Task Order Manual Fuels Reduction IDIQ

Two-Bit PCT Task Order 1 Klamath National Forest

Section I Contract No. TBD Project Name:

Two-Bit PCT

Requisition No. TBD Issue Date: March 23, 2020 Contractor:

Telephone:___________________________

Issuing and Billing Office:

USDA, US Forest Service NCASA, Redding Office 3644 Avtech Parkway Redding, CA 95963

Section II Item No.

Description Quantity Order

Unit

Unit Price

Amount

1 Precommercial Thinning, Handpiling 620 Acre $__________ $__________

Optional Line Item *2 Precommercial Thinning, Handpiling 283 Acre $_________ $__________

Total Price: $_______________

Section III Contractor: (Name and Signature)

Contractor DUNS #:________________________ Email:__________________________________

RESPONSE DUE BY: April 23, 2020, 1:00 PDT

IDIQ Solicitation response date. April 23, 2020, 1:00 PDT

RESPONSE BY:

Email to: paul.wood@usda.gov

*52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor by September 15, 2020. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

Two-Bit PCT Task Order 2 Klamath National Forest

Section VI

1. DESCRIPTION OF WORK:

The intent of this contract is to secure services for Pre-commercial Thinning & Hand piling on 620 acres (plus 283 optional acres).

2. PROJECT LOCATION(S):

The treatment units are located on the Happy Camp/Oak Knoll Ranger District, Klamath National Forest, northwest of Happy Camp, California.

3. SPECIFIC WORK REQUIREMENT:

Thinning/Pruning/Piling (620 acres (plus 283 optional acres):

Leave trees: (larger, healthy conifer) shall be spaced 30’ apart. Cut down smaller conifers. All conifers >12” dbh are leave trees that shall be pruned up 7 feet.

(1)Leave trees shall be those having the greatest growth rate, the longest crown, good color, and the straightest stem, and are free of damage from insects, disease, or mechanical causes. Leave trees shall have terminal growth that is equal to or greater than that of other competing conifers and have a crown ratio greater than 40%. The Contractor shall select leave trees using the following priorities:

(a)The Maximum DBH Cut Limit is: Conifer (12”).

(b)The Contractor shall select additional leave trees, from healthy undamaged conifers under the specified Maximum DBH Cut Limit, as necessary to achieve the average spacing specified. Spacing may be varied up to 50% to select the most desirable tree.

Cut Trees for Pre-Commercial Thinning

All live conifers less than 12” dbh and more than 4’ tall that are not selected as leave trees shall be felled.

All cut trees shall be completely cut from their stump of origin less than 6” above ground, measured on the uphill side, and all green limbs shall be completely cut from the stump. Stumps shall be cut horizontally so that no sharp staubs are left sticking up.

When felling cut trees, special care shall be exercised to prevent damage to leave trees. Cut trees shall not be placed on top of leave trees, or where they might roll onto the leave trees.

Pruning:

All leave trees shall be pruned. All live and dead branches shall be pruned up 7’ from ground level. Pruning cuts shall be made approximately ½” to 1” from the trunk, at the outer edge of the “shoulder” of the branch, so it’s easier for the trunk to heal over the wound.

Materials to be piled:

Thinning slash, including bole, top, and limb materials, from 1” up to 5” in diameter and greater than 3’ in length shall be piled. Larger diameter boles of thinned trees 5” up to 12” shall be bucked into 8’ lengths, limbed, and left on the ground. Material greater than a 5” diameter need not be piled. However, limbs shall be cut from the bole and piled. All piles shall be covered above the 4’ ht. level with waxed paper or plastic sheeting (contractor’s preference), hanging equally down both sides.

Two-Bit PCT Task Order 3

Location of piles:

(1) Pile locations within the unit shall allow for at least 20’ between each pile, and shall be in the widest, most open space available within a practical distance. No portion of the pile shall be below the limbs of a living tree or within 7’ of its trunk. Irregular spacing may be necessary to make room for the piles. Holes may need to be created to accomplish this.

(2) If conditions make it impractical to locate piles to avoid damage to live trees, a space shall be cleared, and all material shall be piled in the cleared areas.

Pile Construction:

(1) Piles shall be constructed compactly, and protruding pieces shall be trimmed to allow covering in a manner permitting the piles to shed water. Material shall be bucked into lengths not greater than 8’.

(2) Pile height shall be no less than 5 feet and no greater than 8 feet. The piles within the unit shall not exceed approximately 7’ across the base or 8’ in height. If the pile is constructed in a natural opening it may be larger in size.

(3) All Hand piles shall be constructed into a “Haystack” shape. Smaller diameter fuels shall be in the bottom ½ of the pile area, the intermediate sized slash in the ¾ area, and the larger diameter slash in the top ¼ of the pile.

Maintain 20’ between pile edges. Leave trees may need to be cut to create openings for piling. A few large piles are preferred to many small piles.

(4) All piles shall be covered at or above the 4’ ht. level with waxed paper or plastic sheeting, hanging equally down both sides.

Pre-Commercial Thinning Inspection

Periodic compliance inspections may be made by designated Government Officials to ensure performance in accordance with the technical specifications of the contract. Any failure to achieve the specified work standards will be brought to the attention of the Contractor or designated representative, who shall take prompt corrective action. Failure to correct poor work following notification may result in a reduction in payment, a poor performance evaluation and/or termination for default.

(A) Thinning Inspection Procedure: When a thinning unit is completed, the contractor shall notify the Government and an acceptance inspection will be performed, no later than four working days following notification. While this acceptance inspection is being performed, the Contractor may proceed to the next unit designated by the Contracting Officer’s Representative (COR), and begin work. The acceptance inspection will consist of a 100% visual inspection of the unit for compliance with the work standards, and may include a systematic survey designed to sample leave tree spacing in a percentage of the unit (for example 0.5 to 1% of the unit). Plots will be 1/50th acre and plot centers will be marked and numbered.

Each plot will be examined and the findings on the items listed below recorded:

• Number of trees on plot.

• Number of trees should have left.

• Number of satisfactory trees.

• Number of trees missing.

• Number of trees excess.

• Remarks.

Upon inspection of all plots for a unit, the quality of thinning shall be calculated as follows:

Two-Bit PCT Task Order 4

[1.00 - (No. of missing trees + No. of excess trees)] X 100 = quality % (No. of leave trees that should have been left)

(B) Rework and Re-inspection After Rework: If inspection results are below 90% and excess trees constitute a part of the deficiency, payment may not be made until the excess tree problem has been corrected, unless the Contracting Officer determines that a reduction in pay in lieu of rework, is acceptable. Inspections after rework will be made in the same manner as the first inspection but at different plot locations. The Contractor shall pay for all inspections necessitated by rework.

(C) Re-inspection of Thinning Upon Contractor Request: If the original inspection results are unacceptable to the Contractor and a second inspection is requested without rework, the same inspection procedure will be used. However, the inspection pattern will be shifted. If the second inspection shows less than a 5%-point improvement from the first inspection, the Contractor shall pay the cost of the second inspection, and the result of the first inspection will be used to determine payment. Requests for re-inspection shall be made in writing.

Inspection of Hand-Piling

Periodic compliance inspections will be made by designated Government Officials, to ensure that the Contractor is performing in accordance with the technical specifications of this task order.

(A) Piling Inspection Procedure: When the Contractor has completed a unit, the Government shall be notified, and an acceptance inspection will be performed. The acceptance inspection will consist of a 100% visual inspection of the unit for compliance with the work standards.

(B) Rework and Re-inspection after Rework: if the results of an original inspection are not acceptable, rework may be required. Inspections after rework will be made in the same manner as the first inspection.

Contractor shall pay for all inspections necessitated by rework.

4. PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this project is from Task Order Award through 12/31/2020.

5. FAR 52.237-1 SITE VISIT (APR 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

6. GOVERNMENT FURNISHED PROPERTY: None

7. LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages

1. Detailed Unit Information Sheet 1

2. Fire Plan 10

3. Map 1

4. Wage Determination

Two-Bit PCT Task Order 5

Section V

8. EVALUATION CRITERIA:

Price is the only factor to be considered for award.

FY-20 Two-Bit PCT-Piling Contract Unit Information Item 1 - KV Funded

Comp/Stand Acres Funding Treatment SUID

225-22 2 KV PCT-HP 505522250022000000

225-79 3 KV PCT-HP 505522250079000000

225-81 13 KV PCT-HP 505522250081000000

210-4 10 KV PCT-HP 505522100004000000

210-12 18 KV PCT-HP 505522100012000000

210-25 6 KV PCT-HP 505522100025000000

211-4 12 KV PCT-HP 505522110004000000

211-2 3 KV PCT-HP 505522110002000000

211-17 22 KV PCT-HP 505522110017000000

211-1 6 KV PCT-HP 505522110001000000

211-5 10 KV PCT-HP 505522110005000000

211-10 9 KV PCT-HP 505522110010000000

211-58 6 KV PCT-HP 505522110058000000

211-26 26 KV PCT-HP 505522110026000000

211-27 38 KV PCT-HP 505522110027000000

210-67 9 KV PCT-HP 505522100067000000

212-64 21 KV PCT-HP 505522120064000000

210-66 4 KV PCT-HP 505522100066000000

210-65 11 KV PCT-HP 505522100065000000

211-58 6 KV PCT-HP 505522110058000000

5 KV PCT-HP

12 KV PCT-HP

4 KV PCT-HP

6 KV PCT-HP

50 KV PCT-HP

5 KV PCT-HP

11 KV PCT-HP

1 KV PCT-HP

5 KV PCT-HP

201-03 14 KV PCT-HP

? 36 KV PCT-HP

201-05 10 KV PCT-HP

201-05 12 KV PCT-HP

210-23 13 KV PCT-HP

210-22 27 KV PCT-HP

202-42 10 KV PCT-HP

201-15 19 KV PCT-HP

201-13 19 KV PCT-HP

201-13 10 KV PCT-HP

201-25 12 KV PCT-HP

202-80 39 KV PCT-HP 505522020080000000

209-40 65 KV PCT-HP 505522090040000000

Total Funded Acres 620

FY-20 Two-Bit PCT-Piling Contract Unit Information Item 2 (Optional) - Pending Funding

Comp/Stand Acres Funding Treatment SUID

Natural Stand 6 pending PCT-HP

Natural Stand 3 pending PCT-HP

Natural Stand 6 pending PCT-HP

Natural Stand 10 pending PCT-HP

201-06 26 pending PCT-HP

210-17 20 pending PCT-HP

Natural Stand 7 pending PCT-HP

201-19 14 pending PCT-HP

202-29 9 pending PCT-HP

202-22 23 pending PCT-HP

202-93 3 pending PCT-HP

202-28 9 pending PCT-HP

202-142 5 pending PCT-HP

202-45 9 pending PCT-HP

202-41 2 pending PCT-HP

202-46 5 pending PCT-HP

202-20 7 pending PCT-HP

202-19 5 pending PCT-HP

202-18 7 pending PCT-HP

Natural Stand 14 pending PCT-HP

201-24 19 pending PCT-HP

Unknown Std-ID 4 pending PCT-HP

202-31 7 pending PCT-HP

Unknown Std-ID 5 pending PCT-HP

Natural Stand 9 pending PCT-HP

Natural Stand 5 pending PCT-HP

Natural Stand 5 pending PCT-HP

Natural Stand 2 pending PCT-HP

209-13 3 pending PCT-HP

209-14 19 pending PCT-HP

209-16 15 pending PCT-HP

Total (non-funded) Acres 283

Total Contract Acres 903

2800 240

4800 2000

® FY-20 Two Bit PCT - 73 units, 903 acres

0 1 20.5 Miles

Map Prepared by TjDrake 02222020@1330hrs

Legend

Item 2 (Optional) - twobit-contract-pct-nokv - 283 acres Item 1 - twobit-contract-pct - 620 acres

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

03/06/2013

1. SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.

2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.

(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.

B. Forest Service

The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.

3. DEFINITIONS:

The following definitions shall apply:

Active Landing: A location the contractor may be skidding logs into, or performing other operations such as delimbing, log manufacturing, and chipping logs. Except for EV and E days, loading logs or stockpiling chips only, on a cleared landing, does not constitute an Active Landing.

Hot Saw: A harvesting system that employs a high-speed (>1100 rpm) rotating felling head, i.e., full rotation lateral tilt head.

Mechanical Operations: The process of felling, skidding, chipping, shredding, masticating, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders , dozers etc.

4. TOOLS AND EQUIPMENT:

The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:

The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.

This contract requires, X does not require, a Fire Box and associated Fire Tools according to CPRC Section 4428.

A. Fire Tools and Equipment: Contractor shall meet minimum requirements of Section 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.

Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.

Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.

B. Fire Extinguishers: Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).

Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.

All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.

Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.

C. Spark Arresters and Mufflers: Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the.

National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition. Every motor vehicle subject to registration shall at all times be equipped with an adequate exhaust system meeting the requirements of the California Vehicle Code.

D. Power Saws: Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. An Underwriters Laboratories (UL) approved fire extinguisher containing a minimum 14 ounces of fire retardant shall be kept with each operating power saw. In addition, a size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.

• This contract requires, X does not require, Section 4E of the Fire Plan.

E. Tank Truck or Trailer: Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor's Operations hereunder during Fire Precautionary Period.

When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing, unless otherwise excepted when Hot Saws or Masticators are being used. See Section 6 for specific contract requirements.

The tank shall contain at least 300 gallons of water available for fire suppression. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area.

Tank truck or trailer shall be equipped with the following:

(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:

T e m p

Sea

Level

Feet

10000

55 179 23 174 23 169 23 165 22 161 22 157 22 153 22 150 21 146 21 142 21 139 21 70 175 23 171 23 166 22 162 22 158 22 154 22 150 21 147 21 143 21 139 21 136 20 85 171 23 168 23 163 22 159 22 155 22 151 21 147 21 144 21 140 21 136 20 133 20 100 168 23 164 23 159 22 155 22 152 22 148 21 144 21 141 21 137 20 133 20 131 20

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

P S I

G P M

The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.

(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.

(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:

G.P.M. Horizontal Range Straight Stream 10 38 feet Fog Spray 6 - 20 N/A

(4) Sufficient fuel to run the pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.

When Contractor is using Hot Saws or Masticators, an additional 250 feet of light weight hose, approved by the Forest Service, shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above.

This equipment and accessories shall be deliverable to a fire in the area of operations and is subject to the requirements for each specific activity level identified in Section 6.

F. Compressed Air Foam System: A Compressed Air Foam System (CAFS) is a fire suppression system where compressed air is added to water and a foaming agent. By agreement, Contractor may substitute a CAFS or functional equivalent in lieu of the tank truck, trailer or fire extinguishers, provided it meets or exceeds the following specifications and requirements:

1. Variable foam expansion ratio – 10:1 to 20:1.

2. Units shall be kept fully charged with air; water and foam concentrate as recommended by the manufacturer and have the appropriate tools to service the system.

3. The unit shall contain enough energy to empty tank and clear hose prior to exhausting propellant.

4. The unit shall be capable of being completely recharged within 10 minutes.

5. When used on cable yarding landings, the unit shall be outfitted for immediate attachment to carriage and transported without damage to the unit.

Fire extinguishers required for Hot Saws, Masticators and similar equipment identified in Section 4 B.

above may be substituted with a 3 gallon CAFS.

Tank truck, trailer or equivalent may be substituted with a 30 Gallon CAFS with at least 550 feet of one inch hose and an adjustable nozzle with enough water, air and foam concentrate for at least one recharge.

This equipment and accessories shall also be deliverable to a fire in the area of operations and subject to the requirements for each specific activity level identified in Section 6.

5. GENERAL

A. State Law: In addition to the requirements in this Fire Plan, the Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.

B. Permits Required: The Contractor must secure a special written permit from the District Ranger or designated representative before burning, welding or cutting metal or starting any warming fires. If contract requires Blasting and Storing of Explosives and Detonators, an Explosives Permit may be required pursuant to the California Health and Safety Code, Section 12101.

C. Blasting: Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a Fire Patrolperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.

D. Smoking: Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see.

Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.

E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.

F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.

Contractor's employees shall report all fires as soon as possible to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:

Name Office Address Telephone Number Dispatch Center YICC Yreka, CA 911 or 530-842-4600 Nearest FS Station Happy Camp R.D. 63822 Hwy 96 530-493-2243 COR Todd Drake 63822 Hwy 96 530-493-1740 Inspector ...

District Ranger Tom Mutz 63822 Hwy 96 530-598-4197

When reporting a fire, provide the following information:

Your Name Call back telephone number Project Name

Location: Legal description (Township, Range, Section); and Descriptive location (Reference point)

Fire Information: Including Acres, Rate of Spread and Wind Conditions.

This contract requires, X does not require, Section 5G of the Fire Plan.

G. Communications: Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone.

This contract requires, X does not require, Section 5H of the Fire Plan.

H. Fire Patrolperson: Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level C or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required. This Fire patrol is required on foot, unless otherwise agreed.

By agreement, one patrolperson may provide patrol on this and adjacent projects. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.

The Contractor shall, prior to commencing work, furnish the following information relating to key personnel:

Title Name Telephone Number Fire Supervisor

Fire Patrolperson

I. Clearing of Fuels: Contractor shall clear away, and keep clear, fuels and logging debris as follows:

Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:

10 feet slope radius

Tail or corner haulback blocks: All running blocks shall be located in the center of an area cleared to mineral soil at least 15 feet in diameter.

Lines near, between or above blocks: Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material.

6. EMERGENCY PRECAUTIONS

Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Project Activity Levels applicable to this project shall be the predicted activity levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map Legend on Integrated Resource Service Contracts (IRSC’s), and other contracts where applicable.

Fire Danger Rating Area/Fire Weather Station for Project Slater Butte RAWS

The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM. Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day.

Phone Number or Website to obtain Predicted Activity Levels: 530-842-6131

Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below.

PROJECT ACTIVITY LEVEL

Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.

A Minimum requirements noted above in Sections 4 and 5.

B 1. Tank truck, trailer, or approved CAFS substitute shall be on or adjacent to the Active Landing.

C 1. When Hot Saws or Masticators are operating, a tank truck, trailer, or approved CAFS substitute shall be within ¼ mile of these operations. Effective communications shall exist between the operator and the Active Landing.

2. Immediately after Mechanical Operations cease, Fire patrol is required for two hours.

D 1. Immediately after Hot Saw or Masticator operations cease, Fire patrol is required for three hours.

2. No Dead Tree felling after 1:00 PM, except recently dead.

3 No burning, blasting, welding or cutting of metal after 1:00 PM, except by special permit.

Ev 1. The following activities may operate all day:

a) Loading and hauling logs decked at approved landings.

b) Loading and hauling chips stockpiled at approved landings.

c) Servicing equipment at approved sites.

d) Dust abatement, road maintenance (Chainsaw use prohibited), culvert installation within cleared area, chip sealing, paving, earth moving or rock aggregate stock pile loading and installation (does not include pit or quarry development).

e) Chainsaw and log processing operations associated with loading logs or other forest products at approved landings.

2. Hot Saws or Masticators may operate until 1:00 PM; provided that:

a) A tractor with a blade or other equipment capable of constructing fireline is on or adjacent to the active landing or within ¼ mile of the operating equipment. This piece of equipment shall have effective communication with the Hot Saw or Masticator.

b) Any additional restrictions specified by the Forest.

3. All other conventional Mechanical Operations are permitted until 1:00 PM.

4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement. Activities for which a Variance may be issued are:

• Rubber Tire Skidding

• Chipping on Landings

• Helicopter Yarding

• Fire Salvage

When approved by a Line Officer, a Variance Agreement can be implemented when the criteria specified in the agreement are met and mitigation measures are in place. This approval is good for ten

(10) days unless cancelled sooner or extended by the Contracting Officer for an additional ten (10) days. Variance approval can be withdrawn at the sole discretion of the Forest Service. Variance approval is contingent on the 7-day fire weather forecast, fuel conditions, site characteristics, current fire situation, state of Contractor’s equipment for prevention and suppression readiness, type of operation and social and community considerations etc. (See attached Project Activity Level Variance Agreement).

Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.

E The following activities may operate all day:

1. Loading and hauling logs decked at approved landings.

2. Loading and hauling chips stockpiled at approved landings.

3. Servicing Equipment at approved sites.

4. Dust abatement, road maintenance (chainsaw use prohibited) or loading stock piles and rock aggregate installation (does not include pit or quarry development).

5. Chainsaw operation associated with loading at approved landings.

All other activities are prohibited.

This Project utilizes “The Project Activity Level” (PAL), an industrial operation’s fire precaution system. The following Climatology Chart indicates the Historic Activity Levels for the Project Fire Danger Rating Area or Fire Weather Station utilized on this Project. This is only a historical average of the Activity Levels for the identified Fire Danger Rating Area or Weather Station.

Project Activity Level Climatology

Fire Danger Rating Area/Weather Station

Years Analyzed

A B C D Ev E Days Month Expected Days per Month at Each PAL Value Analyzed July August September October

Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement

Project Name: ___FY20 Two-Bit Precommercial Thinning __ Contract Number: _____tba__________________________________ Contractor Name: _____tba__________________________ Request #___________, for period: _____July 2020 to December 2020____________ Units/Subdivisions Affected: __Klamath NF, Happy Camp/Oak Knoll District_____

Location of operation:

Slope 30%

Aspect Various

Elevation 2,500’ to 4,500’

Fuels on site Planted forest, mixed conifer

Fuels in surrounding area Planted forest, mixed conifer

7 Day PAL Outlook Tba

Short range predictions (Red Flags)

Tba

Fuel Moistures Tba

Response time of suppression resources

10 minutes to 20 minutes

Potential for ignition Low

RAWS location Slater Butte RAWS

Current Fire Situation:

Draw down information Tba

National Readiness Level Tba

Contractual considerations:

Normal Operating Season Summer and Fall

Frequency of recent contract fires in area

None.

Type of operation Thinning, handpiling.

Contractors past/current performance & equipment readiness

Tba

Other site specific mitigation or precaution (i.e. Contractors proposals)

Social & Community Considerations:

Proximity of high value resources Some units adjacent to private property.

Sensitivity of location Low.

Proposed Actions:

Description of Mitigation Measures:

Remarks:

Fire Management Officer Concurrence

Date

Line Officer Approval Date

I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project Activity Level Ev. Unless extended, the approval remains in effect for ten

(10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest Service, this variance can be modified and/or cancelled at no cost to the government.

Contracting Officer Date

Contractor Representative Date

"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 1977-0727 Daniel W. Simms Division of | Revision No.: 60 Director Wage Determinations| Date Of Last Revision: 02/21/2020 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2020. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: California

Area: California Statewide **Fringe Benefits Required Follow the Occupational Listing**

Employed on service contracts for forestry land management the cleaning of public use areas and timber inventory services.

OCCUPATION CODE - TITLE FOOTNOTE RATE

08010 - Brush/Precommercial Thinner 16.34 08040 - Choker Setter 17.16 08070 - Faller/Bucker 35.51 08100 - Fire Lookout 16.34 08160 - Forestry/Logging Heavy Equipment Operator 19.37 08190 - Forestry Technician 18.17 08200 - Forestry Truck Driver 19.65 08250 - General Forestry Laborer 16.00 08280 - Nursery Specialist 22.66 08310 - Slash Piler/Burner 16.34 08340 - Tree Climber 18.34 08370 - Tree Planter 14.54 08400 - Tree Planter Mechanical 14.54

Note: Executive Order (EO) 13706 Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2017. If this contract is covered by the EO the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness injury or other health-related needs including preventive care; to assist a family member (or person who is like family to the employee) who is ill

3/20/2020https://beta.sam.gov/wage-determination/1977-0727/60?index=wd&is_active=false&date_...

injured or has other health-related needs including preventive care; or for reasons resulting from or to assist a family member (or person who is like family to the employee) who is the victim of domestic violence sexual assault or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:

HEALTH & WELFARE: $4.54 per hour up to 40 hours per week or $181.60 per week or $786.93 per month

HEALTH & WELFARE EO 13706: $4.22 per hour up to 40 hours per week or $168.80 per week or $731.47 per month*

*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706 Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.

VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor 3 weeks after 5 years and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor wherever employed and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)

HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day Martin Luther King Jr.'s Birthday Washington's Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans' Day Thanksgiving Day and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)

** UNIFORM ALLOWANCE **

If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract by the employer by the state or local law etc.) the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:

The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition where uniform cleaning and maintenance is made the responsibility of the employee all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount or the furnishing of contrary affirmative proof as to the actual cost) reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However in those instances where the uniforms furnished are made of ""wash and wear"" materials may be routinely washed and dried with other personal garments and do not require any special treatment such as dry cleaning daily washing or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract by the contractor by law or by the nature of the work there is no requirement that employees be reimbursed for uniform maintenance costs.

** NOTES APPLYING TO THIS WAGE DETERMINATION **

Under the policy and guidance contained in All Agency Memorandum No. 159 the Wage and Hour Division does not recognize for section 4(c) purposes prospective wage rates and fringe benefit provisions that are effective only upon such contingencies as ""approval of Wage and Hour issuance of a wage determination incorporation of the wage determination in the contract adjusting the contract price etc."" (The relevant CBA section) in the collective bargaining agreement between (the parties) contains contingency language that Wage and Hour does not recognize as reflecting ""arm's length negotiation"" under section 4(c) of the Act and 29 C.F.R. 5.11(a) of the regulations. This wage determination therefore reflects the actual CBA wage rates and fringe benefits paid under the predecessor contract.

** SERVICE CONTRACT ACT DIRECTORY OF OCCUPATIONS **

The duties of employees under job titles listed are those described in the ""Service Contract Act Directory of Occupations"" Fifth Edition (Revision 1) dated September 2015 unless otherwise indicated.

REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE

Standard Form 1444 (SF-1444)

Conformance Process:

The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e. the work to be performed is not performed by any classification listed in the wage determination) be classified by the contractor so as to provide a reasonable relationship (i.e. appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined (See 29 CFR 4.6(b)(2)(i)). Such conforming procedures shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees (See 29 CFR 4.6(b)(2)(ii)). The Wage and Hour Division shall make a final determination of conformed classification wage rate and/or fringe benefits which shall be retroactive to the commencement date of the contract (See 29 CFR 4.6(b)(2)(iv)(C)(vi)). When multiple wage determinations are included in a contract a separate SF-1444 should be prepared for each wage determination to which a class(es) is to be conformed.

The process for preparing a conformance request is as follows:

1) When preparing the bid the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s).

2) After contract award the contractor prepares a written report listing in order the proposed classification title(s) a Federal grade equivalency (FGE) for each proposed classification(s) job description(s) and rationale for proposed wage rate(s) including information regarding the agreement or disagreement of the authorized representative of the employees involved or where there is no authorized representative the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.

3) The contracting officer reviews the proposed action and promptly submits a report of the action together with the agency's recommendations and pertinent information including the position of the contractor and the employees to the Wage and Hour Division U.S. Department of Labor for review (See 29 CFR 4.6(b)(2)(ii)).

4) Within 30 days of receipt the Wage and Hour Division approves modifies or disapproves the action via transmittal to the agency contracting officer or notifies the contracting officer that additional time will be required to process the request.

5) The contracting officer transmits the Wage and Hour decision to the contractor.

6) The contractor informs the affected employees.

Information required by the Regulations must be submitted on SF-1444 or bond paper.

When preparing a conformance request the ""Service Contract Act Directory of Occupations"" (the Directory) should be used to compare job definitions to ensure that duties requested are not performed by a classification already listed in the wage determination. Remember it is not the job title but the required tasks that determine whether a class is included in an established wage determination.

Conformances may not be used to artificially split combine or subdivide classifications listed in the wage determination."

Two-Bit PCT Task Order
1. DESCRIPTION OF WORK:
1. Detailed Unit Information Sheet
FY20 Two-Bit PCT-HP
3. Map
2. Fire Plan
A. Contractor
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do no...
The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:
The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or ...
F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor. Contractor's employees shall report all fires as so...
The Contractor shall, prior to commencing work, furnish the following information relating to key personnel:
Title
Fire Supervisor
Fire Patrolperson
Fuel Moistures

4. Wage Determination