The file is a comprehensive set of design plans and technical drawings for the TX FLAP UV CR203(1) Fish Hatchery Road project, prepared by the Federal Highway Administration (FHWA), Office of Federal Lands Highway. The project involves widening and reconstructing 0.71 miles of County Road 203, which provides access to the Uvalde National Fish Hatchery and eight private properties. The roadway will be expanded from 15 to 24 feet, with construction phased to utilize the existing roadway during implementation.
The technical documents include detailed cross-sections, survey control sheets, typical road sections, drainage and culvert installation plans, and specifications for pavement markings, signage, and traffic control. The design involves specific engineering details such as roadway aggregate construction, full depth reclamation, asphalt concrete pavement, culvert installations (including 36-inch and 24-inch equivalent diameter pipes), and riprap placement. The project scope encompasses earthwork, roadway surfacing, drainage improvements, signing, striping, and associated infrastructure modifications to enhance road quality and functionality for the Fish Hatchery access road.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/31/2025
PHILIP R. HAHN
109192
Approved via letter signed 7/21/2025
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2025.08.15 14:58:25 -06'00'
DI
footingftg.
finishfin.
flared end sectionFES federalFed.
fill facef.f.F exteriorext.
expansion jointexp. jt.
excavationexc.
edge of waterEW and wifeet ux and otherset al edge of roadER equationEQ or eq.
edge of pavementEOP
Engineer(s)engr(s).
embankmentemb.
elevationelev.
elevation with numberEl. 94.066 superelevation ratee eastEE drawing(s)dwg(s).
donation land claimDLC districtDist.
distancedist.
diaphragmdiaph.
diagonaldiag.
diameterdia. or D drop inletDI design hour volumeDHV decrementdecr.D culvertculv.
contingent sumCTSM centersctrs.
point of curve to spiralCS creekcr.
corrugatedcorr.
continuouscont.
construction jointconstr. jt.
constructionconstr.
concreteconc.
columncol.
countyCo.
corrugated metal pipeCMP clearclr.
center to centerc-c concrete box culvertCBCC bearingbrg.
bridgebr.
balance pointBP bench markBM backBK beginning, beginbeg.
both facesb.f.B asphaltasph.
approachappr.
alternatealt.
aheadAH aggregateaggr.
average daily trafficADT abutmentabut.A diameterØ curve deltaΔ centerline�
ABBREVIATIONS
routerte.
rightRt. or RT reference hubRH retaining wallret. wall ReservationRes.
reservoirres.
requiredreqd.
reinforcementreinf.
reconstructionreconst.
roadwayrdwy.
roadrd.
right-of-wayR/W rangeR.
radiusRR quantitiesquant., QtyQ pavementpvmt.
point of tangentPT pounds per square inchpsi projectproj.
point on tangentPOT point on spiralPOS point on curvePOC platepl.
point of intersectionPI perforateperf.
point of compound curvePCC point of curvePCP outside diameterOD other faceo.f.
on centerso.c.O numberno. or # negativeneg.
normal crownNC northNN mountain(s)mtn(s).
monumentmon.
minimummin.
maximummax.
materialmatl.
maintenancemaint.
magneticmag.M low waterLW leftLt. or LT lump sumLPSM longitudelong.
latitudelat.
laminationlam.
length of curveLL jointjt.J interiorint.
inclusive, includingincl.
inside diameterIDI highwayhwy.
high waterHW horizontalhoriz.
hexagonhex.
homestead entry surveyHES headwallhdwl.H girdergdr.
galvanizedgalv.
gage (gauge)ga.G
WestWW vertical point of intersectionVPI vehicles per hourvph verticalvert.
design speedVV typicaltyp.
point of tangent to spiralTS transversetransv.
temporary construction easementTCE temporary bench markTBM tangenttan.
townshipT.
tangent lengthTT symmetricalsym.
structuralstruc.
straightstr.
stiffenerstiff.
standardstd.
stationsta.
point of spiral to tangentST streetst.
specificationspec.
spacing, spaces or spacedspa.
shouldershldr.
sectionsec.
point of spiral to curveSC seasonal average daily trafficSADT southSS
DRAINAGE SYMBOLS
Riprap apron (proposed)
Underdrain (existing, proposed)
With drop inlet (existing, proposed)
With headwalls (existing, proposed)
With end sections (existing, proposed)
Pipe culvert (existing, proposed)
Box culvert (existing, proposed)
Bridge (existing, proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (existing, proposed)
:0
P
M
J u n e
S y m b o ls S h e e t c p w w o rk in g \c e n tr a l0
\d
\S
Y M
(2 )U
V .d g n
AND ABBREVIATIONS
CONVENTIONAL PLAN SYMBOLS
Sheet 1 of 2
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
A2
109192
BH
N
0.00EL.
TP
TP
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (existing, proposed)
Fence with gate (existing, proposed)
Fence (existing, proposed)
GEOLOGIC SYMBOLS
Material source
Boring location
LANDSCAPING & VEGETATION SYMBOLS
Treeline
Tree
MAPPING SYMBOLS
Survey control point
Trail
Spot elevation
Double Track
Single Track
Railroad
North arrow
Coordinate Grid Tick
Building (existing, proposed)
RIGHT-OF-WAY SYMBOLS
Section corner (found, projected)16
Section corner (found, projected)4
Section corner (found, projected)
Right-of-way line (proposed)
Right-of-way line (existing)
Property line
Parcel number
Monument (as described)
Temporary (proposed)
Permanent (proposed)
Permanent (existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section16
Section4
Section
Township or Range line
City
County
State
National
Boundaries
GUARDRAIL, BARRIER & WALL SYMBOLS
Retaining Wall (existing, proposed)
Median & Side Barrier (existing, proposed)
Guardwall (proposed)
Guardrail (existing, proposed)
SIGN SYMBOLS
Post mounted (existing, proposed)
Portable (proposed)
Delineator (existing, proposed)
Commerical (existing, proposed)
Signs
ROADWAY SYMBOLS
Roadway obliteration
Roadway centerline (with station ticks)
Edge of roadway (existing, proposed)
Toe of fill
Transition
Top of Cut
Slope state limits
Clearing/construction limits
UTILITY SYMBOLS
Telephone (existing, proposed)
Power (existing, proposed)
Fiber optic (existing, proposed)
CATV (existing, proposed)
Overhead utility
Water (existing, proposed)
Telephone (existing, proposed)
Sanitary sewer (existing, proposed)
Power (existing, proposed)
Oil (existing, proposed)
Gas (existing, proposed)
Fiber optic (existing, proposed)
CATV (existing, proposed)
Underground utility
Telephone pedestal (existing, proposed)
Street light (exisiting, proposed)
Support pole anchor (existing, proposed)
Support pole (existing, proposed)
Surface (existing, proposed)
Underground (existing, proposed)
Irrigation ditch
PROJECT SPECIFIC SYMBOLS
:0
J u n e
S y m b o ls S h e e p w w o r k in g \c e n tr a l0
\d
\S
Y M
U
V .d g n
AND ABBREVIATIONS
CONVENTIONAL PLAN SYMBOLS
Sheet 2 of 2
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
A3
S u r v e y C o n tr o l
S h e p w w o r k in g \c e n tr a l0
\d
\C
T L
U
V .d g n
:0
M a r c h
5 SURVEY CONTROL
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
A4
LC
See note 1
(1:6 desirable)
1:4 or flatter
See note 1
(1:6 desirable)
1:4 or flatter
See note 5
LC
4" Aggregate base edge
Subgrade edge
Aggregate base pavement edge
Asphalt concrete
See note 6
R
See note 3
Typical culvert location
Subgrade edge
Aggregate base edge
Shoulder edge
See note 6
R
End section A-A
See note 1
Flatten slope x = 15' min. for type 2 x = 0' for type 1
See note 2
End section A-A edge
Subgrade base edge
Aggregate pavement edge
Asphalt concrete
See note 2
Aggregate base edge
SECTION A-A
See note 4 See note 4
VariableW Variable
3'
Variable
(min.)
SECTION B-B
1.3'W 1.3' d
Variable Variable
1:41:3s
2.67'2'd
Type 2Type 1 s
APPROACH ROAD
TYPES 1 & 2
TYPICAL SECTION
W
A
A
B
B
W x 16'
Total length
Paved length
R ig h t-o f w a y o r s ta k e d b y t h e C
O
M a in li n e
Approach road �
APPROACH ROAD
TYPE 3
TYPICAL SECTION
Approach road �
M a in li n e
B
B
Total length
R ig h t-o f-w a y o r s ta k e d l im it s
4' (typ.)
Paved length
(t y p
(t y p
W
90°
A
A
1.Construct cut and fill slopes for approach roads to match with mainline roadway construction.
2.Under special conditions, the approach road and shown may be varied ±20°.
3.Place culverts at the end of the approach road radius to provide a flatter foreslope and increased mainline recovery area. When a culvert must be placed within the clear zone of the mainline roadway, use safety end sections (See standard drawing 602-9).
4.Apply the normal mainline crown section to approach roads with widths greater than 15 feet.
5.Refer to mainline typical sections for structural section thicknesses and foreslopes.
6.Vary radii to fit unusual field conditions. Do not reduce existing radii or widths. R is on the left side of the approach road centerline.
Note:
Sheet 1 of 2 No Scale
T y p ic a l S e c ti o n A p p ro a c h
R o a d s S h e e p w w o rk in g \c e n tr a l0
\d
\T Y
P (2
)U V
.d g n
:1
J a n u a ry
APPROACH ROADS
TYPICAL SECTION
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
A7
Type
Class
See note 1
Mainline stationing grade (optional)
Typical maximum design
LC
Normal subgrade edge
VPC
VPI Typical maximumn grade ±10%
N/AN/A26.04.04.03A43+05 Rt
25.025.020.028.028.01A35+16 Lt
N/AN/A13.015.04.03A29+87 Lt
25.015.012.027.927.91A28+49 Lt
25.020.011.023.023.01A14+88 Lt
25.015.012.021.121.11A14+47 Rt
35.020.010.033.333.31A12+35 Lt
N/AN/A24.84.04.03A12+34 Rt
REMARKS
(ft)
R
(ft)
R
(ft)
W
(ft)
LENGTH
TOTAL
(ft)
LENGTH
PAVED
CLASS
TYPE
See note 1
STATION
APPROACH ROAD SUMMARY
TYPICAL SYMBOL
A
Example of symbol showing standard approach road connection on plan and profile sheet
TYPICAL PROFILE
Mainline
20' desirable 15' min.
±2%
See note 2
Paved apronN/A*A3
ADT ≥ 2005028E2
100 ≤ ADT ≤ 1994024D2
25 ≤ ADT ≤ 1004022C2
ADT < 252520B2
Minimum 2-Way Use2518A2
Logging Truck Use4016D1
Farm Equipment2516C1
Minimum 1-Way Use2514B1
Field Access1510A1
APPLICATION
SAMPLE
(ft) R
RADIUS
MIN.
(ft) W
WIDTH
MIN.
CLASSTYPE
1.Stations shown are approximate locations. Actual locations to be field verified.
2.Construct approach roads with landing areas having grades within ±2%. Under special conditions, use 6% maximum.
Note:
Sheet 2 of 2 No Scale
T y p ic a l S e c ti o n A p p ro a c h
R o a d s S h e e p w w o rk in g \c e n tr a l0
\d
\T Y
P (2
)U V
.d g n
:4
A
M a rc h
APPROACH ROADS
TYPICAL SECTION
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
A8 right
Sheet and Description
B3 B3 B4 B4 B5 B6 B7 B7
Survey and
Staking
Summary
Grading
Summary
Clearing and
Revegetation
Summary
Removals
Summary
Surfacing
Summary
Drainage
Summary
Permanent
Pavement
Markings
Summary
Permanent
Sign
Summary
Allowance Bid
Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 8 8
A0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 2 2
A0040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING
CONTROL MILE 0.71 0.71
A0050 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.42 1.42
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0070 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0090 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0100 15720-0000 STORMWATER POLLUTION PREVENTION PLAN LPSM ALL
A0110 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0120 20101-0000 CLEARING AND GRUBBING ACRE 3.28 0.22 3.50
A0130 20301-1200 REMOVAL OF HEADWALL EACH 4 4
A0140 20301-2300 REMOVAL OF SIGN/MARKER EACH 13 13
A0150 20302-2100 REMOVAL OF PIPE CULVERT LNFT 72 72
A0160 20303-2300 REMOVAL OF PAVEMENT, CONCRETE SQYD 390 20 410
A0170 20402-0000 SUBEXCAVATION CUYD 100 As approved by CO
A0180 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,203 97 1,300
A0190 25101-0200 PLACED RIPRAP, CLASS 2 CUYD 9.3 0.7 10.0
A0200 25101-0300 PLACED RIPRAP, CLASS 3 CUYD 13.4 1.6 15.0
A0210 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 3,647 153 3,800
A0220 30402-5000 FULL DEPTH RECLAMATION, METHOD 2 (2-INCH DEPTH) SQYD 7,642 358 8,000
A0230 31502-0000 RECYCLED AGGREGATE BASE CUYD 425 75 500
A0240 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,765 235 2,000
A0250 40601-0000 FOG SEAL TON 4.51 0.49 5.00
A0260 41102-1000 PRIME COAT, METHOD 1 SQYD 3,505 195 3,700
A0270 41105-0000 BLOTTER TON 15.56 1.44 17.00
A0280 41201-0000 TACK COAT TON 4.51 0.49 5.00
A0290 60201-1000 36-INCH PIPE CULVERT LNFT 42 3 45
A0300 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT LNFT 39 6 45
A0310 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 2 2
A0320 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH
OR ELLIPTICAL PIPE CULVERT EACH 2 2
A0330 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0340 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 18-INCH WIDTH HOUR 20
A0350 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20
A0360 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER HOUR 20
MileStone: 100% PS&E
Date Completed: 03/25/25
Report Date: 03/25/25
A
M
E
N
D
Line
Item
No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -M a r-
:4 P
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities c p w w o rk in g \c e n tr a l0
\d
T X F
L A P U
V C
R (1
S O
Q .x ls m
]S h e e t
PROJECT
B1
TX FLAP UV CR203(1)
FISH HATCHERY ROAD
SHEET
NUMBER
07/31/2025 right
Sheet and Description
B3 B3 B4 B4 B5 B6 B7 B7
Survey and
Staking
Summary
Grading
Summary
Clearing and
Revegetation
Summary
Removals
Summary
Surfacing
Summary
Drainage
Summary
Permanent
Pavement
Markings
Summary
Permanent
Sign
Summary
Allowance Bid
Schedule
A0370 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A0380 62201-3150 HYDRAULIC EXCAVATOR, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR 20
A0390 62301-0000 GENERAL LABOR HOUR 40
A0400 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40
A0410 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 1.89 0.11 2.00
A0420 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.89 0.11 2.00
A0430 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.89 0.11 2.00
A0440 63301-0000 SIGN SYSTEM EACH 7 7
A0450 63308-2000 OBJECT MARKER, TYPE 2 EACH 9 9
A0460 63308-3400 OBJECT MARKER, TYPE 4 EACH 1 1
A0470 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 36,196 204 36,400
A0480 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW EACH 2 2
A0490 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0500 63701-0000 FIELD OFFICE EACH 1
A0510 64620-0400 REMOVE AND RESET MAILBOX EACH 5 5
-M a r-
:4 P
M
MileStone: 100% PS&E
Date Completed: 03/25/25
Report Date: 03/25/25 c p w w o rk in g \c e n tr a l0
\d
T X F
L A P U
V C
R (1
S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
PROJECT
B2
TX FLAP UV CR203(1)
FISH HATCHERY ROAD
SHEET
NUMBER
07/31/2025
:3
F e b r u a r y
M is c e ll a n e o u s S u m m a r ie s S h e e p w w o r k in g \c e n tr a l0
\d
\S
U M
U
V .d g n
MISCELLANEOUS SUMMARIES
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
B4
:5
M a r c h
S u r f a c in g S u m m a r y p w w o r k in g \c e n tr a l0
\d
\S
U M
U
V .d g n
SURFACING SUMMARY
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
B5
109192
08/06/2025
:5
M a r c h
D r a in a g e S u m m a y p w w o r k in g \c e n tr a l0
\d
\S
U M
U
V .d g n
DRAINAGE SUMMARY
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
B6
:0
M a r c h
M is c e ll a n e o u s S u m m a r ie s S h e e p w w o r k in g \c e n tr a l0
\d
\S
U M
U
V .d g n
SUMMARIES
SIGNING AND STRIPING
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
B7
Profile Grade
Exisiting Ground
8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
926 926
928 928
930 930
932 932
+2.7 3%
-2.42%
+2.7 3%
-2.42%
.6
.0
.3
.0
' VC200
39K =
'309SSD =
' VC250
139K =
.9
F P
F P++
C P
County Rd 203
Concrete Pavement
Sawcut Existing Asphalt
Protect in place
Existing Gate
.7
PC
.0
P
O B
N25°14'13"W
Protect in place
Existing Overhead Power
Pavement
Existing Edge of of Pavement
Proposed Edge Protect in place
Existing Fence
Protect in place
Existing Overhead Power
Protect in place
Existing Fence of Pavement
Proposed Edge
Pavement
Existing Edge of
BEGIN PROJECT
BEGIN ROADWAY CONSTRUCTION
TX FLAP UV CR203(1)
FISH HATCHERY ROAD
12+00.00 "P-BL203"
N= 13617689.9737
E= 1702192.4939
A
A
A
A
Reset Mailbox
Remove and
Reset Mailbox
Remove and
Reset Mailbox
Remove and
Begin Taper
12+80, 7.28' Lt.
End Taper
13+70, 12.00' Lt.
Reset Mailbox
Remove and
Proposed Ditch (typ.)
F P
F P++
N
25 50012.525
Scale in feet
.7
PC
.0
P
N25°14'13"W
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:1
D e c e m b e r
12+00 TO 16+00
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
C1
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
07/31/2025
C P
P C
P C
P C
Pav ementExis ting Ed ge o f of P ave mentPro pos ed E dge of P ave mentPro pos ed E dge
Pav ementExis ting Ed ge o f
Protect in placePower
Existing Overhead
Protect in place
Existing Fence of Pavement
Proposed Edge
Pavement
Existing Edge of
Pavement
Existing Edge of of Pavement
Proposed Edge Protect in place
Existing Fence
Protect in placePower
Existing Overhead
County Rd 203
Curve CR203-1
Protect in place
Existing Water Line
Protect in placePower
Existing Overhead
Proposed Ditch (typ.)
N
25 50012.525
Scale in feet
Profile Grade
Exisiting Ground
16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50
906 906
908 908
910 910
912 912
914 914
918 918
920 920
922 922
924 924
926 926
-0.63%
+0.45% -0.63%
.3
.0
' VC220
203K =
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:1
J a n u a r y
16+00 TO 23+50
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
C2
07/31/2025
P C
P C
I R
P
KI
R
.9
PT
County Rd 203
A
Protect in placePower
Existing Overhead
Protect in place
Existing Fence
Power Protect in place
Existing Overhead
Protect in place
Existing Fence of Pavement
Proposed Edge
Pavement
Existing Edge of of Pavement
Existing Edge of Pavement
Proposed Edge
A
Proposed Ditch (typ.)
N
25 50012.525
Scale in feet
N04°44'54"E
Profile Grade
Exisiting Ground
23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00
904 904
906 906
908 908
912 912
914 914
916 916
920 920
922 922
924 924
926 926
-0.24% +0.16%+0.45% -0.24%
.1
.0
.5
.0
0' VC100
144K =
'1609SSD =
' VC200
505K =
R e m o v x is ti n g c u lv e r t
R e m o v e e x is ti n g h a d w a ll s
L t a n d R t
I n s ta ll x
R C
P
E n d S e c ti o n
L t a n d R t
R ip r a p C la s s
R t
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:1 a n u a r y
23+50 TO 31+00
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
C3
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
07/31/2025
+ G
C P
F P
P C
N04°44'54"E
Protect in place
Existing Overhead Power of Pavement
Proposed Edge
Pavement
Existing Edge of
County Rd 203
Protect in placePower
Existing Overhead
Protect in place
Existing Fence
A of Pavement
Proposed Edge
Pavement
Existing Edge of
Protect in place
Existing Fence
Protect in Place
Existing Gas Line
Proposed Ditch (typ.)
+ G
F P
N
25 50012.525
Scale in feet
N04°44'54"E
Profile Grade
Exisiting Ground
31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50
906 906
908 908
910 910
912 912
914 914
916 916
920 920
922 922
924 924
926 926
+0.16%
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:1
D e c e m b e r
31+00 TO 38+50
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
C4
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
07/31/2025
Protect in placePower
Existing Overhead
Protect in placePower
Existing Overhead
Protect in place
Existing Fence of Pavement
Proposed Edge
Pavement
Existing Edge of
County Rd 203
A
Protect in place
Existing Culvert of Pavement
Proposed Edge
Pavement
Existing Edge of
Protect in placePower
Existing Overhead
Proposed Ditch (typ.)
N
25 50012.525
Scale in feet
N04°44'54"E
Profile Grade
Exisiting Ground
38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00
908 908
910 910
912 912
914 914
916 916
920 920
922 922
924 924
926 926
928 928
+0.16%
.5
.0
' VC150
122K =
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:1
D e c e m b e r
38+50 TO 46+00
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
C5
FISH HATCHERY ROAD
TX FLAP UV CR203(1)
07/31/2025
T P
T P
J B
+C P
I P
END PROJECT
END ROADWAY CONSTRUCTION
TX FLAP UV CR203(1)
FISH HATCHERY ROAD
49+42.00 "P-BL203"
N= 13621369.1530
E= 1702102.3184
12.00'
48+31.77
12.00'
48+54.17
R = 100'
R = 130'
.4
P
E
Protect in place
Existing Overhead Power
Protect in place
Existing Fence
Reset Mailbox
Remove and
Protect in placePower
Existing Overhead of Pavement
Proposed Edge of Pavement
Existing Edge of Pavement
Proposed Edge Pavement
Existing Edge of
Contractor to verify location in field
Existing Fiber Optic Line Protect in Place Removal
Concrete
Begin
49+05.26
Concrete Pavement
Tie Into Existing Asphalt
End Concrete Removal
64.0' LT
49+42
72.6' RT
49+42
Proposed Ditch (typ.)
T P
T P
J B
N
25 50012.525
Scale in feet
.4
P
E
Profile Grade
Exisiting Ground
46+00 46+50 47+00 47+50 48+00 48+50 49+00 49+50 50+00 50+50 51+00
910 910
912 912
914 914
916 916
918 918
920 920
922 922
924 924
926 926
930 930
932 932
+1.38%
-0.44%
+1.38%
-0.44%
.4
.0
' VC100
55K =
'642SSD =
.0
R e m o v is ti n g c u lv e r t
R e m o v e e x is ti g h a d w a ll s
L t a n d R t
I n s ta ll x
E q u iv a le n t
D ia m e te rc h o r E ll ip ti c a l
R C
P
E n d S e c ti o n
, L t a n d R t
R ip r a p C la s s
L t
P
B
L
P la n p w w o r k in g \c e n tr a l0
\d
\P
N P
U
V .d g n
:2
D e c e m b e r
46+00 TO 49+42
CR203 FISH HATCHERY ROAD -
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
C6
NO SCALE
for structural section
See typical sections
Finished grade according to Section 204
Backfill with material
See note 6
Stabilization geogrid for structural section
See typical sections
Finished grade according to Section 204
Backfill with material
NOTE:
See bench detail than Bench if greater Varies min.
Width of need
Total subexcavation width
See note 3
714.03.
Furnish stabilization geogrid conforming to Subsection 6.
not construct slopes steeper than 1V:2H unless approved.
slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slop or make 5.
roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within of the 4.
every of subexcavation depth.
bottom layers. Provide a minimum. bench width for
Widen top of subexcavation area to allow for bench width in 3.
Do not place backfill material within the structural section.2.
Minimum subexcavation dimensions are1.
TYPICAL SECTION
SUBEXCAVATION
BENCH DETAIL
(2' typ.)
2'
1'
2' max.
6 foot wide x 6 foot long.
1-foot
2 feet
4 feet
SUBEXCAVATION
C204-51
FP-24
06/2024
CFLHD DETAIL
:5
O c to b e r
D e t
C p w w o r k in g
\c e n tr a l0
\d
\C
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
F1
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
C
PLAN VIEW PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o
L
A A
B B
PLAN VIEW
Variable slope ground Original
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in .)Variable slope ground Original m in
L
D D
D
H
H
D D
D
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
L
C C
C
NOTE:
L
H
D
SECTION E-E
SECTION D-D
ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
D
W id th
D it c h B o tt o m
W id th
D it c h B o tt o m
D
4D
PLAN VIEW
or flatter
Sloped 1V:2H
D
D D
Flowline
D
D D
(min.)
(min.)
not be measured for payment.
3. Excavation for placement of riprap will tables for class and type.
subsection 714.01(a). See summary
2. Furnish geotextile filter conforming to slopes of less than 10%.
Use for aprons serving culverts with 1.
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
C251-50
FP-24
09/2021
CFLHD DETAIL
:1
D e c e m b e r
S td p w w o r k in g \c e n tr a l0
\d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USEAT CULVERT OUTLETS
PLACED RIPRAP
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
G1
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
CONCRETE ROUND PIPE CULVERT LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
PIPE
SIZE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
Roadway embankment
Limits of pipe compaction
SECTION A-A
A
A
Compacted backfill material placed in layers flowable backfill according to Section 614
Bedding (See table)Bedding (See table)
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast permitted
Tapered holes over pipe joint
Do not install fastener
O Ring if required
2H2H
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H
" min.2 12'-6 not exceeding 6" compacted depth.
not exceeding 6" compacted depth, or
1'-0" (min.)
" dia. hole for4
" max.2
2'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
1" dia. Joint tie
H H
H H
1.
2.
3.
4.
5.
6.
Construct a piping plug of impermeable backfill material at the pipe inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
When directed, camber pipe culverts upwards from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
For flexible pavement and aggregate surface roadways, measure minimum cover from the top of the pipe culvert to the bottom of the roadway subgrade.
For rigid pavements, measure minimum cover from the top of the pipe culvert to the top of the pavement. For all roadway surface types, measure maximum fill height from the top of the pipe culvert to the top of the pavement.
Pipe compaction limits shown are for pipe installation in an embankment. For pipe installation in a trench, the compaction limits are the walls of the trench.
Where unyielding or unstable material is encountered, install the pipe culvert according to the limits of pipe compaction shown on
Maximum fill heights for pipe culvert installations may be increased on approval of site-specific structural pipe designs meeting the criteria of
AASHTO Standard Specifications for Highway Bridges.
Use Supplemental Concrete Pipe Tie when specified in the contract documents.
NOTE:
NO SCALE
Standard 602-3.
602-7
FP-24
8/2024
FLH STANDARD
:1 e b r u a r y
S td p w w o r k in g \c e n tr a l0
\d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
INSTALLATION
CONCRETE PIPE CULVERT
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T1
NOTE:
3.
2.
1.
flared end section.
Warp embankment slopes to match the slope of the the inlet end section with a tongue end.
Fabricate the outlet end section with a groove end and allow for manufacturer's standards.
Variations in design and dimensions are permitted to
L
BC
T D ia m e te r T
F
A
TWT
R
TWT
R
TDiameterT
A
PLAN
ELEVATION
SECTION A-A
TDiameterT
TWT
PLAN
TWT
ELEVATION
SECTION A-A
BC
L
T D ia m e te r T
F
A
R
A B
B
PIPE SIZE
END SECTIONS FOR ROUND PIPE CULVERT
T
T
T A B C L W F R1 R2 R3inch DIAMETER inch
DIMENSIONS
"2
-- 2
FOR ROUND PIPE
CONCRETE END SECTION
602-8
FP-24, FP-14
1/2024
:1 e b ru a ry
S td
-8 p w w o rk in g \c e n tr a l0
\d
\S td -8
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T2
(INCH)
ROUND SIZE
EQUIVALENT
SPAN X RISE
SPAN X RISE
1 - 13 14 - 21
HE - III HE - I V
1 - 13 14 - 21 22 - 29
VE - III VE - I V VE - V
68 x 106
63 x 98
58 x 91
53 x 83
48 x 76
43 x 68
38 x 60
34 x 53
32 x 49
29 x 45
SPAN
RISE
SPAN
RISE
MAX. HEIGHT OF COVER IN FEET MAX. HEIGHT OF COVER IN FEET
HORIZONTAL INSTALLATION VERTICAL INSTALLATION
106 x 68
98 x 63
91 x 58
83 x 53
76 x 48
68 x 43
60 x 38
53 x 34
49 x 32
45 x 29
42 x 27
38 x 24
34 x 22
30 x 19
23 x 14
ELLIPTICAL CONCRETE PIPE COVER TABLES FOR H-20 LIVE LOAD
B E
D D
IN
G
M A
T E
R
IA
L
B E
D D
IN
G
M A
T E
R
IA
L
B E
D D
IN
G
M A
T E
R
IA
L
B E
D D
IN
G
M A
T E
R
IA
L
B E
D D
IN
G
M A
T E
R
IA
L measure maximum fill height from the top of the pipe culvert to the top of the pavement.
cover from the top of the pipe culvert to the top of the pavement. For all roadway surface types, of the pipe culvert to the bottom of the roadway subgrade. For rigid pavement measure minimum
4. For flexible pavement and aggregate surface roadways, measure minimum cover from the top under entrances and median crossovers is 9 inches.
the standard height have been exhausted. Ensure minimum finished height of cover for pipes minimum finished cover height of 12 inches will be allowed only if all possible means to obtain whichever is greater. In cases in which these cover heights cannot be achieved, an absolute of the span or 2 feet,2
13. Standard minimum finished height of cover for all pipes is with a cut.
minimum of 10 times the span plus 3 feet on each side of the pipe or to the intersection greater. Extend cover the full length of the pipe. Extend the approach fill ramp to a of the span or 3 feet, whichever is2 1 allowing construction traffic to cross installation are
2. To protect pipe during construction, ensure the minimum heights of cover prior to
1. Cover heights indicated in the Tables are for finished construction.
NOTES:
U n ti tl e d
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:1
M a r c h
SPECIAL
ELLIPTICAL CONCRETE PIPE
602-A
NO SCALE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T3
(R/2) + 12"
4"
(R/2) + 12"
4"
MAX. 24"
MIN. 8",
" per 1' of H2
(R/2) + 12"
(R/2) + 12" (R/2) + 12"
(R/2) + 12" pipe where directed.
May be eliminated under entrance
As shown on Tables.
Flexible Pipe
When H is less than or equal to 30'
Rigid Pipe the plans:
follows unless otherwise noted in
Use Method "A" pipe bedding as
X= S + 36"
Culverts where S = 36" and over
X= S + 24"
Culverts less than S = 36"
Top of fill
Earth
Foundation fill* maintained to top of pipe
"X" Dimension to be
MIN. 1/10 R
S
S
X
R/2
R
H Ground line
Top of fill
Earth
Foundation fill*
MIN. 1/10 R
X
R/2 R
MIN. S1 MIN. S 1S
S
MIN. 1/10 R
R
R/2
MIN. S1 MIN. S1
Rock or unyeilding soil
X
S
S
H
Top of fill
R
R/2
MIN. 1/10 R Bedding material Earth
Ground line
MIN. S
MIN. S1 S1
S2
H
Top of fill b maintained to top of pipe
"X" Dimension to be
Earth
Ground line
Top of fill
R/2
R b
MIN. 1/10 R
S
S2
H
X
Top of fill
Ground line
Rock or unyeilding soilR/2
R
MIN. 1/10 R
maintained to top of pipe
"X" Dimension to be
X
H
S
S2 bearing soil.
Depth as shown in the plans or to firm
Outside rise of pipe.
Inside span of pipe.
Outside span of pipe.
drainage structure to finished grade.
Height of cover measured from top of b =
R =
S =
S =
H =
OTHERWISE UNSUITABLE MATERIAL
FOUNDATION SOFT, YIELDING, OR
OTHERWISE UNSUITABLE MATERIAL
FOUNDATION SOFT, YIELDING, OR
ROCK FOUNDATIONNORMAL EARTH FOUNDATION
NORMAL EARTH FOUNDATION ROCK FOUNDATION
PIPE PROJECTION ABOVE GROUND LINE
NO PROJECTION OF PIPE ABOVE GROUND LINE
Embankment.
material placed according to Subsection 209.09.
Suitable roadway excavation or unclassified borrow
Subsection 209.09.
Backfill material placed according to to Subsection 209.07.
Foundation fill material placed according
Ground lineGround line
MAX. 24"
MIN. 8",
" per 1' of H2
U n ti tl e d
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:0
M a r c h
SPECIAL
602-B
CULVERT INSTALLATION
ELLIPTICAL CONCRETE PIPE
NO SCALE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T4
END SECTION DIMENSIONS
6'-0"
5'-6"
5'-0"
4'-0"
2'-8"
E
END VIEW
SPAN X RISE
23" X 14"
30" X 19"
38" X 24"
42" X 27"
45" X 29"
53" X 34" 15"
13"
12"
10"
9"
6"
A B
2'-3"
2'-11"
3'-8"
4'-8"
4'-11"
5'-3" 2'-11"
3'-3"
1'-8"
2'-6"
3'-2"
3'-10"
C L
6'-1"
6'-1"
6'-2"
6'-2"
8'-2"
8'-2"
3'-6"
R is e
Span
E
X
E
X
C B
2:1 slope
Approx.
A
L of pipe
Length C B
SLOPE DETAIL
SECTION X-X
PLAN VIEW
spigot end on inlet end-sections Hub end on outlet end-sections
Shoulder
Culvert
Length of pipe fabric reinforcement
Bar or steel
End section
SPECIAL
602-C
U n ti tl e d
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:0
M a r c h
FOR ELLIPTICAL CONCRETE PIPE
CONCRETE END SECTION
NO SCALE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T5
F P
F P++
C P
County Rd 203
N
25 50012.525
Scale in feet
Solid White Edge Line RtBegin 6"
15+16.00
Solid White Edge Line LtBegin 6"
14+75.00
Begin 6" Solid White Edge Line Lt
13+70.00
Begin 4" Double Yellow Centerline
13+70.00
Begin 6" Solid White Edge Line Rt
13+70.00
End 6" Solid White Edge Line Rt
14+58.00
End 6" Solid White Edge Line Lt
14+22.00
Do Not Disturb Existing Signs
Install OM4-1 Object Marker
C P
N
25 50012.525
Scale in feet
County Rd 203
6" Solid White Edge Line Rt
6" Solid White Edge Line Lt
4" Double Yellow Centerline
:0
M a r c h
P
B
L
P la n P la n
S tr ip in g
P la n
S h e t] p w w o r k in g
\c e n tr a l0
\d
\S
T R
U
V .d g n
12+00 TO 23+50
MARKINGS
SIGNING AND PAVEMENT
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T6
W
3W
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
W
W of curb
Front face pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in pavement
Edge of
H /5 o r m a x
H /5 o r m a x m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
m a x
W
W
W
(typ.)2" max.
(typ.)
2" max.
(typ.)
2" max.
NOTES:
additional information.
Refer to Section 2A.18 of the MUTCD, latest edition, for for U-channel steel posts.
Refer to Special 633-C for breakaway support details for corrosion resistant steel posts.
Refer to Special 633-B for breakaway support details
W is over 4 feet, use double posts.
which the sign panel area is 10 square feet or less but
For U-channel and corrosion resistant steel posts for
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
5.
4.
3.
2.
1.
** See Note 3
* See Note 2
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
SIZE
POST
10* 24 30U-Channel Steel
Class B
10 ga.
2" x 2"
10* 24 Resistant Steel
Corrosion
STOP
SPEED
LIMIT
M PH
SIGN STRUCTURES
633-A p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:5 e b r u a r y
SPECIAL
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T9
2" X 2" dia.
Bolt Torque ft-lbs
(G) (H) (J) (K) (L) (M) (N)
POST SIZE
POST SIZE
t plates, 20 ga.
Bond breaking plates, 20 ga.
Bond breaking
POST SIZE
CONCRETE FOOTING
DIA. MINIMUM DEPTH
2" X 2" 12" 3'
1t(A) (B) (C) (D) (E) (F)
BOLT SPECIFICATIONS
d 3t 1 c
" weep hole4 1Drill
" weep hole4 1Drill
(See Notes 4 and 5)
SINGLE POST BREAKAWAY
4" 5"
FUSE PLATE DATA TABLE
4" "4 12 "8
11 2" "8 7 "16
9 "8 5 "16
7 "4 1 "4
1 "8
FOOTING DATA TABLE
BOND BREAKING PLATE DATA
w(R)
LEGEND:
in r o c k m a
BASE CONNECTION DATA TABLE
Breakaway plate (typ.)
(See Notes 4 and 5) w
E
Weld triangle
High Strength HS
"2 16 "4
31 "4 3 "8
11 "8 5 "16
3 "16 3"16
Dia. Length in-lbs Torque
"8 52" X 2" "2
12 450
(See Base Connection Data Table) washers and nuts (typ.)
HS structural bolts with
A
CE
F
BD
A
D
S ig n p a n e l
G
Sign post
K
L M
L
L t2
2t
Sign post
1t t1 w
2t
2t w
1t 1t
SIDE ELEVATION
SIDE ELEVATION
BOND BREAKING PLATE
SECTION A-A
BREAKAWAY PLATE
A
A
A A
Concrete footing
N
CONCRETE FOOTING
SINGLE POST BREAKAWAYMULTIPLE POST BREAKAWAY
for wrench access
Bevel to allow Sign post
FRONT ELEVATION
SIDE ELEVATION
Finished grade
(See Note 6)
(See Note 6)
1c , no cut bolt hole d
Dia. of
R (typ.)
R (typ.)
S e e F o o ti n g D a ta
T a b le
M in im u m f o o ti n g d e p th web cut through
One flange and at C of plate
C Post cut through
Sign post notches down
Fuse plate, FUSE PLATE
Fuse plate for wrench access
Bevel to allow
Concrete footing
Traffic flow
Traffic flow
Traffic flow and nuts (typ.)
with washers
Structural bolts
NOTES:
7.
6.
5.
4.
3.
2.
1.
details.
Refer to Special 633-A for sign mounting installations only.
Use fuse plates on multiple post lanes of traffic.
single posts where exposed to opposing
Use the Multiple Post Breakaway detail on the corrosion resistant steel posts.
Paint brown to match the appearance of structural bolts with nuts and washers.
bond breaking plates, and fastening
Use galvanized steel in breakaway plates, naturally change color to brown.
corrosion resistant steel posts that do not square steel posts. Paint brown any
Use 10 gage Class B corrosion resistant of major traffic.
Install breakaway assembly in the direction signs placed behind protective barriers.
Breakaway sign support is not required for
3t
CORROSION RESISTANT STEEL
BREAKAWAY SIGN SUPPORT
633-B
SPECIAL
p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:3 e b r u a r y
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T10
Existing ground m in m a x
S e e N o te
Tr af fic fl ow
U-CHANNEL STEEL POST
BREAKAWAY SIGN SUPPORT
t o s p li c e o v e r la p th is fa ce o f p os t)
(M ou nt si gn p an el on
U-channel sign post
Stub bolts, nuts and washers
" dia. galvanized 16
Four
7.
6.
5.
4.
3.
2.
1.
latest edition, for additional information.
Refer to Section 2A.18 of the MUTCD, details.
Refer to Special 633-A for sign mounting latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb per post.
line. Do not place more than one splice line and 18 inches above the ground steel posts entirely between the ground
Position splice overlap on U-channel non-breakaway signs.
barrier. Do not place holes in posts of the clear zone or shield with approved
Place non-breakaway signs outside signs placed behind protective barriers.
Breakaway sign support is not required for
STATE PROJECT
NUMBER
SHEET
NOTES:
STEEL POSTS
BREAKAWAY SIGN SUPPORT
633-C
SPECIAL
p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:0
M a r c h
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T11
40'
30'10' 10'
40'
30'
White edge line centerline
Broken yellow
White edge line yellow centerline
Broken and solid
White edge line yellow centerline
Solid double
White edge line
White edge line yellow centerline
Solid double yellow centerline
Solid double required by the state.
Use 4-inch spacing between lines, or as
NO SCALE
L w
L w
DETAIL C
Two-way traffic
No passing zone both directions
L w
L w and top lift pavement joint
Striped centerline
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder
DETAIL A
Shoulder
DETAIL B
Shoulder w /2
Staked Centerline and top lift pavement joint
Striped centerline
Staked centerline
CURVE WIDENING ON SIMPLE CURVES (INSIDE)
CURVE WIDENING ON SPIRAL CURVES
PAVEMENT MARKING DETAIL ON SIMPLE CURVES
(normal edge of shoulder)
Edge line striping
(normal edge of shoulder)
Edge line striping
(normal edge of shoulder)
Edge line striping
(normal edge of shoulder)
Edge line striping
Two-way traffic
Passing zone both directions
Two-way traffic
No passing zone single lane direction
(Staked)
(Staked)
DETAIL ON SPIRAL CURVES
PAVEMENT MARKING
No Passing Zone
No Passing Zone
Travel way (L)Travel way (L) curve widening (w) guardrail offset shoulder (s) shoulder (s) w/2 shoulder (s)
Travel way (L) curve widening (w/2)
Travel way (L) guardrail offset curve widening (w/2) shoulder (s) s s L
L
Length of curve widening
L L s s s s
L w /2
L w /2
2L w
2L w s s s s
2L w
Length of curve widening
L L
L L
2L w s s w /2
L w /2
L w /2 s s s s
Paved ditchPaved ditch
NOTE:
to curve widening on simple curves.
Centerline offset striping is only applicable curve widening.
widths remain constant throughout the widths within the traveled way. Shoulder curve widening to achieve equal lane
Paint centerline striping on curves with ranges and quantities for pavement markings.
See Summary for tables showing station from the normal edge of shoulder.
way and curve widening, 2-inch maximum
5. Paint the edge line striping outside the travel
4.
3.
2.
1.
note 4
See note 4
See
LINEAR PAVEMENT MARKINGS
C634-50
06/2024
CFLHD DETAIL
:1 e b r u a r y
D e t
C p w w o r k in g \c e n tr a l0
\d
\C
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T12
INTERSECTION LAYOUT
6" Solid Line
LANE LINE LAYOUTS
4" Double Solid Yellow Line (centerline)
NO SCALE
24" Solid White Stop Bar
30'
24" Solid White Stop Bar
R
R
Edge of Pavement
6" Solid White Edge Line
.7
4" Solid White Island Line
12'
20'
.7
4"
PAVEMENT MARKERS
BI-DIRECTIONAL NON-PLOWABLE
ty p
Raised pavement marker or a combination of colors the same as the reflector.
Ensure the shell of the marker is made of the same color
Provide reflective markers with clear (white) color.
Uniform Traffic Control Devices" (MUTCD), latest edition.
the roadway in accordance with the "Manual on
Install pavement striping and symbol markings in
3.
2.
1.
NOTE:
Reflective material
LEGEND:
PAVEMENT MARKING DETAILS
634-A
SPECIAL
P la n S h e e t-p w w o r k in g
\c e n tr a l0
\d
\s p
A
.d g n
:0
M a r c h
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T13
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD NAME
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
WORK
ROAD
AHEAD
xx
MPH
ROAD NAME
ROAD WORK
END
WORK
ROAD
xxxxxxx
ROAD WORK
END
xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o a d as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).
name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
Maintain two-way traffic during all non-work hours except as approved.
Ensure all sign supports exposed to traffic are crashworthy.
construction area.
needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.
signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.
and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be
Erect all project advance warning signs before starting construction work.
State standards may be used as an alternative if approved.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.
at each end of the project. Show the distance on the G20-1 sign to the
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs
Sign Spacing Table.
When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.
Expressway / Freeway
NO SCALE
SIGNS IN FEET
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
2/2024
:0
F e b ru a ry
S td
-1 p w w o rk in g \c e n tr a l0
\d
\S td
-1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T14
Traffic flow
Traffic flow not the advisory speed.
Approach speed based on the regulatory posted speed, *
Device spacing
Spacing Table)
(See Length and Channelizing devices
(optional)
BUFFER SPACE
Flagger location
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
WORK
ROAD
AHEAD
See Note 4
W20-1
ONE LANE
ROAD
AHEAD
xx
MPH
W20-4
(optional)
W13-1P xxx
FEET
W20-7
W16-2P
Flagger location
WORK SPACE
TERMINATION AREA
ROAD WORK
END
See Note 4
G20-2 stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD display the name of the Contractor on the pilot car.
sign at a conspicuous location on the rear of vehicle. Prominently
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) conditions as approved.
Final location and spacing of devices may be changed to fit field to those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar
6.
5.
4.
3.
2.
1.
(optional)(optional)
NOTE:
SIGN SPACING TABLE
LENGTH AND SPACING TABLE
50' - 100' 50' - 100'
See Note 5
10' min.
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
FEET
SPACING IN FEET
MPH
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-6
:0
F e b r u a r y
S td p w w o r k in g \c e n tr a l0
\d
\S td
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T15
Traffic flow
Traffic flow
LENGTH AND SPACING TABLE
WS
WS²
limit or 85 percentile speed prior
Shoulder taper formula:
Where:
L =
L =
Minimum length of taper at required spacing.
Lengthen taper as needed to provide minimum of three channelizing devices in taper **
Approach speed based on the regulatory posted speed, not the advisory speed.*
S =
W =
L =
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
xx
MPH
SHOULDER
WORK
Channelizing devices for S ≤ 40 mph for S ≥ 45 mph
Numerical value of posted speed
Width of offset in feet to work in miles per hour
See Note 2
10' min.
NOTE:
SIGN SPACING TABLE
4.
3.
2.
1.
parked or stored in the buffer space.
Do not allow equipment, materials, or vehicles to be and END ROAD WORK (G20-2) signs.
limits, eliminate the ROAD WORK AHEAD (W20-1) If shoulder closure is completely within the project
Contract Requirements, Section 156.
For project specific minimum width, refer to Special to fit field conditions as approved.
Final location and spacing of devices may be changed
See Note 3 W20-1
Spacing Table) (See Length and
Device spacing
See Note 3 G20-2
TERMINATION AREA
AVARIABLE WORK SPACEBUFFER SPACETAPER AREAAB
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
(optional)
W
A
See Note 3 G20-2
W21-5
See Note 3 W20-1
(optional) W13-1P
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
MINIMUM TAPER LENGTH**
LENGTH
SPACE
BUFFER CHANNELIZING DEVICE
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
MPH
FEET
FEET
SPACING IN FEET
SHOULDER CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-10
:0
F e b ru a ry
S td p w w o rk in g \c e n tr a l0
\d
\S td
-1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T16
See post detail (typ.)
Breakaway holes
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.
Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.
use 7 ft minimum mounting height for main sign
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
bolts per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
State standards may be used as an alternative if approved.
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
635-14
:0
F e b ru a ry
S td p w w o rk in g \c e n tr a l0
\d
\S td
-1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
FISH HATCHERY ROAD
T17
12+00.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
-0.3% -0.3% -2.8% -2.8%
922.92 Des Grade =
922.17 Subgrade =
922.92 Original Grnd =
.1
.2
.1
.2
.1
.8
.9
.0
.9
.0
LC
P r o p C le a r in g
P r o p C le a r in g
12+36.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4 1:6
1:4 +2.6% -1.3% -2.8% -4.7% 1:2.1
1:
923.73 Des Grade =
922.98 Subgrade =
923.61 Original Grnd =
.6
.8
.3
.6
.3
.4
.4
.8
.3
.1
.8
.2
.9
.2
.7
.0
.9
.3
.8
.1
.6
.5
LC
P r o p C le a r in g
P r o p C le a r in g
12+50.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4
1:6 1:4 -2.0% -1.7% -2.9% -2.9%
1:4 1:4
923.96 Des Grade =
923.21 Subgrade =
923.89 Original Grnd =
.6
.1
.8
.5
.8
.5
.9
.9
.9
.7
.0
.2
.2
.9
.9
.0
.9
.6
.8
.0
.8
.0
.2
.8
LC
P r o p C le a r in g
P r o p C le a r in g
13+00.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4
1:6 1:4
-3.0% -3.0% 1:4
1:6 1:4
924.36 Des Grade =
923.61 Subgrade =
924.25 Original Grnd =
.7
.1
.0
.0
.0
.0
.2
.7
.3
.3
.3
.3
.6
.1
.3
.0
.2
.0
.1
.4
.5
.4
.5
.4
.4
.3
.4
.3
TX FLAP UV CR 203(1)
CR 203 FISH HATCHERY ROAD CROSS SECTIONS
FHWA, Office of Federal Lands Highway
:1
M a r c h
P
B
L
.0
S h e p w w o r k in g
\c e n tr a l0
\d
\X
S S
U
V .d g
X1
PROJECT
FISH HATCHERY ROAD
r o p C le a r in g
P r o p C le a r in g
.4
.2
13+50.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4
1:6 1:4
-3.0% -3.0% 1:4
1:6 1:4
924.12 Des Grade =
923.37 Subgrade =
923.81 Original Grnd =
.7
.3
.2
.3
.2
.3
.9
.3
.0
.9
.0
.9
.0
.0
.0
.0
.9
.4
.2
.4
.4
.3
LC
P r o p C le a r in g
P r o p C le a r in g
14+00.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4 1:6
1:4 -3.0% -3.0%
1:4 1:6 1:4
923.23 Des Grade =
922.48 Subgrade =
922.47 Original Grnd =
.1
.7
.4
.9
.4
.9
.0
.4
.1
.0
.1
.0
.1
.0
.1
.0
.0
.4
.4
.7
.4
.7
.8
.4
LC
P r o p C le a r in g
P r o p C le a r in g
.4
.7
1:6 1:4
14+32.78
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:6 1:4
-3.0% -3.0% -4.4% 1:4
922.43 Des Grade =
921.68 Subgrade =
921.59 Original Grnd =
.4
.0
.7
.1
.7
.1
.2
.4
.3
.0
.3
.0
.3
.0
.1
.5
.0
.1
.7
.4
.7
.5
LC
P r o p C le a r in g
1:4 1:6
14+50.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920
930 930
1:4 -3.0% -3.0%
-7.1%
922.02 Des Grade =
921.27 Subgrade =
921.09 Original Grnd =
.5
.3
.4
.7
.4
.7
.8
.4
.9
.0
.9
.0
.9
.0
.5
.5
:3
M a r c h
P
B
L
.0
S h e p w w o r k in g
\c e n tr a l0
\d
\X
S S
U
V .d g
X2
PROJECT
r o p C le a r in g
P r o p C le a r in g
1:6
-0.0% +0.0% -0.0%
1:4
14+74.16
-40 -30 -20 -10 0 10 20 30 40
910 910
920 920 1:4
-3.6% -3.0% -3.0% -3.1% 1:4 1:3
921.43 Des Grade =
920.68 Subgrade =
920.53 Original Grnd =
.6
.5
.6
.3
.6
.3
.9
.5
.0
.0
.3
.0
.3
.0
.3
.0
.2
.4
.6
.2
LC
P r o p C le a r in g
P r o p C le a r in g
1:3 1:61:4
14+96.00
-40 -30 -20 -10 0 10 20 30 40
910 910
920 9201:4 -5.1%
-3.0% -3.0% 1:4
920.92 Des Grade =
920.17 Subgrade =
920.04 Original Grnd =
.0
.3
.9
.7
.9
.7
.1
.2
.3
.5
.8
.0
.8
.0
.8
.0
.7
.4
.1
.1
LC
P r o p C le…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .