD MR

PEWTER WHITE WHITE WHITE WHITE EXISTING

4 INSTALL NEW EQUIPMENT PADS. REFER TO

DETAIL 7/PP501. L & W DIMENSIONS SHALL BE 6"

GREATER THAN THE EQUIPMENT BASE PLATE.

F1

F5

F8

C5

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TANK RM

AutoCAD SHX Text A-001

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text A-002

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text A-003

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text B-005

AutoCAD SHX Text

TANK RM

AutoCAD SHX Text C-001

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text C-002

AutoCAD SHX Text

ELECT.

AutoCAD SHX Text B-006

AutoCAD SHX Text

TANK

AutoCAD SHX Text B-001

AutoCAD SHX Text

STEAM RM

B-002

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

BUILDING 19, 20, 21 LEAD

ABATEMENT PLAN

H-101

SCALE: 3/8" = 1'-0"

BUILDING 19 ARCHITECTURAL PLANF1

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 3/8" = 1'-0"

BUILDING 21 ARCHITECTURAL PLANC5

SCALE: 3/8" = 1'-0"

BUILDING 20 ARCHITECTURAL PLANF8

F1

F5

F8

C5

LEGEND

EXISTING WALL PAINT TO BE ABATED BY

CONTRACTOR.

PAINT REMOVAL NOTES:

1. ALL LEAD BASED PAINT (LBP) ABATEMENT (COMPLETE REMOVAL OF LBP) MUST BE COMPLETED BY AN EPA CERTIFIED ABATEMENT CONTRACTOR FOLLOWING ALL EPA LBP RULES & REGULATIONS. ONCE THE COMPLETE REMOVAL OF LBP IS FINISHED, THE WORK AREA(S) MUST HAVE CLEARANCE DUST WIPES COLLECTED BY AN EPA LBP CERTIFIED 3RD PARTY.

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TANK RM

AutoCAD SHX Text A-001

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text A-002

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text A-003

AutoCAD SHX Text

TANK RM

AutoCAD SHX Text C-001

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text C-002

AutoCAD SHX Text

TANK

AutoCAD SHX Text B-001

AutoCAD SHX Text

STEAM RM

B-002

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% DESIGN

SUBMISSION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

WATSON ENGINEERING

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

REPLACE DOMESTIC HOT

WATER SYSTEMS

CASTLE POINT VA CAMPUS

620A4-19-122

19, 20, 21 Project Director

Revisions: Date: 10/26/2020 EMW CDP

BUILDING 19, 20 INFECTION

CONTROL PLAN

IC-101

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 1/8" = 1'-0"

BUILDING 19 ICRA PLANC1

SCALE: 1/8" = 1'-0"

BUILDING 20 ICRA PLANF1

C1

F1

LEGEND

PROPOSED INFECTION CONTROL BARRIER - 6 MIL FIRE

RETARDANT POLYSTYRENE

INFECTION CONTROL NOTES:

1. HEPA EXHAUST AIR UNITS SHALL BE PROVIDED IN ALL AREAS OF WORK

AND SHALL BE EXHAUSTED TO EXTERIOR WHERE POSSIBLE. PLAN TO BE

COORDINATED PER ICRA PLAN DURING PRE-CONSTRUCTION.

2. HVAC SYSTEM CONTAINED WITHIN CONSTRUCTION AREA SHALL BE

ISOLATED TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.

3. WET MOPPING SHALL BE PERFORMED DAILY IN ALL AREAS OF WORK TO

MINIMIZE DUST.

4. STICKY MATS TO BE INSTALLED OUTSIDE DOORS IN EACH ICRA BARRIER.

5. TEMPORARY BARRIER SHALL BE FIRE RETARDANT POLYSTYRENE, 6 MIL

ABOVE TO DECK.

HEPA EXHAUST AIR UNITS

EGRESS ROUTE

INFECTION CONTROL RISK ASSESSMENT

MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION

TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)

TYPE A INSPECTION AND NON-INVASIVE ACTIVITIES.

INCLUDES, BUT IS NOT LIMITED TO:

REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50 SQUARE FEET

PAINTING (BUT NOT SANDING)

WALLCOVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS

OTHER THAN FOR VISUAL INSPECTION.

TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

INSTALLATION OF TELEPHONE AND COMPUTER CABLING

ACCESS TO CHASE SPACESCUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

TYPE C WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

INCLUDES, BUT IS NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING

REMOVAL OF FLOORCOVERINGS, CEILING TILES AND CASEWORK

NEW WALL CONSTRUCTION

MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

MAJOR CABLING ACTIVITIES

ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.

TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM

NEW CONSTRUCTION.

PATIENT RISK GROUPS THAT WILL BE AFFECTED.

LOW RISK

• OFFICE AREAS

MEDIUM RISK

• CARDIOLOGY

ECHOCARDIOGRAPHY

ENDOSCOPY

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY/MRI

HIGH RISK

• CCU

EMERGENCY ROOM

LABOR & DELIVERY

LABORATORIES (SPECIMEN)

• MEDICAL UNITS

• NEWBORN NURSERY

• OUTPATIENT SURGERY

PEDIATRICS

PHARMACY

POST ANESTHESIA CARE UNIT

HIGHEST RISK

ANY AREA CARING FOR IMMUNOCOMPROMISED PATIENTS

BURN UNIT

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNITS

• NEGATIVE PRESSURE ISOLATION ROOMS

• ONCOLOGY

• OPERATING ROOMS INCLUDING C-SECTION ROOMS• RESPIRATORY THERAPY

• SURGICAL UNITS

PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST)

CONSTRUCTION PROJECT TYPE (A, B, C, D)

CLASS OF PRECAUTIONS (I, II, III OR IV)

IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

PATIENT RISK GROUP

MEDIUM RISK GROUP

HIGHEST RISK GROUP

LOW RISK GROUP

HIGH RISK GROUP

TYPE A

I I I

II

TYPE B

II

II

II

III/IV

TYPE C

II

III

III/IV

III/IV

TYPE D

III/IV

IV

IV

IV

DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

C

LA

SS

II

1. PROVIDE AN ACTIVE MEANS TO PREVENT AIRBORNE

DUST FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE A DUST MAT AT THE ENTRANCE TO AND EXIT

FROM THE WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEMS IN AREAS WHERE

WORK IS BEING PERFORMED.

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .