Little Jones Creek Rd Prjct TO Pkg.pdf

PDF 7 MB Posted

Attached to
Manual Fuels Reduction IDIQ Federal contract opportunity
Solicitation number
129AC720Q0044
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manual Fuels Reduction IDIQ

Section I Contract No. NA Project Name:

Little Jones Creek Road Project

Requisition No. 999871 Issue Date: 04/23/2020 Contractor:

Telephone:_____________________

Issuing and Billing Office:

NCASA, Redding Office 3644 Avtech Parkway Redding, CA 96002

Section II Item No.

Description Quantity Order

Unit

Unit Price

Amount

Manual thinning, pruning, hand piling, and covering of vegetation. 238 Acres $_________ $__________

Total Price:

Section III Contractor: (Name and Signature)

Contractor DUNS #:________________________ Email:__________________________________

RESPONSE DUE BY: May 7, 2020, 1:00 PDT

IDIQ Solicitation response date. May 7, 2020, 1:00 PDT

RESPONSE MAY BE:

Emailed to:paul.wood@usda.gov

Section IV

1. DESCRIPTION OF WORK

The purpose of this contract is to secure services for manual fuels treatment operations of:

Thinning, Pruning, Hand Piling, and Covering of 238 acres on the Little Jones Creek Project- Little Jones Creek Road. The Contractor shall furnish all labor, equipment, supervision, transportation and supplies (including black 6ml plastic to cover piles) to perform all work specified therein.

2. PROJECT LOCATIONS

The project area is located on the Smith River National Recreation Area of the Six Rivers National Forest. A vicinity map and treatment unit maps are included as attachments, showing the location of units to be treated. The Little Jones Creeek Project-Little Jones Creek Road is accessed by Forest Service Road 17N08-(Little Jones Creek Road), 17N05 (Jaw Bone Road), and 17N04 Roads.

The units have been determined by Geographic Information Systems (GIS) and are located within 150 feet in width on each side of the main road.

3. PERIOD OF PERFORMANCE

Period of performance Task order award through January 31, 2021.

4. LIMITED OPERATING PERIODS

There are Limited Operating Periods on some of the units due to the protection of the Northern Spotted Owl (NSO), January 31 through August 1 and Marten, January 31 through June 1.

LOP’s are subject to change through consultation with Fish and Wildlife Service (FWS).

The Maximum LOP for NSO could be Feb 1- Sept 15 for certain units. Based on this the Contracting Officer’s Representative may specify a priority of work by unit, without additional costs. In nearly all cases, work will move to adjacent units. Unit maps will be given with detailed information on LOP’s and restrictions.

5. SPECIFIC WORK REQUIREMENT

Objective: The work to be accomplished includes cutting ladder fuels such as dead woody material, brush, and small diameter seedling and sampling trees <8 inch DBH, pruning lower limbs of overstory trees, and hand piling the cut material. Trees less than 8 inch DBH that are desirable “leave” trees (conifers or hardwoods) shall be selected by the Contractor as “leave” trees using the following priorities: The leave trees shall generally be those of tallest height, largest crown, and straightest boles, and that are free from damage due to insects, disease, physical and mechanical causes to achieve average spacing of 16' X 16". When conifers and hardwoods are not present shrubs shall be selected. Unit boundaries are NOT flagged. It shall be Contractor responsibility to locate the unit boundaries, in accordance with guidelines provided by the USFS.

Fuelbreak Construction: The Project includes the construction of fuelbreaks along primary access roads and on ridgetops to approximately 150 feet in width on each side of the road or other various combinations resulting in approximately 300 feet in width, or to the nearest ridgetop.

• Cutting live or dead trees <8 inch DBH unless needed to meet canopy closure requirements and all brush species. All stumps of trees or brush are to be flush cut and not exceed 3 inches above ground or natural obstacles on the uphill side (no branches should be left on stumps).

• Pruning all live and dead branches on leave trees 8 feet above ground as measured from the uphill side without reducing the live crown to less than 50% of the overall tree height.

Therefore, on small trees, pruning height may be less than 6 feet. Limbs are to be cut in such a manner so as not to cause damage to the bole of the tree, generally leaving about a 1 inch stub.

• Hand piling all cut material and dead and down woody debris such as small limbs and logs of 1/4 to 6 inches diameter on the big end and greater than 2 feet long. Piles are to be manageable, compact, and free of soil for burning and generally not greater than 4 ft high x 4 ft wide x 6 ft long. Piles are not to be placed next to or on top of residual green trees, standing dead tree, near down logs greater than 10 inch diameter, or in creeks, roadways or ditches. All piles are to be placed perpendicular to the slope to prevent rollout and have a good base to prevent the pile from toppling.

• Covering hand piles with black 6ml plastic, which will be provided by the Contractor.

Plastic needs to be placed over the crown of the pile and cover a minimum of 75 percent of the pile. Limbs or other woody debris should be placed over the pile to secure the paper against reasonable wind events.

Public Fire Wood Gathering: All logs 4-8 inch DBH within 50 feet of a road way will be left outside of piles for fire wood gatherers.

Water is abundant on our district. In the event that a wet area was not located in the detailed mapping from the forest service the contractor shall stop cutting/buffer and notify the forest service of this area.

Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft. for all stream channels and within 25 ft. of a spring. Exceptions cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Fueling of chainsaws or refilling fuel containers must be done with use of a spill kit to prevent fuel from being dumped all over roadways.

Garbage and human waste shall be disposed of properly. No trash will be placed in piles or left at the job site (this includes old chainsaw parts). Human waste will be buried with a shovel away from the job site.

A portion of F-7 coincides with known locations of the Survey and Manage (SM) lichen species, Lobaria oregana. Pile construction restrictions to the sub-canopy of each “parent tree” would be applied to the point on the map with a 30’ radius. Due to this lichen species’ sensitivity to air quality changes, avoid establishing burn piles beneath the inner canopy of late-mature trees. Overstocked trees <8” DBH will still be reduced and pruning of residual trees will still be allowed in the unit, but cut materials will be pulled away 30’ radius from the inner canopy of parent-late mature trees. (See unit maps).

An Invasive Plant buffer occurs in unit F-6- road edge occurrence, 15’ radius from the point.

Invasive plant demarcation= orange flagging with “Noxious Weed” on flagging (See unit maps).

In units F-5, F-7, F-12, and F-14 these mid-and late-mature stands contain potential Sensitive fungi habitat or contain moderate quality NSO foraging habitat, treat the first 50 feet (roadside) and, if it occurs, the 50 feet nearest the ridge top following the standard fuelbreak prescription described above. In the remaining 50 to 100 feet (depending if the area is adjacent to a ridge top), 40-50% of existing brush will be maintained in a mosaic pattern to provide habitat components for wildlife and fungi (i.e. continuity of underground fungal “stems” called mycelia). Overstocked trees <8” DBH will still be reduced and pruning of residual trees will still be allowed in these areas (See unit maps).

EQUIPMENT CLEANING FOR POC AND NOXIOUS WEED AVOIDANCE

MEASURES

To prevent the spread of noxious weeds and to protect Port-Orford Cedar (POC) from the fatal root fungus Phytophthora lateralis, all equipment will be washed to remove soil and organic debris prior to entry into the project area and upon final exit on site. Use chlorinated water to wash all vehicles and equipment.

• Clean all equipment used in the area prior to entry on site.

• Inspect all equipment prior to leaving the site to ensure weed material and organic debris is not exported from the area.

• All equipment shall be washed to remove soil and organic debris upon exit of the project.

6. FAR 52.237-1 Site Visit (Apr 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

7. GOVERNMENT FURNISHED PROPERTY:

None provided

8. CAMPING: There shall be no camping on Six Rivers National Forest lands in execution of this contract.

9. LIST OF ATTACHMENTS:

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages

1) Project Vicinity Map 1

2) Unit Maps 34

3) Fire Plan 9

4) Wage Determination 4

5) Shape files

Section V

10. EVALUATION CRITERIA:

Price is the only factor to be considered for award.

!(199

Mo nk ey Cr ee k

Little Jones Creek Siskiyou Fork Smith River

F-2

F-14

F-12

F-1

F-15A

F-3

F-7

F-4

F-5

F-13

F-7

F-10

F-6

F-19

F-20

F-9

F-21

F-15

17N05

17N08

N0

18N08

17N

17N27

N0

4S

17N 04L

16N33

17N36B

17N05F

17N 05A

17N36F

N0 5E

N2

7B

N0

8A

N2

7A

N0

5C

17N45

18N16F

17N05G

17N04R

17N27C

N6

Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

Existing FS Road State/County Road Perennial Creek Roadside Fuel Break- 238 acres Joint Chief's Project Boundary Non Forest Service Land

0 0.5 10.25 Miles

²

Little Jones Creek Project Little Jones Creek Road Gasquet Ranger District

Six Rivers National Forest

!(101

!(299

!(96

!(199

Little Jones Creek Project Area

Six Rivers National

Forest

JP20200408

01840

0017N05

17N08

£¤199

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 17.44

HPB

F-1 17N 3E 10

051051FTLITTLEJC001

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1356Min. 961 Max. 1621

Scale: 5000

Ù

GN

MN

0°33´

10 MILS

14½°

258 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

US Highway

Existing FS Road

Current Unit

Fuelbreak

50ft Stream Buffer

Control Area Invasive Species

Section Line

Little Jones Creek Boundary

WSW 247.16

Access: Forest Service Road 17N08 (Little Jones Creek Road), 17N05 (Jaw Bone Road), and 17N40.

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-1 Acres: 17.44

Wildlife and Botany: From HWY 199, first 0.25 miles only reduce fuel concentrations within 15 ft. of main roads. From 0.25 miles to 0.75 miles only treat 15 ft. of road on west (downhill) side of road (standard treatment on uphill sie-150 ft. or to the ridge east side).

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: Present, no treatment.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): NSO LOP (no noise or smoke generating operations between February 1 and July 31).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No Fire Sensitive: N/A

Field Inspector: James Scott, 707-457-3986Task Order: Little Jones Creek Road

17N05

17N08

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 31.13

HPB

F-2 17N 3E 10,15

051051FTLITTLEJC002

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1646Min. 1461 Max. 1909

Scale: 5000

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Control Area Invasive Species

Non Forest Service Land

Section Line

Little Jones Creek

SW 233.63

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-2 Acres: 31.13

Wildlife and Botany: None.

Riparian Reserves: None.

Soils: None.

Inasive Plants: Present, no treatment.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): Marten LOP (no noise or smoke generating operations between February 1 and May 31).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

1440136

17N08

125-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 11.7

HPB

F-3 17N 3E 15

051051FTLITTLEJC003

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1705Min. 1585 Max. 1813

Scale: 3500

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Non Forest Service Land

Section Line

Little Jones Creek

W 261.2

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-3 Acres: 11.7

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): NSO LOP (no noise or smoke generating operations between February 1 and July 31).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

N0

153a-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 10.19

HPB

F-4 17N 3E 15

051051FTLITTLEJC004

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1623Min. 1494 Max. 1762

Scale: 3000

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

Section Line

Little Jones Creek

WSW 253.45

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-4 Acres: 10.19

Wildlife and Botany: None.

Riparian Reserves: None.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

17N08 153a-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 6.28

HPB

F-5 14,15,22

051051FTLITTLEJC005

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1194Min. 1068 Max. 1414

Scale: 6000

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Threatened and Endangered Species

Section Line

Little Jones Creek

NW 308.38 17N 3E

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-5 Acres: 6.28

Wildlife and Botany: Within 0.2 miles of riparian, only reduce fuels within 15 ft. of the road on both creek side and uphill, as well as (15 ft. creek side the entire unit) Remaining uphill of unit, treat the first 50 feet (roadside) and, if it occurs, the 50 feet nearest the ridge top following the standard fuel break prescription described above. In the remaining 50 to 100 feet (depending if the area is adjacent to a ridge top), 40-50% of existing brush will be maintained in a mosaic pattern to provide habitat

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): Marten LOP (no noise or smoke generating operations between February 1 and May 31).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

17N08

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 5.84

HPB

F-6 17N 3E 22

051051FTLITTLEJC006

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1115Min. 1057 Max. 1234

Scale: 3500

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Control Area Invasive Species

Non Forest Service Land

Section Line

Little Jones Creek

WSW 252.9

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-6 Acres: 5.84

Wildlife and Botany: On creek side of the unit, only reduce fuels within 15 ft. of the road (the entire unit). Use standard treatment on uphill side-150 ft. or to the ridge, east side.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: Maintain a vegetative buffer of approximately 10 ft. around the the noxious weed occurrence between the roadside and the fuel break. No activities to occur within this buffer.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: Inasive Plants - orange with 'Noxious Weed'.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

N0

17N36F

17N08A

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 24.13

HPB

F-7 17N 3E 22,27

051051FTLITTLEJC007

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1289Min. 1093 Max. 1632

Scale: 11500

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Lobaria oregena

(TESP)

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Control Area Invasive Species

Non Forest Service Land

Section Line

Little Jones Creek

W 265.96

Ac c ess: Fo rest S ervic e Ro a d 17N08 (Little Jo nes Creek Ro a d ), 17N05 (Ja w Bo ne Ro a d ), a nd 17N40.

Little Jo nes Creek Pilo t Pro jec t Pro jec t Lea d : S heila Ba lent, 707-457-3968 Unit #: F-7 Acres: 24.13

Wild life a nd Bo ta ny: On creek sid e o f the unit, o nly red uc e fuels within 15 ft. o f the ro a d (the entire unit). On the ea st sid e o f the ro a d (up hill) red uc e fuel c o nc entra tio ns within the first 50 ft. (ro a d sid e) a s well a s the 50 ft. nea rest the p riva te la nd fo llo wing the sta nd a rd fuelb rea k p resc rip tio n. In the rem a ining fuelb rea k, 40-50% o f existing brush will b e m a inta ined in a m o sa ic p a ttern to p ro vid e ha b ita t c o m p o nents fo r fungi. Pile c o nstructio n restric tio ns to the sub-c a no p y o f ea c h “p a rent tree” wo uld b e a p p lied to the p o int o n the m a p with a 30 ft. ra d ius. Due to this lic hen sp ec ies’ sensitivity to a ir qua lity c ha nges, a vo id esta b lishing burn p iles b enea th the inner c a no p y o f la te-m a ture trees. Oversto c ked trees <8” DBH will still b e red uc ed a nd p runing o f resid ua l trees will still b e a llo wed in the unit, but cut m a teria ls will b e p ulled a wa y 30 ft. ra d ius fro m the inner c a no p y o f p a rent-la te m a ture trees.

Rip a ria n Reserves: T hinning in Rip a ria n Reserves (RRs) wo uld b e a llo wed to within 50 feet o n ea c h sid e o f a ll strea m c ha nnels, o r the brea k in slo p e a t the ed ge o f the inner go rge, whic hever is grea ter.

All RR a rea s sha ll b e exc lud ed (buffered ) fro m the p ro jec t. No trea tm ent b uffers o f a m inim um o f 50 ft.

fo r a ll strea m c ha nnels a nd within 25 ft. o f a sp ring. Exc ep tio ns inc lud e c utting vegeta tio n enc ro a c hing o n the ro a d wa y where rip a ria n reserves intersect the ro a d .

S o ils: No ne.

Ina sive Pla nts: No ne.

No tes:

Fuels: Any c o nc entra tio ns o f fuels genera ted thro ugh ro a d use o r m a intena nc e will b e ha nd p iled a nd b urned o r c hip p ed o n site.

Burning: Burn p iles sho uld b e o f a size a nd d istributio n a s to m a inta in o vera ll so il c o ver requirem ents (genera lly >50%) a nd keep b a re a rea s sep a ra ted b y filter strip a rea s; und ersto ry (b ro a d c a st) burns sha ll likewise inc lud e in the b urn p la n sp ec ific m ea ns to a c hieve resid ua l so il c o ver requirem ents.

Ignitio n m a y o c c ur within rip a ria n reserves o nly when nec essa ry to m inim ize p resc rib ed fire b eha vio r intensity a nd /o r the p o tentia l fo r burning m a teria l to ro ll d o wn into a rip a ria n reserve. No fire line (sc ra p ed to m inera l so il) will b e c o nstructed within rip a ria n reserves, with the exc ep tio n o f ha nd -c ut brush-o nly c o ntro l lines fo r ho ld ing p urp o ses o n p resc rib ed fires.

T a g & Fla gging Co lo r: No ne.

Lim ited Op era ting Perio d (LOP): No ne.

Herita ge & Cultura l reso urc es: No ne; c o nta c t if ina d verta nt d isc o very.

Cultura l M o nito r required o n site: No Fire S ensitive: N/A

Field Insp ec to r: Ja m es S c o tt, 707-457-3986T a sk Ord er: Little Jo nes Creek Ro a d

17N08

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 2.48

HPB

F-9 17N 3E 35

051051FTLITTLEJC009

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2570Min. 2527 Max. 2629

Scale: 1500

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

Section Line

Little Jones Creek

WNW 284.68

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-9 Acres: 2.48

Wildlife and Botany: None.

Riparian Reserves: None.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

280017N04

N0

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 16.18

HPB

F-10 17N 3E 34,35

051051FTLITTLEJC010

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2562Min. 2344 Max. 2711

Scale: 3500

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Section Line

Little Jones Creek

WSW 237.41

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-10 Acres: 16.18

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): Possible NSO LOP- only if protocol surveys are not continued (February 1 through July 9).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

2880 2400

17N04

N0

4R

131-1

141-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 28.54

CH, HPB

F-12 17N 3E 34

051051FTLITTLEJC012

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2555Min. 2370 Max. 2712

Scale: 7000

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

25ft Spring Buffer

Section Line

Little Jones Creek

S 173.33

Ac c ess: Fo rest S ervic e Ro a d 17N08 (Little Jo nes Creek Ro a d ), 17N05 (Ja w Bo ne Ro a d ), a nd 17N40.

Little Jo nes Creek Pilo t Pro jec t Pro jec t Lea d : S heila Ba lent, 707-457-3968 Unit #: F-12 Acres: 28.54

Wild life a nd Bo ta ny: On the up hill sid e o f the unit (fla gged with white fla gging with red p o lka d o ts) , trea t the first 50 feet (ro a d sid e) a nd , if it o c c urs, the 50 feet nea rest the rid ge to p fo llo wing the sta nd a rd fuel b rea k p resc rip tio n. In the rem a ining 50 to 100 feet (d ep end ing if the a rea is a d ja c ent to a rid ge to p ), 40- 50% o f existing b rush will b e m a inta ined in a m o sa ic p a ttern to p ro vid e ha b ita t c o m p o nents fo r wild life a nd fungi. Oversto c ked trees <8” DBH will still b e red uc ed a nd p runing o f resid ua l trees will still b e

Rip a ria n Reserves: T hinning in Rip a ria n Reserves (RRs) wo uld b e a llo wed to within 25 ft. o f a sp ring.

All RR a rea s a re exc lud ed (buffered ) fro m the p ro jec t. Exc ep tio ns inc lud e c utting vegeta tio n enc ro a c hing o n the ro a d wa y where rip a ria n reserves intersect the ro a d .

S o ils: No ne.

Ina sive Pla nts: No ne.

No tes:

Fuels: Any c o nc entra tio ns o f fuels genera ted thro ugh ro a d use o r m a intena nc e will b e ha nd p iled a nd b urned o r c hip p ed o n site.

Burning: Burn p iles sho uld b e o f a size a nd d istributio n a s to m a inta in o vera ll so il c o ver requirem ents (genera lly >50%) a nd keep b a re a rea s sep a ra ted b y filter strip a rea s; und ersto ry (b ro a d c a st) burns sha ll likewise inc lud e in the b urn p la n sp ec ific m ea ns to a c hieve resid ua l so il c o ver requirem ents.

Ignitio n m a y o c c ur within rip a ria n reserves o nly when nec essa ry to m inim ize p resc rib ed fire b eha vio r intensity a nd /o r the p o tentia l fo r burning m a teria l to ro ll d o wn into a rip a ria n reserve. No fire line (sc ra p ed to m inera l so il) will b e c o nstructed within rip a ria n reserves, with the exc ep tio n o f ha nd -c ut brush-o nly c o ntro l lines fo r ho ld ing p urp o ses o n p resc rib ed fires.

T a g & Fla gging Co lo r: Wild life/Bo ta ny - white with red p o lka d o ts.

Lim ited Op era ting Perio d (LOP): No ne.

Herita ge & Cultura l reso urc es: No ne; c o nta c t if ina d verta nt d isc o very.

Cultura l M o nito r required o n site: No

17N04

N3

2-1

141-1

1-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 9.71

HPB

F-13 17N 3E 33,34

051051FTLITTLEJC013

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2480Min. 2349 Max. 2665

Scale: 2500

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

Control Area Invasive Species

Section Line

Little Jones Creek

ESE 120.16

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-13 Acres: 9.71

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: Present, no treatment.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

22402320

17N05

17N08

17N05A

18N08

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 33.26

HPB

F-14 17N 3E 10,11,14,15

051051FTLITTLEJC014

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1997Min. 1747 Max. 2263

Scale: 6000

Ù

GN

MN

0°33´

10 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Control Area Invasive Species

Non Forest Service Land

Section Line

Little Jones Creek

E 84.22

Ac c ess: Fo rest S ervic e Ro a d 17N08 (Little Jo nes Creek Ro a d ), 17N05 (Ja w Bo ne Ro a d ), a nd 17N40.

Little Jo nes Creek Pilo t Pro jec t Pro jec t Lea d : S heila Ba lent, 707-457-3968 Unit #: F-14 Acres: 33.26

Wild life a nd Bo ta ny: On the d o wnhill sid e o f the unit (fla gged with white fla gging with red p o lka d o ts), trea t the first 50 feet (ro a d sid e) fo llo wing the sta nd a rd fuel brea k p resc rip tio n. In the rem a ining 100 feet, 40-50% o f existing brush will b e m a inta ined in a m o sa ic p a ttern to p ro vid e ha b ita t c o m p o nents fo r wild life a nd fungi. Oversto c ked trees <8” DBH will still b e red uc ed a nd p runing o f resid ua l trees will still b e a llo wed in these a rea s.

Rip a ria n Reserves: T hinning in Rip a ria n Reserves (RRs) wo uld b e a llo wed to within 50 feet o n ea c h sid e o f a ll strea m c ha nnels, o r the brea k in slo p e a t the ed ge o f the inner go rge, whic hever is grea ter.

All RR a rea s sha ll b e exc lud ed (buffered ) fro m the p ro jec t. No trea tm ent b uffers o f a m inim um o f 50 ft.

fo r a ll strea m c ha nnels a nd within 25 ft. o f a sp ring. Exc ep tio ns inc lud e c utting vegeta tio n enc ro a c hing o n the ro a d wa y where rip a ria n reserves intersect the ro a d .

S o ils: No ne.

Ina sive Pla nts: Present, no trea tm ent.

No tes:

Fuels: Any c o nc entra tio ns o f fuels genera ted thro ugh ro a d use o r m a intena nc e will b e ha nd p iled a nd b urned o r c hip p ed o n site.

Burning: Burn p iles sho uld b e o f a size a nd d istributio n a s to m a inta in o vera ll so il c o ver requirem ents (genera lly >50%) a nd keep b a re a rea s sep a ra ted b y filter strip a rea s; und ersto ry (b ro a d c a st) burns sha ll likewise inc lud e in the b urn p la n sp ec ific m ea ns to a c hieve resid ua l so il c o ver requirem ents.

Ignitio n m a y o c c ur within rip a ria n reserves o nly when nec essa ry to m inim ize p resc rib ed fire b eha vio r intensity a nd /o r the p o tentia l fo r burning m a teria l to ro ll d o wn into a rip a ria n reserve. No fire line (sc ra p ed to m inera l so il) will b e c o nstructed within rip a ria n reserves, with the exc ep tio n o f ha nd -c ut brush-o nly c o ntro l lines fo r ho ld ing p urp o ses o n p resc rib ed fires.

T a g & Fla gging Co lo r: Wild life/Bo ta ny - white with red p o lka d o ts.

Lim ited Op era ting Perio d (LOP): Po ssib le NS O LOP- o nly if p ro to c o l surveys a re no t c o ntinued (Februa ry 1 thro ugh July 9).

Herita ge & Cultura l reso urc es: No ne; c o nta c t if ina d verta nt d isc o very.

Cultura l M o nito r required o n site: No

17N05

103-1

114a-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 2.28

HPB

F-15 17N 3E 14

051051FTLITTLEJC015

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2075Min. 1990 Max. 2129

Scale: 1500

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

Control Area Invasive Species

Section Line

Little Jones Creek

S 172.42

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-15 Acres: 2.28

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: Present, no treatment.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): NSO LOP (no noise or smoke generating operations between February 1 and July 31).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

26402720

17N05

N0

5E

17N05F

120-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 24.71

HPB

F-15A 17N 3E 24

051051FTLITTLEJC15A

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2610Min. 2265 Max. 2929

Scale: 5000

Ù

GN

MN

0°31´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

50ft Stream Buffer

Control Area Invasive Species

Non Forest Service Land

Section Line

Little Jones Creek

S 178.83

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-15A Acres: 24.71

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: Present, no treatment.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): Possible NSO LOP- only if protocol surveys are not continued (February 1 through July 9).

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

N0

302-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 6.34

HPB

F-19 17N 3E 35

051051FTLITTLEJC019

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2255Min. 2111 Max. 2402

Scale: 2500

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Section Line

Little Jones Creek

NE 47.84

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-19 Acres: 6.34

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

17N08

302-1

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 5.35

HPB

F-20 17N 3E 26,35

051051FTLITTLEJC020

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 2040Min. 1914 Max. 2189

Scale: 2000

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Temp Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Section Line

Little Jones Creek

NNE 31.71

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-20 Acres: 5.35

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

17N08

Project Name Unit No. Acres Aspect (Avg.) SectionRangeTownshipElevation (ft.)

Treatment

SUID

Little Jones Creek 1.95

HPB

F-21 17N 3E 26

051051FTLITTLEJC021

BAC 4/10/2020

0 500 1,000250 Feet

Avg. 1867Min. 1750 Max. 1958

Scale: 1500

Ù

GN

MN

0°32´

9 MILS

14°29´

257 MILS

UTM GRID AND 2020 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

Existing FS Road

Current Unit

Fuelbreak

25ft Spring Buffer

50ft Stream Buffer

Non Forest Service Land

Section Line

Little Jones Creek

NE 54.86

Little Jones Creek Pilot Project Project Lead: Sheila Balent, 707-457-3968 Unit #: F-21 Acres: 1.95

Wildlife and Botany: None.

Riparian Reserves: Thinning in Riparian Reserves (RRs) would be allowed to within 50 feet on each side of all stream channels, or the break in slope at the edge of the inner gorge, whichever is greater.

All RR areas shall be excluded (buffered) from the project. No treatment buffers of a minimum of 50 ft.

for all stream channels and within 25 ft. of a spring. Exceptions include cutting vegetation encroaching on the roadway where riparian reserves intersect the road.

Soils: None.

Inasive Plants: None.

Notes:

Fuels: Any concentrations of fuels generated through road use or maintenance will be hand piled and burned or chipped on site.

Burning: Burn piles should be of a size and distribution as to maintain overall soil cover requirements (generally >50%) and keep bare areas separated by filter strip areas; understory (broadcast) burns shall likewise include in the burn plan specific means to achieve residual soil cover requirements.

Ignition may occur within riparian reserves only when necessary to minimize prescribed fire behavior intensity and/or the potential for burning material to roll down into a riparian reserve. No fire line (scraped to mineral soil) will be constructed within riparian reserves, with the exception of hand-cut brush-only control lines for holding purposes on prescribed fires.

Tag & Flagging Color: None.

Limited Operating Period (LOP): None.

Heritage & Cultural resources: None; contact if inadvertant discovery.

Cultural Monitor required on site: No

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

03/06/2013

1. SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.

2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .