About this file

Conn Creek Dam Phase II Spillway Assessment Technical Memorandum

This is a technical memorandum related to the City of Napa's Request for Qualifications for the Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study. The document supports a Qualifications-Based Selection (QBS) procurement process consistent with federal requirements under 2 CFR Part 200 and the Brooks Act, anticipating federal funding participation. The project comprises three phases: Phase One focuses on generating a geotechnical data report to be submitted to the California Division of Safety of Dams (DSOD) by December 31, 2028; Phase Two involves comprehensive assessment of the dam's stability, including deformation estimates under static and seismic conditions; and Phase Three develops a feasibility alternatives analysis addressing identified deficiencies, including known spillway deficiencies. The selected consultant must be a highly qualified multidisciplinary engineering firm with specialization in dam engineering, capable of providing professional services in geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation disciplines.

The project supports regulatory compliance with DSOD, advancement of federally authorized flood risk reduction studies through the U.S. Army Corps of Engineers (USACE), and long-term improvements to increase water supply reliability. The Conn Creek Dam has been included by project name in the 2022 Water Resources Development Act (WRDA), positioning the project for federal funding support during design and construction phases. The technical assessment will provide the foundational basis for future environmental review, design, permitting, and construction activities, establishing critical engineering and feasibility documentation for this water infrastructure project.

View the file

Other files

File Type Posted
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study_(Addendum_#4_Revision).pdf PDF
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study_(Addendum_#1_Revision).pdf PDF
DSOD_June_5,_2026_-_rev_1.pdf PDF
Request_for_Qualifications_-_Conn_Dam_Stability_Assessment,_Spillway_Improvements,_and_Feasibility_Alternatives_Study.pdf PDF
Exibit_B_Federal_Compiance_Certifications.docx DOCX document
2.1.2_Services_Agreement_(Professional_Services)_(2024-08-29).pdf PDF
Exibit_B_Federal_Compiance_Certifications.pdf PDF
DSOD_June_5_2026.pdf PDF
TM5_-_Feasibility_Assessment_for_PMF_Hennessey_Res_04Mar2019_FINAL_(2).pdf PDF
Conn_Dam_-_Technical_and_Budget_Proposal_hydroplus.pdf PDF
Hydrologic_Analysis_Report_Conn_Dam_Watershed_and_Spillway_Napa_County,_California_May_1986.pdf PDF
LakeHennesseyBathymetryMap_(1).pdf PDF
City_of_Napa_Public_Works_Department_Summary_Report_and_Cost_Estimate_Conn_Dam_Spillway_Modification_Study_Mar_1,_1968.pdf PDF
DSOD_Inspection_Reports_on_Spillway_1996-2002_(1).pdf PDF
App_B-Conn_Dam_Spillway_Hydraulic_Analysis_28Mar2018-Final_(1).pdf PDF
Memorandum_of_Geologic_Inspection_1965.pdf PDF
Geological_Report_1982__(1).pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .