This notice solicits bids for a service-disabled veteran-owned small business set-aside contract to replace domestic hot water systems at three buildings at the Castle Point VA Medical Center in Wappingers Falls, New York. The scope of work includes removing existing systems, installing new steam-fired water heaters, and connecting them to steam supply, condensate return, and domestic water lines. The contract is classified under NAICS code 237110 with a size standard of $36.5 million. The cost estimate range is $500,000 to $1 million. The period of performance is 270 calendar days from notice to proceed. Bids are due by March 26, 2021. The solicitation will be posted on beta.SAM.gov on or around that date. Responses must be submitted in hard copy to the point of contact, Aletha Bourke at Aletha.Bourke@va.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRTEK ENVIRONMENTAL CORP.
39 – 37 29th Street, Long Island City, New York, 11101 Phone (718) 937-3720 Fax (718) 937-3721 www.airtekenv.com
LIMITED ASBESTOS INSPECTION REPORT
Conducted At:
VA Hudson Valley Health Care System
41 Castle Point Rd Building 19, 20, and 21
Wappingers Falls, NY 12590
Prepared For:
Watson Engineering, PC 1112 State Route 434
Owego, New York 13827
Prepared by:
Airtek Environmental Corp.
39-37 29 th
Street Long Island City, NY 11101
Airtek Project No: 20-0257
May 27. 2020
TABLE OF CONTENTS
Page No.
1.0 BACKGROUND
2.0 SCOPE OF WORK
3.0 AIRTEK INSPECTION RESULTS
4.0 CONCLUSIONS AND RECOMMENDATIONS
5.0 AREAS NOT INSPECTED
6.0 REPORT CERTIFICATIONS
APPENDICES
APPENDIX A: ACM Location Diagram
APPENDIX B: Analytical Results and Chain of Custody
APPENDIX C: Accreditation
Limited Asbestos Inspection Report May 27 th
, 2020 Airtek Project #: 20-0257 Page 1
1.0 BACKGROUND
Airtek Environmental Corp. has conducted a limited asbestos inspection for the presence of Asbestos-Containing Materials (ACM) with the potential to be disturbed at the following:
Site: VA Hudson Valley Health Care System- 41 Castle Point Rd, Wappingers
Falls, NY 12590
Area Inspected: Basement – Building 19, 20, and 21
Scope of Work: Limited inspection of accessible areas for ACM, sampling and quantification of suspect materials.
The Investigator and Inspector responsible for this project were:
Keith Dalbon NYS DOL Asbestos Inspector #16-14838 Exp.: 06/2020
Michael Rivera NYS DOL Asbestos Inspector #14-18878 Exp.: 07/2020
Site Visit: 05/7/2020
Report Date: May 27, 2020
Field Procedures and Analysis Methodology:
Guidelines used for the inspection were established by the Environmental Protection Agency (EPA) in the Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, DOC #560/5-85-024 and 40 CFR Part 763.
Field information was organized as per the concept of homogenous material. A homogenous material is defined as a suspect material of similar age, appearance, function and texture. Each material was grouped together as a specific homogenous material, sampled and then assessed for condition.
Bulk samples of suspect ACM were analyzed by Polarized Light Microscopy (PLM) with dispersion staining, as described in 40 CFR Part 763 and the National Emissions Standard for Hazardous Air Pollutants (NESHAPS).
The New York State Department of Health has recently revised the PLM Stratified Point Counting Method. The new method, “Polarized Light Microscopy Methods for Identifying and Quantitating Asbestos in Bulk Samples” can be found as item 198.1 in the Environmental Laboratory Approval Program (ELAP) Certification manual.
The State of New York ELAP has determined that analysis of Non-friable, Organically Bound Materials (NOB) are not reliably performed by PLM. Therefore, if PLM analysis of a NOB yields a negative result, it must be further confirmed by Transmission Electron Microscopy (TEM).
All samples were initially analyzed by PLM. Samples which produced a negative PLM result and which are classified as a NOB were then re-analyzed utilizing the TEM methodology.
This report contains data which was produced by Airtek’s Laboratory ( 39-37 29th Street, LIC, NY 11101) accredited by ELAP #11040 & NVLAP #102011-0 for bulk asbestos fiber analysis
, 2020 Airtek Project #: 20-0257 Page 2
2.0 SCOPE OF WORK
At the following address, a limited asbestos inspection in support of the fire protection upgrade project was conducted to verify the quantities of ACM that are associated with the property:
VA Hudson Valley Health Care System- 41 Castle Point Rd, Building 19, 20, and 21, Wappingers Falls, NY 12590
The inspection was characterized by a close visual inspection of all accessible areas for suspect ACM. Suspect materials were sampled and inventoried for quantity, condition and friability.
3.0 AIRTEK INSPECTION RESULTS
The following table presents inspection results, by homogeneous materials, obtained during Airtek’s investigation:
TABLE 1
SUMMARY OF INSPECTION RESULTS
41 CASTLE POINT RD, BUILDING 19, 20, AND 21, WAPPINGERS FALLS, NY 12590
Suspect ACM That May Be Affected
Lab Result
Approximate
ACM
Quantity Notes/ Location
Building 19
Fiberglass Pipe Wrap NAD 0
Room C-001
Brick Mortar NAD 0
Wall Paint NAD 0
Red Fire Stop NAD 0
Wall Plaster (white and brown) NAD 0
Pipe Elbow NAD 0 Outside Room C-001
Building 20
Sheetrock NAD 0 Room B-005
Spray on Fireproofing NAD 0
Wall Plaster (white and brown) NAD 0
Room B-001
Wall Paint NAD 0
Brick Mortar NAD 0
Fiberglass Pipe Wrap NAD 0
Red Fire Stop NAD 0
Door Frame Grout NAD 0
Building 21
Pressure Regulator Gasket NAD 0
Room A-002
Hot Water Heater Gasket NAD 0
Wall Paint NAD 0
Concrete Floor Patch NAD 0
Brick Mortar NAD 0
Wall Plaster (brown only) NAD 0 Room A-001
Wall Paint NAD 0
NAD = No Asbestos Detected ACM = Asbestos Containing Material
, 2020 Airtek Project #: 20-0257 Page 3
4.0 CONCLUSIONS AND RECOMMENDATIONS
Asbestos-containing materials were not identified in the spaces accessible to Airtek during our site visit. Asbestos abatement is not required prior to demolition or renovation.
If additional materials are identified that are not listed in this report and have not been tested, they must be assumed to be ACM until tested.
5.0 AREAS NOT INSPECTED
Airtek inspected and sampled materials, which were observable and accessible to the survey team. If materials were not accessible and not sampled, they are assumed ACM unless tested to confirm that they are ACM or non-ACM by laboratory analysis.
6.0 REPORT CERTIFICATIONS
Airtek certifies that the information contained herein is based on the physical and visual inspections conducted by Airtek and data collected during the inspection survey and file review.
Sincerely yours, Michael Rivera
Michael Rivera Project Manager
Airtek Project #: 20-0257 Page 4
APPENDIX A
Sample Location Diagram
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
DESIGN DEVELOPMENT
Office of
Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO NY, 13827
(607)-223-4334
REPLACE DOMESTIC HOT
WATER SYSTEMS
CASTLE POINT VA CAMPUS
620A4-19-122
19 - 20 - 21 Project Director
04/30/2020 EMW CDPRevisions: Date:
BUILDING 19 DEMOLITION
PLAN
PD101
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/8" = 1'-0"
BUILDING 19 DEMOLITION PLAN
F1
SCALE: 3/8" = 1'-0"
ENLARGED TANK ROOM DEMOLITION PLAN
F7
KEYED NOTES
1 REMOVE ALL EXISTING PIPING INSULATION IN ROOM C-001 AND
REPAIR ANY DAMAGED PIPING. ASSUME 185' OF 3" OR SMALLER.
F7
PD101
2 DEMOLISH EXISTING HOT WATER PIPING (1-1/2") IN
TUNNEL (APPROX. 240')
3 DEMOLISH EXISTING HOT WATER RETURN PIPING (3/4") IN
TUNNEL (APPROX. 120')
SCALE: 1/2" = 1'-0"
EXISTING ROOM C-001 DOMESTIC PIPING
C1
3" DCW MAIN SUPPLY
3" DCW MAIN
SUPPLY
CLOSED
1" DHW
3/4" DHWR
2" DCW
1-1/2" DCW
1" DHW
4 DEMOLISH EXISTING HOT WATER PIPING (1-1/2") IN TANK
ROOM TO MANUAL VALVE (APPROX. 50')
5 DEMOLISH EXISTING HOT WATER RETURN PIPING (3/4") IN
TANK ROOM BACK TO MANUAL VALVE (APPROX. 50')
4 5
C1
PD101
18,19,20
14, 17
4, 9, 10
1,2, 3
7,8
5,12,15
13,16
Bulk Sample Locations Building 19
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
MPS
CR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
DESIGN DEVELOPMENT
Office of
Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO NY, 13827
(607)-223-4334
REPLACE DOMESTIC HOT
WATER SYSTEMS
CASTLE POINT VA CAMPUS
620A4-19-122
19 - 20 - 21 Project Director
04/30/2020 EMW CDPRevisions: Date:
BUILDING 20 DEMOLITION
PLAN
PD102
SCALE: 1/8" = 1'-0"
BUILDING 20 DEMOLITION PLAN
F1
SCALE: 3/8" = 1'-0"
ENLARGED MECHANICAL ROOM DEMOLITION PLAN
F8
KEYED NOTES
1 REMOVE ALL EXISTING PIPING INSULATION IN ROOM B-001 AND
REPAIR ANY DAMAGED PIPING. ASSUME 145' OF 4" OR SMALLER.
F8
PD102
SCALE: 1" = 100'-0"
KEY PLAN
2 DEMOLISH EXISTING HOT WATER PIPING (1-1/2") IN
TUNNEL (APPROX. 240').
3 DEMOLISH EXISTING HOT WATER RETURN (3/4")PIPING IN
TUNNEL (APPROX. 240')
SCALE: 1/2" = 1'-0"
EXISTING ROOM B-001 DOMESTIC PIPING
C1
3/4" DHWR
1-1/2" DHW
3/4" DHWR
1-1/2" DHW
4" DCW 3/4" DCW
3/4" DHWR
1-1/2" DHW
4 DEMOLISH EXISTING HOT WATER PIPING (1-1/2") IN ROOM
B-001 BACK TO MANUAL VALVE (APPROX. 20')
5 DEMOLISH EXISTING HOT WATER RETURN PIPING (3/4") IN
ROOM B-001 TO MANUAL VALVE (APPROX. 20')
C1
PD102
4 5
37, 38, 39
32,33, 34 28,31
40, 41, 42
27, 30
43, 44
26, 29
21- 25
35,36
Building 20
MPS
CR
MPS
CR
MPS
CR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
DESIGN DEVELOPMENT
Office of
Construction and Facilities
Management U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO NY, 13827
(607)-223-4334
REPLACE DOMESTIC HOT
WATER SYSTEMS
CASTLE POINT VA CAMPUS
620A4-19-122
19 - 20 - 21 Project Director
04/30/2020 EMW CDPRevisions: Date:
BUILDING 21 DEMOLITION
PLAN
PD103
KEYED NOTES
DEMOLISH EXISTING SEMI-INSTANTANEOUS STEAM HOT
WATER HEATERS (3) AND ASSOCIATED PIPING. ASSUME
270' OF 4" OR SMALLER.
REMOVE ALL EXISTING PIPING INSULATION IN ROOM A-001 AND
REPAIR ANY DAMAGED PIPING. ASSUME 110' OF 1-1/2" OR SMALLER.
SCALE: 1" = 100'-0"
KEY PLAN
3 DEMOLISH EXISTING CONDENSATE PUMPS
SCALE: 3/4" = 1'-0"
TUNNEL PIPING SECTION
C5
CHILLED WATER RETURN
CHILLED WATER SUPPLY
1-1/2" DOM HOT WATER SUPPLY
3/4" DOM HOT WATER RETURN
3/4" DOM HOT WATER RETURN
4 DEMOLISH EXISTING HOT WATER PIPING (1-1/2") IN
TUNNEL (APPROX. 240')
5 DEMOLISH EXISTING HOT WATER RETURN PIPING (3/4") IN
TUNNEL (APPROX. 240')
1-1/2" DOM HOT WATER SUPPLY
4" DOM COLD WATER
1-1/2" DOM COLD WATER
1" DOM HOT WATER
7'-8"
8'-3"
SCALE: 1/8" = 1'-0"
BUILDING 21 DEMOLITION PLAN
F1
SCALE: 3/8" = 1'-0"
ENLARGED MECHANICAL ROOM DEMOLITION PLAN
F7
F7
P-103
3/4" DHWR RISER
1-1/2" DHW RISER
3/4" DHWR RISER
1-1/2" DHW RISER
2" DCW
1-1/2" DHW
1/2" DHWR
FIRE LINE
C5
PD103
48,49,50
54,55,56
45,46,47
57,58
51,52
59, 60, 61
Building 21
Airtek Project #: 20-0257 Page 5
APPENDIX B
Analytical Results and Chain of Custody
Test Report: Asbestos Analysis of Bulk Material
Airtek Project No.: 20-0257
Watson Engineering
Project Address: VA Medical Center
Castle Point
Attn:
Address:
Fax:
Phone:
Project Manager:
Sample Description / Test Fibrous Non-Fibrous Asbestos Comment Vermiculite
Company:
39-37 29th Street Long Island City, NY 11101
Phone: (718) 937-3720
Fax: (718) 937-3721
Sample 20-0228-1 Fiberglass pipe wrap
Building 19- room C-001
Layer 1 Tan Homogeneous Fibrous
28.00% Fiberglass None Detected /
Inconclusive
32.70% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-2 Fiberglass pipe wrap
Building 19- room C-001
Layer 1 Tan Homogeneous Fibrous
25.00% Fiberglass None Detected /
Inconclusive
48.60% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-3 Fiberglass pipe wrap
Building 19- room C-001
Layer 1 Tan Homogeneous Fibrous
None Detected /
Inconclusive
47.20% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-4 Brick mortar
Building 19- room C-001
Layer 1 Gray Homogeneous Non-Fibrous
Friday, May 29, 2020 Page 1 of 12
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-5 Brick mortar
Building 19- room C-001
Layer 1 Gray Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-6 Wall paint
Building 19- room C-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
28.20% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-7 Wall paint
Building 19- room C-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
14.50% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-8 Wall paint
Building 19- room C-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
39.60% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-9 Red fire stop
Building 19- room C-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
27.40% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Friday, May 29, 2020 Page 2 of 12
Sample 20-0228-10 Red fire stop
Building 19- room C-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
62.00% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-11 Red fire stop
Building 19- room C-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
71.50% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-12 Wall plaster- white
Building 19- room C-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-13 Wall plaster- white
Building 19- room C-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-14 Wall plaster- white
Building 19- room C-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-15 Wall plaster- brown
Building 19- room C-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-16 Wall plaster- brown
Building 19- room C-001
Friday, May 29, 2020 Page 3 of 12
Layer 1 Brown Homogeneous Non-Fibrous
Sample 20-0228-17 Wall plaster- brown
Building 19- room C-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-18 Pipe elbow
Building 19- room C-001
Layer 1 Brown Homogeneous Fibrous
19.00% Fiberglass None DetectedPLM NYS 198.1 Friable 5/21/2020 Fbglss=isotropicNone Detected
Sample 20-0228-19 Pipe elbow
Building 19- room C-001
Layer 1 Brown Homogeneous Fibrous
22.00% Fiberglass None DetectedPLM NYS 198.1 Friable 5/21/2020 Fbglss=isotropicNone Detected
Sample 20-0228-20 Pipe elbow
Building 19- room C-001
Layer 1 Brown Homogeneous Fibrous
21.00% Fiberglass None DetectedPLM NYS 198.1 Friable 5/21/2020 Fbglss=isotropicNone Detected
Sample 20-0228-21 Sheetrock
Building 20- room B-005
Layer 1 White/Brown Heterogeneous Fibrous
11.00% Cellullose
4.00% Fiberglass
None DetectedPLM NYS 198.1 Friable 5/21/2020 Cell=ribbons/Fbglss=isotropicNone Detected
Sample 20-0228-22 Sheetrock
Building 20- room B-005
Layer 1 White/Brown Heterogeneous Fibrous
12.00% Cellullose
4.00% Fiberglass
None DetectedPLM NYS 198.1 Friable 5/21/2020 Cell=ribbons/Fbglss=isotropicNone Detected
Sample 20-0228-23 Spray-on
Building 20- room B-005
Friday, May 29, 2020 Page 4 of 12
Layer 1 Tan Homogeneous Fibrous
9.00% Cellullose None DetectedPLM NYS 198.1 Friable 5/21/2020 Cell=ribbonsNone Detected
Sample 20-0228-24 Spray-on
Building 20- room B-005
Layer 1 Tan Homogeneous Fibrous
8.00% Cellullose None DetectedPLM NYS 198.1 Friable 5/21/2020 Cell=ribbonsNone Detected
Sample 20-0228-25 Spray-on
Building 20- room B-005
Layer 1 Tan Homogeneous Fibrous
9.00% Cellullose None DetectedPLM NYS 198.1 Friable 5/21/2020 Cell=ribbonsNone Detected
Sample 20-0228-26 Wall plaster- white
Building 20- room B-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-27 Wall plaster- white
Building 20- room B-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-28 Wall plaster- white
Building 20- room B-001
Layer 1 White Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-29 Wall plaster- brown
Building 20- room B-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-30 Wall plaster- brown
Building 20- room B-001
Friday, May 29, 2020 Page 5 of 12
Sample 20-0228-31 Wall plaster- brown
Building 20- room B-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-32 Wall paint
Building 20- room B-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
36.40% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-33 Wall paint
Building 20- room B-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
47.50% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-34 Wall paint
Building 20- room B-001
Layer 1 Tan Homogeneous Non-Fibrous
None Detected /
Inconclusive
22.10% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-35 Brick mortar
Building 20- room B-001
Layer 1 Gray Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-36 Brick mortar
Building 20- room B-001
Layer 1 Gray Homogeneous Non-Fibrous
Friday, May 29, 2020 Page 6 of 12
Sample 20-0228-37 Fiberglass pipe wrap
Building 20- room B-001
Layer 1 Tan Homogeneous Fibrous
16.00% Fiberglass None Detected /
Inconclusive
26.90% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-38 Fiberglass pipe wrap
Building 20- room B-001
Layer 1 Tan Homogeneous Fibrous
18.00% Fiberglass None Detected /
Inconclusive
31.00% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-39 Fiberglass pipe wrap
Building 20- room B-001
Layer 1 Tan Homogeneous Fibrous
17.00% Fiberglass None Detected /
Inconclusive
36.20% ResiduePLM NYS 198.6 NOB 5/21/2020 Fbglss=isotropicNone Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-40 Red fire stop
Building 20- room B-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
18.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-41 Red fire stop
Building 20- room B-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
19.10% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
Friday, May 29, 2020 Page 7 of 12
Sample 20-0228-42 Red fire stop
Building 20- room B-001
Layer 1 Red Homogeneous Non-Fibrous
None Detected /
Inconclusive
25.60% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-43 Door frame grout
Building 20- room B-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-44 Door frame grout
Building 20- room B-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-45 Pressure regulator gasket
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected0.45% ResiduePLM NYS 198.6 NOB 5/21/2020 * Res < 1%None Detected
Sample 20-0228-46 Pressure regulator gasket
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
13.00% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-47 Pressure regulator gasket
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
26.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
Friday, May 29, 2020 Page 8 of 12
Sample 20-0228-48 Hot water heater gasket
Building 21- room A-002
Layer 1 Green Homogeneous Non-Fibrous
None Detected /
Inconclusive
71.80% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-49 Hot water heater gasket
Building 21- room A-002
Layer 1 Green Homogeneous Non-Fibrous
None Detected /
Inconclusive
64.40% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-50 Hot water heater gasket
Building 21- room A-002
Layer 1 Green Homogeneous Non-Fibrous
None Detected /
Inconclusive
63.10% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-51 Wall paint
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
4.50% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-52 Wall paint
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
3.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
Friday, May 29, 2020 Page 9 of 12
Sample 20-0228-53 Wall paint
Building 21- room A-002
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
10.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-54 Concrete floor patch
Building 21- room A-002
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-55 Concrete floor patch
Building 21- room A-002
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-56 Concrete floor patch
Building 21- room A-002
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-57 Brick mortar
Building 21- room A-002
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-58 Brick mortar
Building 21- room A-002
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-59 Wall plaster (brown)
Building 21- room A-001
Friday, May 29, 2020 Page 10 of 12
Sample 20-0228-60 Wall plaster (brown)
Building 21- room A-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-61 Wall plaster (brown)
Building 21- room A-001
Layer 1 Brown Homogeneous Non-Fibrous
None DetectedPLM NYS 198.1 Friable 5/21/2020 None Detected
Sample 20-0228-62 Wall paint
Building 21- room A-001
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
15.30% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-63 Wall paint
Building 21- room A-001
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
35.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
None DetectedTEM NYS 198.4 NOB 5/21/2020 Not Analyzed
Sample 20-0228-64 Wall paint
Building 21- room A-001
Layer 1 Gray Homogeneous Non-Fibrous
None Detected /
Inconclusive
19.70% ResiduePLM NYS 198.6 NOB 5/21/2020 None Detected
Friday, May 29, 2020 Page 11 of 12
Method: PLM with EPA 600/M4/82/020, ELAP 198.1 and ELAP 198.6; TEM by ELAP 198.4
Methods of stratified point-counting or negative scanning are used on at least 4 mounts, as per 198.1
Polarized light microscopy is not consistently reliable in detecting asbestos in floor covering/non-friable organically bound materials (NOB's).
NOB's should be analyzed by quantitative TEM. The above test report relates only to item tested.
Layered samples are analyzed by layer. Any positive layer will be reported separately.
Asbetos percentage is based on point-counting rules described in ELAP 198.1
*VERMICULTE NOTE DISCLAIMER: Samples that contain more than 10% vermiculite are re-analyzed by ELAP method 198.6. This method does not remove verimculite and may underestimate the level of asbestos containing greater than 10% vermiculite.
Attic fill, block fill or other loose bulk Vermiculite materials must be designated and treated as ACM per NYSDOH
All Surfacing Materials containing vermiculite must be analyzed by a laboratory approved for ELAP 198.8
Airtek collects samples in accordance with EPA 40 CFR Part 763.
This report should not be used to claim product certification, approval or endorsement by NVLAP, NIST or any agency of the federal government and may not be reproduced, except in full, without written approval by Airtek.
Currently approved by ELAP (11040) for Asbestos in Friable Material item 198.1 and EPA 600/M4/82/020, asbestos in Non Friable Materials 198.6 (NOB by PLM) and asbestos in Non Friable
Material 198.4 (TEM)
Currently accredited by the NVLAP lab code 102011-0 for Bulk Asbestos Analysis (PLM) EPA 600/M4/82/020.
This report relates only to the samples reported above and must not be reproduced except in full with the approval of the laboratory.
Efren Martinez, Lab Analyst
Analysts: Efren Martinez
Friday, May 29, 2020 Page 12 of 12
Airtek Project #: 20-0257 Page 6
APPENDIX C
Accreditation
New York State – Department of Labor Division of Safety and Health License and Certificate Unit State Campus, Building 12
Albany, NY 12240
ASBESTOS HANDLING LICENSE
39-37 29th Street
Long Island City, NY 11101
FILE NUMBER: 99-0589
LICENSE NUMBER: 28638
LICENSE CLASS: RESTRICTED
DATE OF ISSUE: 06/13/2019
EXPIRATION DATE: 06/30/2020
Duly Authorized Representative – Saad Zouak:
This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material.
This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor.
Eileen M. Franko, Director SH 432 (8/12) For the Commissioner of Labor