TE_7_GFI_GFMGFE_062015.doc

DOC document 63 KB Posted

Attached to
Operation and Maintenance (O&M) Martinsburg, WV
Solicitation number
TIRNO15R00034
Issued by

About this file

TE-7

View the file

Other files

File Type Posted
SITE_VISIT_122015_RECOMPETE.docx DOCX document
Wage_Determination_2015-3017_-_11-25-2015_-_Revision_1.txt TXT text file
TIRNO15R00034-A0003.zip ZIP file
TIRNO15R00034-A0005.zip ZIP file
TIRNO15R00034-A0004.zip ZIP file
CBA_-_10-01-11_thru_09-30-15.pdf PDF
ECC_QUESTIONS_ _ANSWERS.docx DOCX document
TIRNO15R00034_revised_01082016.rtf RTF text file
Solicitation_questions_and_answers_TIRNO-15-R-00034.docx DOCX document
TE-2 Facility equipment and components 12-17-15.docx DOCX document
Copy of Copy of TE-5 EQUIPMENT LIST FINAL DECEMBER 2015 —
TE_9_Reg_and_Refs_ 12-17-15.doc DOC document
TE-4 IRS Preventive guide cards.doc DOC document
QASP Checksheets 1_1_13.doc DOC document
TIRNO15R00034-A0002.zip ZIP file
TIRNO15R00034-A0001.zip ZIP file
OM_QASP_062015.doc DOC document
SITE_VISIT_122015_RECOMPETE.docx DOCX document
TE_14_Annual_Biobased_Prod_Purchas_062015.doc DOC document
TIRNO15R00034_revised_122015.rtf RTF text file
PAST_PERFORMANCE_ATTACHMENT_3c_ECC.docx DOCX document
TE_12_CERTIFICATE_REG.xlsx XLSX spreadsheet
TE-8-Terminology_062015.doc DOC document
TE_13.zip ZIP file
TE_10_Infrared_Testing_Req_062015.doc DOC document
TE-6_Reports_062015.doc DOC document
MC_4.1_Scope.zip ZIP file
TE_14a_Biopref_FAR_reporting_template_062015.pdf PDF
QASP_Checksheet_Guides_062015.doc DOC document
TE_9_Reg_and_Refs_062015.doc DOC document
TE1_Fac_Location_Data_062015.doc DOC document
TE-2_Facility_equip_and_comp_062015.docx DOCX document
TE-4_IRS_Preventive_guide_cards_08282015.doc DOC document
TE-5_EQUIPMENT_LIST_FINAL_08282015.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building O&M Contract

PWS

TECHNICAL EXHIBIT #7

GOVERNMENT FURNISHED ITEMS

AT

{{ENTER LOCATION}}

1. Government Furnished Space:

The Government will provide the space shown in Table 1 for the use of the Contractor.

TABLE 1

GOVERNMENT FURNISHED SPACE

Area Description
Location
Square Footage
Annex Cub Closet
12 S.F.
Annex Cub RUPS Area
933 S.F.
Annex Cub Storage Rm.U10l
46 S.F.
Annex Cub Storage U 101
185 S.F.
MCC W0036
650 S.F.
MCC MEP
492 S.F.
MCC WE004
100 S.F.
MCC CE003
64 S.F.
MCC MEP
4216 S.F.
MCC W0033
400 S.F.
MCC CE 006
150S.F.
MCC WE003
150 S. F.

2. Government Furnished Material

The Government will provide the materials shown in Table 2

TABLE 2

GOVERNMENT FURNISHED MATERIALS

ITEM
Description
Sub-Description
Quantity

NONE

Add rows below

3. Government Furnished Equipment & Tools

The Government will provide the equipment & tools shown Table 3

TABLE 3

GOVERNMENT FURNISHED EQUIPMENT & TOOLS

Equipment or Tool
Description
Sub-Description
Quantity

NONE

Add rows below

4. Government Furnished Information Technology Equipment & Software The Government will provide the IT equipment & software shown in Table 4.

Note: All IT equipment is on a “Common Operating Environment” (COE) which includes an Enterprise-wide suite of MS Office which cannot be modified.

TABLE 4

GOVERNMENT FURNISHED IT EQUIPMENT & SOFTWARE

Equipment or Tool
Description
Sub-Description
Quantity
Computer
Desk top
CMMS
1

Add rows below

File details come from the government source that posted it. Updated .