TGI_38HVC63102_A02_c0v0.pdf

PDF 2 MB Posted

Attached to
6A1 Corrective Maintenance for Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95
Solicitation number
N6264926RA041
Issued by

About this file

This document is a Task Group Instruction (TGI) for ship repair work on the USS Yorktown (YR-85), prepared by the U.S. Navy. The work scope involves repair and replacement of structural members and studs across multiple deck levels of the vessel, specifically addressing corrosion holes and general corrosion damage identified in a condition report dated August 14, 2024.

The primary work activities include: removal and installation of stack studs for cableways and electrical equipment on the main deck through 03-level weather decks (frames 13-100, port and starboard); fabrication and installation of new structural members including stiffeners and deck plates with specific material specifications (medium steel per MIL-S-22698); weld repair of gouges and corrosion holes on bulkhead plating and lateral stiffeners with air hose testing (zero allowable leakage); drilling and countersinking of holes per specified diameters; and painting of new and disturbed surfaces. The work locations span multiple compartments and rooms across the ship. Government-furnished material will be provided by SRF-JRMC, along with crane services, utilities (electrical, low-pressure air, water, steam), safety and gas-free inspections, QA inspection, and on-site engineering support. Materials required include stack studs (175 total units), adhesives, insulation blocks, tape, metal plates, and associated fasteners. Work is referenced to NAVSEA standards and MIL-STD specifications for welding and structural requirements. The TGI includes detailed engineering instructions, material lists, and location sketches across multiple enclosures.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0410005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0410004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0410003 SF 30.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_IPMR.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0410002 SF 30.pdf PDF
TGI_38HVC16702_A02_c0v0.pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_GFM.pdf PDF
TGI_38HWC51205_A02_c0v0.pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_IPMR.pdf PDF
Solicitation Amendment N6264926RA0410001 SF 30.pdf PDF
TGI_38HWC60001_A03_c0v0.pdf PDF
TGI_38HWC51408_A02_c0v0.pdf PDF
TGI_38HVC66501_A03_c0v1.pdf PDF
TGI_38HVC60001_A02_c0v0.pdf PDF
Attachment II Price Proposal Form N6264926RA041.xlsx XLSX spreadsheet
Attachment (V) Warranty Tracking Information.pdf PDF
Att_N6264926RA041_Pre-Sol.pdf PDF
Attachment (VI) Source of Repair Instruction.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Solicitation - N6264926RA041.pdf PDF
Attachment (VIII) Contracts Data Sheet.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: STRL MBR AND STUD AY A 1 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

YR-85 YR 85 HVC

CU PHASE TITLE:

F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

TSUBASA KOSUGE 231A 315-243-4371 09-APR-2026

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 09-APR-2026

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: STRL MBR AND STUD AY A 1

FOUO

SHIP: YR-85 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 Engrg Inst-02 (1-5)

J1-2 Sketch (1-5)

M1-2 Engrg Inst-01 (1-20)

1. SCOPE/PURPOSE

1.1 Title: Repair of Structural Member and Replacement of Stud in Main Level through 03 Level Exterior; accomplish

1.2 Location of Work:

1.2.1 Main Deck, Weather, Frames between 13 and 100, Port and Starboard (Stbd)

1.2.2 01 Level Weather, Frames between 32 and 100, Port and Stbd

1.2.3 02 Level Weather, Frames between 32 and 100, Port and Stbd

1.2.4 03 Level Weather, Frames between 88 and 90, Port

1.2.5 Rigging Equipment Storeroom/Issue Room (1-12-0-A)

1.2.6 Pipefitter, Sheetmetal Shipfitter Shop (1-18-0-Q)

1.2.7 Welding Shop (1-69-0-Q)

1.2.8 Supervisor Office (1-92-1-Q)

1.2.9 Womens WR and WC (1-92-2-L)

1.2.10 Mens WR and WC (1-97-0-L)

1.2.11 Fan Room (01-20-2-Q)

1.2.12 Lagger Fabrication Shop (01-51-0-Q)

1.2.13 Mens Shower Room (01-88-1-L)

1.2.14 Mens Locker Room (Darty Side) (01-94-0-L)

1.2.15 Womens Locker Room (Dirty Side) (01-88-0-L)

1.2.16 Womens WR, VC and SH (01-83-0-L)

1.2.17 Lagging Material Storeroom (01-63-0-A)

1.2.18 Fan Room (01-43-0-Q)

1.2.19 Fan Room (02-76-0-Q)

FOUO

SHIP: YR-85 CHG/VER: 0/0

1.2.20 Break Room (02-88-0-L)

1.2.21 Mens WR and WC (02-83-2-L)

1.3 Identification:

1.3.1 Quantity (One Lot), Cableway

Remarks: See Engrg Inst Enclosure-01 for details

1.3.2 Quantity (One Lot), Electrical Equipment

Remarks: See Engrg Inst Enclosure-01 for details

1.3.3 Quantity (One Lot), Structural Member in Main Deck through 03 Level Weather Frames between 88 and 91, Port and Starboard (Stbd)

1.3.3.1 Quantity (One EA), Stiffener, Main Deck Level Weather Frames 91 and 92, Port

Remarks: See Engrg Inst Enclosure-02 for material and details

1.3.3.2 Quantity (One EA), Lateral Stiffener, 01 Level Weather Frames between 90 and 91, Stbd

Remarks: See Engrg Inst Enclosure-02 for material and details

1.3.3.3 Quantity (One EA), Deck Plate in 03 Level Weather, Frames between 88 and 90, Port

Remarks: See Engrg Inst Enclosure-02 for material and details

1.3.4 Quantity (3 EA), Pipe Hanger

Remarks: See Sketch Enclosure-03 for location details

1.3.5 Quantity (One Lot), Forward and Aft House Longitudinal Bulkhead in Main Deck Level Weather, Frames between 28 and 94, Port and Stbd

Base Material: Steel, 12.75 LBs, Plate Remarks: See Sketch Enclosure-03 for Location details

1.3.6 Quantity (One Lot), Lateral Stiffener in 02 Deck Level Weather, Frames between 90 and 91, Stbd

Base Material: Steel, 2-1/2 Inches x 3 Inches x 5 LBs Remarks: See Sketch Enclosure-03 for Location details

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. REFERENCES:

FOUO

SHIP: YR-85 CHG/VER: 0/0

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Remove existing and install new each stud for each cableway listed in 1.3.1 and the equipment listed in 1.3.2 in accordance with Enclosure-01. See 5.8.7.

5.1.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) D, Lines One through 7.

5.2 Remove existing, fabricate and install new each structural member listed in 1.3.3 in accordance with Engrg Inst Enclosure-02.

5.2.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) A, Lines One through 7.

5.3 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) One, for each area listed in 1.3.4.

5.4 Accomplish weld repair of gouge(s) and corrosion hole on each existing bulkhead plating and lateral stiffener listed in 1.3.5 and 1.3.6. See 5.8.8.

5.4.1 Drill 1/2 inch diameter hole on each gouge(s) on each existing bulkhead plating listed in 1.3.5.

5.4.2 Drill 3/4 inch diameter hole on each corrosion hole on each existing lateral stiffener listed in 1.3.6.

5.4.3 Shape remaining hole to minimum 20 degrees countersink.

5.4.4 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) A, Lines One through 7.

5.4.5 Accomplish the requirements of 009-025 of Ref. No. One for a local air hose test of each new weld of the bulkhead plating listed in 1.3.5. Allowable leakage: None.

5.5 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

5.6 Notes:

5.6.1 Planner: Code 231A T. Kosuge, 243-4371

Planner: Code 233 Y. Kimura, 080-6845-2423 Engineer: C250 K. Nogi, 243-5294

------------------------------------------------------------------------------ Rose, Aaron J. C1209.4

FOUO

SHIP: YR-85 CHG/VER: 0/0

Engineer: C270 T. Kato, 243-6985

5.6.2 Work Integration Manager (WIM): Code 312, Dean Vanderwege, 243-3199

5.6.3 This TGI is in response to Condition Report No. NNR41016-43-01 R01 from Sumitomo Heavy Industries, Ltd.

Dated 14 AUG 2024.

5.6.4 JCN Y852-4025 is related to this TGI.

5.7 Government Furnished Material (GFM)

5.7.1 SRF-JRMC will provide GFM listed in the Material List.

5.8 SRF-JRMC will provide the following service work: (TGI No. 38HVC63102S02).

5.8.1 [C740] Crane and crane rigging service.

5.8.2 [X99E] Utility service, electrical.

5.8.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.8.6 [C133] QA inspection for (G) Symbol(s).

5.8.7 [C270] On-site engineering support for replace stud.

5.8.8 [C250] On-site engineering support for weld repair.

FOUO

M-1

SHIP: YR-85 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

STRL MBR AND STUD AY A 1 0

CU PHASE TITLE:

F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38HVC63102 A02

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

500 M STACK ST, ORIG: C233 Y.

KIMURA

ORDERED FOR KTR

9Z 5307 LL4777323 NA 4 N 50587507 15/EA

501 M ADHESIVE, ORIG: C231A T.

KOSUGE

243-4371

ORDERED FOR KTR

9B 8040 002738708 NA 4 Y 50585151 3/GL

502 M SOUND , ORIG: C231A T.

KOSUGE

243-4371

ORDEREDF FOR KTR

9Q 5640 007565866 NA 4 N 50585145 10/SH

503 M TAPE, ORIG: C231A T.

KOSUGE

243-4371

ORDERED FOR KTR

9B 8315 002671633 NA 4 N 50585149 3/RO

504 M CAP, ORIG: C231A T. KOSUGE

243-4371

ORDERED FOR KTR

9B 5325 007377648 NA 4 N 50585153

100/EA

505 M INSULATION BLOCK,TH, ORGI:

C231A T. KOSUGE

243-4371

ORDERED FOR KTR

9Q 5640 008096312 NA 4 N 51605239 2/BX

NOTES:

FOUO

M-2

SHIP: YR-85 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

506 M PLATE,METAL, ORIG: C231A T.

KOSUGE

243-4371

ORDEREDF FOR KTR

9B 9515 001533184 NA 4 N 50585155 10/SF

507 M INSULATION BLOCK,TH, ORIG:

C231A T. KOSUGE

243-4371

ORDEREDF FOR KTR

9Q 5640 008096315 NA 4 N 50935754 3/BX

508 M STACK ST, ORIG: C233 Y.

KIMURA

ORDERED FOR KTR

9Z 5307 LL4777324 NA 4 N 50587505

180/EA

509 M INSULATION BLOCK,TH,

INSULATION

BLOCK,THERMAL, 24" X 36" X

1"THK

9Q 5640 008096312 NA 4 N 51905088 2/BX

510 M TAPE,TEX, ORIG: C231A T.

KOSUGE

243-4371

ORDERED FOR KTR

9B 8315 002671632 NA 4 N 50585147 3/RO

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

YR-85 STRL MBR AND STUD AY A 1

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38HVC63102 A02

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

YR-85 STRL MBR AND STUD AY A 1

38HVC63102A02 ENCLOSURE-01 SHEET 1 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 2 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 3 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 4 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 5 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 6 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 7 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 8 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 9 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 10 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 11 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 12 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 13 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 14 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 15 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 16 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 17 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 18 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 19 of 20

38HVC63102A02 ENCLOSURE-01 SHEET 20 of 20

38HVC63102A02 ENCLOSURE-02

Tsubasa.Kosuge.ja Rectangle

Tsubasa.Kosuge.ja_1 Rectangle

Tsubasa.Kosuge.ja_2 Text Box

38HVC63102A02

Tsubasa.Kosuge.ja_3 Text Box SHEET 1 of 5

Tsubasa.Kosuge.ja_4 Text Box 1.3.4

Tsubasa.Kosuge.ja_5 Line

Tsubasa.Kosuge.ja_6 Text Box

SKETCH

Tsubasa.Kosuge.ja_7 Text Box

ENCLOSURE-03

Tsubasa.Kosuge.ja_8 Text Box Location of pipe hanger

Tsubasa.Kosuge.ja_9 Text Box

Tsubasa.Kosuge.ja_10

38HVC63102A02

Tsubasa.Kosuge.ja_11 Text Box SHEET 2 of 5

Tsubasa.Kosuge.ja_12 Rectangle

Tsubasa.Kosuge.ja_13 Rectangle

Tsubasa.Kosuge.ja_14 Text Box 1.3.4

Tsubasa.Kosuge.ja_15 Text Box 1.3.4

Tsubasa.Kosuge.ja_16 Text Box

SKETCH

Tsubasa.Kosuge.ja_17 Text Box

ENCLOSURE-03

Tsubasa.Kosuge.ja_18 Line

Tsubasa.Kosuge.ja_19

Location of pipe hanger

Tsubasa.Kosuge.ja_20

38HVC63102A02

Tsubasa.Kosuge.ja_21 Text Box SHEET 3 of 5

Tsubasa.Kosuge.ja_22 Rectangle

Tsubasa.Kosuge.ja_23 Rectangle

Tsubasa.Kosuge.ja_24 Text Box 1.3.5

Tsubasa.Kosuge.ja_25 Text Box 1.3.5

Tsubasa.Kosuge.ja_26 Text Box 1.3.5

Tsubasa.Kosuge.ja_27 Text Box 48"

Tsubasa.Kosuge.ja_28 Text Box Location of gouges

Tsubasa.Kosuge.ja_29 Text Box

SKETCH

Tsubasa.Kosuge.ja_30 Line

Tsubasa.Kosuge.ja_31

ENCLOSURE-03

Tsubasa.Kosuge.ja_32

38HVC63102A02

Tsubasa.Kosuge.ja_33 Text Box SHEET 4 of 5

Tsubasa.Kosuge.ja_34 Rectangle

Tsubasa.Kosuge.ja_35 Rectangle

Tsubasa.Kosuge.ja_36 Text Box 1.3.5

Tsubasa.Kosuge.ja_37 Text Box 1.3.5

Tsubasa.Kosuge.ja_38 Text Box Location of gouges

Tsubasa.Kosuge.ja_39 Text Box

SKETCH

Tsubasa.Kosuge.ja_40 Text Box

ENCLOSURE-03

Tsubasa.Kosuge.ja_41 Line

Tsubasa.Kosuge.ja_42

38HVC63102A02

Tsubasa.Kosuge.ja_43 Text Box SHEET 5 of 5

Tsubasa.Kosuge.ja_44 Rectangle

Tsubasa.Kosuge.ja_45 Rectangle

Tsubasa.Kosuge.ja_46 Text Box 1.3.6

Tsubasa.Kosuge.ja_47 Text Box Location of corrosion hole

Tsubasa.Kosuge.ja_48 Text Box

SKETCH

Tsubasa.Kosuge.ja_49 Text Box

ENCLOSURE-03

Tsubasa.Kosuge.ja_50 Line

File details come from the government source that posted it. Updated .