TWO_24-08_SR_20_at_CR_83A_Intersection_-_Cost_Estimate.xls
XLS spreadsheet 510 KB Posted
- Solicitation number
- 25-25
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a historical cost estimate report from the Florida Department of Transportation (FDOT) displaying weighted average unit costs for construction and maintenance items based on statewide contract data collected between December 1, 2024, and May 31, 2025. The document serves as a reference tool for estimating costs on the SR 20 and CR 83A West (West Bay Loop) intersection improvements project located west of Freeport, Florida. The project includes construction of intersection improvements consisting of turn lane extensions, multi-use path realignment, concrete traffic separators, resurfacing, drainage improvements, signing, pavement markings, and traffic signalization. The contract duration is 150 days to substantial completion with an additional 30 days for punch list completion. The cost estimate encompasses a comprehensive range of line items across multiple construction categories, including maintenance of traffic ($1,517.76 per day average), temporary traffic control infrastructure, earthwork and excavation, base and pavement materials, concrete work, reinforcing steel, signage and sign structures, and intelligent transportation system (ITS) components such as CCTV cameras, communications equipment, and traffic monitoring systems.
The report presents weighted average unit costs derived from multiple historical contracts, enabling project planners to establish realistic budgeting parameters for the intersection improvements. Pricing is itemized across numerous construction elements, with costs varying significantly based on material type, quantity, and complexity; for example, milling existing asphalt pavement ranges from $2.22 to $18.18 per square yard depending on depth, while overhead static sign structures span from approximately $58,000 to $413,000 per unit depending on cantilever or span configuration. Key infrastructure costs include superpave asphaltic concrete ranging from $135 to $232 per ton, plain and reinforced cement concrete pavement from $127 to $225 per square yard, and various traffic control and signalization components. The data reflects statewide contracting practices under FDOT's standard contract type (CC) and provides essential cost benchmarking information for procurement planning, bid evaluation, and budget allocation for the county-supplied pre-procured signal components and contractor installation requirements outlined in the project specifications.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Historical Costs
| Report Run On: 06/23/2025 | ||||||||
| Florida Department of Transportation | ||||||||
| Item Average Unit Cost | ||||||||
| From 2024/12/01 to 2025/05/31 | ||||||||
| Statewide | ||||||||
| Contract Type: CC | ||||||||
| Displaying: ITEMS WITH HITS | ||||||||
| From: 0102 1 To: 9999999 | ||||||||
| Item | No. of | |||||||
| Conts | Weighted | |||||||
| Average | Total | |||||||
| Amount | Total | |||||||
| Quantity | Unit | |||||||
| Meas | Obs? | Description | ||||||
| 0102 1 | 166 | $1,517.76 | $104,666,208.36 | 68,961.000 | DA | N | MAINTENANCE OF TRAFFIC | |
| 0102 2200 | 40 | $22.89 | $19,489,324.09 | 851,483.000 | SY | N | SPECIAL DETOUR- TEMPORARY PAVEMENT | |
| 0102 2300 | 24 | $116.54 | $13,200,373.47 | 113,271.000 | CY | N | SPECIAL DETOUR- TEMPORARY EARTHWORK/BASE | |
| 0102 2400 | 1 | $625,000.00 | $1,250,000.00 | 2.000 | EA | N | SPECIAL DETOUR- TEMPORARY BRIDGE | |
| 0102 3 | 18 | $123.98 | $302,557.47 | 2,440.400 | CY | N | COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE | |
| 0102 4 1 | 36 | $111.03 | $928,220.34 | 8,360.000 | SY | N | PEDESTRIAN OR BICYCLE SPECIAL DETOUR | |
| 0102 14 | 120 | $89.10 | $17,124,975.64 | 192,199.000 | HR | N | TRAFFIC CONTROL OFFICER | |
| 0102 25100 | 4 | $40.48 | $55,868.00 | 1,380.000 | HR | N | PEDESTRIAN ESCORT OPERATION | |
| 0102 25101 | 2 | $167.66 | $213,434.00 | 1,273.000 | DA | N | TEMPORARY INTELLIGENT TRANSPORTATION SYSTEM | |
| 0102 30 | 8 | $2,077.14 | $4,592,551.00 | 2,211.000 | EA | N | TEMPORARY HIGHWAY LIGHTING | |
| 0102 60 | 152 | $.26 | $1,213,580.78 | 4,651,936.000 | ED | N | WORK ZONE SIGN | |
| 0102 61 | 15 | $34.03 | $30,358.67 | 892.000 | EA | N | BUSINESS SIGN | |
| 0102 62 12 | 2 | $9.47 | $14,333.10 | 1,514.000 | ED | N | BARRIER MOUNTED WORK ZONE SIGN- INDEX 700-012 | |
| 0102 62 13 | 10 | $.57 | $42,879.44 | 75,336.000 | ED | N | BARRIER MOUNTED WORK ZONE SIGN- INDEX 700-013 | |
| 0102 71 13 | 38 | $41.15 | $2,851,031.89 | 69,280.000 | LF | N | TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE | |
| 0102 71 15 | 25 | $10.84 | $3,895,405.52 | 359,256.000 | LF | N | TEMPORARY BARRIER, F&I, ANCHORED | |
| 0102 71 16 | 20 | $4.03 | $704,358.16 | 174,736.000 | LF | N | TEMPORARY BARRIER, F&I, FREE STANDING | |
| 0102 71 23 | 22 | $11.86 | $568,859.44 | 47,984.000 | LF | N | TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE | |
| 0102 71 25 | 16 | $4.44 | $1,293,674.33 | 291,055.000 | LF | N | TEMPORARY BARRIER, RELOCATE, ANCHORED | |
| 0102 71 26 | 16 | $5.37 | $701,613.22 | 130,737.000 | LF | N | TEMPORARY BARRIER, RELOCATE, FREE STANDING | |
| 0102 73 | 1 | $11.55 | $17,140.20 | 1,484.000 | LF | N | TEMPORARY GUARDRAIL | |
| 0102 74 1 | 153 | $.12 | $1,871,077.56 | 15,323,151.000 | ED | N | CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD | |
| 0102 74 8 | 88 | $.09 | $1,154,667.11 | 12,696,703.000 | FD | N | CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE) | |
| 0102 75 1 | 11 | $18.65 | $1,095,619.54 | 58,748.000 | LF | N | TEMPORARY SEPARATOR, F&I REMOVE | |
| 0102 76 | 121 | $6.16 | $732,943.59 | 119,023.000 | ED | N | ARROW BOARD / ADVANCE WARNING ARROW PANEL | |
| 0102 78 1 | 20 | $5.83 | $225,884.65 | 38,722.000 | EA | N | TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER, TYPE D | |
| 0102 89 1 | 35 | $1,443.23 | $808,207.55 | 560.000 | LO | N | TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION | |
| 0102 94 1 | 2 | $61.99 | $390,764.00 | 6,304.000 | LF | N | TEMPORARY GLARE SCREEN, F&I, WALL MATERIAL-CONCRETE | |
| 0102 99 | 148 | $12.54 | $2,945,429.62 | 234,971.000 | ED | N | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | |
| 0102104 | 86 | $26.02 | $3,966,024.12 | 152,440.000 | ED | N | TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION | |
| 0102107 1 | 84 | $15.87 | $2,409,728.23 | 151,818.000 | ED | N | TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION | |
| 0102112 | 11 | $160.23 | $1,937,681.40 | 12,093.000 | DA | N | EXISTING ITS MAINTENANCE | |
| 0102115 | 114 | $.35 | $117,382.66 | 331,022.000 | ED | N | TYPE III BARRICADE | |
| 0102120 | 1 | $225.35 | $27,042.00 | 120.000 | ED | N | TEMPORARY TRAFFIC SIGNALS FOR LANE CLOSURES ON TWO-LANE,TWO-WAY ROADWAYS | |
| 0102150 1 | 44 | $5.82 | $394,847.17 | 67,849.000 | ED | N | PORTABLE REGULATORY, SIGN | |
| 0102150 2 | 46 | $6.22 | $410,938.13 | 66,068.000 | ED | N | RADAR SPEED DISPLAY UNIT | |
| 0102909 | 20 | $39.35 | $206,997.06 | 5,260.000 | DA | N | TEMPORARY RAISED RUMBLE STRIPS- PER DAY, INCLUDES ALL SETS AND RELOCATIONS | |
| 0102913 12 | 2 | $9,253.76 | $9,226.00 | .997 | GM | N | REMOVABLE TAPE, BLACK, 10'-30', 3'-9', 6'-10', or 2'-4' SKIP | |
| 0102913 21 | 30 | $12,511.62 | $627,745.38 | 50.173 | GM | N | REMOVABLE TAPE, WHITE, SOLID 6" | |
| 0102913 22 | 13 | $3,901.51 | $95,594.78 | 24.502 | GM | N | REMOVABLE TAPE, WHITE, 10'-30', 3'-9', 6'-10', or 2'-4' SKIP, 6" WIDE | |
| 0102913 23 | 8 | $16.61 | $11,710.92 | 705.000 | LF | N | REMOVABLE TAPE, WHITE, 24" STOP BAR | |
| 0102913 24 | 7 | $6.77 | $39,310.09 | 5,805.000 | LF | N | REMOVABLE TAPE, WHITE, 12" CROSSWALK | |
| 0102913 29 | 8 | $344.04 | $28,211.24 | 82.000 | EA | N | REMOVABLE TAPE, WHITE, MESSAGE, SYMBOL OR ARROW | |
| 0102913 31 | 26 | $13,038.29 | $445,961.70 | 34.204 | GM | N | REMOVABLE TAPE, YELLOW, SOLID, 6" | |
| 0102913 32 | 5 | $8,379.62 | $6,251.20 | .746 | GM | N | REMOVABLE TAPE, YELLOW, 10'-30', 3'-9', 6'-10', or 2'-4' SKIP | |
| 0103 1100 | 1 | $1,409,600.00 | $1,409,600.00 | 1.000 | LS | N | TEMPORARY WORK STRUCTURE | |
| 0104 1 | 6 | $4.87 | $189,889.83 | 38,958.000 | SY | N | ARTIFICIAL COVERINGS /ROLLED EROSION CONTROL PRODUCTS | |
| 0104 6 | 2 | $58.92 | $54,090.00 | 918.000 | LF | N | TEMPORARY SLOPE DRAIN / RUNOFF CONTROL STRUCTURE | |
| 0104 7 | 2 | $292.18 | $5,551.38 | 19.000 | EA | N | SEDIMENT BASIN / CONTAINMENT SYSTEM | |
| 0104 9 | 1 | $12,000.00 | $36,000.00 | 3.000 | EA | N | SEDIMENT BASIN / CONTAINMENT SYSTEM- CLEANOUT | |
| 0104 10 3 | 116 | $2.88 | $3,219,290.62 | 1,117,996.000 | LF | N | SEDIMENT BARRIER | |
| 0104 11 | 43 | $20.34 | $842,327.70 | 41,409.000 | LF | N | FLOATING TURBIDITY BARRIER | |
| 0104 12 | 24 | $10.07 | $316,763.39 | 31,441.000 | LF | N | STAKED TURBIDITY BARRIER- NYLON REINFORCED PVC | |
| 0104 15 | 31 | $4,269.82 | $606,315.09 | 142.000 | EA | N | SOIL TRACKING PREVENTION DEVICE | |
| 0104 18 | 120 | $164.33 | $1,233,494.87 | 7,506.000 | EA | N | INLET PROTECTION SYSTEM | |
| 0107 1 | 132 | $34.70 | $5,692,659.04 | 164,075.520 | AC | N | LITTER REMOVAL | |
| 0107 2 | 131 | $55.45 | $7,554,189.42 | 136,234.410 | AC | N | MOWING | |
| 0108 1 | 32 | $11,540.94 | $450,096.54 | 39.000 | EA | N | MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING | |
| 0108 2 | 27 | $18,515.35 | $629,521.97 | 34.000 | EA | N | MONITOR EXISTING STRUCTURES- VIBRATION MONITORING | |
| 0108 3 | 2 | $43,000.00 | $86,000.00 | 2.000 | EA | N | MONITOR EXISTING STRUCTURES- GROUNDWATER MONITORING | |
| 0110 1 1 | 127 | $49,687.45 | $66,743,161.22 | 1,343.260 | AC | N | CLEARING & GRUBBING | |
| 0110 2 2 | 12 | $33,207.29 | $599,723.62 | 18.060 | AC | N | SELECTIVE CLEARING AND GRUBBING, AREAS WITH TREES TO REMAIN | |
| 0110 3 | 18 | $149.62 | $35,153,998.54 | 234,953.000 | SF | N | REMOVAL OF EXISTING STRUCTURES/BRIDGES | |
| 0110 3300 | 1 | $96.47 | $10,611.70 | 110.000 | LF | N | REMOVAL OF EXISTING PILE JACKET | |
| 0110 4 10 | 103 | $41.15 | $11,512,671.44 | 279,749.000 | SY | N | REMOVAL OF EXISTING CONCRETE | |
| 0110 7 1 | 17 | $363.49 | $37,803.20 | 104.000 | EA | N | MAILBOX, F&I SINGLE | |
| 0110 12 1 | 1 | $1,000.00 | $129,000.00 | 129.000 | SY | N | HYDRODEMOLITION, REMOVAL OF DECK SURFACE | |
| 0110 21 | 24 | $6.03 | $400,414.18 | 66,404.000 | LF | N | TREE PROTECTION BARRIER | |
| 0110 22 | 16 | $2,910.31 | $398,712.64 | 137.000 | EA | N | TREE ROOT AND BRANCH PRUNING | |
| 0110 23 | 13 | $1,524.21 | $329,230.39 | 216.000 | EA | N | TREE REMOVAL | |
| 0110 71 1 | 2 | $1,694.69 | $1,532,000.00 | 904.000 | LF | N | BRIDGE FENDER SYSTEM, REMOVAL & DISPOSAL | |
| 0110 73 | 1 | $210.00 | $35,280.00 | 168.000 | LF | N | REMOVE EXISTING BULKHEAD | |
| 0110 86 | 1 | $34,000.00 | $34,000.00 | 1.000 | LS | N | DELIVERY OF SALVAGEABLE MATERIAL TO FDOT | |
| 0120 1 | 78 | $10.99 | $24,861,639.73 | 2,261,773.500 | CY | N | REGULAR EXCAVATION | |
| 0120 2 2 | 33 | $48.19 | $1,303,102.86 | 27,043.000 | CY | N | BORROW EXCAVATION, TRUCK MEASURE | |
| 0120 4 | 23 | $23.32 | $2,361,164.42 | 101,249.500 | CY | N | SUBSOIL EXCAVATION | |
| 0120 5 | 4 | $19.11 | $2,347,075.50 | 122,804.400 | CY | N | CHANNEL EXCAVATION | |
| 0120 6 | 71 | $9.38 | $26,695,368.69 | 2,844,752.700 | CY | N | EMBANKMENT | |
| 0120 71 | 25 | $26,494.03 | $741,832.84 | 28.000 | LS | N | REGULAR EXCAVATION (3-R PROJECTS ONLY) | |
| 0120 72 | 1 | $190.00 | $2,730,870.00 | 14,373.000 | CY | N | GRAVEL FILL | |
| 0120 74 | 1 | $83.00 | $19,314.10 | 232.700 | CY | N | SURCHARGE EMBANKMENT | |
| 0121 70 | 10 | $267.18 | $675,584.04 | 2,528.600 | CY | N | FLOWABLE FILL | |
| 0125 1 | 1 | $250.00 | $98,950.00 | 395.800 | CY | N | EXCAVATION FOR STRUCTURES | |
| 0141 70 | 1 | $2,100.00 | $4,200.00 | 2.000 | AS | N | SETTLEMENT PLATE ASSEMBLY | |
| 0145 1 | 1 | $30.00 | $80,340.00 | 2,678.000 | SF | N | GEOSYNTHETIC REINFORCED SOIL SLOPE | |
| 0145 2 | 2 | $35.46 | $31,735.67 | 895.000 | SY | N | GEOSYNTHETIC REINFORCED FOUNDATION OVER SOFT SOIL | |
| 0145 3 | 1 | $30.00 | $15,660.00 | 522.000 | SY | N | GEOSYNTHETIC REINFORCED EMBANKMENT | |
| 0145 71 | 1 | $7.67 | $23,577.58 | 3,074.000 | SY | N | REINFORCEMENT GRID FOR SOIL STABILIZATION | |
| 0160 4 | 74 | $8.88 | $18,020,732.03 | 2,029,663.000 | SY | N | TYPE B STABILIZATION | |
| 0173 76 | 1 | $40.00 | $248,600.00 | 6,215.000 | LF | N | GROUT PIPE INSTALLATION | |
| 0173 77 1 | 1 | $425.00 | $140,675.00 | 331.000 | CY | N | SUBSURFACE PRESSURE GROUTING, SAND CEMENT | |
| 0173 79100 | 1 | $815.58 | $1,084,720.78 | 1,330.000 | CY | N | SOIL STABILIZATION/IMPROVEMENT BY COLUMN SUPPORTED EMBANKMENT | |
| 0210 1 8 | 1 | $1.10 | $1,069.20 | 972.000 | SY | N | REWORKING LIMEROCK BASE, 4" | |
| 0210 1 9 | 1 | $1.10 | $139.70 | 127.000 | SY | N | REWORKING LIMEROCK BASE, 3" | |
| 0210 2 | 1 | $170.00 | $68,748.00 | 404.400 | CY | N | LIMEROCK-NEW MATERIAL FOR REWORKING BASE | |
| 0285701 | 42 | $19.49 | $5,323,349.64 | 273,175.000 | SY | N | OPTIONAL BASE, BASE GROUP 01 | |
| 0285702 | 10 | $42.43 | $9,484,564.08 | 223,534.000 | SY | N | OPTIONAL BASE, BASE GROUP 02 | |
| 0285703 | 5 | $24.33 | $213,831.33 | 8,790.000 | SY | N | OPTIONAL BASE, BASE GROUP 03 | |
| 0285704 | 10 | $25.59 | $383,933.06 | 15,001.000 | SY | N | OPTIONAL BASE, BASE GROUP 04 | |
| 0285705 | 1 | $18.00 | $232,344.00 | 12,908.000 | SY | N | OPTIONAL BASE, BASE GROUP 05 | |
| 0285706 | 22 | $24.15 | $9,818,360.55 | 406,513.000 | SY | N | OPTIONAL BASE, BASE GROUP 06 | |
| 0285707 | 4 | $68.85 | $1,525,511.00 | 22,158.000 | SY | N | OPTIONAL BASE, BASE GROUP 07 | |
| 0285708 | 4 | $32.14 | $395,264.50 | 12,299.000 | SY | N | OPTIONAL BASE, BASE GROUP 08 | |
| 0285709 | 46 | $32.88 | $8,004,387.41 | 243,466.000 | SY | N | OPTIONAL BASE, BASE GROUP 09 | |
| 0285710 | 12 | $38.41 | $3,120,248.33 | 81,231.000 | SY | N | OPTIONAL BASE, BASE GROUP 10 | |
| 0285711 | 16 | $27.76 | $15,878,257.53 | 572,040.000 | SY | N | OPTIONAL BASE, BASE GROUP 11 | |
| 0285712 | 9 | $48.49 | $3,447,316.28 | 71,097.000 | SY | N | OPTIONAL BASE, BASE GROUP 12 | |
| 0285713 | 6 | $91.88 | $1,331,014.61 | 14,486.000 | SY | N | OPTIONAL BASE, BASE GROUP 13 | |
| 0285714 | 2 | $119.34 | $107,525.00 | 901.000 | SY | N | OPTIONAL BASE, BASE GROUP 14 | |
| 0285715 | 10 | $112.35 | $1,405,479.11 | 12,510.000 | SY | N | OPTIONAL BASE, BASE GROUP 15 | |
| 0286 1 | 13 | $55.45 | $314,925.41 | 5,679.000 | SY | N | TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS | |
| 0286 2 | 7 | $327.27 | $465,147.21 | 1,421.300 | TN | N | TURNOUT CONSTRUCTION-ASPHALT/DRIVEWAY BASE- ASPHALT MATERIAL | |
| 0289 1103 | 1 | $253.81 | $7,360.49 | 29.000 | SY | Y | COARSE AGGREGATE BASE SPECIAL DESIGN, 12" | |
| 0327 70 1 | 16 | $2.22 | $2,576,574.09 | 1,159,174.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH | |
| 0327 70 2 | 20 | $3.68 | $3,104,081.93 | 842,629.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH | |
| 0327 70 3 | 6 | $5.94 | $2,270,681.13 | 382,336.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 4 1/2" AVG DEPTH | |
| 0327 70 4 | 39 | $3.16 | $6,831,281.86 | 2,165,100.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH | |
| 0327 70 5 | 27 | $3.36 | $3,595,980.38 | 1,071,582.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH | |
| 0327 70 6 | 100 | $3.50 | $11,260,960.02 | 3,219,600.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH | |
| 0327 70 7 | 17 | $4.71 | $2,452,216.89 | 520,283.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 4" AVG DEPTH | |
| 0327 70 8 | 18 | $3.18 | $2,571,797.36 | 808,079.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 2 1/2" AVG DEPTH | |
| 0327 70 9 | 1 | $6.82 | $11,314.38 | 1,659.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 5 1/4" AVG DEPTH | |
| 0327 70 10 | 5 | $8.18 | $94,460.11 | 11,550.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 5" AVG DEPTH | |
| 0327 70 11 | 30 | $2.79 | $8,705,264.86 | 3,118,631.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH | |
| 0327 70 12 | 16 | $2.41 | $1,388,360.11 | 575,694.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 1 1/4" AVG DEPTH | |
| 0327 70 13 | 7 | $2.81 | $347,890.59 | 123,613.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 1 3/4" AVG DEPTH | |
| 0327 70 14 | 1 | $9.00 | $18,036.00 | 2,004.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 6 1/2" AVG DEPTH | |
| 0327 70 15 | 8 | $3.42 | $1,332,477.15 | 389,719.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 2 3/4" AVG DEPTH | |
| 0327 70 16 | 3 | $2.35 | $126,570.42 | 53,949.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 1/2" AVG DEPTH | |
| 0327 70 17 | 9 | $3.37 | $1,421,441.96 | 421,408.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 3 1/4" AVG DEPTH | |
| 0327 70 18 | 1 | $8.72 | $55,023.20 | 6,310.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 5 1/2" AVG DEPTH | |
| 0327 70 19 | 12 | $2.52 | $346,033.34 | 137,228.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH | |
| 0327 70 20 | 12 | $3.52 | $1,867,560.60 | 530,089.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 3 3/4" AVG DEPTH | |
| 0327 70 22 | 4 | $3.89 | $441,368.16 | 113,508.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 4 1/4" AVG DEPTH | |
| 0327 70 23 | 3 | $11.59 | $28,722.70 | 2,478.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 6" AVG DEPTH | |
| 0327 70 26 | 3 | $4.11 | $371,345.90 | 90,435.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 4 3/4" AVG DEPTH | |
| 0327 70 27 | 1 | $2.70 | $144,309.60 | 53,448.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 5 3/4" AVG DEPTH | |
| 0327 70 31 | 1 | $7.00 | $44,961.00 | 6,423.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 7 1/2" AVG DEPTH | |
| 0327 70 43 | 1 | $18.18 | $186,217.74 | 10,243.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 11" AVG DEPTH | |
| 0327 70 46 | 1 | $10.00 | $343,360.00 | 34,336.000 | SY | N | MILLING EXISTING ASPHALT PAVEMENT, 12" AVG DEPTH | |
| 0328 1 | 2 | $2.98 | $69,010.54 | 23,179.000 | SY | N | ASPHALT PAVEMENT GROOVING | |
| 0334 1 12 | 27 | $152.80 | $11,063,917.84 | 72,409.800 | TN | N | SUPERPAVE ASPHALTIC CONC, TRAFFIC B | |
| 0334 1 13 | 55 | $143.11 | $45,960,170.31 | 321,157.800 | TN | N | SUPERPAVE ASPHALTIC CONC, TRAFFIC C | |
| 0334 1 15 | 17 | $135.23 | $24,697,011.96 | 182,631.700 | TN | N | SUPERPAVE ASPHALTIC CONC, TRAFFIC E | |
| 0334 1 52 | 15 | $180.24 | $4,726,470.27 | 26,223.800 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 | |
| 0334 1 53 | 53 | $161.47 | $62,818,980.08 | 389,053.800 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 | |
| 0334 1 55 | 23 | $153.08 | $64,428,958.68 | 420,885.600 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC E, PG76-22 | |
| 0334 1 56 | 1 | $180.43 | $360,661.53 | 1,998.900 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, HIGH POLYMER | |
| 0334 1 57 | 3 | $232.81 | $650,024.62 | 2,792.100 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, HIGH POLYMER | |
| 0334 1 59 | 4 | $192.06 | $14,057,936.63 | 73,194.400 | TN | N | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC E, HIGH POLYMER | |
| 0337 7 25 | 40 | $216.80 | $55,030,789.62 | 253,829.000 | TN | N | ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 | |
| 0337 7 26 | 4 | $216.09 | $4,618,545.48 | 21,373.300 | TN | N | ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, HIGH POLYMER | |
| 0337 7 80 | 4 | $239.39 | $1,464,016.50 | 6,115.500 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-9.5, PG 76-22 | |
| 0337 7 81 | 21 | $193.98 | $6,315,610.75 | 32,558.500 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 | |
| 0337 7 82 | 12 | $193.11 | $8,202,377.24 | 42,475.300 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-9.5, PG 76-22 | |
| 0337 7 83 | 86 | $177.98 | $105,457,179.46 | 592,530.200 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-12.5, PG 76-22 | |
| 0337 7 88 | 12 | $172.86 | $13,505,705.71 | 78,130.700 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC E, FC-12.5, PG 76-22 | |
| 0337 7 91 | 1 | $254.06 | $422,501.78 | 1,663.000 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, HIGH POLYMER | |
| 0337 7 93 | 3 | $220.15 | $636,139.16 | 2,889.600 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-12.5, HIGH POLYMER | |
| 0337 7 95 | 2 | $208.60 | $2,937,588.27 | 14,082.500 | TN | N | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC E, FC-12.5, HIGH POLYMER | |
| 0339 1 | 58 | $351.94 | $4,656,248.47 | 13,230.200 | TN | N | MISCELLANEOUS ASPHALT PAVEMENT | |
| 0350 3 1 | 3 | $184.29 | $165,862.84 | 900.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 6" | |
| 0350 3 6 | 1 | $177.00 | $1,030,317.00 | 5,821.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 8.5" | |
| 0350 3 7 | 4 | $127.59 | $26,669,053.19 | 209,015.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 9" | |
| 0350 3 9 | 1 | $132.50 | $140,582.50 | 1,061.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 10" | |
| 0350 3 12 | 1 | $142.00 | $3,652,950.00 | 25,725.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 11.5" | |
| 0350 3 17 | 1 | $400.00 | $27,600.00 | 69.000 | SY | N | PLAIN CEMENT CONCRETE PAVEMENT, 14" | |
| 0350 4101 | 1 | $225.00 | $438,525.00 | 1,949.000 | SY | Y | REINFORCED CEMENT CONCRETE PAVEMENT,12", TYPE III SYNTHETIC FIBER REINFORCED | |
| 0350 5 | 5 | $2.83 | $3,865,153.85 | 1,364,857.000 | LF | N | CLEANING & SEALING JOINTS- CONCRETE PAVEMENT | |
| 0350 6 | 2 | $4.40 | $71,217.00 | 16,169.000 | LF | N | CLEANING & SEALING RANDOM CRACKS- CONCRETE PAVEMENT | |
| 0350 30 13 | 2 | $238.40 | $208,597.93 | 875.000 | SY | N | CONCRETE PAVEMENT FOR ROUNDABOUT APRON, 12" DEPTH | |
| 0352 70 | 5 | $4.81 | $4,114,628.06 | 856,262.000 | SY | N | GRINDING CONCRETE PAVEMENT | |
| 0353 70 | 2 | $1,526.46 | $5,898,850.70 | 3,864.400 | CY | N | CONCRETE PAVEMENT SLAB REPLACEMENT | |
| 0370 1 | 1 | $10.00 | $21,180.00 | 2,118.000 | LF | N | BRIDGE APPROACH EXPANSION JOINT FOR CONCRETE PAVEMENT | |
| 0400 0 11 | 18 | $950.38 | $2,853,326.99 | 3,002.300 | CY | N | CONCRETE CLASS NS, GRAVITY WALL INDEX 400-011 | |
| 0400 0 13 | 1 | $4,100.00 | $3,690.00 | .900 | CY | N | CONCRETE CLASS NS, STEPS | |
| 0400 1 30 | 1 | $2,000.00 | $4,800.00 | 2.400 | CY | N | CONCRETE, CLASS I (SEAL) | |
| 0400 2 1 | 2 | $1,949.06 | $2,393,450.00 | 1,228.000 | CY | N | CONCRETE CLASS II, CULVERTS | |
| 0400 2 4 | 12 | $1,648.82 | $22,844,905.80 | 13,855.300 | CY | N | CONC CLASS II, BRIDGE SUPERSTRUCTURE | |
| 0400 2 5 | 3 | $1,966.83 | $584,740.00 | 297.300 | CY | N | CONCRETE CLASS II, BRIDGE SUBSTRUCTURE | |
| 0400 2 8 | 2 | $2,515.02 | $773,370.00 | 307.500 | CY | N | CONCRETE CLASS II, BULKHEAD | |
| 0400 2 10 | 14 | $770.43 | $3,436,523.00 | 4,460.500 | CY | N | CONCRETE CLASS II, APPROACH SLABS | |
| 0400 2 11 | 1 | $4,440.00 | $572,316.00 | 128.900 | CY | N | CONCRETE CLASS II, RETAINING WALLS | |
| 0400 2 12 | 1 | $4,100.00 | $8,610.00 | 2.100 | CY | N | CONCRETE, CLASS II, TRENCH SLAB | |
| 0400 2 25 | 1 | $1,500.00 | $131,700.00 | 87.800 | CY | N | CONCRETE CLASS II, MASS, BRIDGE SUBSTRUCTURE | |
| 0400 4 1 | 7 | $1,692.38 | $18,499,602.41 | 10,931.100 | CY | N | CONCRETE CLASS IV, CULVERTS | |
| 0400 4 4 | 4 | $1,536.53 | $1,272,710.00 | 828.300 | CY | N | CONCRETE CLASS IV, SUPERSTRUCTURE | |
| 0400 4 5 | 18 | $2,845.60 | $18,401,619.28 | 6,466.700 | CY | N | CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE | |
| 0400 4 6 | 1 | $1,143.00 | $147,447.00 | 129.000 | CY | N | CONCRETE CLASS IV, COUNTERWEIGHT | |
| 0400 4 8 | 6 | $2,192.99 | $989,038.84 | 451.000 | CY | N | CONC CLASS IV, BULKHEAD | |
| 0400 4 11 | 6 | $712.64 | $1,732,504.11 | 2,431.100 | CY | N | CONC CLASS IV, RETAINING WALLS | |
| 0400 4 25 | 10 | $1,919.38 | $12,927,243.50 | 6,735.100 | CY | N | CONCRETE CLASS IV, MASS, SUBSTRUCTURE | |
| 0400 4 47 | 2 | $1,347.02 | $950,591.52 | 705.700 | CY | N | CONCRETE CLASS IV, CAST IN PLACE TOPPING WITH SHRINKAGE REDUCING ADMIXTURE | |
| 0400 7 1 | 10 | $10.54 | $457,768.06 | 43,444.000 | SY | N | BRIDGE DECK GROOVING | |
| 0400 9 1 | 6 | $12.19 | $321,166.03 | 26,338.000 | SY | N | BRIDGE DECK PLANING | |
| 0400 45 5 | 2 | $246.44 | $53,478.00 | 217.000 | SY | N | REINFORCED CONCRETE, TOLL SITE EQUIPMENT SLAB, 12" THICK | |
| 0400 60 2 | 1 | $150,000.00 | $150,000.00 | 1.000 | LS | N | CATHODIC PROTECTION - ELECTRICAL WORK, DC POWER SOURCE ASSEMBLY | |
| 0400 60 3 | 3 | $448.91 | $2,141,308.50 | 4,770.000 | LF | N | CATHODIC PROTECTION - ELECTRICAL WORK, CONDUIT, WIRING, AND ACCESSORIES | |
| 0400 60 4 | 3 | $400,371.33 | $2,402,228.00 | 6.000 | LS | N | CATHODIC PROTECTION - ELECTRICAL WORK, EQUIPMENT & INSTRUMENTATION | |
| 0400140 1 | 3 | $8,430.23 | $2,175,000.00 | 258.000 | EA | N | NEOPRENE PAD REPLACEMENT, BENT/PIER | |
| 0400140 2 | 1 | $12,500.00 | $100,000.00 | 8.000 | EA | N | NEOPRENE PAD REPLACEMENT, ABUTMENT | |
| 0400142 3 | 1 | $60.00 | $556,380.00 | 9,273.000 | SF | N | CATHODIC PROTECTION SYSTEM, ZINC ALUMINUM SPRAY | |
| 0400142 4 | 1 | $75.00 | $661,725.00 | 8,823.000 | SF | N | CATHODIC PROTECTION SYSTEM, ZINC ALUMINUM SHEETS | |
| 0400142 7 | 1 | $24.00 | $2,080,512.00 | 86,688.000 | SF | N | CATHODIC PROTECTION SYSTEM, TITANIUM MESH | |
| 0400142 9 | 1 | $297.21 | $312,070.50 | 1,050.000 | SF | N | CATHODIC PROTECTION SYSTEM, OTHER MATERIAL | |
| 0400143 | 6 | $2.39 | $806,614.45 | 337,871.000 | SF | N | CLEANING & COATING CONCRETE SURFACE, CLASS 5 | |
| 0400145 | 3 | $.54 | $29,919.90 | 55,754.000 | SF | N | CLEANING CONCRETE SURFACE | |
| 0400147 | 10 | $1,326.10 | $632,680.50 | 477.100 | CF | N | COMPOSITE NEOPRENE PADS | |
| 0400148 | 3 | $1,905.95 | $77,381.50 | 40.600 | CF | N | PLAIN NEOPRENE BEARING PADS | |
| 0400150 | 1 | $5.99 | $6,547.07 | 1,093.000 | SF | N | CLEANING AND SEALING EXISTING CONCRETE SURFACE | |
| 0400153 | 1 | $224.00 | $70,336.00 | 314.000 | CF | N | NON SHRINK GROUT, F&I, MISCELLANEOUS- STRUCTURES REHAB | |
| 0401 70 3 | 11 | $866.08 | $4,712,929.26 | 5,441.700 | CF | N | RESTORE SPALLED AREAS, LATEX MODIFIED MORTAR- ACRYLIC | |
| 0401 70 4 | 4 | $995.27 | $336,799.74 | 338.400 | CF | N | RESTORE SPALLED AREAS, PORTLAND CEMENT GROUT | |
| 0401 70 7 | 2 | $379.61 | $293,626.00 | 773.500 | CF | N | RESTORE SPALLED AREAS, SHOTCRETE | |
| 0401 70 9 | 2 | $887.41 | $163,905.00 | 184.700 | CF | N | RESTORE SPALLED AREAS, VERY RAPID HARDENING MORTAR/CONCRETES | |
| 0403 1100 | 3 | $102.07 | $312,128.00 | 3,058.000 | SY | N | EPOXY CONCRETE OVERLAY FOR CONCRETE BRIDGE DECKS | |
| 0403 2100 | 1 | $1,200.00 | $2,400.00 | 2.000 | CF | N | RESTORE SPALLED AREAS FOR CONCRETE BRIDGE DECKS | |
| 0405 70 1 | 1 | $1,900.00 | $366,700.00 | 193.000 | CF | N | LATEX MODIFIED PORTLAND CEMENT CONCRETE, TYPE I | |
| 0411 1 | 14 | $355.08 | $45,804.72 | 129.000 | GA | N | EPOXY MATERIAL FOR CRACK INJECTION- STRUCTURES REHAB | |
| 0411 2 | 14 | $149.67 | $598,228.85 | 3,997.000 | LF | N | CRACKS INJECT & SEAL- STRUCTURES REHAB | |
| 0412 1 1 | 1 | $116.00 | $4,524.00 | 39.000 | GA | N | MATERIAL FOR CRACK INJECTION, WATER REACTIVE POLYURETHANE GROUT | |
| 0412 2 | 1 | $116.00 | $8,816.00 | 76.000 | LF | N | INJECT & SEAL CRACK, OTHER MATERIALS | |
| 0413149 | 4 | $226.16 | $62,194.76 | 275.000 | GA | N | PENETRANT SEALER | |
| 0413151 | 10 | $64.56 | $596,387.00 | 9,238.000 | GA | N | METHACRYLATE MONOMER | |
| 0413154 | 13 | $1.70 | $1,390,466.41 | 817,577.000 | SF | N | CLEANING & SEALING CONCRETE SURFACES - PENETRANT SEALER OR METHACRYLATES | |
| 0415 1 1 | 7 | $.25 | $560,207.72 | 2,272,518.000 | LB | N | REINFORCING STEEL- ROADWAY | |
| 0415 1 3 | 7 | $1.78 | $289,350.84 | 162,747.000 | LB | N | REINFORCING STEEL- RETAINING WALL | |
| 0415 1 4 | 14 | $1.44 | $5,310,597.10 | 3,683,857.000 | LB | N | REINFORCING STEEL - BRIDGE SUPERSTRUCTURE | |
| 0415 1 5 | 22 | $1.61 | $4,996,125.16 | 3,095,597.000 | LB | N | REINFORCING STEEL- BRIDGE SUBSTRUCTURE | |
| 0415 1 6 | 2 | $3.11 | $22,643.00 | 7,285.000 | LB | N | REINFORCING STEEL- MISCELLANEOUS | |
| 0415 1 8 | 5 | $2.45 | $122,486.49 | 50,024.000 | LB | N | REINFORCING STEEL- BULKHEAD | |
| 0415 1 9 | 14 | $1.55 | $1,269,382.65 | 818,565.000 | LB | N | REINFORCING STEEL- APPROACH SLABS | |
| 0415 2 5 | 1 | $5.50 | $60,852.00 | 11,064.000 | LB | N | STAINLESS REINFORCING STEEL, SUBSTRUCTURE | |
| 0415 10 4 | 1 | $3.75 | $86,265.00 | 23,004.000 | LF | N | FIBER REINFORCED POLYMER BARS, #4 BAR | |
| 0415 10 5 | 2 | $4.05 | $441,016.95 | 108,922.000 | LF | N | FIBER REINFORCED POLYMER BARS, #5 BAR | |
| 0415 10 6 | 2 | $3.03 | $65,708.60 | 21,681.000 | LF | N | FIBER REINFORCED POLYMER BARS, #6 BAR | |
| 0415 10 8 | 2 | $6.63 | $38,423.50 | 5,796.000 | LF | N | FIBER REINFORCED POLYMER BARS, #8 BAR | |
| 0425 1201 | 7 | $11,283.05 | $157,962.76 | 14.000 | EA | N | INLETS, CURB, TYPE 9, <10' | |
| 0425 1203 | 1 | $7,500.00 | $15,000.00 | 2.000 | EA | N | INLETS, CURB, TYPE 9, J BOT, <10' | |
| 0425 1205 | 2 | $10,341.94 | $20,683.87 | 2.000 | EA | N | INLETS, CURB, TYPE 9, PARTIAL | |
| 0425 1211 | 1 | $7,445.00 | $7,445.00 | 1.000 | EA | N | INLETS, CURB, TYPE 10, <10' | |
| 0425 1311 | 12 | $10,649.64 | $1,203,408.95 | 113.000 | EA | N | INLETS, CURB, TYPE P-1, <10' | |
| 0425 1312 | 1 | $21,600.00 | $86,400.00 | 4.000 | EA | N | INLETS, CURB TYPE P-1, >10' | |
| 0425 1315 | 2 | $12,456.69 | $24,913.38 | 2.000 | EA | N | INLETS, CURB TYPE P-1, PARTIAL | |
| 0425 1321 | 7 | $12,388.61 | $185,829.22 | 15.000 | EA | N | INLETS, CURB, TYPE P-2, <10' | |
| 0425 1331 | 4 | $9,960.00 | $49,800.00 | 5.000 | EA | N | INLETS, CURB, TYPE P-3, <10' | |
| 0425 1335 | 2 | $11,740.00 | $58,700.00 | 5.000 | EA | N | INLETS, CURB, TYPE P-3, PARTIAL | |
| 0425 1341 | 3 | $14,815.00 | $74,075.00 | 5.000 | EA | N | INLETS, CURB, TYPE P-4, <10' | |
| 0425 1345 | 2 | $9,136.95 | $18,273.89 | 2.000 | EA | N | INLETS, CURB, TYPE P-4, PARTIAL | |
| 0425 1351 | 19 | $9,603.54 | $1,315,684.35 | 137.000 | EA | N | INLETS, CURB, TYPE P-5, <10' | |
| 0425 1352 | 4 | $14,908.44 | $298,168.75 | 20.000 | EA | N | INLETS, CURB, TYPE P-5, >10' | |
| 0425 1355 | 7 | $9,098.81 | $63,691.65 | 7.000 | EA | N | INLETS, CURB, TYPE P-5, PARTIAL | |
| 0425 1361 | 12 | $9,693.08 | $465,267.70 | 48.000 | EA | N | INLETS, CURB, TYPE P-6, <10' | |
| 0425 1362 | 2 | $16,461.97 | $32,923.93 | 2.000 | EA | N | INLETS, CURB, TYPE P-6, >10' | |
| 0425 1365 | 3 | $20,256.08 | $60,768.25 | 3.000 | EA | N | INLETS, CURB, TYPE P-6, PARTIAL | |
| 0425 1369 | 1 | $15,651.86 | $31,303.72 | 2.000 | EA | N | INLETS, CURB, TYPE P-6, MODIFY | |
| 0425 1411 | 3 | $14,960.00 | $74,800.00 | 5.000 | EA | N | INLETS, CURB TYPE J-1, <10' | |
| 0425 1412 | 1 | $23,700.00 | $23,700.00 | 1.000 | EA | N | INLETS, CURB, TYPE J-1, >10' | |
| 0425 1415 | 1 | $13,208.75 | $13,208.75 | 1.000 | EA | N | INLETS, CURB, TYPE J-1, PARTIAL | |
| 0425 1421 | 2 | $15,500.00 | $62,000.00 | 4.000 | EA | N | INLETS, CURB, TYPE J-2, <10' | |
| 0425 1422 | 1 | $21,900.00 | $43,800.00 | 2.000 | EA | N | INLETS, CURB, TYPE J-2, >10' | |
| 0425 1441 | 2 | $21,793.75 | $43,587.50 | 2.000 | EA | N | INLETS, CURB, TYPE J-4, <10' | |
| 0425 1451 | 10 | $12,561.27 | $326,592.96 | 26.000 | EA | N | INLETS, CURB, TYPE J-5, <10' | |
| 0425 1452 | 3 | $18,782.15 | $150,257.20 | 8.000 | EA | N | INLETS, CURB, TYPE J-5, >10' | |
| 0425 1455 | 1 | $42,500.00 | $42,500.00 | 1.000 | EA | N | INLETS, CURB, TYPE J-5, PARTIAL | |
| 0425 1461 | 7 | $12,886.15 | $141,747.68 | 11.000 | EA | N | INLETS, CURB, TYPE J-6, <10' | |
| 0425 1462 | 1 | $18,579.60 | $18,579.60 | 1.000 | EA | N | INLETS, CURB, TYPE J-6, >10' | |
| 0425 1465 | 2 | $9,626.11 | $28,878.34 | 3.000 | EA | N | INLETS, CURB, TYPE J-6, PARTIAL | |
| 0425 1471 | 4 | $8,631.92 | $77,687.30 | 9.000 | EA | N | INLETS, CURB, TYPE 7, <10' | |
| 0425 1472 | 1 | $17,521.10 | $35,042.20 | 2.000 | EA | N | INLETS, CURB, TYPE 7, >10' | |
| 0425 1473 | 1 | $25,000.00 | $25,000.00 | 1.000 | EA | N | INLETS, CURB, TYPE 7, J BOT , <10' | |
| 0425 1475 | 1 | $9,586.08 | $19,172.16 | 2.000 | EA | N | INLETS, CURB, TYPE 7, PARTIAL | |
| 0425 1501 | 2 | $6,854.91 | $109,678.50 | 16.000 | EA | N | INLETS, DT BOT, TYPE A, <10' | |
| 0425 1505 | 1 | $4,401.82 | $44,018.20 | 10.000 | EA | N | INLETS, DT BOT, TYPE A, PARTIAL | |
| 0425 1511 | 2 | $7,083.33 | $42,500.00 | 6.000 | EA | N | INLETS, DT BOT, TYPE B, <10' | |
| 0425 1513 | 1 | $12,500.00 | $12,500.00 | 1.000 | EA | N | INLETS, DT BOT, TYPE B, J BOT, <10' | |
| 0425 1521 | 25 | $7,154.68 | $422,126.37 | 59.000 | EA | N | INLETS, DT BOT, TYPE C,<10' | |
| 0425 1522 | 1 | $7,000.00 | $14,000.00 | 2.000 | EA | N | INLETS, DT BOT, TYPE C,>10' | |
| 0425 1523 | 4 | $14,679.78 | $117,438.27 | 8.000 | EA | N | INLETS, DT BOT, TYPE C,JBOT, <10' | |
| 0425 1524 | 2 | $15,616.67 | $46,850.00 | 3.000 | EA | N | INLETS, DT BOT, TYPE C, JBOT, >10' | |
| 0425 1525 | 2 | $5,825.00 | $23,300.00 | 4.000 | EA | N | INLETS, DITCH BOTTOM, TYPE C, PARTIAL | |
| 0425 1529 | 3 | $6,760.00 | $33,800.00 | 5.000 | EA | N | INLETS, DT BOT, TYPE C, MODIFY | |
| 0425 1531 | 1 | $12,407.38 | $24,814.76 | 2.000 | EA | N | INLETS, DITCH BOTTOM, TYPE C MODIFIED- BACK OF SIDEWALK, <10' | |
| 0425 1535 | 2 | $11,439.34 | $45,757.37 | 4.000 | EA | N | INLETS, DITCH BOTTOM TYPE C MODIFIED- BACK OF SIDEWALK, PARTIAL | |
| 0425 1541 | 17 | $7,984.35 | $582,857.88 | 73.000 | EA | N | INLETS, DT BOT, TYPE D, <10' | |
| 0425 1543 | 5 | $12,948.15 | $194,222.19 | 15.000 | EA | N | INLETS, DITCH BOTTOM, TYPE D, J BOT, <10' | |
| 0425 1544 | 1 | $11,966.05 | $11,966.05 | 1.000 | EA | N | INLETS, DITCH BOTTOM, TYPE D, J BOT, >10' | |
| 0425 1545 | 2 | $4,906.13 | $9,812.26 | 2.000 | EA | N | INLETS, DITCH BOTTOM, TYPE D, PARTIAL | |
| 0425 1549 | 7 | $9,814.27 | $225,728.27 | 23.000 | EA | N | INLETS, DT BOT, TYPE D, MODIFY | |
| 0425 1551 | 7 | $7,892.50 | $189,420.00 | 24.000 | EA | N | INLETS, DT BOT, TYPE E, <10' | |
| 0425 1553 | 2 | $13,400.00 | $26,800.00 | 2.000 | EA | N | INLETS, DT BOT, TYPE E, J BOT, <10' | |
| 0425 1555 | 4 | $5,778.40 | $57,784.00 | 10.000 | EA | N | INLETS, DT BOT, TYPE E, PARTIAL | |
| 0425 1559 | 2 | $10,649.47 | $63,896.80 | 6.000 | EA | N | INLETS, DT BOT, TYPE E, MODIFY | |
| 0425 1561 | 8 | $7,571.96 | $189,298.99 | 25.000 | EA | N | INLETS, DT BOT, TYPE F, <10' | |
| 0425 1563 | 1 | $17,858.50 | $71,434.00 | 4.000 | EA | N | INLETS, DITCH BOTTOM, TYPE F, J BOT, <10' | |
| 0425 1565 | 2 | $7,852.67 | $23,558.00 | 3.000 | EA | N | INLETS, DITCH BOTTOM, TYPE F, PARTIAL | |
| 0425 1571 | 3 | $10,776.82 | $86,214.56 | 8.000 | EA | N | INLETS, DITCH BOTTOM, TYPE G, <10' | |
| 0425 1579 | 1 | $20,000.00 | $40,000.00 | 2.000 | EA | N | INLETS, DITCH BOTTOM, TYPE G, MODIFY | |
| 0425 1581 | 7 | $13,125.15 | $210,002.42 | 16.000 | EA | N | INLETS, DT BOT, TYPE H, <10' | |
| 0425 1585 | 1 | $7,750.00 | $38,750.00 | 5.000 | EA | N | INLETS, DT BOT, TYPE H, PARTIAL | |
| 0425 1589 | 3 | $20,250.00 | $101,250.00 | 5.000 | EA | N | INLETS, DT BOT, TYPE H, MODIFY | |
| 0425 1601 | 1 | $8,800.00 | $8,800.00 | 1.000 | EA | N | INLETS, DT BOT, TYPE J, <10' | |
| 0425 1619 | 1 | $13,575.00 | $13,575.00 | 1.000 | EA | N | INLETS, DITCH BOTTOM, TYPE K, J BOTTOM, MODIFY | |
| 0425 1701 | 19 | $5,935.84 | $2,463,372.88 | 415.000 | EA | N | INLETS, GUTTER, TYPE S, <10' | |
| 0425 1702 | 4 | $10,140.47 | $131,826.10 | 13.000 | EA | N | INLETS, GUTTER, TYPE S, >10' | |
| 0425 1703 | 5 | $10,479.82 | $1,393,816.50 | 133.000 | EA | N | INLETS, GUTTER, TYPE S, J BOTTOM <10' | |
| 0425 1704 | 4 | $13,991.57 | $1,035,376.00 | 74.000 | EA | N | INLETS, GUTTER, TYPE S, J BOTTOM, >10' | |
| 0425 1705 | 4 | $7,446.25 | $96,801.19 | 13.000 | EA | N | INLETS, GUTTER, TYPE S, PARTIAL | |
| 0425 1711 | 9 | $10,268.52 | $205,370.40 | 20.000 | EA | N | INLETS, GUTTER, TYPE V, <10' | |
| 0425 1713 | 2 | $12,500.00 | $50,000.00 | 4.000 | EA | N | INLETS, GUTTER, TYPE V, J BOT, <10' | |
| 0425 1714 | 1 | $14,400.00 | $14,400.00 | 1.000 | EA | N | INLETS, GUTTER, TYPE V, J BOTTOM, >10' | |
| 0425 1715 | 1 | $6,160.00 | $12,320.00 | 2.000 | EA | N | INLETS, GUTTER, TYPE V, PARTIAL | |
| 0425 1781 | 3 | $9,565.00 | $191,300.00 | 20.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 1, <=10' | |
| 0425 1783 | 1 | $12,300.00 | $110,700.00 | 9.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 1, J BOT, <10' | |
| 0425 1784 | 1 | $25,400.00 | $25,400.00 | 1.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 1, J BOT, >10' | |
| 0425 1790 | 3 | $10,171.69 | $844,250.00 | 83.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 2, < =10' | |
| 0425 1793 | 3 | $14,073.64 | $774,050.00 | 55.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 2, J BOT, <10' | |
| 0425 1794 | 2 | $21,050.00 | $126,300.00 | 6.000 | EA | N | INLETS, MEDIAN BARRIER, TYPE 2, J BOT, >10' | |
| 0425 1881 | 5 | $11,569.71 | $462,788.57 | 40.000 | EA | N | INLETS, BARRIER WALL, RIGID, CURB & GUTTER, <=10' | |
| 0425 1882 | 2 | $20,900.00 | $83,600.00 | 4.000 | EA | N | INLETS, BARRIER WALL, RIGID, CURB & GUTTER, >10' | |
| 0425 1883 | 1 | $17,500.00 | $140,000.00 | 8.000 | EA | N | INLETS, BARRIER WALL, RIGID, CURB & GUTTER, J BOT<10' | |
| 0425 1910 | 8 | $9,622.28 | $317,535.12 | 33.000 | EA | N | INLETS, CLOSED FLUME | |
| 0425 1921 | 9 | $10,289.21 | $3,117,630.75 | 303.000 | EA | N | INLETS, ADJACENT BARRIER, <=10' | |
| 0425 1922 | 8 | $14,905.42 | $611,122.20 | 41.000 | EA | N | INLETS, ADJACENT BARRIER, >10' | |
| 0425 1923 | 6 | $17,488.37 | $752,000.00 | 43.000 | EA | N | INLETS, ADJACENT BARRIER, J BOTTOM, < 10' | |
| 0425 1924 | 4 | $41,893.10 | $1,214,900.00 | 29.000 | EA | N | INLETS, ADJACENT BARRIER, J BOTTOM, >10' | |
| 0425 1925 | 2 | $4,890.00 | $24,450.00 | 5.000 | EA | N | INLETS, ADJACENT BARRIER, PARTIAL | |
| 0425 2 41 | 15 | $8,818.72 | $546,760.87 | 62.000 | EA | N | MANHOLES, P-7, <10' | |
| 0425 2 42 | 1 | $7,000.00 | $7,000.00 | 1.000 | EA | N | MANHOLES, P-7, >10' | |
| 0425 2 43 | 8 | $6,358.57 | $69,944.28 | 11.000 | EA | N | MANHOLES, P-7, PARTIAL | |
| 0425 2 61 | 18 | $7,177.51 | $1,227,353.48 | 171.000 | EA | N | MANHOLES, P-8, <10' | |
| 0425 2 62 | 6 | $11,460.32 | $217,746.11 | 19.000 | EA | N | MANHOLES, P-8, >10' | |
| 0425 2 63 | 7 | $6,070.07 | $182,102.19 | 30.000 | EA | N | MANHOLES, P-8, PARTIAL | |
| 0425 2 71 | 11 | $14,095.92 | $408,781.69 | 29.000 | EA | N | MANHOLES, J-7, <10' | |
| 0425 2 72 | 5 | $25,492.68 | $382,390.24 | 15.000 | EA | N | MANHOLES, J-7, >10' | |
| 0425 2 73 | 2 | $11,724.17 | $70,345.00 | 6.000 | EA | N | MANHOLES, J-7, PARTIAL | |
| 0425 2 75 | 1 | $25,400.00 | $101,600.00 | 4.000 | EA | N | MANHOLES, J-7, >10' CONTROL STRUCTURE | |
| 0425 2 91 | 11 | $11,722.40 | $562,675.04 | 48.000 | EA | N | MANHOLES, J-8, <10' | |
| 0425 2 92 | 8 | $16,368.35 | $769,312.62 | 47.000 | EA | N | MANHOLES, J-8, >10' | |
| 0425 2 93 | 1 | $4,050.00 | $4,050.00 | 1.000 | EA | N | MANHOLES, J-8, PARTIAL | |
| 0425 3 43 | 1 | $2,500.00 | $2,500.00 | 1.000 | EA | N | JUNCTION BOX, DRAINAGE, P-7, PARTIAL | |
| 0425 4 | 7 | $1,185.83 | $54,548.12 | 46.000 | EA | N | INLETS, ADJUST | |
| 0425 5 | 54 | $1,191.53 | $1,024,713.39 | 860.000 | EA | N | MANHOLE, ADJUST | |
| 0425 5 1 | 18 | $1,963.26 | $257,186.65 | 131.000 | EA | N | MANHOLE, ADJUST, UTILITIES | |
| 0425 6 | 28 | $1,093.96 | $660,751.91 | 604.000 | EA | N | VALVE BOXES, ADJUST | |
| 0425 6 1 | 5 | $804.17 | $11,258.44 | 14.000 | EA | N | METER BOXES, ADJUST | |
| 0425 7 | 3 | $2,545.12 | $50,902.48 | 20.000 | EA | N | MANHOLE COVER- REPLACE | |
| 0425 10 | 1 | $4,000.00 | $8,000.00 | 2.000 | EA | N | YARD DRAIN | |
| 0425 11 | 5 | $4,491.40 | $35,931.17 | 8.000 | EA | N | MODIFY EXISTING DRAINAGE STRUCTURE | |
| 0425 14 1 | 1 | $350.00 | $4,900.00 | 14.000 | SF | N | GRATE FOR EXISTING DRAINAGE STRUCTURE, FURNISH AND INSTALL | |
| 0425 71 | 1 | $4,500.00 | $9,000.00 | 2.000 | EA | N | INLETS RELOCATING | |
| 0425 82 | 3 | $2,012.50 | $12,075.00 | 6.000 | EA | N | REPLACE GRATE | |
| 0425100 22 | 1 | $67,000.00 | $335,000.00 | 5.000 | EA | N | MANHOLE, TYPE 7, PARTIAL, CAST IN PLACE | |
| 0425100 24 | 1 | $16,400.00 | $32,800.00 | 2.000 | EA | N | SPECIAL DRAINAGE STRUCTURE, UTILITY CONFLICT MANHOLE | |
| 0425100 25 | 2 | $3,550.00 | $28,400.00 | 8.000 | EA | N | SPECIAL DRAINAGE STRUCTURE, TOLL SITE DRY WELL AND ACCESSORIES | |
| 0430 94 1 | 2 | $25.10 | $161,720.50 | 6,444.000 | LF | N | DESILTING PIPE, 0 - 24" | |
| 0430 94 2 | 1 | $26.00 | $36,868.00 | 1,418.000 | LF | N | DESILTING PIPE, 25 - 36" | |
| 0430 94 3 | 2 | $80.76 | $64,933.00 | 804.000 | LF | N | DESILTING PIPE, 37 - 48" | |
| 0430 94 4 | 1 | $105.00 | $25,200.00 | 240.000 | LF | N | DESILTING PIPE, 49 - 60" | |
| 0430173115 | 4 | $326.12 | $43,700.00 | 134.000 | LF | N | PIPE CULVERT OPTIONAL MATERIAL, ROUND, 15", GUTTER DRAIN | |
| 0430173118 | 8 | $190.02 | $529,967.42 | 2,789.000 | LF | N | PIPE CULVERT OPTIONAL MATERIAL, ROUND, 18", GUTTER DRAIN | |
| 0430173124 | 2 | $202.02 | $136,972.00 | 678.000 | LF | N | PIPE CULVERT OPTIONAL MATERIAL, ROUND, 24", GUTTER DRAIN | |
| 0430173130 | 1 | $550.00 | $2,200.00 | 4.000 | LF | N | PIPE CULVERT OPTIONAL MATERIAL, ROUND, 30", GUTTER DRAIN | |
| 0430173136 | 1 | $429.00 | $66,066.00 | 154.000 | LF | N | PIPE CULVERT OPTIONAL MATERIAL, ROUND, 36", GUTTER DRAIN | |
| 0430174112 | 1 | $157.41 | $5,351.94 | 34.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 12"SD | |
| 0430174115 | 3 | $639.83 | $33,910.92 | 53.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 15"SD | |
| 0430174118 | 18 | $290.94 | $336,909.41 | 1,158.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18"SD | |
| 0430174124 | 7 | $181.83 | $94,914.67 | 522.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 24"SD | |
| 0430174130 | 3 | $210.47 | $78,925.55 | 375.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 30"SD | |
| 0430174142 | 1 | $572.00 | $32,032.00 | 56.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 42"SD | |
| 0430174215 | 1 | $130.00 | $8,450.00 | 65.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 15"SD | |
| 0430174218 | 6 | $183.41 | $156,267.55 | 852.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 18"SD | |
| 0430174224 | 4 | $437.52 | $113,318.45 | 259.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 24"SD | |
| 0430174242 | 1 | $475.00 | $21,850.00 | 46.000 | LF | N | PIPE CULVERT, OPTIONAL MATERIAL, ELLIP/OTHER, 42"SD | |
| 0430175112 | 4 | $238.75 | $19,816.00 | 83.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 12"S/CD | |
| 0430175115 | 22 | $322.00 | $369,658.17 | 1,148.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 15"S/CD | |
| 0430175118 | 54 | $127.92 | $13,392,089.30 | 104,689.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 18"S/CD | |
| 0430175124 | 32 | $155.58 | $6,172,739.46 | 39,676.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 24"S/CD | |
| 0430175130 | 19 | $238.28 | $4,803,659.62 | 20,160.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 30"S/CD | |
| 0430175136 | 16 | $255.18 | $5,022,159.71 | 19,681.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 36"S/CD | |
| 0430175142 | 15 | $371.99 | $3,419,680.80 | 9,193.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 42"S/CD | |
| 0430175148 | 10 | $405.00 | $2,923,261.28 | 7,218.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 48"S/CD | |
| 0430175154 | 5 | $442.91 | $2,288,072.56 | 5,166.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 54"S/CD | |
| 0430175160 | 2 | $502.71 | $1,690,600.00 | 3,363.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 60"S/CD | |
| 0430175166 | 2 | $775.99 | $173,045.00 | 223.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 66"S/CD | |
| 0430175184 | 1 | $1,215.00 | $699,840.00 | 576.000 | LF | N | PIPE CULVERT, OPT MATERIAL, ROUND, 84"S/CD | |
| 0430175215 | 4 | $286.67 | $73,961.22 | 258.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,OTHER-ELIP/ARCH, 15"S/CD | |
| 0430175218 | 16 | $221.55 | $786,938.30 | 3,552.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,OTHER-ELIP/ARCH, 18"S/CD | |
| 0430175224 | 9 | $207.15 | $271,367.92 | 1,310.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,OTHER SHAPE-ELIP/ARCH, 24"S/CD | |
| 0430175230 | 5 | $460.61 | $204,971.83 | 445.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 30"S/CD | |
| 0430175236 | 5 | $422.76 | $486,591.56 | 1,151.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 36"S/CD | |
| 0430175242 | 2 | $433.20 | $780,630.00 | 1,802.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 42"S/CD | |
| 0430175248 | 1 | $1,890.00 | $7,560.00 | 4.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 48"S/CD | |
| 0430175254 | 1 | $525.00 | $2,095,275.00 | 3,991.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 54"S/CD | |
| 0430175260 | 1 | $575.00 | $317,400.00 | 552.000 | LF | N | PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 60"S/CD | |
| 0430185118 | 3 | $1,849.47 | $3,523,238.00 | 1,905.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 18" , STORM AND CROSS DRAIN | |
| 0430185124 | 4 | $1,877.53 | $4,981,080.00 | 2,653.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 24", STORM AND CROSS DRAIN | |
| 0430185130 | 3 | $3,037.42 | $3,960,800.00 | 1,304.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 30", STORM AND CROSS DRAIN | |
| 0430185136 | 3 | $2,272.30 | $2,106,425.00 | 927.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 36", STORM AND CROSS DRAIN | |
| 0430185142 | 2 | $962.88 | $1,626,312.72 | 1,689.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 42", STORM AND CROSS DRAIN | |
| 0430185148 | 2 | $2,657.88 | $2,655,220.00 | 999.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 48", STORM AND CROSS DRAIN | |
| 0430185154 | 3 | $2,911.80 | $1,610,224.80 | 553.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 54", STORM AND CROSS DRAIN | |
| 0430185160 | 1 | $5,500.00 | $2,530,000.00 | 460.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 60" , STORM AND CROSS DRAIN | |
| 0430185166 | 1 | $.01 | $1.43 | 143.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 66" , STORM AND CROSS DRAIN | |
| 0430185172 | 1 | $.01 | $3.10 | 310.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 72" , STORM AND CROSS DRAIN | |
| 0430185199 | 1 | $.01 | $2.39 | 239.000 | LF | N | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 99" OR GREATER , STORM AND CROSS DRAIN | |
| 0430200 25 | 1 | $9,200.00 | $27,600.00 | 3.000 | EA | N | FLARED END SECTION, CONCRETE, 18" | |
| 0430200 40 | 1 | $11,000.00 | $11,000.00 | 1.000 | EA | N | FLARED END SECTION, CONCRETE, 42" | |
| 0430515100 | 1 | $5,000.00 | $5,000.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 15", SINGLE, 0 DEGREES, ROUND | |
| 0430518100 | 7 | $3,782.90 | $75,658.03 | 20.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 18", SINGLE, 0 DEGREES, ROUND | |
| 0430518102 | 1 | $3,566.37 | $10,699.11 | 3.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 18", SINGLE, 0 DEGREES, ELLIPTICAL | |
| 0430518112 | 1 | $5,000.00 | $5,000.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 18", SINGLE, 15 DEGREES, ELLIPTICAL | |
| 0430524100 | 7 | $6,125.61 | $79,632.96 | 13.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 24", SINGLE, 0 DEGREES, ROUND | |
| 0430524200 | 1 | $13,500.00 | $13,500.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 24", DOUBLE, 0 DEGREES, ROUND | |
| 0430524300 | 1 | $8,300.00 | $8,300.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 24", TRIPLE, 0 DEGREES, ROUND | |
| 0430530100 | 4 | $5,562.19 | $38,935.35 | 7.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 30", SINGLE, 0 DEGREES, ROUND | |
| 0430530200 | 1 | $16,500.00 | $33,000.00 | 2.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 30", DOUBLE, 0 DEGREES, ROUND | |
| 0430536100 | 6 | $12,600.14 | $88,201.01 | 7.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 36", SINGLE, 0 DEGREES, ROUND | |
| 0430536110 | 1 | $20,000.00 | $20,000.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 36", SINGLE, 15 DEGREES, ROUND | |
| 0430536120 | 1 | $17,000.00 | $34,000.00 | 2.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 36", SINGLE, 30 DEGREES, ROUND | |
| 0430536200 | 3 | $13,145.77 | $52,583.07 | 4.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 36", DOUBLE, 0 DEGREES, ROUND | |
| 0430536300 | 1 | $15,100.00 | $30,200.00 | 2.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 36", TRIPLE, 0 DEGREES, ROUND | |
| 0430542100 | 4 | $13,579.24 | $81,475.44 | 6.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 42", SINGLE, 0 DEGREES, ROUND | |
| 0430548100 | 1 | $13,500.00 | $13,500.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 48", SINGLE, 0 DEGREES, ROUND | |
| 0430548110 | 1 | $25,200.00 | $50,400.00 | 2.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 48", SINGLE, 15 DEGREES, ROUND | |
| 0430548200 | 1 | $12,981.87 | $25,963.74 | 2.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 48", DOUBLE, 0 DEGREES, ROUND | |
| 0430554100 | 1 | $14,404.30 | $57,617.20 | 4.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 54", SINGLE, 0 DEGREES, ROUND | |
| 0430560200 | 1 | $66,000.00 | $66,000.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 60", DOUBLE, 0 DEGREES, ROUND | |
| 0430566100 | 1 | $26,300.00 | $26,300.00 | 1.000 | EA | N | STRAIGHT CONCRETE ENDWALLS, 66", SINGLE, 0 DEGREES, ROUND | |
| 0430602125 | 2 | $7,730.00 | $15,460.00 | 2.000 | EA | N | U-ENDWALL, WITH GRATE,INDEX 260/430-010, 1:4 SLOPE, 18" | |
| 0430610025 | 1 | $5,200.00 | $78,000.00 | 15.000 | EA | N | U-ENDWALL, INDEX 261/430-011, 1:6 SLOPE, 18"PIPE | |
| 0430610029 | 1 | $7,867.00 | $15,734.00 | 2.000 | EA | N | U-ENDWALL, INDEX 261/430-011, 1:6 SLOPE, 24"PIPE | |
| 0430611025 | 1 | $3,050.00 | $3,050.00 | 1.000 | EA | N | U-ENDWALL, INDEX 261/430-011, BAFFLES, 1:6 SLOPE, 18"PIPE | |
| 0430611125 | 5 | $4,313.73 | $120,784.48 | 28.000 | EA | N | U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:4 SLOPE, 18"PIPE | |
| 0430611129 | 1 | $3,750.00 | $11,250.00 | 3.000 | EA | N | U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:4 SLOPE, 24"PIPE | |
| 0430611225 | 5 | $5,649.84 | $124,296.44 | 22.000 | EA | N | U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:3 SLOPE, 18"PIPE | |
| 0430611325 | 4 | $5,865.54 | $146,638.42 | 25.000 | EA | N | U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:2 SLOPE, 18"PIPE | |
| 0430611329 | 1 | $5,800.00 | $5,800.00 | 1.000 | EA | N | U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:2 SLOPE, 24"PIPE | |
| 0430611333 | 1 | $9,105.00 | $18,210.00 | 2.000 | EA | N | U-ENDWALL, BAFFLES, INDEX 261/430-011, 1:2 SLOPE, 30"PIPE | |
| 0430613125 | 1 | $7,000.00 | $14,000.00 | 2.000 | EA | N | U-ENDWALL, WITH BAFFLES & GRATE, INDEX 261/430-011,1:4 SLOPE,18"PIPE | |
| 0430613133 | 1 | $9,300.00 | $9,300.00 | 1.000 | EA | N | U-ENDWALL, WITH BAFFLES & GRATE, INDEX 261/430-011,1:4 SLOPE,30"PIPE | |
| 0430613325 | 1 | $8,725.00 | $17,450.00 | 2.000 | EA | N | U-ENDWALL, WITH BAFFLES & GRATE, INDEX 261/430-011,1:2 SLOPE,18"PIPE | |
| 0430821 23 | 1 | $2,070.00 | $12,420.00 | 6.000 | EA | N | CLEANING & SEALING EXISTING PIPE JOINT, 15" STORM SEWER | |
| 0430821 25 | 2 | $9,279.26 | $83,513.37 | 9.000 | EA | N | CLEANING & SEALING EXISTING PIPE JOINT, 18" STORM SEWER | |
| 0430821 33 | 1 | $32,608.04 | $32,608.04 | 1.000 | EA | N | CLEANING & SEALING EXISTING PIPE JOINT, 30" STORM SEWER | |
| 0430830 | 8 | $405.95 | $741,181.00 | 1,825.800 | CY | N | PIPE FILLING AND PLUGGING- PLACE OUT OF SERVICE | |
| 0430880 01 | 1 | $8,400.00 | $8,400.00 | 1.000 | EA | N | FLAP GATES, 0-24" | |
| 0430880 03 | 1 | $93,100.00 | $93,100.00 | 1.000 | EA | N | FLAP GATES, 37-48" | |
| 0430886 18 | 1 | $4,500.00 | $9,000.00 | 2.000 | EA | N | MANATEE GRATE FOR 18" PIPE, UNHINGED | |
| 0430950 | 6 | $511.49 | $1,378,676.96 | 2,695.400 | CY | N | DESILTING CONCRETE BOX CULVERT | |
| 0430963 1 | 3 | $137.20 | $18,796.00 | 137.000 | LF | N | PVC PIPE FOR BACK OF SIDEWALK, 4" | |
| 0430963 2 | 1 | $200.00 | $77,600.00 | 388.000 | LF | N | PVC PIPE FOR BACK OF SIDEWALK, NON STANDARD DIAMETER | |
| 0430964 6 | 1 | $60.00 | $7,740.00 | 129.000 | LF | N | PVC PIPE, 8 INCH | |
| 0430964 7 | 1 | $352.17 | $4,226.04 | 12.000 | LF | N | PVC PIPE, 6 INCH | |
| 0430982121 | 2 | $2,057.00 | $10,285.00 | 5.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 12" CD | |
| 0430982123 | 2 | $6,000.00 | $12,000.00 | 2.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 15" CD | |
| 0430982125 | 24 | $2,992.63 | $454,880.15 | 152.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 18" CD | |
| 0430982129 | 15 | $3,688.61 | $221,316.66 | 60.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 24" CD | |
| 0430982133 | 10 | $6,563.25 | $190,334.28 | 29.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 30" CD | |
| 0430982138 | 6 | $7,026.49 | $217,821.06 | 31.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 36" CD | |
| 0430982140 | 5 | $8,365.12 | $83,651.23 | 10.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 42" CD | |
| 0430982141 | 3 | $8,861.88 | $70,895.00 | 8.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 48" CD | |
| 0430982142 | 1 | $14,000.00 | $14,000.00 | 1.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 54" CD | |
| 0430982143 | 1 | $21,000.00 | $42,000.00 | 2.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 60" CD | |
| 0430982144 | 1 | $22,000.00 | $22,000.00 | 1.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 66" CD | |
| 0430982623 | 1 | $1,850.00 | $1,850.00 | 1.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 15" CD | |
| 0430982625 | 4 | $4,219.41 | $59,071.77 | 14.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 18" CD | |
| 0430982629 | 5 | $4,152.01 | $45,672.13 | 11.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 24" CD | |
| 0430982638 | 3 | $6,987.50 | $27,950.00 | 4.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 36" CD | |
| 0430982640 | 1 | $7,000.00 | $7,000.00 | 1.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 42" CD | |
| 0430982642 | 1 | $12,185.00 | $24,370.00 | 2.000 | EA | N | MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 54" CD | |
| 0430984121 | 1 | $2,308.41 | $9,233.64 | 4.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 12" SD | |
| 0430984123 | 3 | $3,238.14 | $32,381.44 | 10.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 15" SD | |
| 0430984125 | 19 | $3,337.93 | $277,047.88 | 83.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 18" SD | |
| 0430984129 | 11 | $4,382.04 | $144,607.18 | 33.000 | EA | N | MITERED END SECTION, OPTIONAL ROUND, 24" SD | |
| 0430984133 | 8 | $6,562.70 | $190,318.32 | 29.000 | EA | N | MITERED END SECTION , OPTIONAL ROUND, 30" SD | |
| 0430984138 | 2 | $7,000.00 | $35,000.00 | 5.000 | EA | N | MITERED END SECTION , OPTIONAL ROUND, 36" SIDE DRAIN | |
| 0430984623 | 2 | $3,400.00 | $13,600.00 | 4.000 | EA | N | MITERED END SECTION, OPTIONAL OTHER - ELLIP/ARCH, 15" SD | |
| 0430984625 | 8 | $3,481.23 | $83,549.57 | 24.000 | EA | N | MITERED END SECT, OPTIONAL - ELLIPTICAL / ARCH, 18" SD | |
| 0430984629 | 4 | $7,367.68 | $95,779.90 | 13.000 | EA | N | MITERED END SECT, OPTIONAL - ELLIPTICAL / ARCH, 24" SD | |
| 0430984638 | 1 | $12,160.00 | $12,160.00 | 1.000 | EA | N | MITERED END SECT, OPTIONAL /ELLIP/ARCH, 36" SD | |
| 0430984640 | 1 | $14,000.00 | $28,000.00 | 2.000 | EA | N | MITERED END SECT, OPTIONAL /ELLIP/ARCH, 42" SD | |
| 0430984643 | 1 | $18,350.00 | $73,400.00 | 4.000 | EA | N | MITERED END SECTION, OPTIONAL SHAPE /ELLIP/ARCH, 60" SIDE DRAIN | |
| 0430990 | 2 | $4,497.50 | $17,990.00 | 4.000 | EA | N | MITERED END SECT, REPLACE GRATE | |
| 0431 1115 | 6 | $306.04 | $195,865.30 | 640.000 | LF | N | PIPE LINER, CURED IN PLACE, 15" | |
| 0431 1118 | 8 | $242.29 | $657,331.56 | 2,713.000 | LF | N | PIPE LINER, CURED IN PLACE, 18" | |
| 0431 1124 | 3 | $241.53 | $118,834.00 | 492.000 | LF | N | PIPE LINER, CURED IN PLACE, 24" | |
| 0431 1130 | 1 | $225.00 | $95,400.00 | 424.000 | LF | N | PIPE LINER, CURED IN PLACE, 30" | |
| 0431 1136 | 1 | $835.00 | $431,695.00 | 517.000 | LF | N | PIPE LINER, CURED IN PLACE, 36" | |
| 0431 1142 | 3 | $498.94 | $496,449.60 | 995.000 | LF | N | PIPE LINER, CURED IN PLACE, 42" | |
| 0431 1148 | 1 | $510.00 | $103,020.00 | 202.000 | LF | N | PIPE LINER, CURED IN PLACE, 48" | |
| 0431 1154 | 1 | $675.00 | $131,625.00 | 195.000 | LF | N | PIPE LINER, CURED IN PLACE, 54" | |
| 0431 1160 | 1 | $694.71 | $181,319.31 | 261.000 | LF | N | PIPE LINER, CURED IN PLACE, 60" | |
| 0431 1900 | 1 | $925.00 | $1,136,825.00 | 1,229.000 | LF | Y | PIPE LINER- SPIN CAST, 10' X 4' | |
| 0431 1901 | 1 | $915.00 | $139,080.00 | 152.000 | LF | Y | PIPE LINER- SPIN CAST, 6' X 3' | |
| 0431 1902 | 1 | $1,100.00 | $1,078,000.00 | 980.000 | LF | Y | PIPE LINER- SPIN CAST, 12.5' X 6' | |
| 0432 3 2 | 2 | $751.36 | $5,259.50 | 7.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 18" | |
| 0432 3 4 | 2 | $875.32 | $10,503.87 | 12.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 24" | |
| 0432 3 5 | 2 | $5,573.11 | $44,584.88 | 8.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 30" | |
| 0432 3 6 | 1 | $1,100.00 | $4,400.00 | 4.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 36" | |
| 0432 3 7 | 1 | $4,907.09 | $4,907.09 | 1.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 42" | |
| 0432 3 9 | 1 | $1,433.53 | $4,300.59 | 3.000 | EA | N | CHEMICAL GROUT REPAIR, PIPE, NON-TEST, 54" | |
| 0433 1 | 2 | $10,579.20 | $21,158.39 | 2.000 | EA | N | CHEMICAL GROUT REPAIR, MANHOLE / INLET | |
| 0436 1 1 | 5 | $407.84 | $707,606.98 | 1,735.000 | LF | N | TRENCH DRAIN, STANDARD | |
| 0436 1 3 | 1 | $425.00 | $9,775.00 | 23.000 | LF | N | TRENCH DRAIN, SPECIAL DESIGN | |
| 0440 1 10 | 1 | $45.00 | $60,435.00 | 1,343.000 | LF | N | UNDERDRAIN, TYPE I | |
| 0440 1 20 | 3 | $52.54 | $147,378.00 | 2,805.000 | LF | N | UNDERDRAIN, TYPE II | |
| 0440 1 50 | 1 | $105.00 | $99,015.00 | 943.000 | LF | N | UNDERDRAIN, TYPE V | |
| 0440 70 | 2 | $4,139.02 | $169,700.00 | 41.000 | EA | N | UNDERDRAIN INSPECTION BOX | |
| 0440 73 1 | 2 | $245.24 | $7,112.00 | 29.000 | LF | N | UNDERDRAIN OUTLET PIPE, 4" | |
| 0440 73 2 | 5 | $56.66 | $39,551.60 | 698.000 | LF | N | UNDERDRAIN OUTLET PIPE, 6" | |
| 0443 70 4 | 4 | $353.31 | $369,562.50 | 1,046.000 | LF | N | FRENCH DRAIN, 24" | |
| 0446 1 1 | 3 | $43.17 | $5,233,751.50 | 121,230.000 | LF | N | EDGEDRAIN DRAINCRETE, STANDARD | |
| 0446 71 1 | 3 | $104.29 | $1,093,862.00 | 10,489.000 | LF | N | EDGEDRAIN OUTLET PIPE, 4" | |
| 0450 1 1 | 2 | $433.20 | $652,834.00 | 1,507.000 | LF | N | PRESTRESSED BEAMS, TYPE II | |
| 0450 1201 | 1 | $400.00 | $227,600.00 | 569.000 | LF | N | PREST BEAMS, TYPE II, MODIFIED | |
| 0450 2 36 | 9 | $459.80 | $6,890,587.00 | 14,986.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 36" | |
| 0450 2 45 | 6 | $482.98 | $4,483,062.00 | 9,282.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 45" | |
| 0450 2 54 | 2 | $496.13 | $1,900,160.00 | 3,830.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 54" | |
| 0450 2 63 | 3 | $460.16 | $6,082,428.00 | 13,218.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 63" | |
| 0450 2 72 | 2 | $541.54 | $1,220,080.00 | 2,253.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 72" | |
| 0450 2 78 | 1 | $530.00 | $1,767,020.00 | 3,334.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 78" | |
| 0450 2 96 | 1 | $570.00 | $1,574,340.00 | 2,762.000 | LF | N | PREST BEAMS: FLORIDA-I BEAM 96" | |
| 0450 8 34 | 1 | $633.00 | $1,695,174.00 | 2,678.000 | LF | N | PRESTRESSED BEAM: FLORIDA SLAB BEAM, BEAM DEPTH 18" CARBON STEEL, WIDTH 58-60" | |
| 0450 82 | 3 | $828.09 | $2,211,000.00 | 2,670.000 | LF | N | BEAM REPAIR | |
| 0450 83 1 | 2 | $3,516.10 | $573,124.00 | 163.000 | EA | N | BEAM REPAIR, STRAND SPLICES | |
| 0451 70 | 3 | $3,031.51 | $1,079,219.00 | 356.000 | EA | N | PREST SOIL ANCHORS | |
| 0451 70 1 | 3 | $10.00 | $330.00 | 33.000 | EA | N | PRESTRESSED SOIL ANCHOR, PERFORMANCE TEST | |
| 0451 70 2 | 3 | $6.82 | $116.00 | 17.000 | EA | N | PRESTRESSED SOIL ANCHOR, CREEP TEST | |
| 0455 14 42 | 1 | $114.00 | $2,359,344.00 | 20,696.000 | SF | N | CONCRETE SHEET PILING, CFRP/GFRP, 12" WALL THICKNESS | |
| 0455 15 11 | 2 | $162.69 | $398,435.00 | 2,449.000 | LF | N | PREFORMED PILE HOLES, 15" TO 17" DRILL/PUNCH SIZE | |
| 0455 15 13 | 2 | $91.22 | $1,448,244.00 | 15,876.000 | LF | N | PREFORMED PILE HOLES, 22" TO 26" DRILL/PUNCH SIZE | |
| 0455 15 14 | 5 | $231.38 | $1,540,281.00 | 6,657.000 | LF | N | PREFORMED PILE HOLES, 24" TO 29" DRILL/PUNCH SIZE | |
| 0455 15 15 | 2 | $125.46 | $576,499.00 | 4,595.000 | LF | N | PREFORMED PILE HOLES, 30" TO 34" DRILL/PUNCH SIZE | |
| 0455 15 16 | 4 | $247.16 | $645,836.00 | 2,613.000 | LF | N | PREFORMED PILE HOLES, 36" TO 43" DRILL/PUNCH SIZE | |
| 0455 15 21 | 1 | $477.50 | $76,400.00 | 160.000 | LF | N | PREFORMED PILE HOLES CASING, 15" TO 17" DRILL/PUNCH SIZE | |
| 0455 15 23 | 1 | $124.00 | $143,468.00 | 1,157.000 | LF | N | PREFORMED PILE HOLES CASING, 22" TO 26" DRILL/PUNCH SIZE | |
| 0455 15 24 | 3 | $66.43 | $239,618.00 | 3,607.000 | LF | N | PREFORMED PILE HOLES CASING, 24" TO 29" DRILL/PUNCH SIZE | |
| 0455 15 26 | 4 | $280.56 | $717,401.00 | 2,557.000 | LF | N | PREFORMED PILE HOLES CASING, 36" TO 43" DRILL/PUNCH SIZE | |
| 0455 15 40 | 2 | $.04 | $2,934.76 | 76,962.000 | SF | N | PREFORMED PILE HOLES, SHEET PILE | |
| 0455 17118 | 1 | $6,000.00 | $60,000.00 | 10.000 | EA | N | PRE-PLANNED PILE SPLICE, CONCRETE SQUARE, 18" | |
| 0455 17124 | 1 | $7,800.00 | $226,200.00 | 29.000 | EA | N | PRE-PLANNED PILE SPLICE, CONCRETE SQUARE, 24" | |
| 0455 20 1 | 14 | $685.92 | $1,283,359.00 | 1,871.000 | EA | N | PILE INSPECTION, DRIVEN PILE | |
| 0455 34 3 | 7 | $187.94 | $8,774,983.50 | 46,690.000 | LF | N | PRESTRESSED CONCRETE PILING, 18" SQ | |
| 0455 34 5 | 6 | $228.45 | $8,907,875.00 | 38,992.000 | LF | N | PRESTRESSED CONCRETE PILING, 24" SQ | |
| 0455 34 23 | 1 | $730.00 | $544,580.00 | 746.000 | LF | N | PRESTRESSED CONCRETE PILING, 18" SQ W/FRP OR STAINLESS STEEL STRAND AND REINFORCING | |
| 0455 34 25 | 2 | $450.37 | $2,093,300.00 | 4,648.000 | LF | N | PRESTRESSED CONCRETE PILING, 24" SQ W/FRP OR STAINLESS STEEL STRAND AND REINFORCING | |
| 0455 35 6 | 2 | $177.62 | $3,683,812.00 | 20,740.000 | LF | N | STEEL PILING, HP 14 X 89 | |
| 0455 35 8 | 2 | $332.43 | $1,140,907.50 | 3,432.000 | LF | N | STEEL PILING, HP 14 X 117 | |
| 0455 35 11 | 2 | $387.82 | $1,414,392.00 | 3,647.000 | LF | N | STEEL PILING, HP 12 X 74 | |
| 0455 35 22 | 2 | $389.94 | $1,408,449.00 | 3,612.000 | LF | N | STEEL PILING, 24" DIA. PIPE | |
| 0455 35116 | 1 | $550.00 | $100,650.00 | 183.000 | LF | Y | STEEL PILING, HP 18 X 204 | |
| 0455 35119 | 1 | $850.00 | $273,700.00 | 322.000 | LF | Y | STEEL PILING, W 14 X 398 | |
| 0455 76 | 2 | $3,455.77 | $718,800.00 | 208.000 | EA | N | WRAP PILE CLUSTERS | |
| 0455 81101 | 1 | $3,500.00 | $31,500.00 | 9.000 | EA | N | CATHODIC PROTECTION, F&I, PILE, ZINC ANODE ASSEMBLY | |
| 0455 81106 | 1 | $55.00 | $167,750.00 | 3,050.000 | EA | N | CATHODIC PROTECTION, F&I, PIER, OTHER MATERIAL ASSEMBLY | |
| 0455 87 | 2 | $2,956.21 | $215,803.30 | 73.000 | EA | N | ANCHOR BAR, STEEL | |
| 0455 88 4 | 1 | $2,200.00 | $1,709,400.00 | 777.000 | LF | N | DRILLED SHAFT, 42" DIA | |
| 0455 88 6 | 1 | $2,200.00 | $1,148,400.00 | 522.000 | LF | N | DRILLED SHAFT, 60" DIA | |
| 0455108112 | 1 | $700.00 | $77,000.00 | 110.000 | LF | Y | STEEL CASING FOR FUTURE PILE, 42" | |
| 0455111 | 1 | $95.00 | $81,605.00 | 859.000 | LF | N | CORE-PILOT HOLE, DRILLED SHAFT EXCAVATION | |
| 0455115 | 14 | $2,985.56 | $1,561,448.00 | 523.000 | EA | N | PILE REDRIVE | |
| 0455120 7 | 1 | $1,500.00 | $88,500.00 | 59.000 | EA | N | PILE POINT PROTECTION, 24" ROUND | |
| 0455122 4 | 1 | $800.00 | $621,600.00 | 777.000 | LF | N | EXCAVATION UNCLASSIFIED SHAFT, 42" DIA | |
| 0455122 6 | 1 | $1,800.00 | $999,000.00 | 555.000 | LF | N | EXCAVATION UNCLASSIFIED SHAFT, 60" DIA | |
| 0455133 2 | 10 | $31.49 | $13,581,945.44 | 431,288.000 | SF | N | SHEET PILING STEEL, TEMPORARY-CRITICAL | |
| 0455133 3 | 9 | $36.70 | $6,929,566.56 | 188,817.000 | SF | N | SHEET PILING STEEL, F&I PERMANENT |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .