This document is a Task Group Instruction (TGI) for ship repair work on the USS Yorktown (YR-85), prepared by the U.S. Navy. The work scope involves repair and replacement of structural members and studs across multiple deck levels of the vessel, specifically addressing corrosion holes and general corrosion damage identified in a condition report dated August 14, 2024.
The primary work activities include: removal and installation of stack studs for cableways and electrical equipment on the main deck through 03-level weather decks (frames 13-100, port and starboard); fabrication and installation of new structural members including stiffeners and deck plates with specific material specifications (medium steel per MIL-S-22698); weld repair of gouges and corrosion holes on bulkhead plating and lateral stiffeners with air hose testing (zero allowable leakage); drilling and countersinking of holes per specified diameters; and painting of new and disturbed surfaces. The work locations span multiple compartments and rooms across the ship. Government-furnished material will be provided by SRF-JRMC, along with crane services, utilities (electrical, low-pressure air, water, steam), safety and gas-free inspections, QA inspection, and on-site engineering support. Materials required include stack studs (175 total units), adhesives, insulation blocks, tape, metal plates, and associated fasteners. Work is referenced to NAVSEA standards and MIL-STD specifications for welding and structural requirements. The TGI includes detailed engineering instructions, material lists, and location sketches across multiple enclosures.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: STRL MBR AND STUD AY A 1 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
YR-85 YR 85 HVC
CU PHASE TITLE:
F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TSUBASA KOSUGE 231A 315-243-4371 09-APR-2026
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 09-APR-2026
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: STRL MBR AND STUD AY A 1
FOUO
SHIP: YR-85 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 Engrg Inst-02 (1-5)
J1-2 Sketch (1-5)
M1-2 Engrg Inst-01 (1-20)
1. SCOPE/PURPOSE
1.1 Title: Repair of Structural Member and Replacement of Stud in Main Level through 03 Level Exterior; accomplish
1.2 Location of Work:
1.2.1 Main Deck, Weather, Frames between 13 and 100, Port and Starboard (Stbd)
1.2.2 01 Level Weather, Frames between 32 and 100, Port and Stbd
1.2.3 02 Level Weather, Frames between 32 and 100, Port and Stbd
1.2.4 03 Level Weather, Frames between 88 and 90, Port
1.2.5 Rigging Equipment Storeroom/Issue Room (1-12-0-A)
1.2.6 Pipefitter, Sheetmetal Shipfitter Shop (1-18-0-Q)
1.2.7 Welding Shop (1-69-0-Q)
1.2.8 Supervisor Office (1-92-1-Q)
1.2.9 Womens WR and WC (1-92-2-L)
1.2.10 Mens WR and WC (1-97-0-L)
1.2.11 Fan Room (01-20-2-Q)
1.2.12 Lagger Fabrication Shop (01-51-0-Q)
1.2.13 Mens Shower Room (01-88-1-L)
1.2.14 Mens Locker Room (Darty Side) (01-94-0-L)
1.2.15 Womens Locker Room (Dirty Side) (01-88-0-L)
1.2.16 Womens WR, VC and SH (01-83-0-L)
1.2.17 Lagging Material Storeroom (01-63-0-A)
1.2.18 Fan Room (01-43-0-Q)
1.2.19 Fan Room (02-76-0-Q)
FOUO
SHIP: YR-85 CHG/VER: 0/0
1.2.20 Break Room (02-88-0-L)
1.2.21 Mens WR and WC (02-83-2-L)
1.3 Identification:
1.3.1 Quantity (One Lot), Cableway
Remarks: See Engrg Inst Enclosure-01 for details
1.3.2 Quantity (One Lot), Electrical Equipment
Remarks: See Engrg Inst Enclosure-01 for details
1.3.3 Quantity (One Lot), Structural Member in Main Deck through 03 Level Weather Frames between 88 and 91, Port and Starboard (Stbd)
1.3.3.1 Quantity (One EA), Stiffener, Main Deck Level Weather Frames 91 and 92, Port
Remarks: See Engrg Inst Enclosure-02 for material and details
1.3.3.2 Quantity (One EA), Lateral Stiffener, 01 Level Weather Frames between 90 and 91, Stbd
Remarks: See Engrg Inst Enclosure-02 for material and details
1.3.3.3 Quantity (One EA), Deck Plate in 03 Level Weather, Frames between 88 and 90, Port
Remarks: See Engrg Inst Enclosure-02 for material and details
1.3.4 Quantity (3 EA), Pipe Hanger
Remarks: See Sketch Enclosure-03 for location details
1.3.5 Quantity (One Lot), Forward and Aft House Longitudinal Bulkhead in Main Deck Level Weather, Frames between 28 and 94, Port and Stbd
Base Material: Steel, 12.75 LBs, Plate Remarks: See Sketch Enclosure-03 for Location details
1.3.6 Quantity (One Lot), Lateral Stiffener in 02 Deck Level Weather, Frames between 90 and 91, Stbd
Base Material: Steel, 2-1/2 Inches x 3 Inches x 5 LBs Remarks: See Sketch Enclosure-03 for Location details
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
FOUO
SHIP: YR-85 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing and install new each stud for each cableway listed in 1.3.1 and the equipment listed in 1.3.2 in accordance with Enclosure-01. See 5.8.7.
5.1.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) D, Lines One through 7.
5.2 Remove existing, fabricate and install new each structural member listed in 1.3.3 in accordance with Engrg Inst Enclosure-02.
5.2.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) A, Lines One through 7.
5.3 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) One, for each area listed in 1.3.4.
5.4 Accomplish weld repair of gouge(s) and corrosion hole on each existing bulkhead plating and lateral stiffener listed in 1.3.5 and 1.3.6. See 5.8.8.
5.4.1 Drill 1/2 inch diameter hole on each gouge(s) on each existing bulkhead plating listed in 1.3.5.
5.4.2 Drill 3/4 inch diameter hole on each corrosion hole on each existing lateral stiffener listed in 1.3.6.
5.4.3 Shape remaining hole to minimum 20 degrees countersink.
5.4.4 Accomplish the requirements of 009-012 of Ref. No. One, including Table 4, Column(s) A, Lines One through 7.
5.4.5 Accomplish the requirements of 009-025 of Ref. No. One for a local air hose test of each new weld of the bulkhead plating listed in 1.3.5. Allowable leakage: None.
5.5 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
5.6 Notes:
5.6.1 Planner: Code 231A T. Kosuge, 243-4371
Planner: Code 233 Y. Kimura, 080-6845-2423 Engineer: C250 K. Nogi, 243-5294
------------------------------------------------------------------------------ Rose, Aaron J. C1209.4
FOUO
SHIP: YR-85 CHG/VER: 0/0
Engineer: C270 T. Kato, 243-6985
5.6.2 Work Integration Manager (WIM): Code 312, Dean Vanderwege, 243-3199
5.6.3 This TGI is in response to Condition Report No. NNR41016-43-01 R01 from Sumitomo Heavy Industries, Ltd.
Dated 14 AUG 2024.
5.6.4 JCN Y852-4025 is related to this TGI.
5.7 Government Furnished Material (GFM)
5.7.1 SRF-JRMC will provide GFM listed in the Material List.
5.8 SRF-JRMC will provide the following service work: (TGI No. 38HVC63102S02).
5.8.1 [C740] Crane and crane rigging service.
5.8.2 [X99E] Utility service, electrical.
5.8.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.8.6 [C133] QA inspection for (G) Symbol(s).
5.8.7 [C270] On-site engineering support for replace stud.
5.8.8 [C250] On-site engineering support for weld repair.
FOUO
M-1
SHIP: YR-85 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR AND STUD AY A 1 0
CU PHASE TITLE:
F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38HVC63102 A02
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
500 M STACK ST, ORIG: C233 Y.
KIMURA
ORDERED FOR KTR
9Z 5307 LL4777323 NA 4 N 50587507 15/EA
501 M ADHESIVE, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 50585151 3/GL
502 M SOUND , ORIG: C231A T.
KOSUGE
243-4371
ORDEREDF FOR KTR
9Q 5640 007565866 NA 4 N 50585145 10/SH
503 M TAPE, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 50585149 3/RO
504 M CAP, ORIG: C231A T. KOSUGE
243-4371
ORDERED FOR KTR
9B 5325 007377648 NA 4 N 50585153
100/EA
505 M INSULATION BLOCK,TH, ORGI:
C231A T. KOSUGE
243-4371
ORDERED FOR KTR
9Q 5640 008096312 NA 4 N 51605239 2/BX
NOTES:
FOUO
M-2
SHIP: YR-85 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
506 M PLATE,METAL, ORIG: C231A T.
KOSUGE
243-4371
ORDEREDF FOR KTR
9B 9515 001533184 NA 4 N 50585155 10/SF
507 M INSULATION BLOCK,TH, ORIG:
C231A T. KOSUGE
243-4371
ORDEREDF FOR KTR
9Q 5640 008096315 NA 4 N 50935754 3/BX
508 M STACK ST, ORIG: C233 Y.
KIMURA
ORDERED FOR KTR
9Z 5307 LL4777324 NA 4 N 50587505
180/EA
509 M INSULATION BLOCK,TH,
INSULATION
BLOCK,THERMAL, 24" X 36" X
1"THK
9Q 5640 008096312 NA 4 N 51905088 2/BX
510 M TAPE,TEX, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 50585147 3/RO
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
YR-85 STRL MBR AND STUD AY A 1
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38HVC63102 A02
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
YR-85 STRL MBR AND STUD AY A 1
38HVC63102A02 ENCLOSURE-01 SHEET 1 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 2 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 3 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 4 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 5 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 6 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 7 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 8 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 9 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 10 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 11 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 12 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 13 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 14 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 15 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 16 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 17 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 18 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 19 of 20
38HVC63102A02 ENCLOSURE-01 SHEET 20 of 20
38HVC63102A02 ENCLOSURE-02
Tsubasa.Kosuge.ja Rectangle
Tsubasa.Kosuge.ja_1 Rectangle
Tsubasa.Kosuge.ja_2 Text Box
38HVC63102A02
Tsubasa.Kosuge.ja_3 Text Box SHEET 1 of 5
Tsubasa.Kosuge.ja_4 Text Box 1.3.4
Tsubasa.Kosuge.ja_5 Line
Tsubasa.Kosuge.ja_6 Text Box
SKETCH
Tsubasa.Kosuge.ja_7 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_8 Text Box Location of pipe hanger
Tsubasa.Kosuge.ja_9 Text Box
Tsubasa.Kosuge.ja_10
38HVC63102A02
Tsubasa.Kosuge.ja_11 Text Box SHEET 2 of 5
Tsubasa.Kosuge.ja_12 Rectangle
Tsubasa.Kosuge.ja_13 Rectangle
Tsubasa.Kosuge.ja_14 Text Box 1.3.4
Tsubasa.Kosuge.ja_15 Text Box 1.3.4
Tsubasa.Kosuge.ja_16 Text Box
SKETCH
Tsubasa.Kosuge.ja_17 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_18 Line
Tsubasa.Kosuge.ja_19
Location of pipe hanger
Tsubasa.Kosuge.ja_20
38HVC63102A02
Tsubasa.Kosuge.ja_21 Text Box SHEET 3 of 5
Tsubasa.Kosuge.ja_22 Rectangle
Tsubasa.Kosuge.ja_23 Rectangle
Tsubasa.Kosuge.ja_24 Text Box 1.3.5
Tsubasa.Kosuge.ja_25 Text Box 1.3.5
Tsubasa.Kosuge.ja_26 Text Box 1.3.5
Tsubasa.Kosuge.ja_27 Text Box 48"
Tsubasa.Kosuge.ja_28 Text Box Location of gouges
Tsubasa.Kosuge.ja_29 Text Box
SKETCH
Tsubasa.Kosuge.ja_30 Line
Tsubasa.Kosuge.ja_31
ENCLOSURE-03
Tsubasa.Kosuge.ja_32
38HVC63102A02
Tsubasa.Kosuge.ja_33 Text Box SHEET 4 of 5
Tsubasa.Kosuge.ja_34 Rectangle
Tsubasa.Kosuge.ja_35 Rectangle
Tsubasa.Kosuge.ja_36 Text Box 1.3.5
Tsubasa.Kosuge.ja_37 Text Box 1.3.5
Tsubasa.Kosuge.ja_38 Text Box Location of gouges
Tsubasa.Kosuge.ja_39 Text Box
SKETCH
Tsubasa.Kosuge.ja_40 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_41 Line
Tsubasa.Kosuge.ja_42
38HVC63102A02
Tsubasa.Kosuge.ja_43 Text Box SHEET 5 of 5
Tsubasa.Kosuge.ja_44 Rectangle
Tsubasa.Kosuge.ja_45 Rectangle
Tsubasa.Kosuge.ja_46 Text Box 1.3.6
Tsubasa.Kosuge.ja_47 Text Box Location of corrosion hole
Tsubasa.Kosuge.ja_48 Text Box
SKETCH
Tsubasa.Kosuge.ja_49 Text Box
ENCLOSURE-03