TWO_24-08_SR20_at_CR83A_Intersection_Improvements_-_Final.pdf
PDF 8 MB Posted
- Solicitation number
- 25-25
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a final roadway construction plan document prepared by Panhandle Engineering & Construction for Walton County, Florida, in coordination with the Florida Department of Transportation (FDOT), detailing intersection improvements at State Road 20 and County Road 83A (West Bay Loop) west of Freeport. The project includes turn lane extensions, multi-use path realignment, concrete traffic separator installation, pavement resurfacing and widening, drainage structure improvements, signing, pavement markings, and traffic signalization. The construction project begins at SR 20 Station D 1405+61.87 and extends to Station D 1414+28.27, with an additional segment on CR 83A from Station 101+50.00 to Station 105+84.63, encompassing approximately 4.87 acres of disturbed area. The contract duration is one hundred fifty (150) days to substantial completion with an additional thirty (30) days for punch list completion. The project is funded through a Defense Infrastructure Grant (S0238) and is identified as FDOT Section No. 60030 at Walton County Milepost 14.625.
The design plans were prepared under the authority of multiple professional engineers including John C. Fielding, P.E. (License No. 79082) of Panhandle Engineering & Construction, Craig E. Dunkleberger, P.E. (License No. 49932) of EGS, Inc., and Eric K. Nelson, Jr., P.E. (License No. 79361) of Consor North America, Inc. The project incorporates FDOT FY 2025-26 Standard Specifications and Standard Plans for Road and Bridge Construction, with pavement designed for an estimated opening year of 2026 with an AADT of 11,700 vehicles and a design year of 2046 with an AADT of 21,200 vehicles at a design speed of 55 mph. All work must comply with current FDOT standards, the Florida Greenbook, and the Manual on Uniform Traffic Control Devices (MUTCD). Project administration and contact information is provided through Anna Hudson, P.E., Project Manager for Walton County, and John C. Fielding, P.E., Engineer of Record, with utility coordination requirements mandated at least 48 hours prior to construction activities.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIGHTING
SIGNALIZATION
SIGNING & PAVEMENT MARKING
ROADWAY
F
LO
R
ID
A 'S
T H
E O
F F
I C
I A
L R
E C
O R
D O
F T
H I S
S H
E E
T I
S T
H E
E L
E C
T R
O N
I C
F I L
E D
I G
I T
A L
L Y
S I G
N E
D A
N D
S E
A L
E D
U N
D E
R R
U L
E
G
.0
F
.A .C
/7
/2
:2
:0
A M
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
SHEET DESCRIPTIONSHEET NO.
jf ie ld in g
INDEX OF ROADWAY PLANS
STATE ROAD 20 AT CR 83A (W BAY LOOP) INTERSECTION IMPROVEMENTS BEE LINE
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
DEPARTMENT OF PUBLIC WORKS
CONTRACT PLANS
CONTRACT PLANS COMPONENTS
CONTRACT NO.
CONSTRUCTION
TBD
NO.
SHEET
YEAR
FISCAL
CITY
LAKE
GOVERNING STANDARD SPECIFICATIONS:
http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:
Florida Department of Transportation, FY 2025-26 Standard Specifications
GOVERNING STANDARD PLANS:
APPLICABLE IRs: IR - -following website: http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction and associated IRs are available at the
Bridge Construction and applicable Interim Revisions (IRs).
Florida Department of Transportation, FY2025-26 Standard Plans for Road and
(850) 892-8108
ANNA HUDSON, P.E.
WALTON COUNTY PROJECT MANAGER:
ENGINEER OF RECORD:
ROADWAY PLANS
C
F D
O T
C o n n e c t1
.1
\W o r k s p a c e s \F
D O
T \W o r k S e ts
\2 W a lt o n N o r th
E n d T r a il s \R o a d w a y \K
E Y
S R
D th
P h I .d g n
4277 LAFAYETTE STREET
MARIANNA, FLORIDA 32446
WALTON COUNTY TASK ORDER 24-08
JOHN C. FIELDING, P.E., PTOE
P.E. LICENSE NUMBER 79082
PANHANDLE ENGINEERING & CONST.
VENDOR NO.: 45-2846275
(850)526-2291
SAPM PLANS-1 to S-3
UTILITY PLAN35 - 37
TEMPORARY TRAFFIC CONTROL PLAN34
STORMWATER POLLUTION PREVENTION PLAN32 - 33
CROSS SECTIONS17 - 31
ROADWAY SOIL SURVEY16
PROJECT DETAILS14 - 15
DRAINAGE PROFILES12 - 13
DRAINAGE STRUCTURES11
ROADWAY PLAN8 - 10
GENERAL NOTES7
PROJECT LAYOUT6
TYPICAL SECTIONS4-5
DRAINAGE MAP3
SIGNATURE SHEET 2
KEY SHEET 1
LOCATION OF PROJECTWALTON COUNTY
FL DEFENSE INFRASTRUCTURE GRANT S0238
� SR 20
STA. D 1405+61.87
BEGIN PROJECT
� SR 20
STA. D 1414+28.27
END PROJECT
WALTON COUNTY
MILEPOST: 14.625
FDOT SECTION NO. 60030
SR 20 AT CR 83A INTERSECTION
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
TWO 24-08
WALTON
SR 2032446 FL, MARIANNA
4277 LAFAYETTE STREET
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
SIGNATURE SHEET
SIGNATURESHEETS : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\SIGNRD01.dgn
11:40:05 AM8/7/2025jfielding
STATE OF
No 79082
ESNECIL
GNI
DLEIF .C NHOJ
R E
E
NIGNE LANOIS
SEF
O R
P
ADIROL
F
ON ANY ELECTRONIC COPIES
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
SHEET DESCRIPTIONSHEET NO.
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
JOHN C. FIELDING, P.E. NO. 79082
MARIANNA, FL 32446
4277 LAFAYETTE STREET
PANHANDLE ENGINEERING & CONSTRUCTION, INC.
SAPM PLANS-1 to S-3
UTILITY PLAN35 - 37
TEMPORARY TRAFFIC CONTROL PLAN34
STORMWATER POLLUTION PREVENTION PLAN32 - 33
CROSS SECTIONS17 - 31
PROJECT DETAILS14 - 15
ROADWAY PLAN8 - 10
GENERAL NOTES7
PROJECT LAYOUT6
TYPICAL SECTIONS4-5
SIGNATURE SHEET 2
KEY SHEET 1
ON ANY ELECTRONIC COPIES
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
SHEET DESCRIPTIONSHEET NO.
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
CRAIG E. DUNKLEBERGER, P.E. NO. 49932
TALLAHASSEE, FL 32303
3676 HARTSFIELD ROAD
EGS, INC.
ROADWAY SOIL SURVEY16
SIGNATURE SHEET 2
ON ANY ELECTRONIC COPIES
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
SHEET DESCRIPTIONSHEET NO.
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
ERIC K. NELSON, JR., P.E. NO. 79361
WESLEY CHAPEL, FL 33544
2818 CYPRESS RIDGE BLVD, SUITE 200
CONSOR NORTH AMERICA, INC
DRAINAGE PROFILES12 - 13
DRAINAGE STRUCTURES11
DRAINAGE MAP3
SIGNATURE SHEET 2
STATE OF
No 49932
ESNECIL
R E
GREBEL
KNUD .E GI
A R
C
R E
E
NIGNE LANOIS
SEF
O R
P
ADIROL
F
STATE OF
No 79361
ESNECIL .
RJ
NOSLEN .K CIRE
R E
E
NIGNE LANOIS
SEF
O R
P
ADIROL
F
S68°40'59"E
N °2
'4
"E
N
BEGIN PROJECT
BEGIN CONSTRUCTION
STA. D 1405+61.87
END PROJECT
END CONSTRUCTION
STA. D 1414+28.27
BEGIN CONSTRUCTION
STA. 101+50.00
END CONSTRUCTION
STA. 105+84.63
C R
A
(W
B
A Y
L
O O
P
SR 20
� SR 20
� CR 83A
B E
N K
IN
G R
O A
D
S FL 64.98
N FL 64.09
18" CMP
SIDE DRAIN
W FL 60.37
E FL 60.83
12" X 16" CMP
SIDE DRAIN
W FL BURIED
E FL 63. 07
18" RCP
SIDE DRAIN (TO BE REMOVED)S FL 64.28
N FL 63.93
18" HDPE
SIDE DRAIN
S-01 S-03
S-02
P-01
STA. 1412+43.71 � SR 20 =
STA. 106+02.81 � CR 83A
P-02
4.87 AC
1400 1405 1410 1415 1420 1425
0.79 AC
0.33 AC
DRAINAGE MAP
DRAINAGE MAP - 200 [SHEET] : c:\pw_work\american-pw-01\d0948507\DRMPRD01.dgn
7:44:44 AM7/16/2025jfielding
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
SR 2033544 FL, WESLEY CHAPEL
2818 CYPRESS RIDGE BLVD, SUITE 200
CONSOR NORTH AMERICA, INC.
79361LICENSE NUMBER:
ERIC K. NELSON, JR., P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
TYPICAL SECTIONS
TYPICALSHEETS : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\TYPSRD01.dgn
7:44:45 AM7/16/2025jfielding
SHOULDER & ASPHALT APRON PAVEMENTTRAFFIC DATA
4"
SHOULDER PAVEMENT DETAIL
1:4
FRICTION COURSE FC-9.5 (TRAFFIC C) (PG 76-22) (1")
OPTIONAL BASE GROUP 1 LBR 40
STABILILZATION
TYPE B
0.06
10'
PAVEMENT
SHOULDER
5'
OPTIONAL BASE
AT NO ADDITIONAL COMPENSATION
OF OPTIONAL BASE MATERIAL (GRANULAR ONLY)
THIS AREA MAY BE CONSTRUCTED
Natural Ground
THAN 1:3
SOD SLOPES STEEPER
TURF
STANDARD CLEARING AND GRUBBING
R/W VARIES (47' MIN.)
R/W LINE
R/W VARIES (47' MIN.)
(± 0'-17')
MILLING AND RESURFACING VARIES
EXISTING RIGHT TURN LANE
LANE
TRAVEL
± 12'
(MIN)
SHLDR
6'
4"
LBR 40
12" TYPE B STABILIZATION
(INDEX 105)
TREATMENT I
2'-6" SOD
� SR 20
1:4
(MIN.)
SHLDR
6'
R/W LINE
LIMITS OF CONSTRUCTION
EXIST. EXIST.
PAVT.
SHLDR
5'
LANE
TRAVEL
± 12'
(0'-17')
PAVT WIDENING
0.06
*EXIST.
8' (AUX. LANE)
18' (TRAVEL LANE)
CLEAR ZONE
APPLICABLE
1:3
IN WIDENING AREAS
SAWCUT AT EDGE OF TRAVEL
Natural Ground
EXIST.
MATCH
TYPICAL SECTION
SR 20
STA. D 1405+61.87 TO STA. D 1414+28.27
STA. D 1413+16.71 TO STA. D 1414+28.27
EXIST.
MATCH
PAVEMENT WIDENING
FRICTION COURSE FC-9.5 (TRAFFIC C) (PG 76-22) (1")
TYPE SP STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (2")
OPTIONAL BASE GROUP 9
MILLING & RESURFACING
FRICTION COURSE FC-9.5 (TRAFFIC C) (PG 76-22) (1")
MILL EXISTING ASPHALT PAVEMENT (1" AVG DEPTH)
DESIGN SPEED = 55 MPH
DESIGN HOUR T = 7.5%
K = 9.5% D = 60.4% T = 7.5% (24 HOUR)
ESTIMATED DESIGN YEAR = 2046 AADT = 21,200
ESTIMATED OPENING YEAR = 2026 AADT = 11,700
CURRENT YEAR = 2023 AADT = 10,900
OPTIONAL BASE
TYPE B STABILIZATION
OPTIONAL BASE
ASPH. APRON
5'
0.06
4"
ASPHALT APRON DETAIL
AT NO ADDITIONAL COMPENSATION.
OPTIONAL BASE MATERIAL (GRANULAR ONLY)
THIS AREA MAY BE CONSTRUCTED OF
0.02
STA. D 1406+06.80 TO STA. D 1407+91.24
EXIST. DRIVEWAY
AT APRON EDGE
MATCH EXIST. EL.
0.02 FT/FT MINIMUM.
MUST EQUAL OR EXCEED ADJACENET TRAVEL LANE SLOPE,
SEE CROSS SECTIONS FOR REQUIRED SLOPES. CROSS SLOPE *
ASPHALT PAVEMENT TIE-IN DETAIL
± 6"
PROPOSED FRICTION COURSE
PROPOSED STRUCTURAL COURSE
PROPOSED OPTIONAL BASE
PROPOSED STABILIZATION
EXIST. BASE MATERIAL
EXIST. PAVEMENT
SAWCUT
CONSTRUCTION FRICTION COURSE LIFT OVER MILLED KEY-IN AND PAVEMENT WIDENING.5.
LINE, TO A DEPTH FLUSH WITH THE TOP OF WIDENING STRUCTURAL COURSE.
MILL EXISTING FRICTION COURSE ±6 INCHES, INCLUDING FULL WIDTH OF EXISTING WHITE EDGE 4.
CONSTRUCT PROPOSED PAVEMENT WIDENING TO TOP OF STRUCTURAL COURSE.3.
SAWCUT PAVEMENT FOR WIDENING AND LEAVE EXISTING WHITE EDGE LINE.2.
KEY IN FRICTION COURSE TO PREVENT LATERAL PAVEMENT SHIFTING.1.
NOTES:
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
CR 83A32446 FL, MARIANNA
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
TYPICAL SECTIONS
TYPICALSHEETS 2 : C:\FDOTConnect10.12\Workspaces\FDOT\WorkSets\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\TYPSRD01.dgn
7:44:46 AM7/16/2025jfielding
SHARED USE PATH
PAVEMENT WIDENING
FRICTION COURSE FC-9.5 (TRAFFIC C) (PG 76-22) (1")
TYPE SP STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (2")
OPTIONAL BASE GROUP 9
")2
TYPE SP STRUCTURAL COURSE (TRAFFIC C) (1
OPTIONAL BASE GROUP 1
Natural Ground
STANDARD CLEARING AND GRUBBING
R/W VARIES (47' MIN.)
R/W LINE
R/W VARIES (47' MIN.)
VARIES (± 0'-24')
MILLING & RESURFACING
LANE
TRAVEL
± 11'
(MIN)
SHLDR
6'
4"
LBR 40
12" TYPE B STABILIZATION
� CR 83A
(TYP.)
SHLDR
6'
R/W LINE
LIMITS OF CONSTRUCTION
EXIST.
MATCH
EXIST.
MATCH
LANE
TRAVEL
± 11'
(0'-13' TYP.)
PAVT WIDENING
0.02
8' (AUX. LANE)
CLEAR ZONE
APPLICABLE
1:3
Natural Ground
TYPICAL SECTION
CR 83A
STA. 101+50.00 TO STA. 105+16.71
4"
2' SOD
PATH
USE
SHARED
8'
0.02 0.02 0.02
SOD
SOD
MILLING & RESURFACING
FRICTION COURSE FC-9.5 (TRAFFIC C) (PG 76-22) (1")
MILL EXISTING ASPHALT PAVEMENT (1" AVG DEPTH)
TYPE I, OPTION II
4' CONC. TRAFFIC SEPARATOR
LANE
TURN
± 11'
U
U
U
U
GAS
WATER
U
U U
WATER
WATER
U
C
WATER
WATERWATER
WATER
WATER
WATER
C
U
WATER
C
C
WATERWATER
WATER
GAS
U
U
U
WATER
WATER
U
U U
WATER
WATER
U
U
BEGIN PROJECT
BEGIN CONSTRUCTION
STA. D 1405+61.87
N °2
'4
"E
S68°40'59"E
BEGIN CONSTRUCTION
STA. 101+50.00
END PROJECT
END CONSTRUCTION
STA. D 1414+28.27
5/8" IRC SSMC TRAV
STA. 1406+85.53
OFF. = 33.15' LT.
X = 1442415.45'
Y = 552991.02'
EL. = 66.47'
5/8" IRC SSMC TRAV
STA. 1412+26.54
OFF. = 27.08' LT.
X = 1442917.23'
Y = 552788.69'
EL. = 66.21'
5/8" IRC SSMC TRAV
STA. 1417+26.65
OFF. = 27.78' LT.
X = 1443383.38'
Y = 552607.54'
EL. = 63.65'
MAG NL WITH DISK
STA. 100+31.27
OFF. = 21.04' RT.
X = 1442742.96'
Y = 552214.44'
EL. = 67.64'
8 9
STATION EQUATION
STA. 1412+43.71 � SR 20 =
STA. 106+02.86 � CR 83A
1405 1410 14151410
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
PROJECT LAYOUT
AL-SR20 - PLAYOUT [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\PLAYRD01.dgn
7:44:50 AM7/16/2025jfielding
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
GENERAL NOTES
GENERALNOTES : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\GNNTRD01.dgn
7:44:57 AM7/16/2025jfielding
772-643-5001SHELBY FERGUSONFLOCK SAFETY
850-878-8595, ext. 528COLLIN JOHNSONLUMEN
251-214-7059CHARLIE CROFTUNITI FIBER
50-729-47008SHAWN CROFTOKALOOSA GAS DISTRICT
800-624-9675, ext. 2MCI UO1MCI
850-880-6553LARRY TUGGLECITY OF FREEPORT
850-599-1444BILL MCCLOUDCENTURYLINK
850-307-1199DERRICK MARSHALLCHELCO, INC.
PHONECONTACTCOMPANY
UTILITY OWNERS:
4770 SO THE UTILITY OWNERS CAN SPOT VERIFY AND/OR EXPOSE UTILITIES.
NOTIFY ALL UTILITY OWNERS AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION BY CALLING SUNSHINE ONE CALL 811 OR 800-432-15.
STRUCTURES.
VERIFY AND FIELD STAKE THE LOCATION OF THE LIMITS OF CONSTRUCTION AND FRONT SLOPE PRIOR TO PLACING DRAINAGE 14.
REPLACE EXISTING MAILBOXES DAMAGED BY CONSTRUCTION.13.
RESTORE VEGETATION ON R/W AND EASEMENTS VIA SOD STRIPS UNLESS OTHERWISE NOTED IN THE PLANS.12.
CLOSURES.
MAINTAIN ONE LANE OF TRAVEL AT ALL TIMES. OBTAIN THE APPROVAL OF THE PROJECT ADMINISTRATOR PRIOR TO ANY LANE 11.
ROUTING. REPLACE ANY SIGNS DAMAGED BY CONSTRUCTION OPERATIONS.
MAINTAIN THE VISIBILITY OF STREET NAME SIGNS DURING CONSTRUCTION TO FACILITATE EMERGENCY VEHICLE ACCESS AND 10.
MAINTAIN ACCESS TO SIDE STREETS AND DRIVEWAYS DURING CONSTRUCTION.9.
EXERCISE CAUTION WHEN WORKING WITHIN THE VICINITY OF OVERHEAD TRANSMISSION LINES OR UNDERGROUND UTILITIES.8.
EXISTING DRAINAGE FEATURES SHALL REMAIN UNLESS OTHERWISE NOTED.7.
REFERENCED, NOTIFY THE ENGINEER AND COUNTY SURVEYOR IMMEDIATELY.
PROJECT LIMITS SHALL BE PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY
PRESERVE OR RELOCATE ALL BENCHMARKS AS NEEDED DURING CONSTRUCTION. ANY PUBLIC LAND CORNER MONUMENTS WITHIN THE 6.
THE COUNTY PRIOR TO CONSTRUCTION.
OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. ANY REQUIRED WETLAND OR STORMWATER PERMITS WILL BE OBTAINED BY 5.
ASSOCIATED DISTURBED SOIL AREAS ARE STABILIZED UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
SEDIMENT CONTROL INSPECTORS MANUAL, LATEST EDITION. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL
DURING CONSTRUCTION BY PROVIDING SILT FENCE AND/OR STAKED HAY BALES AS REQUIRED BY THE FLORIDA STORMWATER, EROSION, AND
TAKE ALL STEPS NECESSARY TO PREVENT EROSION AND ANY OFFSITE SEDIMENT TRANSPORT RESULTING FROM INCREASED RUNOFF 4.
PATCH OR RECONSTRUCT ALL ROADS DAMAGED BY CONSTRUCTION.3.
POINTS SHOWN. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED.
NVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS APPLY ONLY AT THE
THE LOCATIONS OF THE UTILITIES SHOWN IN THE PLANS (INCLUDING THOSE DESIGNATED Vv, Vh, AND Vvh) ARE BASED ON LIMITED I2.
NOTIFY THE PROJECT ADMINISTRATOR OR DESIGNER 48 HOURS PRIOR TO CONSTRUCTION.1.
PROJECT NOTES:
(850) 638-0790
CHIPLEY, FL 32428
1130 US HWY 90
SOUTHEASTERN SURVEYING AND MAPPING CORPORATION (SSMC)
P.S.M. NO. LS6746
LEE ANDERSON, P.S.M.
AND MAPPER OF RECORD IS:
SUPPORTING DATA IN THE PRODUCTION OF DESIGN PLANS AND FOR CONSTRUCTION ON SUBJECT PROJECT. THE PROFESSIONAL SURVEYOR
ALL SURVEY INFORMATION WAS OBTAINED FROM A LICENSE FLORIDA PROFESSIONAL SURVEYOR AND MAPPER AND UTILIZED AS 1.
SURVEY NOTES:
OF THE DRAINAGE DITCH (NOT SEDIMENT BUILD-UP) TO ENSURE POSITIVE STORMWATER FLOW.
IT IS THE CONTRACTOR’S RESPONSIBILITY TO PLACE SIDE DRAIN PIPES AT PROPER ELEVATIONS TO MATCH THE FLOWLINE 10.
MORE DETAILS AT 850- 836-5790 OR 850-836-5742.
WORK STARTING. ALLOW UP TO 2 WEEKS FOR LANE CLOSURE APPROVAL PROCESS.”CONTACT LOCAL PERMIT’S OFFICE FOR ALL LANE AND SHOULDER CLOSURES MUST BE REQUESTED IN WRITING AND APPROVED A MINIMUM OF 48 HOURS PRIOR TO 9.
INCH OR 90 MILS TO 0.12 INCH OR 120 MILS WHEN MEASURED ABOVE THE PAVEMENT SURFACE.
PAVEMENT SURFACE. MARKINGS OTHER THAN LONGITUDINAL LINES, WHEREVER LOCATED, WILL HAVE A THICKNESS OF 0.09 THICKNESS OF 0.10 INCH OR 100 MILS AND A MAXIMUM THICKNESS 0.15 INCH OR 150 MILS WHEN MEASURED ABOVE THE APPLY OR RECAP STANDARD THERMOPLASTIC PAVEMENT MARKINGS FOR LONGITUDINAL LINES TO ATTAIN A MINIMUM 8.
PROVIDE TEMPORARY PAVEMENT MARKINGS DURING THE INTERIM PERIOD PRIOR TO OPENING THE ROAD TO TRAFFIC.
FOLLOW THE MANUFACTURER’S RECOMMENDATIONS FOR SURFACE PREPARATION FOR THERMOPLASTIC ON CONCRETE.
THERMOPLASTIC PAVEMENT MARKINGS. INSTALLATION OF THERMOPLASTIC ON CONCRETE REQUIRES A CLEAN, DRY SURFACE.
711-4.1 STATES; “WAIT AT LEAST 14 DAYS AFTER CONSTRUCTING THE FINAL ASPHALT SURFACE COURSE TO PLACE 001 AND SECTION 711 OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION”. STANDARD SPEC ALL STRIPING WITHIN FDOT RIGHT OF WAY SHALL BE THERMOPLASTIC AND ADHERE TO FDOT STANDARD PLANS INDEX 711-7.
STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION.
REPAIRED BY SEEDING OR HYDRO-SEEDING. SEE FDOT STANDARD PLANS INDEX 570-010 AND SECTION 570 OF THE FDOT SOD AREAS WITHIN 32” OF EDGE OF PAVEMENT & SLOPES GREATER THAN 1:3. OTHER DISTURBED AREAS MAY BE 6.
LABORATORY. ALL TEST RESULTS SHALL BE PROVIDED TO FDOT AS SOON AS PRACTICAL.
WORK MEETING. QUALITY CONTROL TESTING SHALL BE PERFORMED BY FDOT CERTIFIED TECHNICIANS AND TESTING CONTRACTOR MUST SUBMIT A QUALITY CONTROL PLAN FOR FDOT REVIEW AND APPROVAL BEFORE OR AT THE REQUIRED PRE-5.
SUBMITTED FOR APPROVAL PRIOR TO OR AT THE PRE-PAVING MEETING.
PAVING CONTRACTOR SHALL SCHEDULE A PRE-PAVING MEETING WITH FDOT. PROPOSED ASPHALT MIX DESIGNS SHALL BE 4.
FIRM, FDOT, QUALITY CONTROL TESTING LABORATORY, PRIME CONTRACTOR, AND ANY OTHER INTERESTED PARTY PRESENT.
ENGINEER SHALL SCHEDULE AND HAVE AN ON-SITE PRE-WORK MEETING WITH REPRESENTATIVES FROM THE ENGINEERING 3.
DIRECTED BY THE PERMITS MANAGER.
OR ANY OTHER CATASTROPHIC EVENT AND SHALL REMAIN OPEN FOR THE DURATION OF THE EVACUATION OR EVENT AS ALL LANES MUST BE OPENED TO TRAFFIC WITHIN 12 HOURS AFTER RECEIVING NOTIFICATION OF A HURRICANE EVACUATION 2.
DESIGN MANUAL, FLORIDA GREENBOOK, AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
PLANS FOR ROADWAY CONSTRUCTION, FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION, FLORIDA ALL WORK IN THE RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE CURRENT EDITION OF THE FDOT STANDARD 1.
FDOT NOTES:
C
WATER
WATER
N 10 40
Feet
� SR 20
EXIST. R/W
EXIST. R/W
LEGEND
PAVEMENT WIDENING
MILLING & RESURFACING
FOR RIGHT TURN LANE
PAVEMENT WIDENING
+97.35
15.89' RT.
+97.20
31.64' RT.
+61.87
10.90' RT.
+61.87
27.90' RT.
SHOULDER
WIDENING. REMOVE EXIST. PAVED
TRAVEL FOR LANE PAVEMENT
SAWCUT PAVEMENT AT EDGE OF
& RESURFACING
LIMITS OF MILLING
SAWCUT FOR PAVEMENT WIDENING
FREEPORT RECYCLE
VOLTAGE: <50 kV
EXIST. O.E. (CHELCO)
VOLTAGE: <50 kV
EXIST. O.E. (CHELCO)
BEGIN PROJECT
BEGIN CONSTRUCTION
STA. D 1405+61.87
SR 20
55 MPH
5' ASPHALT APRON FOR DRIVEWAY
1406 1407 1408 1409 1410 1411
S68°40'59"E
14101410
+91.24
29.87' RT.
+86.20
34.83' RT.
LIMITS OF CONSTRUCTION
NOTE: SAWCUT PAVEMENT AT EDGE OF TRAVEL LANES AND ENSURE EXISTING WHITE
EDGE LANE REMAINS DURING CONSTRUCTION. REMOVE EXISTING PAVED SHOULDER
AND BASE MATERIAL FOR PAVEMENT WIDENING. MILL AND RESURFACE WHITE EDGE
LINE DURING FRICTION COURSE TIE-IN.
LINE
FLOW
DITCH
+06.80
28.28' RT.
+11.76
33.33' RT.
DRIVEWAY (TO REMAIN)
FREEPORT RECYCLE
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ROADWAY PLAN
SR20 - 1 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\PLANRD01.dgn
7:45:04 AM7/16/2025jfielding
WATERWATER
GAS
U
U
U
WATER
WATER
U
U U
N 10 40
Feet
N °2
'4
"E
S68°40'59"E
VOLTAGE: <50 kV
EXIST. O.E. (CHELCO)
VOLTAGE: <50 kV
EXIST. O.E. (CHELCO)
+89.08
34.97' RT.
+33.04
79.28' RT.
+69.57
59.50' RT.
+09.56
18.92' RT.
RW: +94.95
47.00' RT.
RW: +94.95
47.00' RT.
RW: +23.76
47.00' RT.
RW: +16.06
50.00' RT.
+28.27
18.92' RT.
+83.66
65.70' RT.
.0
R
.0
.0
49.21' 50.78'
8' SHARED USE PATH
(SEE PROJECT DETAILS)
6" THK CONC. LANDING
(SEE PROJECT DETAILS)
6" THK CONC. LANDING
(SEE PROJECT DETAILS)
6" THK CONC. LANDING
& RESURFACING
LIMITS OF MILLING
& RESURFACING
LIMITS OF MILLING
5' PVD SHLDR
ACCELERATION TAPER
SAWCUT & REMOVE
(REMOVE)
EXIST. 18" PIPE
� SR 20
� CR 83A
END PROJECT
END CONSTRUCTION
STA. D 1414+28.27
STA. 1412+43.71 � SR 20 =
STA. 106+02.81 � CR 83A
LEGEND
PAVEMENT WIDENING
MILLING & RESURFACING
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
FOR RIGHT TURN LANE
PAVEMENT WIDENING
SHARED USE PATH
VACANT PARCEL
VACANT PARCEL
VACANT PARCEL
MATCH LINE - SHEET 10
SR 20
55 MPH
C R
A
(W
B
A Y
L
O O
P
M
P H
+57.56
18.36' RT.
+57.08
68.29' RT.
SAWCUT FOR WIDENING
(TO REMAIN)
EXIST. 18" PIPE
.0
R 40.00'
R
+47.52
56.17' RT.
+43.52
56.23' RT.
4' CONC. TRAF SEP
1412 1413 1414 1415 1416 14171415
LIMITS OF CONSTRUCTION
DITCH FLOW LINE
DRAINAGE INFORMATION.
DRAINAGE PROFILE SHEETS FOR
SEE DRAINAGE STRUCTURES AND
DRIVEWAY (TO REMAIN)
VACANT PARCEL
DITCH FLOW LINE
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
SR21 - 1 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\PLANRD01.dgn
7:45:07 AM7/16/2025jfielding
M A
T C
H
L I N
E
S
H E
E T
EXIST. R/W
EXIST. R/W
& RESURFACING
LIMITS OF MILLING
PAVEMENT WIDENING FOR RIGHT TURN LANE
8' SHARED USE PATH
100 101 102 103 104
N20°29'46"E
100100100
BEGIN CONSTRUCTION
BEGIN MILLING & RESURFACING
BEGIN PAVEMENT WIDENING
STA. 101+50.00
+50.00
26.19' RT. +90.00
39.00' RT.
+90.00
25.00' RT.
VOLTAGE: <50 kV
EXIST. O.E. (CHELCO)
LEGEND
PAVEMENT WIDENING
MILLING & RESURFACING
SHARED USE PATH
EXIST. ASPH SHARED USE PATH
CR 83A (W BAY LOOP)
45 MPH
VACANT PARCEL
TRAILER PARK
.5
.4
(TO REMAIN)
EXIST. 18" PIPE
N
10 40
Feet
+00.00
1.00' LT.
+00.00
3.00' RT.
4' CONC TRAF. SEP
DITCH FLOW LINE
LIMITS OF CONSTRUCTION
DRIVEWAY (TO REMAIN)
TRAILER PARK
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
CR83A [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\PLANRD01.dgn
7:45:09 AM7/16/2025jfielding
GAS
U
U
U
WATER
WATER
U
U U
R
1411 1412 1413 1414
S68°40'59"E
S-01
S-02 S-03P-
N
� SR 20
� CR 83A
N °2
'4
"E
Node-7 Node-6
Node-5
Node-4
Node-1
Node-2
Node-3
P-02
DITCH FLOW LINE
DITCH FLOW LINE
EXIST. R/W
DITCH FLOW LINE
EXIST. R/W
EXIST. R/W
EXIST. R/W
1" = 4' Vertical
1" = 40' Horizontal
SCALE
60 60
64 64
68 68
0 1
DIRECTLY ABOVE PIPE
EXISTING GROUND
DIRECTLY ABOVE PIPE
FINISHED GRADE
S-03
S-02
S-01
P-01 P-02
BFOC
Node-1
BFOC
Node-2
BFOC
Node-3 WM
Node-4
BFOC
Node-5
4" GM
Node-6
WM
Node-7
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
CONSOR NORTH AMERICA, INC.
79361LICENSE NUMBER:
ERIC K. NELSON, JR., P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
DRAINAGE STRUCTURES
DRAINAGE STRUCTURES [SHEET] : c:\pw_work\american-pw-01\d0948507\DRXSRD01.dgn
7:45:11 AM7/16/2025jfielding
(Out) P-02
(In) P-01
63.1066.213.5' DIA.MANHOLE TYPE 718.67105+77AL-CR83AS-02
(Out) P-01
63.2265.18
APRON
12" STD. SLOT WITH CONCRETE
NON-TRAVERSABLE INLET WITH
DBI TYPE C-40.40105+49AL-CR83AS-01
Label -Pipe-
(ft) Invert)
(Structure Elevation
Sump
(ft) Elevation
Point Reference
Remarksseries) Notes FDOT Standard Plans (400 index
Dimensions Bottom Structure Type
(ft) Offset
Baseline
(ft) Station
Baseline
Feature Baseline Label
Structure Data
63.05CD MES 1:447.39105+65AL-CR83AS-03
Remarksindex series) Notes FDOT Standard Plans (400
(ft) (Invert)
Elevation Structure Type
(ft) Offset
Baseline
(ft) Station
Baseline
Feature Baseline Label
Endwall and MES Data
ERCP, CLASS II63.05S-0363.11S-0214x23 inch261P-02
ERCP, CLASS II63.11S-0263.22S-0114x23 inch621P-01
Optional Pipe(ft) Stop Invert
(Lower) Stop Node
(ft) Start Invert
(Upper) Start Node Size
(ft) (Construction)
Length
B a rr e ls
Label
Pipe Data
552705.851442958.4048.47105+64.98AL-CR83AS-03WMNode-7
552712.161442951.3239.63105+68.42AL-CR83AP-024" GMNode-6
552723.801442893.27-18.83105+59.00AL-CR83AP-01BFOCNode-5
552723.441442888.69-22.99105+57.05AL-CR83AP-01WMNode-4
552721.861442869.09-40.79105+48.71AL-CR83AS-01BFOCNode-3
552721.831442868.79-41.07105+48.58AL-CR83AS-01BFOCNode-2
552723.941442867.48-43.03105+50.10AL-CR83AS-01BFOCNode-1
Notes(ft) Y
(ft) X
(ft) Baseline Offset
(ft) Station
Baseline
Feature Baseline ConflicterConflicteeLabel
Utilities In Close Proximity To Drainage Features
1" = 4' Vertical
1" = 40' Horizontal
SCALE
56 56
60 60
64 64
68 68
72 72
1407 1408 1409 1410 1411 1412
BEGIN DITCH PROFILE RT
STA. 1408+06.98
EL. 67.20'
DITCH VPI RT
STA. 1411+00.19
EL. 66.50'
DITCH VPI RT
STA. 1409+15.30
EL. 67.06'
PROPOSED DITCH RT @ � SR 20
EXISTING GROUND @ � SR 20
DITCH VPI RT
STA. 1411+48.95
EL. 66.25'
DITCH VPI RT
STA. 1411+52.17
EL. 65.83'
DITCH VPI RT
STA. 1411+95.22
EL. 64.41'
END DITCH PROFILE RT
STA. 1412+04.10
EL. 64.27'
(+)13.059%
(-)0.134% (-)0.302%
(-)0.520%
(-)3.279% (-)1.598%
1" = 4' Vertical
1" = 40' Horizontal
SCALE
56 56
60 60
64 64
68 68
72 72
1413 1414 1415 1416 1417
BEGIN DITCH PROFILE RT
STA. 1412+91.91
EL. 63.07'
END DITCH PROFILE RT
STA. 1414+28.27
EL. 63.00'
PROPOSED DITCH RT @ � SR 20
EXISTING GROUND @ � SR 20
(-)0.051%
DRAINAGE PROFILES
DRAINAGE PROFILE - SR 20 [SHEET] : c:\pw_work\american-pw-01\d0948507\PROFRD01.dgn
7:45:14 AM7/16/2025jfielding
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
CONSOR NORTH AMERICA, INC.
79361LICENSE NUMBER:
ERIC K. NELSON, JR., P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
1" = 4' Vertical
1" = 40' Horizontal
SCALE
48 48
52 52
56 56
60 60
64 64
68 68
72 72
76 76
80 80
101 102 103 104 105 106
BEGIN DITCH PROFILE RT
STA. 101+47.56
EL. 65.49'
BEGIN DITCH PROFILE LT
STA. 105+16.86
EL. 65.25'
END DITCH PROFILE LT
STA. 105+48.87
EL. 65.18'
END DITCH PROFILE RT
STA. 105+62.38
EL. 63.07'
DITCH VPI RT
STA. 105+51.80
EL. 63.95'
DITCH VPI RT
STA. 103+77.69
EL. 64.95'
PROPOSED DITCH LT @ � CR 83A
PROPOSED DITCH RT @ � CR 83A
EXISTING GROUND @ � CR 83A
(-)0.234%
(-)0.575% (-)8.315%
(-)0.219%
DRAINAGE PROFILES
DRAINAGE PROFILE - CR 83A [SHEET] : c:\pw_work\american-pw-01\d0948507\PROFRD01.dgn
7:45:14 AM7/16/2025jfielding
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
CR 83A33544 FL, WESLEY CHAPEL
CONSOR NORTH AMERICA, INC.
79361LICENSE NUMBER:
ERIC K. NELSON, JR., P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
GAS
U
U
WATER
WATER
U
U U
N
Feet
0 5
N °2
'4
"E
6" THK CONC LANDING
6" THK CONC LANDING
6" THK CONC LANDING
ELEVATION
PAVEMENT
MATCH
ELEVATION
PAVEMENT
MATCH
ELEVATION
PAVEMENT
MATCH
+92.95
23.14' LT.
+84.95
23.15' LT.
+86.45
31.14' LT. +91.45
31.14' LT.
+85.71
26.82' RT.
+22.65
51.26' RT.
+17.01
45.59' RT.
+12.47
52.21' RT.
+15.99
55.75' RT.
WARNING SURFACE MAT
24" DETECTABLE
WARNING SURFACE MAT
24" DETECTABLE
WARNING SURFACE MAT
24" DETECTABLE
1411 1412 1413
S68°40'59"E
+75.27
38.34' RT.
+83.34
43.12' RT.
+75.34
43.24' RT.
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
PROJECT DETAILS
AL-SR20 - PLAN 1 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\SPDTRD01.dgn
7:45:18 AM7/16/2025jfielding
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
PROJECT DETAILS
SPECIALDETAILSHEETS : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\SPDTRD01.dgn
7:45:19 AM7/16/2025jfielding
NOT TO SCALE
: PAVEMENT PATCHPROJECT DETAIL
BASE MATERIAL PAYMENT.
INCLUDE THE COST OF MILLED TRANSITION IN ASPHALT AND 7.
DISCRETION OF THE COUNTY PROJECT ADMINISTRATOR.
PAVEMENT, EXISTING BASE MAY BE REUSED AT THE
THE PAVEMENT PATCH IS REQUIRED TO REPAIR DAMAGED
IF THERE IS NO REQUIRED PIPE OR UTILITY FOR TRENCH AND 6.
PAVEMENT WIDENING PAVEMENT DESIGN.
PLACE PATCH PAVEMENT IN LIFTS CONSISTENT WITH THE 5.
DENSITY.
LAYERS. COMPACT TO 98% OF MODIFIED PROCTOR MAXIMUM
PLACE BACKFILL MATERIAL IN 6 INCH COMPACTED THICKNESS 4.
INCH SIZE.
EXCLUDE CLAY MATERIALS AND LOOSE ROCKS LARGER THAN 3/4
USE AASHTO CLASS A-3 SUITABLE SOIL FOR BACKFILL AND 3.
POSSIBLE OR AS REQUIRED BY OSHA STANDARDS.
OTHERWISE, TRENCH SIDES SHALL BE AS VERTICAL AS
BETWEEN AN ELEVATION OF 1 FOOT ABOVE THE TOP OF PIPE;
MAINTAIN AN APPROXIMATELY VERTICAL TRENCH SIDE 2.
SAWCUT EDGES OF EXCAVATION TRENCH.1.
NOTES:
TRENCH WIDTH2' MILLING (1" AVG DEPTH)
GENERAL BACKFILL MATERIAL
PIPE OR UTILITY
BEDDING MATERIAL (AS REQUIRED)
OPTIONAL BASE GROUP 09
PAVEMENT, 2"
TYPE SP ASPHALT
PAVEMENT ON EITHER SIDE OF TRENCH CUT
PROVIDE MILLED TRANSITION TO ADJACENT
EXIST. ASPH PAVT
MILLED SURFACE
EXIST. BASE MATERIAL
PAVEMENT, 1"
TYPE FC ASPHALT
STATE OF FLORIDA
DATE OF SURVEY: OCTOBER 2024
DEPARTMENT OF TRANSPORTATION
DISTRICT: THREE
SURVEY MADE BY: ENVIRONMENTAL AND GEOTECHNICAL ROAD NO.: SR 20 / CR 83A
SPECIALISTS, INC. MATERIALS AND RESEARCH COUNTY: WALTON
SUBMITTED BY: C. DUNKELBERGER, P.E.
PROJECT NAME: SR 20 AT CR 83A INTERSECTION IMPROVEMENTS
FINANCIAL PROJECT ID: ---
CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS
SR 20 SURVEY BEGINS STA.: 1405+61 SR 20 SURVEY ENDS STA.: 1412+46
CR 83A SURVEY BEGINS STA.: 103+40 CR 83A SURVEY ENDS STA.: 105+40
REFERENCE: BASELINE SURVEY SR 20
REFERENCE:BASELINE SURVEY CR 83A
CONTENT
ORGANIC
CONTENT
MOISTURE
% PASS
SIEVE ANALYSIS RESULTS
LIMITS (%)
ATTERBERG
NO.
STRATUM
TESTS
NO. OF
ORGANIC
TESTS
NO. OF
MOISTURE
TESTS
NO. OF
MESH
MESH
MESH
MESH
MESH
TESTS
NO. OF
LIMIT
LIQUID
INDEX
PLASTIC
GROUP
AASHTO
COLOR DESCRIPTION
1 -- -- -- -- 6 82-100 59-76 22-35 11-17 8-11 -- -- -- A-2-4
A-3, BROWN, GRAY
(<15% PASSING #200 SIEVE)
SANDY LIMESTONE BASE
FINE SAND, SILTY FINE SAND,
2 -- -- -- -- 3 89-99 70-88 51-73 32-52 20-32 -- -- -- A-2-4 BROWN, GRAY
(≥15% PASSING #200 SIEVE)
SANDY LIMESTONE BASE
SILTY FINE SAND,
EMBANKMENT AND SUBGRADE MATERIAL
STRATA BOUNDARIES ARE APPROXIMATE. MAKE FINAL CHECK AFTER GRADING.
GNE - GROUNDWATER NOT ENCOUNTERED
STRATUM NOTES
1.STRATA BOUNDARIES ARE APPROXIMATE AND REPRESENT SOIL STRATA AT EACH BORING ONLY. ANY SUBSOIL
CONNECTING LINES ARE FOR ESTIMATING ONLY AND DO NOT INDICATE ACTUAL STRATUM LIMITS. SUBSURFACE
VARIATIONS BETWEEN BORINGS SHOULD BE ANTICIPATED.
2.STRATA 1 IS A "SELECT" SOIL.
3.STRATUM 2 IS A "SELECT" SOIL WITH >15% FINES. DUE TO THE HIGH FINES CONTENT, STRATUM 2 WILL RETAIN
MOISTURE AND MAY BE DIFFICULT TO COMPACT WHEN WET.
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
SR 2032303 FL, TALLAHASSEE
3676 HARTSFIELD ROAD
EGS, INC.
49932LICENSE NUMBER:
CRAIG E. DUNKLEBERGER, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ROADWAY SOIL SURVEY
SOILSURVEYSHEET : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Geotechnical\SSUVRD01.dgn
7:45:20 AM7/16/2025jfielding
8.41% 3.03% 1.67% 6.09%
� SR 20
1405+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
BFOC
EXIST. PGL
EL. 67.09'
SHLDR
PVD
EXIST.
SHLDR
PVD
EXIST.
EXISTING TO REMAIN
1.85%
2.54%
9.23%
12 ' RT
PROPOSED
SHLDR
6' UNPVD
PROPOSED
EXISTING TO REMAIN
WIDENING
PROPOSED PAVT
EXISTING TO REMAIN
� SR 20
1406+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00%
BFOCBFOCBFOCBFOC BFOC
EXIST. PGL
EL. 67.63'
KEYHOLE
5'
SAWCUT
SHLDR
PVD
EXIST.
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
CROSS SECTIONS
(SR 20)
AL1 - D 1405+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:25 AM7/16/2025jfielding
PROPOSED
EXISTING TO REMAIN
WIDENING
PROPOSED PAVT
2.74% 1.79%
7.13%
� SR 20
1406+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 1.22%
BFOC
EXIST. PGL
EL. 68.06' SAWCUT
SHLDR
PVD
EXIST.
KEYHOLE
5'
DWY APRON
5' PVD
5.95% 3.04% 1.86%
SAWCUT
� SR 20
12 ' RT
PROPOSED
WIDENING
1407+00.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 1.32%
BFOC
EXIST. PGL
EL. 68.47'
SHLDR
PVD
EXIST.
KEYHOLE
5'
DWY APRON
5' PVD
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1406+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:26 AM7/16/2025jfielding
PROPOSED
WIDENING
2.06%
3.15% 6.09%
1407+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.50% 3.12%
BFOC
EXIST. PGL
EL. 68.88'
DWY APRON
5' PVD
KEYHOLE
5'
SHLDR
PVD
EXIST.
12 ' RT
PROPOSED
WIDENING
2.22%
2.07% 5.58%
SAWCUT
1408+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.50% 4.09%
BFOC BFOC
EXIST. PGL
EL. 69.06'
DWY APRON
5' PVD
KEYHOLE
5'
SHLDR
PVD
EXIST.
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1407+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:27 AM7/16/2025jfielding
1.77% 6.63%
2.19%
WIDENING
PROPOSED PAVT
12 ' RT
PROPOSED
SHLDR
6' UNPVD
PROPOSED
1408+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.50% 6.00%
BFOC
EXIST. PGL
EL. 69.14'
1:4
5.00'
.1
KEYHOLE
5'
SHLDR
PVD
EXIST.
1:4
EXISTING TO REMAIN
7.97% 2.33%
SAWCUT
� SR 20
SHLDR
6' UNPVD
PROPOSED
12 ' RT
PROPOSED
WIDENING
PROPOSED PAVT
1.89%
EXISTING TO REMAIN
1409+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.50% 6.00%
EXIST. PGL
EL. 69.14'
KEYHOLE
5'
SHLDR
PVD
EXIST.
1:4
5.00'
.0
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1408+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:28 AM7/16/2025jfielding
7.07% 2.35% 2.45%
EXISTING TO REMAIN
EXISTING TO REMAIN WIDENING
PROPOSED PAVT
12 ' RT
PROPOSED
SHLDR
6' UNPVD
PROPOSED
SAWCUT
� SR 20
1409+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.50% 6.00%
EXIST. PGL
EL. 69.01'
KEYHOLE
5'
SHLDR
PVD
EXIST.
1:4
5.00'
1:46 .9
� SR 20
6.71% 4.63% 3.19%
EXISTING TO REMAIN
SHLDR
6' UNPVD
PROPOSED
1410+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
6.00% 3.09%
EXIST. PGL
EL. 68.81'
SHLDR
PVD
EXIST.
1:4
5.00'
1:46 .8
RT
EXIST.
KEYHOLE
EXIST.
GORE
±16' RESURFACING
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1409+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:30 AM7/16/2025jfielding
1.34%
1.94%
6.54% 2.96%
1410+50.00STA.
1" = 10' Vertical
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
� SR 20
EXIST. PGL
EL. 68.56'
KEYHOLE
RT
EXIST.
±17' RESURFACING
SHLDR
6.00%
1:4
5.00'
.6
EXISTING TO REMAIN
� SR 20
1.69%1.89% 6.42% 2.45%
1411+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
EXIST. PGL
EL. 68.25'
6.00% 1:4 1:4
5.00'
±17' RESURFACING
SHLDR
PVD
EXIST.
KEYHOLE
EXIST.
RT
EXIST.
.5
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1410+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:31 AM7/16/2025jfielding
1.87%1.84% 6.52% 2.46%
1411+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
WM
BFOC
EXIST. PGL
EL. 67.88'
.1
SHLDR
PVD
EXIST.
KEYHOLE
EXIST.
RT
EXIST.
6.00% 1:4
4.12'
EXISTING TO REMAIN
� SR 20
1.91%1.75% 6.66% 2.90%
1412+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
WM
BFOC
EXIST. PGL
EL. 67.47'
6.00%
RT
EXIST.
KEYHOLE
EXIST.
SHLDR
PVD
EXIST.
.3
RADIAL WIDENING
VARIES (SEE PLANS)
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1411+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:33 AM7/16/2025jfielding
1412+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
WM
BFOC
EXISTING TO REMAIN
� SR 20
CR 83A (W BAY LOOP)
1.15%1.17% 6.36%
EXIST. PGL
EL. 67.00'
GORE
EXIST.
SHLDR
PVD
EXIST.
EXISTING TO REMAIN
� SR 20
2.71%1.15% 6.56%
SAWCUT
ACCEL LANE
REMOVE EXIST.
3.50%
1413+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
1:4
1:6
GM
EXIST. PGL
EL. 66.58'
5' PVD
.0
RECONSTRUCTION
10' SHLDR
2.71%1.15%
SHLDR
PVD
EXIST.
6.00%
6.39'
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1412+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:35 AM7/16/2025jfielding
1.64%1.67%
SAWCUT
7.06%
5'
1:4
1413+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
6.00%
GM
6.00%
EXIST. PGL
EL. 66.25'
SHLDR
PVD
EXIST.
SHLDR
5' PVD
RECONST.
10' SHLDR
1:6
ACCEL LANE
REMOVE EXIST.
1.64%1.67%
.0
5'
� SR 20
EXISTING TO REMAIN
6.98% 1.84% 1.80%
SAWCUT
1414+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
1:4
6.00% 6.00%
EXIST. PGL
EL. 65.96'
SHLDR
PVD
EXIST.
SHLDR
5' PVD
RECONST.
10' SHLDR
1:6
ACCEL LANE
REMOVE EXIST.
1.84% 1.80%
.0
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1413+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:36 AM7/16/2025jfielding
1414+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
� SR 20
EXISTING TO REMAIN
6.94% 1.87% 2.27%
3.54%
EXIST. PGL
EL. 65.71'
SHLDR
EXIST.
1.87% 2.27%
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL1 - D 1414+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-SR20-01.dgn
7:45:38 AM7/16/2025jfielding
101+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00%
1:3
GM
EXIST. PGL
EL. 67.82'
� SR 83A
1:
RESURFACE, MATCH EXIST.
6'
UNPVD
SHLDR
8'
ASPH
MUP
2' UNPVD SHLDR
.4
4.18'
1.98% 3.17%
102+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00%
1:3
GM
4' TRAF.
SEP.
RESURFACE
EXIST.
RESURFACE
EXIST.
13' PAVT.
WIDENING
8' ASPH
MVP
6' UNPVD
SHLDER
2.67% 1.90%
� SR 83A
SHLDR
2' UNPVD
1:
.3
4.00'
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
CROSS SECTION
(CR 83A)
AL-CR83A - 101+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-CR83A-02.dgn
7:45:41 AM7/16/2025jfielding
102+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00%
1:3
GM
RESURFACE
4' TRAF.
SEP.
3.93% 1.18%
RESURFACE
EXIST.
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
� SR 83A
1:
.2
4.00'
103+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70 E
X
IS
T
IN
G R
/W L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00% 1:3
GM
4.19%
RESURFACE
EXIST.
4' TRAF.
SEP.
RESURFACE
EXIST.
� SR 83A
2.03%
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
.1
4.00'
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL-CR83A - 102+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-CR83A-02.dgn
7:45:42 AM7/16/2025jfielding
103+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00%
1:3
GM
3.19%
RESURFACE
EXIST.
4' TRAF.
SEP.
RESURFACE
EXIST.
� SR 83A
2.35%
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
1:
.0
4.00'
104+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60 60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00% 1:3
GM
3.29%
RESURFACE
EXIST.
4' TRAF.
SEP.
RESURFACE
EXIST.
� SR 83A
2.66%
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
4.00'
1:
.8
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL-CR83A - 103+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-CR83A-02.dgn
7:45:43 AM7/16/2025jfielding
104+50.00STA.
1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00% 1:3
GM
1.73%
RESURFACE
EXIST.
4' TRAF.
SEP.
RESURFACE
EXIST.
� SR 83A
2.89%
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
4.00'
.5
1:
105+00.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
2.00% 2.00% 2.00% 1:3
BFOCBFOCBFOC
GM
2.32%
RESURFACE
EXIST.
4' TRAF.
SEP.
RESURFACE
EXIST.
� SR 83A
2.08%
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
.2
4.00'
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL-CR83A - 104+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-CR83A-02.dgn
7:45:45 AM7/16/2025jfielding
2.71% 3.54%
� SR 83A
RESURFACE
EXIST.
RESURFACE
EXIST.
13' PAVT.
WIDENING
6' UNPVD
SHLDER
8' ASPH
MUP SHLDR
2' UNPVD
CONC.
LANDING
RADIAL
WIDENING
UNPVD
SHLDER
105+50.00STA.
1" = 10' Vertical 1" = 20' Horizontal
SCALE
60 40 20 0 20 40 60
60 60
70 70
E X
IS
T
IN
G
R /W
L
IN
E
E X
IS
T
IN
G
R /W
L
IN
E
1.64% 1:16 1:8
1:3
WM
WM
BFOCBFOCBFOC
GM
1.11% 2.11% 1.81%
.9
.1
4.00'
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
AL-CR83A - 105+50.00 [SHEET] : P:\PECS Engineering\Worksets\FDOT\22-018-02 SR20 at W Bay Loop - WalCo\Roadway\RDXSRD-CR83A-02.dgn
7:45:46 AM7/16/2025jfielding
DATE DESCRIPTION
NO.
SHEETWALTON COUNTY
BOARD OF COUNTY COMMISSIONERS
SR 20
/1
/2
P
P E
C S
E n g in e e r in g \W o r k s e ts
\F D
O T
\2 S
R a t W
B a y L o o p
W a lC o \R o a d w a y \S
W P
P P
.d g n
:4
:4
A
M jf ie ld in g
32446 FL, MARIANNA
4277 LAFAYETTE STREET
PANHANDLE ENGINEERING & CONST.
79082LICENSE NUMBER:
JOHN C. FIELDING, P.E.
T H
E O
F F
IC
IA
L R
E C
O R
D O
F T
H
IS
S H
E E
T I
S T
H E
E L
E C
T R
O N
IC
F
IL
E
D
IG
IT
A
L L
Y S
IG
N
E D
A N
D S
E A
L E
D U
N D
E R
R U
L E
G
-2
.0
F
.A .C
ENGINEER OF RECORD
PREVENTION PLAN
STORMWATER POLLUTION
PETROLEUM BASED PRODUCTS
PAINTS
CLEANING SOLVENTS
ASPHALT
DETERGENTS
TAR
FERTILIZERSCONCRETE
MASONRY BLOCKS
ROOFING MATERIALS
METAL STUDS
WOOD
TRANSFORMERS LIGHTING EQUIPMENT
SITE DESCRIPTION
SITE LOCATION:
DESCRIPTION:
SOIL DISTURBING ACTIVITIES WILL INCLUDE:
SOILS:
SEE REPORT OF GEOTECHNICAL EXPLORATION IN PROJECT MANUAL
SITE MAPS:
* SEE ATTACHED CONSTRUCTION PLANS FOR PRE & POST DEVELOPMENT GRADES, AREAS
OF SOILS, DISTURBANCE, LOCATION OF SURFACE WATERS, WETLANDS, PROTECTED AREAS,
MAJOR STRUCTURAL AND NONSTRUCTURAL CONTROLS AND STORM WATER DISCHARGE POINTS.
CONTROLS
THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND
SEDIMENTATION CAUSED BY STORMWATER RUNOFF. EROSION AND SEDIMENTATION CONTROLS
ON THE SITE PLAN HAVE BEEN PREPARED TO INSTRUCT THE CONTRACTOR ON PLACEMENT
OF THESE CONTROLS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND MAINTAIN
THE CONTROLS PER PLAN AS WELL AS ENSURING THE PLAN IS PROVIDING THE PROPER
PROTECTION AS REQUIRED BY FEDERAL, STATE AND LOCAL LAWS. REFER TO "CONTRACTORS
RESPONSIBILITY" FOR A VERBAL DESCRIPTION OF THE CONTROLS THAT MAY BE
IMPLEMENTED.
STORMWATER MANAGEMENT
GENERAL
THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S REQUIREMENTS
OUTLINED HEREON AND THOSE MEASURES SHOWN ON THE SWPPP SITE PLAN. IN ADDITION
THE CONTRACTOR SHALL UNDERTAKE ADDITIONAL MEASURES REQUIRED TO BE IN
COMPLIANCE WITH APPLICABLE PERMIT CONDITIONS AND STATE WATER QUALITY STANDARDS.
DEPENDING ON THE NATURE OF MATERIALS AND METHODS OF CONSTRUCTION THE
CONTRACTOR MAY BE REQUIRED TO IMPLEMENT SEDIMENTATION CONTROL MEASURES NOT
SPECIFICALLY LISTED OR SHOWN HEREON AT NO COST TO THE OWNER.
SEQUENCE OF MAJOR ACTIVITIES:
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. INSTALL EROSION AND SEDIMENTATION CONTROLS ACCORDING TO THE CONTRACT
DOCUMENTS.
2. CONSTRUCT SITE IMPROVEMENTS.
3. INSTALL ADDITIONAL EROSION AND SEDIMENTATION CONTROLS AS MAY BE WARRANTED TO
CONTROL ADVERSE ENVIRONMENTAL IMPACTS AND TO MEET APPLICABLE PERMIT
REQUIREMENTS.
4. MAINTAIN EROSION AND SEDIMENTATION CONTROLS AND REPAIR ERODED AREAS
THROUGHOUT CONSTRUCTION UNTIL THE SITE IS STABILIZED AND ACCEPTED BY THE
OWNER.
PERMITS:
1. CONTRACTOR SHALL OBTAIN A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
(NPDES) PERMIT FOR CONSTRUCTION ACTIVITIES AND SHALL ABIDE BY NPDES PERMIT
CONDITIONS. CONTRACTOR MAY UTILIZE THE STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) INCLUDED IN THESE PLANS OR PROVIDE HIS OWN SWPPP FOR NPDES
PERMITTING. COST FOR OBTAINING AN NPDES PERMITS AND FOR ABIDING BY ALL PERMIT
CONDITIONS SHALL BE BORNE BY THE CONTRACTOR.
TIMING OF CONTROLS/MEASURES
AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, THE SILT FENCES AND HAY BALES,
WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE
SITE. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICAL IN PORTIONS OF
THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED.
ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA, THAT AREA WILL BE
STABILIZED PERMANENTLY IN ACCORDANCE WITH THE PLANS. AFTER THE ENTIRE SITE IS
STABILIZED, THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM ANY SEDIMENT TRAPS,
THE RETENTION POND BOTTOM WILL BE CONTOURED TO TO FINAL ELEVATION, AND THE SITE
STABILIZED IN ACCORDANCE WITH THE EROSION & SEDIMENTATION CONTROL PLAN.
CONTROLS
IT IS THE CONTRACTORS RESPONSIBILITY TO IMPLEMENT THE EROSION AND SEDIMENTATION
CONTROLS AS SHOWN ON THE SITE PLAN. IT IS ALSO THE CONTRACTORS RESPONSIBILITY
TO ENSURE THESE CONTROLS ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING
PROPERLY TO PREVENT TURBID OR POLLUTED WATER FROM LEAVING THE PROJECT SITE.
THE CONTRACTOR WILL ADJUST THE EROSION AND SEDIMENTATION CONTROLS SHOWN ON
THE SITE PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED,TO ENSURE THE
SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND SEDIMENTATION CONTROL
REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER. THE FOLLOWING BEST MANAGEMENT
PRACTICES WILL BE IMPLEMENTED BY THE CONTRACTOR AS REQUIRED BY THE EROSION AND
SEDIMENTATION CONTROL PLAN AND AS REQUIRED TO MEET THE EROSION AND
SEDIMENTATION REQUIREMENTS IMPOSED ON THE PROJECT SITE BY THE REGULATORY
AGENCIES.
EROSION AND SEDIMENT CONTROLS STABILIZATION PRACTICES
11.HAY BALE BARRIER: HAY BALE BARRIERS CAN BE USED BELOW DISTURBED AREAS
SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS:
11.A. WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT.
11.B. IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE
AREA IS NO GREATER THAN 2 ACRES.
11.C. WHERE EFFECTIVENESS IS REQUIRED FOR LESS THAN 3 MONTHS.
11.D. EVERY EFFORT SHOULD BE MADE TO LIMIT THE USE OF STRAW BALE BARRIERS
CONSTRUCTED IN LIVE STREAMS OR IN SWALES WHERE THERE IS THE POSSIBILITY
OF A WASHOUT. IF NECESSARY, MEASURES SHALL BE TAKEN TO PROPERLY ANCHOR
BALES TO INSURE AGAINST WASHOUT.
12.FILTER FABRIC BARRIER: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS:
12.A. WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT.
12.B. IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE
AREA IS NO GREATER THAN 2 ACRES.
13.BRUSH BARRIER WITH FILTER FABRIC: BRUSH BARRIER MAY BE USED BELOW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .