TM5_-_Feasibility_Assessment_for_PMF_Hennessey_Res_04Mar2019_FINAL_(2).pdf

PDF 26 MB Posted

Attached to
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation number
2026-RFQL-054
Issued by
Napa County, California

About this file

This file is a feasibility assessment report for the Hennessey Reservoir prepared for the City of Napa, California. The document evaluates engineering and hydrological aspects relevant to long-term reservoir expansion and water supply reliability. The assessment addresses the technical foundation necessary for advancing the Conn Dam Stability Assessment, Spillway Improvements, and Long-Term Reservoir Expansion Feasibility Study. The project is structured in three phases: Phase One requires submission of a geotechnical data report to the California Division of Safety of Dams (DSOD) by December 31, 2028; Phase Two involves assessment of dam stability including deformation estimates under static and seismic conditions; and Phase Three develops a feasibility alternatives analysis report addressing identified deficiencies including known spillway deficiencies. The services sought include professional engineering, geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation services from multidisciplinary consulting firms specialized in dam engineering.

The City of Napa anticipates utilizing federal funding for design and construction phases, with the project included in the 2022 Water Resources Development Act (WRDA) under the project name Conn Creek Dam, California. The procurement will follow a Qualifications-Based Selection (QBS) process consistent with applicable federal procurement requirements under 2 CFR Part 200 and the Brooks Act principles. The selected consultant must support regulatory compliance with DSOD and assist in advancing federally authorized flood risk reduction studies through the U.S. Army Corps of Engineers (USACE). The assessment document provides technical analysis to support future environmental review, design, permitting, and construction activities.

View the file

Other files

File Type Posted
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study_(Addendum_#4_Revision).pdf PDF
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study_(Addendum_#1_Revision).pdf PDF
DSOD_June_5,_2026_-_rev_1.pdf PDF
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study.pdf PDF
Exibit_B_Federal_Compiance_Certifications.docx DOCX document
2.1.2_Services_Agreement_(Professional_Services)_(2024-08-29).pdf PDF
Exibit_B_Federal_Compiance_Certifications.pdf PDF
DSOD_June_5_2026.pdf PDF
Conn_Dam_-_Technical_and_Budget_Proposal_hydroplus.pdf PDF
Hydrologic_Analysis_Report_Conn_Dam_Watershed_and_Spillway_Napa_County,_California_May_1986.pdf PDF
LakeHennesseyBathymetryMap_(1).pdf PDF
City_of_Napa_Public_Works_Department_Summary_Report_and_Cost_Estimate_Conn_Dam_Spillway_Modification_Study_Mar_1,_1968.pdf PDF
DSOD_Inspection_Reports_on_Spillway_1996-2002_(1).pdf PDF
App_B-Conn_Dam_Spillway_Hydraulic_Analysis_28Mar2018-Final_(1).pdf PDF
Memorandum_of_Geologic_Inspection_1965.pdf PDF
Geological_Report_1982__(1).pdf PDF
TM_-_Conn_Creek_Dam_Phase_II_Spillway_Assessment_2020-08-17.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .