TE-2 Facility equipment and components 12-17-15.docx

DOCX document 24 KB Posted

Attached to
Operation and Maintenance (O&M) Martinsburg, WV
Solicitation number
TIRNO15R00034
Issued by

About this file

TE-2

View the file

Other files

File Type Posted
SITE_VISIT_122015_RECOMPETE.docx DOCX document
Wage_Determination_2015-3017_-_11-25-2015_-_Revision_1.txt TXT text file
TIRNO15R00034-A0003.zip ZIP file
TIRNO15R00034-A0005.zip ZIP file
TIRNO15R00034-A0004.zip ZIP file
CBA_-_10-01-11_thru_09-30-15.pdf PDF
ECC_QUESTIONS_ _ANSWERS.docx DOCX document
TIRNO15R00034_revised_01082016.rtf RTF text file
Solicitation_questions_and_answers_TIRNO-15-R-00034.docx DOCX document
Copy of Copy of TE-5 EQUIPMENT LIST FINAL DECEMBER 2015 —
TE_9_Reg_and_Refs_ 12-17-15.doc DOC document
TE-4 IRS Preventive guide cards.doc DOC document
QASP Checksheets 1_1_13.doc DOC document
TIRNO15R00034-A0002.zip ZIP file
TIRNO15R00034-A0001.zip ZIP file
OM_QASP_062015.doc DOC document
SITE_VISIT_122015_RECOMPETE.docx DOCX document
TE_14_Annual_Biobased_Prod_Purchas_062015.doc DOC document
TE_7_GFI_GFMGFE_062015.doc DOC document
TIRNO15R00034_revised_122015.rtf RTF text file
PAST_PERFORMANCE_ATTACHMENT_3c_ECC.docx DOCX document
TE_12_CERTIFICATE_REG.xlsx XLSX spreadsheet
TE-8-Terminology_062015.doc DOC document
TE_13.zip ZIP file
TE_10_Infrared_Testing_Req_062015.doc DOC document
TE-6_Reports_062015.doc DOC document
MC_4.1_Scope.zip ZIP file
TE_14a_Biopref_FAR_reporting_template_062015.pdf PDF
QASP_Checksheet_Guides_062015.doc DOC document
TE_9_Reg_and_Refs_062015.doc DOC document
TE1_Fac_Location_Data_062015.doc DOC document
TE-2_Facility_equip_and_comp_062015.docx DOCX document
TE-4_IRS_Preventive_guide_cards_08282015.doc DOC document
TE-5_EQUIPMENT_LIST_FINAL_08282015.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IRS Building Delegations Performance Work Statement Revised 12-17-2015

TECHNICAL EXHIBIT TE-2

FACILITY COMPONENTS AND EQUIPMENT

The Contractor shall be fully responsible for all operations, maintenance, repairs, service calls, etc. for all building equipment and systems including but not limited to the following:

Exterior of Structure: Structural components including, but not limited to, exterior walls, roofing, flashing, skylights, chimneys, ventilators (and other items that pierce the roof), gutters, downspouts, splash blocks, overhangs, windows, swing doors, overhead doors, sliding doors, revolving doors, hardware closures, hinges, locking devices, lightning protection systems, and exterior stairways. Dock area truck restraints.

Interior of Structure: Structural components including, but not limited to, interior walls, soundproofing, floor coverings, hardwood flooring, window blinds, window draperies, screening, insulation, drywall, interior signage, carpeting, ceramic tile, interior stairways, ceilings and ceiling tiles, doors, door hardware, raised flooring, mechanical/electrical/key card locks, windows, glass, and mirrors.

Parking Lots and Appurtenances: Structural components including, but not limited to, sidewalks, driveways, roads, curbing, parking areas, signage, patios, canopies, covered walkways, fencing, gates, barriers, barrier arms, entrances, flagpoles, and retaining walls. Work includes snow removal.

Storm Drainage Systems: Complete including, but not limited to, manholes, roof drains, sump pumps, and exterior grates

Chilled Water Systems: Complete chilled water systems including, but not limited to, all computer room A/C units, central chilled water units, and all associated insulation and piping, water treatment, valves, gauges, thermometers, pumps, switches, and controls. Associated water and glycol condenser systems including: exterior cooling towers, piping loops, exterior air cooled condensing units, piping hangars, valves, pumps, expansion tanks, controls, switches, structural system platforms, makeup valves, and back-flow preventers. Well flow testing and required sampling, as requested.

HVAC Controls: HVAC controls including, but not limited to, electronic and compressed control air systems including air compressors.

Electrical Power Systems: All electrical power, interior and exterior related lighting systems, and apparatus includes, but is not limited to: Rotary Uninterruptible Power Supply (RUPS) units, controls, batteries, transfer switches, diesel/motor generators, switchboards, switchgear, breaker panels, conduits, hangers, receptacles, lighting switches, and circuit breakers. Also, all buildings electrical distribution equipment including, but not limited to, motors, motor controls center and breakers, high- voltage transformers and switchgear, individual circuits, valves, heaters, heat pumps, electric gate operators, and central clock system.

Emergency Light Systems: Emergency lighting systems complete including, but not limited to, individual units w/battery backup, wiring, breaker panels, special dock spotlights, controls, and emergency lighting generators.

Fire Alarm/Suppression Systems: The complete fire alarm system including but not limited to control panels, alarms, horns, pull stations, smoke detectors, heat detectors, fire doors, fire dampers, all supervisory signaling devices on equipment as alarm check valves, dry pipe deluge and pre-action valves, flame detectors, fire suppression systems including wet pipe and dry pipe sprinkler systems, and all types of fire extinguishers.

Fire Pumps: Complete fire sprinkler pumping system and all associated equipment.

Heating Systems: Heating systems including, but not limited to, low pressure hot water boilers, heating elements, controls, circulating pumps, hot water heaters and coils, unit heaters, HVAC unit coils, control valves, pressure regulating valves, pressure relief valves, heat exchangers, reheat coils, steam systems, vacuum pumps, and heating control systems.

HVAC Systems: HVAC system complete including, but not limited to, air handlers, return air fans, controls, heat pumps, Energy Management Systems, cooling towers, glycol dry coolers, VAV and mixing boxes, central systems BAS controls, chillers, motors, filters, duct work, insulation, balancing dampers, fire dampers and curtains, thermostats, gauges, thermometers, balancing valves, control valves, cutoff valves, under floor leak detection systems, compressed air control systems and strainers. Heat traces tape and all of its components. Monthly filter cleaning/replacement.

Elevators, Escalators, Dumbwaiters, Hoists, and Loading Dock Levelers: Lifting equipment systems including but not limited to the following: all associated equipment in machine rooms and pits, all motors; all hoist motors, motor generators and regulators, geared machines, brakes, car gates, lighting:, hydraulic machines, emergency items, loading dock levelers, escalator devices, and cranes, or other lifting devices.

Overhead Doors: Overhead doors include, but not limited to, automatic motorized overhead doors, PVC transparent overlapping door panels, dock bumper/plates, platforms, and air curtains.

Plumbing: Building Plumbing system complete including, but not limited to: all piping, insulation, valves, meters, gauges, check valves, back-flow preventers, sump pumps, sewage ejection pumps, steam regulating valves, manual valves, check valves, hot water regulating valves, unit heaters, vacuum/condensate steam traps, radiator, hot water pumps, domestic hot water heaters, strainers, condensation drains, water fountains, sinks, sensor controlled fixtures, sink faucets, urinals, commodes, rest room fixtures, and rest room partitions

Sanitary Sewage System: Complete building(s) to city connection including but not limited to: ejectors, controls, valves, piping, floor drains, fixture seals, and grease traps.

Kitchen Equipment: Kitchen equipment includes but not limited to installed icemakers, ranges, grills, refrigeration units, freezer units, kettles, drink dispensers, coffee pots, and vented exhaust hoods.

Child Care Play Equipment: Play Ground Equipment includes, but is not limited to, swings, bars, slides, other wood/plastic structures, and padded exterior play areas.

Tanks: Tanks include but not limited to water and fuel tanks, that may be above or underground and all associated monitoring systems, refrigeration tanks, and air tanks.

Security Equipment: Equipment includes, but is not limited to, X-ray Machines, Power supply/battery backup for security, power conditioner, multi-media control, low voltage control, wireless system, diversity receiver, dipole antenna, hand held transmitter, lavaliere mic combiner and diplexor w/8watt 70vt transformer, control transmitter, digital audio control, computer power amplifier, power amplifier, 2-channel mic pre amp, 2-channel, monitor loudspeaker, audio monitor, amplified monitor speaker, stereo audio cassette recorder, 5 disc cd player, video switcher, s-vhs cassette recorder, document camera, TV tuner, keyboard, mouse, monitor receiver, 8200lc data projector, overhead projector, control system, power controller, computer, computer interface, wireless transmitter, wireless receiver, power supply, line amp, power block, power supply, amp with return option, receiver/monitor, transformer, power conditioner, rf amplifier security system devices: glass break sensors, video recorders, server rack, motion detectors, door contacts, card readers, duress buttons, security workstations, monitors, alarm interface and intercom system, security system controllers and security cameras.

The Service Provider is not responsible for operation, maintenance or repair of any of the equipment named below in any building(s) in this contract.

· Computers

· Office furniture

· Office machines

· Paper pulpers

· Personally owned appliances

· Mail handling equipment

· Special purpose incinerators

· Printing plant equipment

· Laboratory equipment