Unit Price Forms All Districts 2025 DB Tank and Soil Removal ISID.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
2025 DB Tank & Soil ISID
Solicitation number
RFP-171-250000001560-3
Issued by
Michigan

About this file

This is a unit price form for tank and soil removal services across eleven Michigan districts: Detroit, Warren, Jackson, Kalamazoo, Lansing, Grand Rapids, Bay City, Cadillac, Gaylord, Western UP, and Eastern UP for 2025. The scope includes professional services such as site visits, excavation planning, UST removal oversight, construction reporting, monitoring well installation and abandonment, soil vapor monitoring, and various tank-related services. The work encompasses UST system closure and removal for tanks ranging from 0-1,000 gallons up to 15,001-20,000 gallons, along with associated excavation, transportation, and disposal of hazardous and non-hazardous materials.

The pricing structure is organized into nine major categories: Project Administration, Professional Services, UST System Close in Place, UST System Removal and Disposal, Excavation/Transportation/Disposal, Waste Characterization and Disposal, Miscellaneous Services, Site Restoration, and Mobilization/Demobilization. Each district has identical line items but allows for different unit pricing based on location. A standard provisionary allowance of $10,000 is included for each district. Pricing is requested in various units including percentage of design and construction, lump sum, per day, linear foot, ton, gallon, drum, square foot, and cubic yard measurements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Detroit District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: DETROIT DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Warren District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: WARREN DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Jackson District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: JACKSON DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Kalamazoo District Unit Prices

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: KALAMAZOO DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Lansing District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: LANSING DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Grd Rpds District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: GRAND RAPIDS DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Bay City District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: BAY CITY DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Cadillac District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: CADILLAC DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Gaylord District Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: GAYLORD DISTRICT - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Western UP Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: WESTERN UP - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)

Eastern UP Unit Pricing

2025 Tank & Soil Removal ISID Unit Pricing
BIDDER NAME:
DISTRICT: EASTERN U.P. - UNIT PRICING
Line ItemDescriptionUnitsUnit Price
1aProject Administration% of D&C
2Professional Services
2aSite Visit (Maximum of 3)Each
2bExcavation Plans/DrawingsLump Sum
2cUST Removal/Excavation OversightDay
2dConstruction/Removal ReportLump Sum
2d1Test Pitting Tech MemoLump Sum
2eNotification to Remove and UST registrationLump Sum
2fUST Removal (Part 211) Site Assessment and ReportingLump Sum
2gMonitoring Well AbandonmentLineal Foot
2hMonitor Well Installation - Hollow Stem AugerLineal Foot
2iMobilization and Demobilization - Hollow Stem Auger Drilling EquipmentLump Sum
2jMonitor Well Installation – GeoprobeLineal Foot
2kMobilization and Demobilization - Geoprobe Equipment for Monitoring Well and Soil Vapor Monitoring Point InstallationLump Sum
2lGroundwater Monitoring and ReportingEvent
2mSoil Vapor Monitoring Points Installation- GeoprobeLineal Foot
2nSub Slab Soil Gas Vapor Pin InstallationEach
2oSoil Vapor Monitoring and ReportingEvent
3UST System Close in Place (includes removing liquids and sludges, cleaning and filling with an inert solid material)
3a0 - 1000 gallonTank
3b1001 - 4000 gallonTank
3c4001 - 6000 gallonTank
3d6001 - 8000 gallonTank
3e8001 - 10,000 gallonTank
3f10,001 - 12,000 gallonTank
3g12, 001 - 15,000 gallonTank
3h15,001 - 20,000 gallonTank
4UST System Removal and Disposal (includes purging, cleaning and all associated piping)
4a0 - 1000 gallonTank
4b1001 - 4000 gallonTank
4c4001 - 6000 gallonTank
4d6001 - 8000 gallonTank
4e8001 - 10,000 gallonTank
4f10,001 - 12,000 gallonTank
4g12, 001 - 15,000 gallonTank
4h15,001 - 20,000 gallonTank
5Excavation, Transportation, and Disposal of Non-Hazardous Soil and Excavation Backfill
5a0- 250 tonsTon
5b251 - 500 tonsTon
5c501 - 1000 tonsTon
5d1001 - 2000 tonsTon
5e> 2000 tonsTon
6Waste Characterization and DisposalUnits
6aNon- Hazardous LiquidGallon
6bHazardous LiquidGallon
6cHazardous Solid / SludgeGallon
6d55-gallon drum removal - Non-Hazardous Solid/SludgeDrum
6e55-gallon drum removal - Hazardous Solid/SludgeDrum
7Miscellaneous
7aVac Truck and OperatorDay
7bSite Preparation Including Excavation Sloping and Overburden StockpilingCubic yard
7cClearing and Chipping Dense & Woody VegetationDay
7dProvisionary AllowanceAllowance$10,000.00
7eConcrete Disposal/RecyclingSq. Foot
7fAsphalt Disposal/RecyclingSq. Foot
7g5,000-gallon Frac TankDay
7hAir MonitoringDay
7iTest Pitting ServicesDay
7i1Mobilization Fee for Test Pitting Services ONLYLump Sum
7i2Saw Cut Concrete (<6 inches)Lump Sum
7i3Saw Cut Concrete (>6 inches)Lump Sum
7i4Saw Cut AsphaltLump Sum
8Site Restoration
8a22a GravelTon
8bCrushed LimestoneTon
8cAsphalt Paving (4" Thick)Sq. Foot
8dConcretecubic yard
8e2" Topsoil and SeedingSq. Foot
Subtotal Construction
9Mobilization, Demobilization and General Conditions% of construction
Subtotal Design & Construction (D&C)